CAPITAL DOWN AT TALA HAMZA

Similar documents
Positive DFS for Tala Hamza Project

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

For personal use only

Aeon Metals Limited HIGHLIGHTS

SALT LAKE POTASH PLANS SOP PILOT PLANT AT GOLDFIELDS SALT LAKES PROJECT. ONGOING DISCUSSIONS WITH PROSPECTIVE GLOBAL INDUSTRY PARTNERS.

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Thalanga Operations Ore Reserve and Mineral Resource Statement

STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS

Financial results for the 6 months to 30 June 2008

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

For personal use only

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

For personal use only

For personal use only

For personal use only

QUARTERLY REPORT for the period ending 30 September 2017

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES

For personal use only

For personal use only

TALA HAMZA FEASIBILITY STUDY COMPLETED

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Bald Hill Delivers Excellent Metallurgical Test Work Results

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

For personal use only

Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010

PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE

For personal use only

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

For personal use only

5 th Asian Bauxite & Alumina Conference

Maiden Ore Reserve for Camel Creek JV

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

For personal use only

Grange Resources Australia s leading magnetite producer

Saracen Mineral Holdings Limited ACN

Mozambique Real Opportunity. Benchmark World Tour Sydney 21 st September

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

Confidence in Carrapateena project grows

ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington

ASX Release ASX Code: YTC

Nymagee Scoping Study

WA s MT THIRSTY COBALT-NICKEL PROJECT POTENTIALLY WORLD S FOURTH LARGEST COBALT PRODUCER

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

Updated Epanko Scoping Study

FIRST GOLD ORE DISPATCHED FROM ULYSSES

TEMBANG PROJECT OPTIMISATION

Nullagine Gold Project

Panda Hill Niobium Project. January 2014

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

For personal use only

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

Second drill rig to accelerate major drilling program at Productora

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate

For personal use only

A G M P R E S E N T A T I O N O c t o b e r 2018

Re : Completion of the Barnes Hill drill-out

Aeon Metals Limited. ASX Announcement 18 April 2017 WALFORD CREEK COBALT ROASTING SCOPING STUDY. 18 April 2017

DALGARANGA PRE-FEASIBILITY UPDATE

For personal use only

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

Commenting on the approval of the development of the Mt Carlton Project Conquest Executive Chairman, Jake Klein commented:

Excellent Results from Conceptual Mine Study Ondjou Prospect, Namibia

For personal use only

For personal use only

FIRST QUARTILE CASH COSTS

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Quarterly Report 30 June 2011

SIGNIFICANT INCREASE IN KANMANTOO LIFE OF MINE AND TARGETED PROCESSING THROUGHPUT INCREASE

PEGMONT PEA HIGHLIGHTS

EXCO S PROJECT PIPELINE

Montezuma is now Element 25 Limited

FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT

Building South Australia s Largest Iron Ore Project

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

Australia s leading magnetite producer. Southdown Magnetite Project

TOP 5 REASONS WHY MBALAM IS POSITIONED TO BE THE WORLD S NEXT GREAT IRON ORE OPERATION Developing the Mbalam Iron Ore Project in central west Africa

For personal use only

FENIX RESOURCES LIMITED

Great Western Scoping Study Update & Onsite Gold Processing

FORGE RESOURCES TO PURCHASE BALLA BALLA MAGNETITE, VANADIUM AND TITANIUM PROJECT FROM ATLAS IRON LIMITED (ASX:AGO)

MT CATTLIN DRILLING DELIVERS MORE HIGH GRADE INTERCEPTS

For personal use only

ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

fåîéëíçê=mêéëéåí~íáçå r_p=^ìëíê~äá~å=fêçå=lêé C=`ç~ä=`çåÑÉêÉåÅÉ

Pre Feasibility Study Advances the Taronga Tin Project

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

Plomosas Mine Production Planned for 2018

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

POND DEVELOPMENT PROGRAM IDENTIFIES SURFACE CLAY LAYER, SUPPORTS ON-LAKE UNLINED EVAPORATION PONDS

Gruyere Project - Updated Mine Plan

KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015

For personal use only

PILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING

Transcription:

CAPITAL DOWN AT TALA HAMZA ASX Shareholder Report 8 April 2009 Enquiries on this Report or the Company Business may be directed to: Dr Kevin Moriarty Executive Chairman + 61 8 8213 1415 + 61 408 173 157 Website Address: www.terramin.com.au Terramin is a dedicated base metals company focused on developing zinc mines close to infrastructure. TERRAMIN Australia Limited ABN 67 062 576 238 Address Level 22, Westpac House 91 King William Street Adelaide SA 5000 Australia Telephone +61 8 8213 1415 Facsimile +61 8 8213 1416 HIGHLIGHTS The capital estimate has been revised down by 25 per cent to US$266 million for a Sub-Level Caving development Life-of-mine C1 cash costs are estimated at US42c/lb payable zinc Strong potential for at least a 40% increase in Indicated Resources with further infill drilling Mining costs are low by world standards and could be reduced even further by optimisation now underway Environmental impact statement for a mining licence expected in August Early development of twin mine declines under consideration Terramin Australia (ASX: TZN) today released the Prefeasibility Study (PFS) for the Tala Hamza zinc project in Algeria, which concluded that even at current low commodity prices the deposit can be developed successfully as a technically and financially viable long term mine. Dr Kevin Moriarty, Terramin s Executive Chairman, said this was a positive result that has cleared the way to proceed with final feasibility studies for the mine. Tala Hamza is proving to be a low cost, world class project that is getting cheaper to mine the more we study it, Dr Moriarty added. In particular, we are focussed on optimising mine design for either the proposed Sub-Level Caving or a Block Cave to further reduce operating costs and increase metal output. Expressions of interest to finance the Tala Hamza project have been received from within and outside Algeria, while offtake agreements for 240,000tpa of concentrate further underpin financing. We are aiming at start-up in late 2011 to replace production lost as older and less cost efficient mines close, he said. The Tala Hamza project is being designed to produce 250,000 tonnes of zinc and lead concentrate each year, eventually climbing to 400,000-500,000 tonnes. Dr Moriarty commented that the deposit had a lot of high grade resources in the lower section that could lift early cash flows, so we can see where further work can improve financial outcomes. We are also assessing the impact on cash flows of drilling more of the Inferred Resource, particularly given the high grades encountered in holes around the current indicated resource. This could lift concentrate production in the early years. TZN 8 April 2009 Page 1 of 5

Major Conclusions The Prefeasibility Study by Bateman Engineering, Golder Associates and Terramin, concludes that, even at the current low levels of commodity pricing, the Tala Hamza deposit can be developed successfully as a viable long-term project. The project was found to have the advantage of low capital and operating cost in an environment of globally increasing mining costs. The geotechnical analysis indicates that Sub-Level Caving and Block Caving are the most technically favourable options for development of the Tala Hamza deposit. An overall capital requirement of US$266M (c.f. Scoping Study estimate of $356M) has been estimated for project construction and development under the Sub-Level Caving mining method. Operating costs are estimated at US$30 per tonne milled for Sub-Level Caving, and US$25 per tonne for Block Caving. Life of mine C1 cash costs are estimated at US$0.42/lb payable zinc after allowance for lead by-products, based on long term price forecasts of US$0.80/lb zinc and US$0.60/lb lead with a zinc treatment charge of $US229/dmt. C1 cash costs under current spot prices and treatment charges are estimated at US$0.39/lb. Mineral Resources and Ore Reserves Sufficient resource drilling has been completed on a significant portion of the deposit to provide a basis for the prefeasibility studies.. This has allowed estimation of Indicated Resources, reported to the ASX in October 2008. The Prefeasibility Study has been based on the extraction of this Indicated Resource only. Mineral Resource at 2.5% ZnEq cut-off Category Mt Zn (%) Pb (%) Indicated 24.8 6.49 1.82 Inferred 33.8 4.3 0.9 Total 58.6 5.2 1.3 Details of assumptions used in the Resource estimate are included in the Release to the ASX dated 13 October 2008. The Resource is inclusive of material converted to Ore Reserve. Ore Reserves at Tala Hamza have been estimated by Golder Associates for both Sub-Level Cave and Block Cave during the course of the prefeasibility study. The Reserve for the Sub-Level Cave option (preferred method) is presented below. Ore Reserve at 3.17% Zn cut-off 1 Category Mt Zn (%) Pb (%) Proved - - - Probable 24.1 5.89 1.67 Total 24.1 5.89 1.67 The Probable Reserve is estimated at a cut off of 3.17%Zn. To achieve sensible mining shapes the Reserve includes a small tonnage of Inferred Resource (0.5Mt at 3.6% Zn, 1.0% Pb). The Reserve also includes internal dilution of 3.5Mt at 1.6% Zn and 0.3% Pb, comprising Indicated Resource below 3.17% Zn and waste. This Reserve is based on the preliminary mine design and is expected to be refined following optimization during the early stages of the Feasibility Study. The Prefeasibility Study has been completed on only a portion of the known deposit. There is considerable upside potential as demonstrated by subsequent drilling. At least 10Mt of the existing Inferred Resource is considered to have high potential for conversion to Indicated Resource at similar grades. This could allow for an increased extraction rate, increased mining efficiencies and higher throughput. 1 Cut-off grade of 3.17% Zn was applied for the Sub-Level Caving option, based on the following parameters (all figures are Australian dollars unless otherwise stated): Mining cost - $13.25/t ore, Mining dilution - 20% (with 0% Zn), Mill recovery - 90% for Zn and 71% for Pb, Milling cost - $17.0/t ore, Shipping cost - $5.30/t ore, Smelter recovery - 85% for Zn and 95% for Pb, Smelter treatment cost - $31.2/t ore, assuming average in situ ore grade 6.75% Zn, metal prices - US$0.80/lb for Zn and US$0.40/lb for Pb, exchange rate - AUD$1=USD$0.75, Royalty - 2% of net revenue. Terramin Australia Ltd 8 April 2009 Page 2 of 5

Mining The preferred method of mining is Sub-Level Caving as it offers increased flexibility in mine design and grade profile, as well as producing a superior return under current modelling. However the Block Caving option has not been sufficiently optimised at this stage and will therefore be a priority during the initial stages of the Feasibility Study. Preliminary mine designs and production schedules have been generated and capital and operating costs estimated. There will be 14 production levels starting from the -120m level and ending at the -380m level. Twin 5.5x5.5m production and ventilation declines were selected as the main method of access from surface to the bottom of the orebody. Underground road trains were selected for hauling ore and waste to the surface. The decline has been designed to enable upgrading with a conveyor system to allow for increased future production rates. The Feasibility Study will consider the benefits of higher production rates, various processing options including underground crushing and conveying, and any requirement to convert additional Inferred Resources for mining. Metallurgy and Processing The processing plant has been designed to treat 2Mtpa of ore to produce 113,000t of zinc in a zinc concentrate and 27,000t of lead in a lead concentrate. Grinding will be conducted in a conventional SAG mill, ball mill circuit. The Bond ball mill work-indices were relatively consistent ranging from 12.0kWh/t to 14.4kWh/t. These results compared well with the value of 13.5kWh/t obtained from the composite sample used for the majority of the flotation testwork. The zinc flotation circuit will produce a zinc concentrate assaying 54% zinc at an overall recovery of 90%. The lead circuit will produce a lead concentrate assaying 60% Pb at an overall recovery of 72%. There is a sufficiently large area of land available in the Port to store concentrate for shipment, and the Port Authority is willing to make this land available for WMZ to construct a storage shed to be located just to the rear of the designated export berth. Based on the preliminary site-wide water balance it has been assumed for the Prefeasibility Study that additional supplies of water from the Soummam, borefields, or Tichi Haf pipeline will not be required. Further investigation is required to narrow the range of uncertainty in the groundwater estimates and improve the water balance model for the Feasibility Study. A zoned rockfill dam has been selected for the Tailings Storage Facility (TSF) containment structure, lined on the upstream side by a concrete curb-backed bitumen impregnated geomembrane. The TSF will be designed to mitigate the potential for environmental contamination from seepage and run off. Social and environmental Consultation conducted by WMZ to date has included meetings with government agencies, including within the Wilaya of Bejaia, land owner/users in the project area and presence at promotional events for the public within the Wilaya. Most were supportive of the potential employment opportunities and other benefits from this type of project. An archaeological study found that no officially recorded cultural heritage sites or artefacts occur in the project area. Preliminary plans for community management, conceptual mine closure and environmental management have been developed. WMZ will employ more than 410 people for the first year of operation of the project. For these positions approximately 350 people will be recruited from within Algeria and 60 from outside sources to fill all the site-related functions of the mine, processing plant and support services. Financial Analysis The following tables are a summary of study results by Bateman Engineering (processing), Golder (mining) and Terramin (administration, marketing and corporate). Terramin Australia Ltd 8 April 2009 Page 3 of 5

Project summary Project Summary Unit Sub-Level Cave LOM production Mt 24.07 LOM zinc grade % zinc 5.89 LOM lead grade % lead 1.67 Zinc metal produced Mt 1.258 Lead metal produced Mt 0.284 Project capital US$M 266 Life of mine operating cost US$/t ore 30.4 C1 unit cost (after lead by-products) US /lb Zn 42.5 Life of project (from first concentrate) Years 13 Annual milling rate Mtpa 2 C1 unit costs (US cents per lb. payable zinc) Facility Sub-Level Cave Mining 9.94 Processing 12.60 On-site administration 2.04 Subtotal Direct costs 24.58 Concentrate freight 6.45 Zinc treatment charges 23.22 By-product credits (11.77) TOTAL CASH COSTS 42.48 Capital costs (US$ Million) project capital only Facility Sub-Level Cave Block Cave Direct costs Mining, mobile equipment and fixed plant 33 30 Mining, development 30 49 Processing plant inc. crushing, grind, float etc. 58 58 Tailings 22 22 Services, electrical and instrumentation 23 23 Plant & port infrastructure 25 25 Total direct costs 192 207 Indirect costs EPCM 20 20 Owners cost 18 18 Other 2 2 Contingency 15% 35 38 Total indirect costs 74 77 TOTAL CAPITAL COSTS 266 285 Operating costs (US$ per tonne milled) Cost centre Sub-Level Cave Block Cave Mining costs 9.73 5.72 Processing costs 12.34 12.04 Other production costs 1.97 1.83 Marketing and transport 5.30 4.72 Other 1.01 0.97 Non production costs 6.32 5.69 TOTAL OPERATING COSTS 30.36 25.28 Terramin Australia Ltd 8 April 2009 Page 4 of 5

Value add opportunities There is considerable upside potential to add to resources and reserves demonstrated by recent drilling results. This could allow for an increased extraction rate, better mining efficiencies and higher throughput. The use of Block Caving as primary mining method would be expected to reduce mining costs and could potentially sustain a higher production rate and improve cash flows. A hybrid mining system combining Sub-Level Caving and Block Caving could potentially optimise production grade and cashflow. An underground ore crushing/screening and conveyor system could potentially reduce costs and allow increased production, while reducing ventilation requirements. Commence decline excavation earlier to accelerate project development. This will provide for earlier plant construction and cash flows. The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Robert Singer. The information that relates to Ore Reserves is based on information compiled by Dr Yi Huang. Both are Members of The Australasian Institute of Mining and Metallurgy. Mr Singer is Chief Geologist and a full time employee of Terramin Australia Limited. Dr Huang is a full time employee of Golder Associates Pty Ltd, Both have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting Exploration Results, Mineral Resources or Ore Reserves. Mr Singer and Dr Huang consent to the inclusion in the report of the matters based on his information in the form and context in which it appears. Terramin Australia Ltd 8 April 2009 Page 5 of 5