SRP-AirOutshield ROOF Issued:

Similar documents
SRP-AirOutshield UV Issued:

A. This Section provides information regarding vapor permeable roof underlayment for the exterior roof.

SECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT

BREATHABLE MEMBRANES. Canada Inc. Water Vapour Permeable, Air Barriers for Sloped Roofs & Rain Screen Wall Systems

FORTIFIED Home High Wind. Bronze New Roof Requirements

ZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -# Sunrise, Florida Phone

SSL-175. Specifications

DL-200. Specifications

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION BATTEN SEAM COPPER ROOFING

Architectural Roof and Wall Products Guide Specifications

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications

Roofing City of Owatonna BUILDING DEPARTMENT

SECTION PRE-ENGINEERED BUILDING INSULATION

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

Architectural Roof and Wall Products Guide Specifications

SECTION 07530CP EPDM MEMBRANE ROOFING

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017

The better way to build TM. Installation Manual NAILBASE PANELS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ARCHITECTS & SPECIFIERS : SHINGLES, TILES, & ROOF COVERINGS

University of New Hampshire Scholars' Repository

A. Meet at Project site <insert number> days before starting installation.

ROOF ASSEMBLIES CHAPTER 9

Architectural Wall Products Guide Specifications

TYPICAL ROOF CONDITION LAYOUT

Update In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING

SECTION METAL ROOF AND SOFFIT PANELS

SECTION 7307 CONCRETE/ CLAY TILE, METAL, SLATE AND ASPHALT COMPOSITION SELF-ADHERED/ PEEL & STICK ROOF UNDERLAYMENT

SECTION ASPHALT SHINGLE ROOFING SYSTEMS. Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text".

Construction Standards PAGE

SECTION Tile Roof Guideline. B. "Pan" Tile: Clay tile on the underlayment, convex in shape.

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017]

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

Product Guide Specification

TECHNICAL INFORMATION

A. Source Limitations: Obtain each type of building insulation through one source.

STONE COATED METAL ROOF SHINGLE

SLOPE. HIELD SA SELF-ADHERED Vapor Permeable Roof Underlayment INSTALLATION INSTRUCTIONS

ROOF ASSEMBLIES CHAPTER 9

** NOTE TO SPECIFIER ** Delete any sections below not relevant to this project; add others as required. A. Section Mechanical Insulation.

BENJAMIN OBDYKE INCORPORATED

LISTING INFORMATION OF Epilay - Superior, Ultra and Platinum Roofing Underlayments SPEC ID: Epilay Inc S. Main Street, E1 unit C

PART 1 - GENERAL PROJECT NAME SECTION VAPOR PERMEABLE AIR BARRIER

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING FELT AND UNDERLAYMENT REPORT HOLDER: ENVIRONMENTALLY SAFE PRODUCTS, INC.

J41 Reinforced bitumen membrane roof coverings

SECTION WATER-RESISTIVE AIR BARRIER MEMBRANE

EVALUATION REPORT Boral Roofing /MonierLifetile 7575 Irvine Center Drive Suite 100 Irvine, CA

ROOF ASSEMBLIES CHAPTER 9

Product Guide Specification

SECTION 7307 ASPHALT SHINGLE ROOF UNDERLAYMENT

Product and System Specifications DuPont Flashing Systems

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

VISUM3. One tile creates the visual effect of three

Verea Spanish S Roof Tile Installation Guide

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION METAL ROOF PANELS

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE

DMX AG AIR-GAP MEMBRANE. Section Damproofing and Waterproofing

1 Exam Prep. Roofing Practice Exam 5

SECTION SELF-ADHERING SHEET MEMBRANE WATERPROOFING

ROOF ASSEMBLIES CHAPTER 9

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

SECTION COMMERCIAL CURB-MOUNT ACRYLIC DOUBLE DOME SKYLIGHTS

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION BUILT-UP BITUMINOUS WATERPROOFING

EVALUATION REPORT Owens Corning One Owens Corning Parkway Toledo, OH 43659

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

DIVISION 07 - THERMAL & MOISTURE PROTECTION

MAGNUM. I N S P E C T I O N S Inc. ROOF Walked on roof, crawled attic where accessible.

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

Pacific Tile Counter Batten and Batten

Pacific Tile Counter Batten and Batten

SECTION STANDING-SEAM METAL ROOF PANEL

EVALUATION REPORT Boral Roofing 7575 Irvine Center Drive Suite 100 Irvine, CA

CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].

Presents. Roofing Basics

DIVISION 7 THERMAL AND MOISTURE PROTECTION

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

INSTALLATION GUIDE.

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

WeatherSmart Air Barrier Installation Guide

SECTION STANDING SEAM METAL ROOFING

DuPont RainVent Batten Installation Guidelines

J41 Reinforced bitumen membrane roof coverings

TESTING APPLICATION STANDARD (TAS) No TEST PROCEDURE FOR NAIL-ON UNDERLAYMENT FOR USE IN DISCONTINUOUS ROOF SYSTEMS

TESTING APPLICATION STANDARD (TAS) No TEST PROCEDURE FOR NAIL-ON UNDERLAYMENT FOR USE IN DISCONTINUOUS ROOF SYSTEMS

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:

PART 6 - INSULATED WALL SYSTEMS

B-1 DIRECT WATERPROOFING APPLICATION TO LAGGING FOLD OVER ARMORCLAY 1000 FOR GRADE LINE TERMINATION VERTICAL GEO-MAT C DRAIN 110 OR 150 FASTENERS

1 Exam Prep. Roofing Practice Exam 9

SECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES

Transcription:

SECTION 07276: Breathable Underlayment Guide Specification This specification is a guide only and may need editing for the specific intended application. It is the responsibility of the design professional to ensure the accuracy and completeness of the specifications issued. NOTE: SRP AirOutshield ROOF is not recommended for roofs with a slope of less than 2:12. SECTION 07276 Breathable Underlayment PART 1 - GENERAL 1.1 SUMMARY A. This Section provides for the exterior roof, breathable underlayment. B. Related Sections include the following: 1. Division 6 Section "Rough Carpentry" for exterior sheathing. 2. Division 7 Section "Clay Tile" for roofing assembly. 3. Division 7 Section "Wood Shakes and Shingles" for roofing assembly 4. Division 7 Section "Metal Roofing" for roofing assembly. 5. Division 13 Section "Pre-Engineered Buildings" for metal siding and roofing. 1.2 REFERENCES A. ASTM E 84 Standard Test Method for Surface Burning Characteristics of Building Materials. B. ASTM E 96 - Standard Test Methods for Water Vapor Transmission of Materials. 1.3 SUBMITTALS A. Product Data: Include manufacturer's written instructions, technical data, and tested physical and performance properties of breathable underlayment. B. Shop Drawings: Provide drawings showing relationship of underlayment to: 1. Framing or blocking members. 2. Purlins. 3. Metal Decking. 4. Thermal Insulation. 5. Sheathing. 6. All roofing, fascia and gable end conditions. 7. Roofing or attic ventilation penetrations. 8. Roof curbs. 9. Pipe, Conduit and Duct penetrations. a. Include actual manufactured flashing and or weather-heads. Issued: 2017-07-28 07276-1

C. Samples: 1. 8-1/2-x-11-inch square of breathable underlayment sheet. 2. Tapes (Single & Double-Sided). 3. Provide materials and fasteners for mock-up D. Manufacturer s Instructions: Provide manufacturer s instructions showing the recommended procedures and sequence of installation of breathable underlayment. 1.4 QUALITY ASSURANCE A. Ensure all work of this section and the related sections is performed inaccordance with local codes and system manufacturer s instructions. B. Obtain all breathable underlayment through one source from a single manufacturer. C. Pre-installation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section "Project Management and Coordination." Review requirements for underlayment, including surface preparation specified under other Sections, substrate condition and pretreatment, temporary weather protection, forecasted weather conditions, special details and sheet flashings, installation procedures, testing and inspection procedures, and protection and repairs. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to Project site in original containers with seals unbroken, wrapped in a polythene sleeve, labeled with manufacturer's name, and product brand name. B. Store rolls under cover, on a clean, level surface, either flat or upright. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Products: Spun Bonded Polypropylene, triple layer breather membrane, nominal weight 170g/m2, 0.6mm thick, roll size of 1.5m wide by 50 m long, black interior and black exterior colour, Water Vapor Transmission of 6827 ng/pa/s/m² (119 perms) per ASTM E 96-10, Method A (as tested by an independent laboratory). by SRP Canada, phone (866) 533-0233, www.srpcanada.ca 2.2 AUXILIARY MATERIALS A. Tape 1. Detail Tape: a. SRP 100 UV Tape, single sided. To seal to itself and to other surfaces and substrates. To connect a Self Adhered membrane to SRP- AirOutshield ROOF 2. Seam Tapes: Issued: 2017-07-28 07276-2

a. SRP 1 D.S (double sided) Seam Tape distributed by SRP Canada Inc. 30 mil. To seal vertical and horizontal seams between layers of. b. SRP 60 UV Seam Seal Tape distributed by SRP Canada Inc. To seal vertical and horizontal seams between layers of. B. Eave Protection 1. Self adhered membrane a. High Temperature resistant underlayment C. Fasteners 1. Fasteners: Minimum No. 12-gage [0.109-inch-shank-diameter (2.77mm)] corrosionresistant steel or stainless steel nails having a minimum 3/8-inch diameter (9.5 mm) head, or minimum No. 14 gage [0.083-inch-shank-diameter (2.11 mm)] corrosionresistant steel or stainless steel screws or nails installed with a 1-inch-diameter (25.4 mm) caps, plate or washer. D. Ventilation Mat: non woven nylon with maximum 20% or battens. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance. B. Refer to the most recent version of the manufacturers installation guide as available at www.srpcanada.ca 3.2 SURFACE PREPARATION A. Clean and prepare substrate according to manufacturers written recommendations. Provide clean and dry substrate free of frost, loose nails, dirt, debris or other containments that would adversely affect the installation of the breathable underlayment. B. Do not expose the membrane to chemicals including surfactants, soaps and solvents. 3.3 PENETRATIONS A. Seal all penetrations using AirOutshield ROOF in combination with SRP Tapes, Self adhered membranes and other compatible sealants and products. B. Pipes and Conduit: 1. Install manufactured penetration sleeves sized for the penetration and install as recommended by the manufacturer. 2. Unroll membrane next to penetration and fold membrane back on itself. Mark and cut out penetration size out of membrane. Ensure cutout section is slightly smaller than diameter of penetration. Slide membrane over penetration. 3. Wrap SRP 100 UV tape around penetration. Ensure that 2 extends onto the membrane. If required, install a second 4 piece of SRP 100 UV Tape around the penetration. (See standard details) Issued: 2017-07-28 07276-3

C. Large, Curbed, Roof Penetrations: 1. Follow roof manufacturers and curb manufacturer s approved shop drawings for curb and roof system installation. 3.4 BREATHABLE UNDERLAYMENT APPLICATION A. 1. is installed as a secondary drainage plane under the primary water shedding roofing such as tile, slate, zinc, copper or metal roofing material. 2. Install printed side up, laid such that it forms a continuous membrane over the entire roof area, allowing any water to drain down to the gutters. Avoid blockages that would otherwise obstruct the water flow. 3. Do not use on roofs with slope less than 2:12 (16.7 %). 4. Fasten using roofing nails, screws or other approved fastner. Do Not use Staples. Ensure compatibility between fasteners and the roofing material. 5. Take appropriate precautions during installation in high winds to avoid injury. 6. Along valleys, hips and ridges, install eave protection membrane and ensure overlap minimum 12 o.c. both sides. 7. Where the self adhered membrane is to be applied over do not apply primers as they will damage the AirOutshield. 8. At eaves, install SRP-AirOutshield ROOF overlapping the self adhered eave protection membrane by 12 inches minimum. 9. Unroll horizontally across the roof perpendicular to roof slope. Install successive layers of in a shingling manner up the roof slope maintaining minimum 6 horizontal and vertical overlaps. 10. Tape all seams when roof slope is 3:12 or less or as required by this specification using SRP- 1 D.S. Double Sided Seam Tape or SRP 60 UV Seam Seal Tape. 11. OPTIONAL Tape all vertical and horizontal seams using SRP- 1 D.S. Double Sided Seam Tape or SRP 60 UV Seam Seal Tape. 12. Extend AirOutshield ROOF 4 over gable ends and fasten to fascia boards at 12 o.c. 13. Fasten AirOutshield ROOF along top and bottom of roll at 12 o.c. and maximum 2-0 o.c. in the field. 14. During installation, protect from rainwater runoff from upper to lower roofs (overhangs/eaves/valleys). 15. Limit heavy foot traffic on and repair any damaged material due to traffic abuse. 16. AirOutshield ROOF is not to be covered by asphalt shingles. B. Roof Installation 1. Ensure is installed in compliance with this specification and all details are complete. 2. OPTIONAL Install Ventilation Mat or battens over the to form a positive drainage and ventilation space. 3. Install primary roofing system as soon as possible and in accordance with the roof system manufacturers written instructions and the project specifications. 3.5 FIELD QUALITY CONTROL A. [Owner will engage] [Engage] an independent inspector to observe substrate and installation. Inspector shall provide a written, sign-off log, on all penetrations before the underlayment is Issued: 2017-07-28 07276-4

placed against them. Form of log shall be approved by Architect before contract with inspection service is approved. 3.6 PROTECTING AND CLEANING A. Protect installed from damage due to ultraviolet light, harmful weather exposures, physical abuse, exposure to solvents or soaps and other causes. Augment with additional waterproofing materials (e.g., tarps) DURING THE CONSTRUCTION PHASE to ensure that interiors are protected until the primary roofing material is applied. B. Repair torn breathable underlayment as follows: a. Insert a full height piece of underlayment extending 12 inches horizontally beyond the damage and extend up and under the underlayment above. Mechanically attach underlayment to substrate top and bottom. Tape all seams. C. Remove mud and similar marks with a water scrub; do not use soap or solvents. If chemicals have been spilled on underlayment, remove and replace as stated above. END OF SECTION 07275 Revised: 2017-07-28 Issued: 2017-07-28 07276-5