PIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing

Similar documents
PIP RFTB1000 Brick Refractory Installation Qualification, Inspection, and Testing

PIP RFTA1000 Refractory Anchor and Accessory Installation Qualification, Inspection, and Testing

March Process Industry Practices Refractory. PIP RFIA1000 Refractory Anchor and Accessory Installation Details

PIP RFTM1000 Monolithic Refractory Installation Qualification, Inspection, and Testing

COMPLETE REVISION September Process Industry Practices Piping. PIP PNSM0120 Purchasing Requirements for Bolting

PIP PNSM0115 Purchasing Requirements for Pipe

REAFFIRMATION WITH EDITORIAL REVISION September Process Industry Practices Insulation. PIP INIH1000 Hot Insulation Installation Details

REAFFIRMATION WITH EDITORIAL REVISION October Process Industry Practices Insulation. PIP INIC1000 Cold Insulation Installation Details

PIP VESSP002 Supplemental Design and Fabrication Specification for Shell and Plate Heat Exchangers ASME Code Section VIII, Divisions 1 and 2

COMPLETE REVISION November Process Industry Practices Architectural. PIP ARS08111 Standard Steel Doors and Frames Supplier Specification

PIP ARS08111 Standard Steel Doors and Frames Supplier Specification

PIP STF05511 Fixed Industrial Stairs

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

EDITORIAL REVISION January Process Industry Practices Vessels. PIP VEFV1100M Vessel/S&T Heat Exchanger Standard Details (Metric Units)

PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units)

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines

EDITORIAL REVISION August Process Industry Practices Insulation. PIP INEG2000 Guidelines for Use of Insulation Practices

PIP VEFV1100 Vessel/S&T Heat Exchanger Standard Details (U.S. Customary Units)

PIP STF05501 Fixed Ladders Fabrication Details

PIP INSA1000 Acoustic Insulation Systems Specification

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces

COMPLETE REVISION January Process Industry Practices Electrical. PIP ELIGD000 Grounding Installation Details

Electrical PIP ELILS000 Lighting and Receptacle Installation Details for Class I, Division 2, Class II, Division 2, and Unclassified Areas

COMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification

EDITORIAL REVISION March Process Industry Practices Refractory. PIP RFSM1000 Monolithic Refractory Material Specification

Pipeline Systems PLSC0017 Requirements for Welder Qualifications in Accordance with ASME Section IX

PIP STE05501 Fixed Ladders and Cages Design Guide

PIP CTSC1000 Application of Coatings to Concrete

COMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details

TECHNICAL REVISION September Process Industry Practices Refractory. PIP RFSB2000 Brick Refractory Installation Specification

PIP PNEM0001 Piping Service Index

March Process Industry Practices Structural. PIP STE05535 Vessel Circular Platform Detail Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

COMPLETE REVISION June Process Industry Practices Architectural. PIP ARS08390 Blast Resistant Doors, Frames, and Related Hardware Specification

PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

PIP REEE002 Reliability Indicators for Rotating Machinery

PIP ARS08710 Standard Steel Door Hardware Supplier Specification

PIP INSR1000 Installation of Flexible, Removable/Reusable Insulation Covers for Hot Insulation Service

COMPLETE REVISION February Process Industry Practices Structural. PIP STS05130 Structural and Miscellaneous Steel Erection Specification

COMPLETE REVISION May Process Industry Practices Piping. PIP PNSM0110 Purchasing Requirements for Valves

INS QA Programme Requirements

MATERIAL REQUISITION FOR BOLTS AND NUTS

Trident Precision Manufacturing

Quality Management System

Student Services & Classroom Addition

COMPLETE REVISION October Process Industry Practices Civil. PIP CVC01017 Plant Site Data Sheet

QUALITY REQUIREMENTS

Prototype Integration Facility SUPPLIER QUALITY SYSTEM REQUIREMENTS

TABLE OF CONTENTS. 1.0 INTRODUCTION Page SCOPE Page REFERENCES Page REQUIREMENTS Page QUALITY ASSURANCE Page 8

Ontario ENGINEERING STANDARD SPECIFICATION 1/7 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA CLARABELLE MILL NI-HARD TYPE 1 LINERS

Supplier Quality Procurement Requirements (SQPR) DATED: 01/31/2018

Specification for Pipe Fittings

SECTION QUALITY REQUIREMENTS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION CORROSION PROTECTION FOR CONCRETE STRUCTURES

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

DS131 EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

SPECIAL INSPECTION & TESTING AGREEMENT CITY OF NORTON SHORES BUILDING DEPARTMENT Michigan Building Code 2015

***************************************************************************************************************

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"

PIP PNSC0011 Installation of ASME B31.3 Metallic Piping

Special Provision No. 199S66 March For the purpose of this Special Provision, the following definitions apply:

There is an inspection report prepared after the Digester cleaning was carried out.

Quality Control and Quality Assurance for Installation of Steel Deck

Facilities Planning and Construction (FP&C)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION

CSI Exceed PART 1.0 GENERAL. plae.us SUMMARY 1.2 REFERENCES

Requirements for Suppliers

SECTION GROUND STORAGE TANK

Ontario ENGINEERING STANDARD SPECIFICATION 1/8 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA CLARABELLE MILL CAST Q & T STEEL LINERS

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SHORING & UNDERPINNING 02250

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

SECTION QUALITY REQUIREMENTS

SECTION DRY-PLACED GRANITE

SECTION STRUCTURE MOUNT RAILING SYSTEM

SECTION A. Manufacturer's data sheets on each product to be used, including:

Town of Poughkeepsie BUILDING DEPARTMENT 1 OVEROCKER ROAD POUGHKEEPSIE, NY12603 (845)

CONCRETE REINFORCEMENT. 1. Supplementary Conditions, General Conditions, General Requirements, shall govern Work of this Section.

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:


C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

INSTRUCTIONS FOR COMPLETING PRE-QUALIFICATION STATEMENT

Supplier Requirements Manual

GRMA-032-PRO-00 Page 1 of 8

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

REQUEST FOR PROPOSAL WAYFINDING SIGN DESIGN AND FABRICATION FOR THE CITY OF SALIDA, COLORADO

PIP STE05501 Fixed Ladders Design Guide

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

KOSTER AMERICAN CORPORATION

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

Supplier Quality Requirements Revision B Dated November 21, 2017

STANDARD QUALITY REQUIREMENTS FOR SUPPLIERS F05-QP008 Rev A Dated 08/12/2010

Transcription:

EDITORIAL REVISION March 2013 Process Industry Practices Refractory PIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contractors, or standards organizations. By harmonizing these technical requirements into a single set of Practices, administrative, application, and engineering costs to both the purchaser and the manufacturer should be reduced. While this Practice is expected to incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended to and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice to particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time to time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended to be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject to revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas 78759. PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays to clearly indicate modifications or exceptions to specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contractors with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited to the procurement process (e.g., as attachments to requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires to provide any third party with copies of the Practice. PUBLISHING HISTORY January 2013 Issued March 2013 Editorial Revision Not printed with State funds

EDITORIAL REVISION March 2013 Process Industry Practices Refractory PIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing Table of Contents 1. Introduction... 2 1.1 Purpose... 2 1.2 Scope... 2 2. References... 2 2.1 Process Industry Practices... 2 2.2 Industry Codes and Standards... 2 3. Definitions... 2 4. Requirements... 3 4.1 General... 3 4.2 Ceramic Fiber Refractory Lining Anchors... 3 4.3 Confirmation of Materials by Purchaser... 3 4.4 Surface Preparation... 4 4.5 Installer Prequalification Requirement... 4 4.6 Installation Inspection and Testing... 4 4.7 Lining Repairs... 5 Data Form RFTF1000-F Inspection Hold Point and Sign-Off Schedule Process Industry Practices Page 1 of 5

PIP RFTF1000 EDITORIAL REVISION Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing March 2013 1. Introduction 1.1 Purpose This Practice provides requirements for quality control and quality assurance for the installation of ceramic fiber refractory. 1.2 Scope 2. References This Practice covers the general requirements for inspection of ceramic fiber refractory linings. Inspection methods include documentation review, in-progress installation inspection, and final inspections of the completed lining. Applicable parts of the following Practices and industry codes and standards shall be considered an integral part of this Practice. The edition in effect on the date of contract award shall be used, except as otherwise noted. Short titles are used herein where appropriate. 2.1 Process Industry Practices (PIP) PIP RFSF1000 Ceramic Fiber Refractory Material Specification PIP RFSF2000 Ceramic Fiber Refractory Installation Specification PIP RFIA1000 Refractory Anchor and Accessory Installation Details (under development) PIP RFSA1000 Refractory Anchor and Accessories Specification (under development) PIP RFTA1000 Refractory Anchor and Accessories Installation Qualification, Inspection, and Testing 2.2 Industry Codes and Standards 3. Definitions American Society for Testing and Materials (ASTM) ASTM C71 Standard Terminology Relating to Refractories With the exception of the terms listed in this section, terms used in this Practice are defined in accordance with ASTM C 71. If a definition as used in this Practice differs from the one listed in the referenced documents, the modified definition is included in the following listing: installer: Party responsible for installing the ceramic fiber refractory. This includes each individual ceramic fiber installer, who is pre-qualified/certified before allowed to install ceramic fiber lining. installer s inspector: Installer s authorized representative, responsible for the quality control of all materials, installations, and workmanship provided by the installers, and any of the installer s subcontractors or vendors owner: Party who owns the facility wherein the refractory lined equipment will be used Process Industry Practice Page 2 of 5

PIP RFTF1000 EDITORIAL REVISION Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing March 2013 purchaser: Party who awards the contract to the installer. The purchaser may be the owner or the owner s authorized agent. purchaser s inspector: Purchaser s authorized representative with authority to act in the interest of, and on behalf of, the purchaser in all quality assurance matters. The inspector shall be experienced in the evaluation of ceramic fiber installation techniques and completed linings. 4. Requirements 4.1 General 4.1.1 Conflicts, Exceptions, Deviations, and Substitutions 4.1.1.1 All conflicts between the referenced documents and this Practice shall be submitted in writing to purchaser for clarification and resolution before proceeding. 4.1.1.2 All exceptions, deviations, and substitutions to the requirements specified herein and in referenced documents shall be approved by purchaser. 4.1.2 Regulations and Material Safety Data Sheets (MSDS) 4.1.2.1 Ceramic fiber refractory materials shall be in accordance with all applicable federal, state, and local codes and regulations on storage, handling, safety, and environmental requirements. 4.1.2.2 The latest issue of the ceramic fiber refractory material manufacturer s MSDS shall be provided for each installation site and complied with during the installation of the ceramic fiber refractory. 4.1.3 Documentation Ceramic fiber refractory material manufacturer s product data sheets and the approved installation procedure in accordance with PIP RFSF2000 shall be provided for each installation site and complied with during the installation of the ceramic fiber refractory. 4.1.4 Notification Purchaser s inspector shall be given adequate notice (e.g., time and location) before the start of all work and hold points, so that the inspector can witness the work. 4.2 Ceramic Fiber Refractory Lining Anchors The qualification of ceramic fiber refractory anchor welders, selection of anchors, anchor installation, anchor testing, and inspection shall be in accordance with PIP RFIA1000, PIP RFSA1000, and PIP RFTA1000. 4.3 Confirmation of Materials by Purchaser 4.3.1 Purchaser s inspector shall confirm that the ceramic fiber refractory lining materials are in accordance with the contract documents and PIP RFSF1000. Items to be confirmed shall include material, style, geometry and/or dimensions of blankets, board, or modules and accessories. Process Industry Practices Page 3 of 5

PIP RFTF1000 EDITORIAL REVISION Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing March 2013 4.3.2 Purchaser s inspector shall confirm that ceramic fiber materials and accessories are not damaged, contaminated, or wet. See PIP RFSF2000 for water contamination evaluation criteria. Comment: Damage and contamination are defined as degradations of the lining that the purchaser s inspector determines to be detrimental to the serviceability of the ceramic fiber lining. Examples of damage include cuts, cracks, tears, compression, and missing materials. Examples of contamination include sea water, dirt, chemicals, and other foreign materials. 4.3.3 Purchaser s inspector shall confirm that positive material identification (PMI) has been performed during installation on module hardware and loose metallic components. All items shall be in accordance with the contract documents and appropriately marked. 4.4 Surface Preparation Surface preparation for the installation of coating, ceramic fiber refractory and accessories shall be in accordance with PIP RFSF2000. 4.5 Installer Prequalification Requirement 4.5.1 Documentation shall be provided, from other recently completed installations, that confirms each installer s ability to install the specific material type in a similar or same application as proposed for the subject installation. The documentation shall be provided to purchaser for review and determination of acceptance. 4.5.2 If the documentation specified in Section 4.5.1 cannot be provided, each installer shall be required to produce a mockup of the proposed installation. The mockup shall include all critical service areas as defined by purchaser s inspector. 4.5.3 Unless Section 4.5.1 or 4.5.2 is satisfactorily completed, installation of ceramic fiber shall not be permitted by that installer. 4.5.4 The installer s inspector shall provide documentation of their ability to inspect ceramic fiber linings. The documentation shall be provided to purchaser for review and determination of acceptance. 4.6 Installation Inspection and Testing 4.6.1 General 4.6.1.1 Installation of ceramic fiber anchors shall be in accordance with PIP RFIA1000. Inspection and testing shall be in accordance with PIP RFTA1000. 4.6.1.2 In-progress inspection of the refractory lining shall confirm that ceramic fiber materials, accessories, anchor system and layout, and lining design details including any coatings are in accordance with the contract documents. Comment: In-progress refers to continuous monitoring at regular intervals throughout the duration of the work. Process Industry Practice Page 4 of 5

PIP RFTF1000 EDITORIAL REVISION Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing March 2013 4.6.1.3 Inspection of ceramic fiber refractory lining installation shall be by visual inspection in accordance with Section 4.6.3. 4.6.2 Hold Points 4.6.2.1 Inspection hold points shall be in accordance with purchaser s PIP RFTF1000-F Inspection Hold Point and Sign-Off Schedule. 4.6.2.2 Work shall not progress until all parties listed on purchaser s PIP RFTF1000-F have signed off at each hold point in the order as shown on the form. 4.6.3 Visual Inspection 4.7 Lining Repairs 4.6.3.1 Before ceramic fiber refractory installation, welded anchors and accessories shall be 100% visually examined to confirm that all welding is in accordance with PIP RFIA1000. 4.6.3.2 The layout, size and location of anchorage shall be in accordance with the detailed design drawings accepted by the purchaser. 4.6.3.3 By visual inspection of the in-progress ceramic fiber refractory lining installation, the following shall be confirmed to be in accordance with the lining design drawings accepted by the purchaser: a. Lining thickness b. Ceramic fiber layout c. Backup materials d. Expansion joints e. Anchor attachment f. Lining construction 4.6.3.4 The installed ceramic fiber refractory lining shall be confirmed to be within design dimensional tolerances accepted by the purchaser. 4.6.3.5 During in-progress inspection of the ceramic fiber refractory installation, any defects found shall be cause for work to cease. All inspection parties shall be notified of the defects and a report detailing type and extent of defects and the recommended repair procedure prepared. The detailed inspection report, and recommended repair procedure shall be submitted to purchaser for resolution. 4.6.3.6 Defects noted in the lining during the final inspection shall be brought to the attention of the purchaser for resolution. All lining repairs shall be subjected to the same inspection as the original lining. Process Industry Practices Page 5 of 5

ASSOC. PIP: RFTF1000 INSPECTION HOLD POINT AND SIGN-OFF SCHEDULE PIP RFTF1000-F CERAMIC FIBER REFRACTORY INSTALLATION QUALIFICATION, INSPECTION, AND TESTING PAGE 1 OF 1 MARCH 2013 NO. DATE REVISION DESCRIPTION BY CHECKED APPROVED PROJECT NO. FACILITY NAME LOCATION PROJECT DOCUMENT NO. SUPPLIER: REPORT DATE: / / SIGNOFF SCHEDULE HOLD POINT INSTALLER S INSPECTOR PURCHASER S INSPECTOR OWNER REQUIRED INITIALS/ DATE REQUIRED INITIALS/ DATE REQUIRED INITIALS/ DATE 1. REVIEW DESIGN DRAWINGS AND PROCEDURES YES YES YES 2. INSTALLER PREQUALIFICATION YES YES NO 3. CONFIRM MATERIALS YES YES NO 4. SURFACE PREPARATION YES YES NO 5. ANCHOR SYSTEM INSTALLATION YES YES YES 6. COATING YES YES NO 7. IN-PROGRESS VISUAL INSPECTION YES YES NO 8. FINAL LINING INSPECTION YES YES YES COMMENTS: INSTALLER S INSPECTOR SIGNATURE: PURCHASER S INSPECTOR SIGNATURE: (PRINTED) (PRINTED)