E16. Trees in open space zones

Similar documents
D13. Notable Trees Overlay

Appendix D Comparative District Plan Analysis Table

D21. Sites and Places of Significance to Mana Whenua Overlay

Commencement Date. This section applies to all land under Newcastle Local Environmental Plan 2012.

E20 Māori Land. (2) The importance of economic development to support the occupation, development and use of Māori land is recognised.

E5. On-site and small scale wastewater treatment and disposal

H28. Special Purpose Quarry Zone

Tree and Streetscape Policy

general natural area GUIDELINES TO THE RULES This section updated September 2015

Section Three, Part 2 Protection of the Urban Environment

TREE PRESERVATION ORDER

Street Tree Planting and Management Policy

Section 10B 10B Purpose of the High-Voltage Transmission Plan Area

C01-03, C01-05 Building Line, Patiki Road

MPT.2.8. Management Plan Technique. Index. Description and Explanations

ROYAL FOREST AND BIRD PROTECTION SOCIETY OF NEW ZEALAND INCORPORATED KAPITI COAST DISTRICT COUNCIL

Arboricultural Assessment Report

European Tree Technician

30A RULES FOR RENEWABLE ENERGY GENERATION

Some trees are valued by the community. Part A, Chapter 6 Ecological Areas. The District Plan seeks a balanced approach to tree protection

S e c t i o n B i o d i ve r s i t y

APPLICATION FOR LANDUSE RESOURCE CONSENT

subdivision WORKING ENVIRONMENT AND COMMUNITY ENVIRONMENT RULES ASSESSMENT CRITERIA

Arboricultural Assessment

Main Campus Urban Forest and Landscape Management Policy

CITY OF NAPIER DISTRICT PLAN. The following resource management issues have been identified as significant throughout Napier City:

I322. Mount Wellington 5 Precinct

A smaller 7.65MW wind farm at Mount Stuart, comprising 9 turbines with a maximum height of 75- metres, was also constructed in 2011.

Tree Policy For the Management of Trees on City Property

I433. Pukekohe Hill Precinct

El DORADO COUNTY GENERAL PLAN POLICIES RELATED TO OAK WOODLANDS

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

I335. Western Springs Stadium Precinct

This part of the Plan explains what a District Plan is and provides a user friendly guide.

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...

NTW.1 Network Utilities

F3. Coastal Marina Zone

dpd 331B Seattle Permits Tip Hazard Trees STEPS FOR TREE ASSESSMENT Department of Planning and Development

9 Plant Wind and Flood Resistant Trees

I321. Mount Smart Stadium Precinct

Instructions Fee Schedule

IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention

I321. Mount Smart Stadium Precinct

TREE REMOVAL PERMIT NARRATIVE OR 213: I-205 REDLAND ROAD OVERCROSSING PROJECT

E31. Hazardous substances

Tree Management Plan

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.

Proposed District Plan Change 83: Kiwi Point Quarry. Plan Change Document: Alterations to the Wellington City District Plan

IN THE MATTER IN THE MATTER AND COUNCIL CONSENT ORDER

Preliminary Arboricultural Report 95 Bingley Crescent, (Block 1, Section 13) Fraser, ACT

I300. Alexandra Park Precinct

Instructions Fee Schedule

TREE PROTECTION (no.) CODE 990

UTE.1 Urban Transition Environment

TREE CONSERVATION REPORT

Summary of Relief Sought by Transpower New Zealand Limited

Electronic Communication

5.3 CONSERVATION (WETLAND) ZONE

TREE MANAGEMENT REPORT FOR DEVELOPMENT

subdivision BUSH LIVING ENVIRONMENT ASSESSMENT CRITERIA RULES

H2. Residential Rural and Coastal Settlement Zone

E7. Taking, using, damming and diversion of water and drilling

TOWN OF ATHERTON. Tree Preservation Guidelines. Standards and Specifications

subdivision INFILL SUBDIVISION ASSESSMENT CRITERIA RULES

19 RELOCATED BUILDINGS AND TEMPORARY ACTIVITIES

I503. AUT Millennium Institute of Sport Precinct

E36. Natural hazards and flooding

Sections:

E36. Natural hazards and flooding

Urban Design Manual 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY. Definitions. Air Photo: Standards General Vegetation Overview:

DRAFT (July 2018) Butte County Oak Woodland Mitigation Ordinance

Electronic Communication. 1/2. Applicant s And Agent s Names And Addresses. 3. Tree Location. 4. Tree Ownership

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

SRIE.1 Strategic Rural Industries Environment

APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDTION

E36. Natural hazards and flooding

D9. Significant Ecological Areas Overlay

- CITY CODE. Chapter 25 - TREES

Butte County Oak Woodlands Technical Manual Draft

PART 1 - DISTRICT PLAN STRUCTURE

Public Information Centre

TREE REMOVAL, PROTECTION & CARE

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

SUBJECT: Roseland Pilot Private Tree By-law. Committee of the Whole. Roads, Parks and Forestry. Recommendation: Purpose: Background and Discussion:

SAN MARINO PLANNING AND BUILDING DEPARTMENT Submittal Checklist for PRIVATE TREE REMOVAL REQUEST

The damage and destruction of heritage trees can significantly affect the heritage, cultural, amenity and natural values of an area.

E37. Genetically modified organisms [CIV : Federated Farmers of New Zealand Incorporated]

Åtgärdsprogram för. särskilt skyddsvärda träd i kulturlandskapet RAPPORT 5411 OKTOBER 2004

Instructions Arborist Verification of Hazardous or Conflicting Tree

SUBCHAPTER TREE PRESERVATION AND PROTECTION

E30. Contaminated land

Auckland Council Regional Plan: Air, Land and Water

Vegetation management on private land

H21. Rural Waitākere Ranges Zone

13 Land Use Activities and Indigenous Biological Diversity

Notification of Proposed Works to Trees in Conservation Areas (CA)

City of Kingston Tree By-Law Guidelines

Transcription:

E16. Trees in open space zones E16.1. Background Trees in the open space zones are an important public asset and need to be managed appropriately. As urban areas intensify, open space zones will be relied on to a greater extent to provide amenity in these areas. Trees in the open space zones contribute towards Auckland being a desirable place to live and are an important part of Auckland s natural heritage and identity. Environmentally, trees provide important ecological values in terms of storing carbon and providing habitat and food for wildlife, improving air quality and providing ecosystem services. E16.2. Objectives (1) Trees in open space zones that contribute to cultural, amenity, landscape and ecological values are protected. (2) There is an increase in the quality and extent of tree cover in open space zones, particularly within areas identified for intensified living. E16.3. Policies (1) Encourage ongoing maintenance of trees to enhance open space zones, while recognising existing constraints and functional requirements of the site. (2) Manage trees within open space zones to protect their cultural, amenity, landscape and ecological values, while acknowledging that multiple uses occur in open space areas. (3) Encourage the use of indigenous trees and vegetation for planting within open space zones, where appropriate, to recognise and reflect cultural, amenity, landscape and ecological values. E16.4. Activity table Table E16.4.1 Activity table specifies the activity status for land use activities related to trees in open space zones pursuant to section 9(3) of the Resource Management Act 1991 PC 4 (See modifications) The rules that apply to network utilities and electricity generation are located in Section E26 Infrastructure. [New text to be inserted] These rules apply if the location of the trunk of the tree is in the open space zones. Auckland Unitary Plan Operative in part 1

Table E16.4.1 Activity Table Activity Activity status (A1) Biosecurity tree works P (A2) Dead wood removal P (A3) Emergency tree works P (A4) Pest plant removal of any tree less than 4m in height and P less than 400mm in girth (A5) Tree trimming or alteration P (A6) Tree trimming or alteration that does not comply with RD Standard E16.6.1 (A7) Works within the protected root zone P (A8) Works within the protected root zone that do not comply with RD Standard E16.6.2 (A9) Tree removal of any tree less than 4m in height and less than 400mm in girth P (A10) Tree removal of any tree greater than 4m in height or greater RD than 400mm in girth E16.5. Notification (1) Any application for resource consent for an activity listed in Table E16.4.1 Activity table above will be subject to the normal tests for notification under the relevant sections of the Resource Management Act 1991. (2) When deciding who is an affected person in relation to any activity for the purposes of section 95E of the Resource Management Act 1991 the Council will give specific consideration to those persons listed in Rule C1.13(4). E16.6. Standards All permitted and restricted discretionary activities listed in Table E16.4.1 must comply with the following standards. E16.6.1. Tree trimming or alteration (1) The maximum diameter of any branch removed must be no greater than 100mm at severance. (2) No more than 20 per cent of live growth of the tree may be removed in any one calendar year. (3) All works must be carried out in accordance with best arboricultural practice. (4) All trimming or alteration must retain the natural shape, form and branch habit of the tree. (5) Any diseased tree material is to be treated in accordance with the Biosecurity Act 1993. Auckland Unitary Plan Operative in part 2

E16.6.2. Works within protected root zone (1) For roots less than 60mm in diameter: (a) excavation undertaken by hand digging or air spade or hydro vac or machine excavator within the protected root zone without direction and/or supervision of a qualified arborist: (i) the surface area of a single excavation shall not exceed 1m²; (ii) works involving root pruning must not be on roots greater than 35mm (iii) works must not disturb more than 10 per cent of the protected root (iv) any machine excavator must operate on top of paved surfaces and/or ground protection measures; and (v) any machine excavator must be fitted with a straight blade bucket. (b) excavation undertaken by hand digging, air spade, hydro vac or machine excavator within the protected root zone with direction and/or supervision of a works arborist: (i) works must not disturb more than 20 per cent of the protected root (ii) works involving root pruning must not be on roots greater than 60mm (iii) any machine excavator must operate on top of paved surfaces and/or ground protection measures; and (iv) any machine excavator must be fitted with a straight blade bucket. (c) excavation undertaken by trenchless methods must not be undertaken at a depth less than 800mm below ground level. (d) replacement of existing structures, kerbs, and hard surfaces within the protected root zone must be done so that: (i) the removal of the surface is carried out without damage to any tree roots; and (ii) the machine excavator must operate on top of paved surfaces and/or ground protection measures and must be fitted with a straight blade bucket. (e) Standard E16.6.2(1)(a),(b),(c) and (d) does not apply to any tree works undertaken inside existing infrastructure such as pipes and meter boxes. (2) For roots greater than 60mm but less than 80mm in diameter: Auckland Unitary Plan Operative in part 3

(a) excavation undertaken by hand digging, or air spade, or hydro vac or machine excavator within the protected root zone with direction and/or supervision of a qualified arborist: (i) works must not disturb more than 20 per cent of the protected root (ii) works involving root pruning must not be on roots greater than 80mm (iii) any machine excavator must operate on top of paved surfaces and/or ground protection measures; (iv) any machine excavator must be fitted with a straight blade bucket; and (v) the Council s manager for Parks, Sports and Recreation must be notified prior to commencing work. (b) Standard E16.6.2(2)(a) does not apply to any tree works undertaken inside existing infrastructure such as pipes and meter boxes. E16.7. Assessment controlled activities There are no controlled activities in this section. E16.8. Assessment restricted discretionary activities E16.8.1. Matters of discretion The Council will restrict its discretion to all of the following matters when assessing a restricted discretionary resource consent application: (1) all restricted discretionary activities: (a) the effect on the values of the tree or trees; (b) any loss or reduction of amenity values provided by the tree or trees; (c) the risk of damage to people or property; (d) any mitigation proposed; (e) consistency with best arboricultural practice; (f) methods to control plant pathogens; (g) any tree works plan, reserve management plan, or landscape plan relevant to the tree or group of trees; (h) the functional and operational needs of infrastructure; and (i) the benefits derived from infrastructure. Auckland Unitary Plan Operative in part 4

E16.8.2. Assessment criteria The Council will consider the relevant assessment criteria for restricted discretionary activities from the list below: (1) all restricted discretionary activities: (a) the specific values of the trees including any ecological values with respect to water and soil conservation, ecosystem services, stability, ecology, habitat for birds and amelioration of natural hazards; (b) the loss of amenity values that tree or trees provided; (c) the risk of actual damage to people and property from the tree or trees including the extent to which adverse effects on the health and safety of people have been addressed as required under health and safety legislation; (d) any alternative methods that could result in retaining the tree or trees; (e) the degree to which any proposed mitigation adequately compensates for the values that trees provide; (f) the degree to which the proposal is consistent with best practice guidelines for tree management; (g) methods to contain and control plant pathogens and diseases including measures for preventing the spread of soil and the safe disposal of plant material; (h) the provision of a tree works plan to address the effects of the works on the tree or trees and outlining the proposed methods to be used, and where applicable: (i) the provision of a landscape plan; or (ii) consistency with any reserve management plan. (i) the need for the direction and supervision of an on-site monitoring arborist while the works are being carried out; (j) the functional and operational needs of infrastructure; and (k) the benefits derived from infrastructure. E16.9. Special information requirements There are no special information requirements for this section. Auckland Unitary Plan Operative in part 5