Legal And Policy Options and Best Practices In Host Countries

Similar documents
Biomass Asia Conference, May G. Ilango Bharathi YTL SV Carbon Sdn. Bhd. Malaysia

GUIDELINES FOR GREEN TECHNOLOGY TAX INCENTIVE (GITA GITE) Green Investment Tax Allowance (GITA) and Green Income Tax Exemption (GITE) Updated May 2016

Biomass and Energy A Perspective from Municipal Solid Waste (MSW)

Overview of the CDM in the agriculture sector

POME Treatment Co-benefits CDM, Malaysia Summary of the Study March, 2008 Pacific Consultants

Upgrading of Malaysian Biomass for Cofiring with Coal. Adlansyah Abd Rahman Centre for Renewable Energy, UNITEN

UNOSD Expert Group Meeting Sustainable Application of Waste-to-Energy in Malaysia. Mohd Ali Hassan

NATIONAL GREEN TECHNOLOGY POLICY

PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 02

Waste management - Hydro, Wind, Solar Energy. - Capturing of landfill methane emission - Biomass power. to generate power - Geothermal, Tidel Energy

BIOGAS OPPORTUNITIES IN MALAYSIA SIVAPALAN KATHIRAVALE

Carl Bro Group HAMDAN MOKHTAR ENVIRONMENT AND BIOPROCESS TECHNOLOGY CENTRE SIRIM BERHAD

Small-Scale CDM & Bundling: Criteria, Advantages & Status

Using CDM as a means to help promote investment in A&R projects

Experience of the Clean Development Mechanism as a result based mechanism for methane abatement

Frequently Asked Questions for Vehicle Shipping Service from Peninsular to Sabah and Sarawak or from Sabah and Sarawak to Peninsular

Clean Development Mechanism (CDM)

CDM What and How? /

The Philippines Interest in Climate Change Mitigation

A CASE STUDY IN CDM PRACTICALITIES

BENEFITS OF CDM APPLICATION ON THE LCA PERSPECTIVE A CASE STUDY ON MALAYSIAN PALM OIL INDUSTRY

Implementing Energy Efficiency Initiatives in Industries. 16t h March 2006

2008 CDM/JI Feasibility Study Report. Executive Summary

PROGRESS & CHALLENGES IN UTILIZATION OF PALM BIOMASS

TOPIC 4: INTERACTION BETWEEN PUBLIC AND PRIVATE FOR SCALING UP FUNDING AND INVESTMENTS IN CLIMATE RESILIENCE

INTRODUCTION OF EFB TREATMENT MACHINES

Current Preparation of Nusantara Carbon Scheme (NCS): Indonesia case on completing the building blocks

Expert Group Meeting on Sustainable Application of Waste-to-Energy in Asian Region

Adopting Clean Development Mechanism for Sustainable Development and Economic Growth in Bangladesh

LINKING GHG INVENTORY TO MITIGATION ACTIONS

Krubong Melaka LFG Collection & Energy Recovery CDM Project. Kajima Corporation Mitsui & Co., Ltd. Southern Waste Management Sdn. Bhd.

Registered CDM Projects Average Annual Emission Reduction (tco 2 ) Total ERs by 2012 (tco 2 )

Highlights of Full Scale Demonstration Projects on Cogeneration Technologies

West Malaysia Unit C10-4, Tower C, Wisma Goshen Bangsar Trade Centre (Plaza Pantai) Jalan 4/83A Kuala Lumpur, Malaysia

Introduction to the Clean Development Mechanism

National Council on Climate Change Indonesia. Registered CDM Projects Average Annual. Review N. of. Total ERs by Amount of Issued

SUNSOURCE ENERGY SDN. BHD.

BRIGHTER SOLUTIONS FOR GREEN ENERGY KEYNOTE SPEECH BY:

Turning waste into a resource

Carbon Trading in Malaysia: Review of Policies and Practices

FELDA PALM INDUSTRIES SDN. BHD

OPPORTUNITIES AND CHALLENGES IN BIOGAS DEVELOPMENT IN INDONESIA. Paul Butarbutar South Pole Carbon Asset Management Ltd

TAX INCENTIVES FOR GREEN TECHNOLOGY INDUSTRY

International Workshop: Future Perspective of Bioenergy Development in Asia

CDM Carbon Finance Workshop. Session 9: Discussion of project risks and mitigation strategies. Accra, June

Sustainable Production (SP) of the Biomass Industries in Malaysia

Wan Asma I, Mahanim S., Zulkafli H., Othman S & Y. Mori. Regional Workshop on UNEP/DTIE/IETC in collaboration with GEC 2-5 th March 2010, OSAKA JAPAN

Na.onal Climate Change Policy

SUSTAINABLE BIOPLASTICS INDUSTRY FROM RENEWABLE RESOURCES IN MALAYSIA

CDM: A Perspective from a Project Developer

NATIONAL KEY ECONOMIC AREAS (NKEA)

GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT

Best Practices & Success Stories of Biomass Industry in Malaysia

A. M. Monsurul Alam Director. Department of Environment Ministry of Environment and Forests

The 5th Workshop on GHG Inventories in Asia (WGIA5)

CDM projects development activities in India. Vivek Kumar TERI 26 July 2005

BUNDLING 5 CPO MILLS FOR RECYCLING POME TO GAS ER - ELECTRICITY

4. The Clean Development Mechanism for Biomass projects in Asia

MEWC/PTM/DANIDA. Final Report Activity 1.3 (a)

Registered CDM Projects. (tco 2 )

Thailand s s Response to Climate Change

INFORMATION ON CONSIGNMENT SERVICES FOR ELECTRICAL AND ELECTRONICS PRODUCTS

INFORMATION ON CONSIGNMENT SERVICES FOR ELECTRICAL AND ELECTRONICS PRODUCTS

Lessons Learned from Country-based practical experience on NAMAs in Cambodia

Global Warming and CDM Implementation in Thailand

Projects and Technology Transfer in China. Shengbo Feng Energy Research Institute National Development & Reform Commission.

Solar PV: Policy, Market & Industry in Malaysia

Overview of financing energy projects

DNA of REDD+? Dicky E. Hindarto and Doddy S. Sukadri

ENERGY EFFICIENCY PROGRAMS IN MALAYSIA

Biomass Landscape in Malaysia & Potential Collaborations with APEC

ADVANCES IN BIOGAS PROCESSING June 2013

Martin-Luther King Strasse Bonn Germany 29th Nov 2007

Gold Standard Validation Report

Bulgarian JI Guidelines. 2006, September

Updates on RE programme and efforts in Malaysia Azah Ahmad Sustainable Energy Development Authority Malaysia

Landfill Gas (LFG) Emission Reduction Purchase Agreements (ERPAs) in China. Case Study: Tianjin

Content. Abbreviation. 1. Preamble. 2. CDM in RCREEE Member States: in Brief

Progress on the Development of a Voluntary Carbon Market in Thailand

Approval process of CDM project and PoA in Viet Nam

Energy Efficiency Roles in Current and Future Indonesia Carbon Market

Department of Standards Malaysia (Standards Malaysia) - National Accreditation Body (AB) Accreditation

Indonesia 2050 Pathway Calculator Phase II

Introduction to the Project Cycle

Introduction to the Project Cycle

GHG reduction with solid separation in POME ponds

Feasibility study of integrated biogas and composting plant at community scale in Malaysia

Malaysian Financial Mechanisms for Renewable Energy (RE) & Future Direction

Alberta s Climate Change Strategy Renewal Update October 9, 2013

Please fill in the form in the grey spaces, by following the instructions in italic.

Emission Reduction in MSW Management Using Composting

Main CDM Activities in Viet Nam

Cost and duration of planning, approving and executing Clean Development Mechanism (CDM) projects

Fast-Tracking Bioenergy Industry Development in Malaysia: Feedstock Availability, Policy

Biomass and Decentralised Energy: Challenges and Benefits

Annotated agenda Methodologies Panel fifty-ninth meeting

Accounting standards for methane emissions: taking stock of existing offset programs

Project Name: Production of Organic Fertiliser Using EFB, POME and other Mill Biomas Project No: GTFS/W/P033 Category: Producer

The Austrian JI/CDM Programme

Carbon Credits for Managing The Laguna De Bay Basin

Transcription:

Legal And Policy Options and Best Practices In Host Countries NOOR AKMAR SHAH GREENTECH MALAYSIA

Presentation Outline Involvement in Climate Change Process CDM Institutional Framework National CDM Criteria CDM Projects Statistic Involvement in Climate Change Process United Nations Framework Convention on Climate Change Signed on 9 June 1993 Ratified on 13 July 1994 Kyoto Protocol Signed on 12 March 1999 Ratified on 4 September 2002 Entered into force on 16 February 2005

The Framework NATIONAL CLIMATE CHANGE POLICY NATIONAL GREEN TECHNOLOGY AND CLIMATE CHANGE COUNCIL (MTHPI) NATIONAL GREEN TECHNOLOGY POLICY STEERING COMMITTEE WG ON INDUSTRY WG ON GREEN NEIGHBOURHOOD WG ON RESEARCH & INNOVATION WG ON TRANSPORTATION WG ON GREEN DEVELOPMENT WG ON ADAPTATION WG ON HUMAN CAPITAL WG ON PROMOTION & PUBLIC AWARENESS NATIONAL COMMITTEE ON CLEAN DEVELOPMENT MECHANISM (NCCDM) NATIONAL KEY ECONOMIC AREA WG = Working Group Related Policies and Plans National Energy Policy Five Fuel Policy National Roadmap to Reduce the Emission Intensity of GDP Green Technology Roadmap Green Township and Green Buildings Initiatives National Strategic Plan for Solid Waste Management, NSP National Biofuel Policy National Renewable Energy Policy 6

CDM Institutional Framework NATIONAL STEERING COMMITTEE ON CLIMATE CHANGE Set up in 1994 by Cabinet Chaired by Secretary General, NRE Members from Government, private sector and NGOs Secretariat: CEMD NATIONAL COMMITTEE ON CDM Chaired by Deputy Secretary General (I), NRE - DNA Members from Government sector and NGOs Secretariat: CEMD TC ENERGY (MEGTW) TC FORESTRY (NRE) RESPECTIVE SECRETARIAT ENERGY GREENTECH MALAYSIA FORESTRY FRIM AGRICULTURE - MARDI TC AGRICULTURE (MOA) DNA: Designated National Authority CEMD: Conservation and Environmental Management Division MEGTW: Ministry of Energy, Green Technology and Water NRE: Ministry of Natural Resources and Environment MOA: Ministry of Agriculture TC: Technical Committee FRIM: Forest Research Institute Malaysia MARDI: Malaysian Agricultural Research and Development Institute National CDM Criteria 1. Project must support the sustainable development policies of Malaysia and bring direct benefits towards achieving sustainable development; 2. Project must involve participation of Annex 1 Party/Parties as CER buyer. In addition, they are encouraged to participate as equity or technology providers; 3. Project must provide technology transfer benefits and/or improvement of technology; including enhancement of local technology; 4. Project must fulfill all conditions underlined by the CDM Executive Board; and 5. Project proponent should justify the ability to implement the proposed CDM project activity * Where flaring is used in methane abatement project, the project developer is required to utilize at least 10 percent of biogas for energy utilization

Revision on National CDM Criteria Criterion 2 Implementation of CDM projects must involve participation of Annex I Party/Parties An Annex I Party is considered to participate in a project in any of the following cases: a) Participation of an Annex I party as buyer, provider of equity and technology; or b) Participation of an Annex I party as buyer and provider of equity; or c) Participation of an Annex I party as buyer and technology provider This criterion has revised to: Project implementation must involve participation of Annex-1 Party/Parties as CER Buyer. In addition, they are encouraged to participate as equity or technology providers. Revision on National CDM Criteria Criterion 3 Project must provide technology transfer benefits and/or improvement of technology This criterion has revised to: Project must provide technology transfer benefits and/or improvement of technology, including enhancement of local technology Additional requirement on 10% Utilisation of biogas for energy utilisation Where flaring is used in methane abatement project, the project developer is required to utilise at least 10% of biogas for energy utilisation

Proposed Indicator for SD Criterion 11 Proposed Indicator for SD Criterion (continued)

Further Requirements Criteria 1 Criteria 2 Criteria 3 Show the Letter from State Department of Environment (EIA requirement, EQA 1974 complience) Show the Letter of Intent which signed by both parties (Buyer and Project Developer) Validation Report Criteria 5 MAA, FORM 9, 24, 49 and MAA Extra Documentation SREP approval letter Malaysia CDM Information Handbook Content: Introduction CDM Project Formalization National CDM Criteria Procedure for CDM Projects Contacts

Approval Process Option 1 National Committee on CDM (NCCDM) Project Proponent Project Idea Note Fulfill National Criteria No Operational Entity (OE) Designated National Authority (DNA) CDM Executive Board Project Design Document Fulfill International Criteria Host Country s Letter of Approval Registration No Yes On condition of OE validation of PDD Approval Process Option 2 National Committee on CDM (NCCDM) Project Proponent Project Design Document Operational Entity (OE) Designated National Authority (DNA) Fulfill National & International Criteria Host Country s Letter of Approval No Yes On condition of OE validation of PDD CDM Executive Board Registration

Malaysia CDM Administration Fee Type of Document Administration Fee (RM) PIN 1,000 PDD 2,500 (Small Scale Project) 5,000 (Large Scale Project) Support for CDM Implementation Tax Incentive for Reduction of GHG Emissions Fiscal Incentives for Renewable Energy (RE) Fiscal Incentives for Energy Efficiency (EE) Feed-in-tariff (FiT)

CDM Application (Energy Project) as of June 2012 Year No. of Projects Estimated ER (tco 2e ) 2002 3 124,987 2003 2 62,190 2004 9 918,275 2005 25 2,823,171 2006 21 2,621,098 2007 45 4,404,588 2008 50 4,342,384 2009 24 1,632,589 2010 14 946,162 2011 27 1,858,370 2012 24 3,871,937 TOTAL 244 23,605,922 CDM Application (Project Type) Estimated ER by project type 2,042,000 160,000 104,800 552,545 660,651 4,414,181 203,052 2,041,948 311,444 158,639 596,254 1,784,376 62,011 1,058,839 3,897,187 Empty Fruit Bunch (EFB) Wood Waste Palm Oil Mill Effluent (POME) Energy Efficiency (EE) Fuel Switch Landfill Municipal Waste to Energy Animal Waste Hydro Mini Hydro Biodiesel - Transportation Chemical Industry Oil and Gas Manufacturing Industries Others ( Rice Husks, Palm Kerne

CER Issued Projects (as of June 2012) No. Type of Project No. of Project CERs Issued (tco2 eq.) 1. Biomass ( i.e. EFB) 9 1,084,248 2. Biogas ( i.e. POME, landfill ) 15 500,038 3. Fuel Switch 1 572,668 4. Hydropower 1 8,372 5. Energy Efficiency 1 775,138 TOTAL 27 2,940,464 CDM Application (Energy Project) 77 energy projects with estimated potential emission reduction amounting 5,286,332 tco 2-eq has been successfully registered with CDM EB. 27 CDM projects were issued CER, amounting to 2,940,464 tco 2-eq @ amounting to USD 29.40 million (RM 93.33 million).

Trend and Analysis of CDM Projects 1. Malaysia CDM project associated with RE (70%), EE (7%), Landfill (8%) and others (15%) 2. More on small scale of the CDM projects 3. More projects on Methane Avoidance, Methane Recovery, Off-grid electricity generation, Landfill and little on Energy Efficiency 4. CERs value and prices varies depends on project agreement 5. Issues: - Uncertainty of Second CP of Kyoto Protocol - Fluctuation of CER price - Buyer of CER Conclusion Current CDM potential in Malaysia associated with energy biomass, biogas, hydro and waste management landfill gas, MSW, Composting Future potential transport sector, biofuel, oil and gas, various industrial sectors and agriculture sector CDM : tool to turn economically unattractive projects into attractive investments Opportunities to develop new markets for innovative, environmental friendly technologies

Contact for Further Information (DNA) Designated National Authority Environmental Management & Climate Change Division Ministry of Natural Resources and Environment Level 6, Tower Block 4G3, Precinct 4 Federal Government Administrative Centre 62574 PUTRAJAYA Contact Person: Dr. Lian Kok Fei Tel. No.: 603-8886 1126 E-mail: drlian@nre.gov.my Contact Person: Mr. Sharil Faizal Abdul Jani Tel. No.: 603-88861137 E-mail: faizal@nre.gov.my Fax No.: 603-8888 4473 Website: www.nre.gov.my Contact for Further Information (DNA) CDM Energy Secretariat Malaysian Green Technology Corporation No. 2, Jalan 9/10, Persiaran Usahawan, Seksyen 9 43650 Bandar Baru Bangi Selangor Darul Ehsan Malaysia Contact person: Cik Sazalina Zakaria Tel. No.: 603-8921 0852 E-mail: sazalina@greentechmalaysia.my Fax No. :603-8921 0801 Website: www.greentechmalaysia.my

CDM Forestry Secretariat Forest Research Institute Malaysia (FRIM) 52110 Kepong, Selangor Darul Ehsan, Malaysia Contact person: Dr. Norini Haron Tel. No.: 603-6279 7540 E-mail: norini@frim.gov.my Fax No. : 603-6280 4629 Website: www.frim.gov.my CDM Agriculture Secretariat Malaysian Agricultural Research and Development Institute (MARDI) Ibu Pejabat MARDI Peti Surat 12301 Pejabat Besar Pos 50774 Kuala Lumpur Contact person: Dr. Abd Jamil Zakaria Tel. No.: 603-8943 7390 E-mail: zajamil@mardi.gov.my Contact person: Mr. Shuhaimen Ismail Tel. No.: 603-8943 7025 E-mail: aimen@mardi.gov.my Fax No. : 603-8948 7639 Malaysian Green Technology Corporation No. 2, Jalan 9/10, Persiaran Usahawan, Seksyen 9 43650 Bandar Baru Bangi, Selangor Darul Ehsan Website: www.greentechmalaysia.my E mail: info@greentechmalaysia.my 28

CER issued projects Project Name CERs Issued (tco2 eq) Biomass Energy Plant-Lumut 116,620 Replacement of Fossil Fuel by Palm Kernel Shell Biomass in the Production of Portland Cement 572,668 SEO Biomass Steam and Power Plant in Malaysia 130,079 LDEO Biomass Steam and Power Plant in Malaysia 97,059 Sahabat Empty Fruit Bunch Biomass Project 72,380 Jenderata Steam & Power Plant 15,888 Methane Recovery in Wastewater Treatment, Project AMA07- W-01, Perak, Malaysia Landfill Gas Recovery and Utilization at Bukit Tagar Sanitary Landfill, Hulu Selangor in Malaysia Bintulu Combined-Cycle Project STG-Unit No,9 Tanjung Kindurong, Bintulu, Sarawak 14,417 155,107 390,909 CER issued projects (continued) Project Name CERs Issued (tco2 eq) AMA08-W-24, Methane Recovery in Wastewater Treatment, Pahang, Malaysia AMA08-W-25, Methane Recovery in Wastewater Treatment, Pahang, Malaysia Methane Capture and On-site Power Generation Project at Syarikat CahayaMuda Perak (Oil Mill) Sdn. Bhd. in Tapah, Perak, Malaysia 7,583 7,349 14,102 Mensilin Holding Biomass Energy Power Plant 12,523 AMA08-W-23, Methane Recovery in Wastewater Treatment, Sarawak, Malaysia AMA08-W-10, Methane Recovery in Wastewater Treatment, Kedah, Malaysia 14,749 11,445 Kuantan Jabor-Jerangau Integrated Landfill Management 4,582

CER issued projects (continued) Project Name CERs Issued (tco2 eq) AMA08-W-21, Methane Recovery in Wastewater Treatment, Johor, Malaysia AMA08-W-22, Methane Recovery in Wastewater Treatment, Johor, Malaysia 28,320 16,437 Landfill Gas Utilization at Seelong Sanitary Landfill, Malaysia 2,597 Taman Beringin Integrated Landfill Management Project, Kuala 8,041 Lumpur, Malaysia Seguntor Bioenergy 11.5MW EFB Power Plant 99,757 Kina Biopower 11.5MW EFB Power Plant 85,296 MY08-WWP-26, Methane Recovery in Wastewater Treatment, Pahang, Malaysia Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak 46,613 10,419 CER issued projects (continued) Project Name CERs Issued (tco2 eq) Biomass Thermal Energy Plant- Hartalega Sdn. Bhd, Malaysia Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia 181,300 93,360 Sungai Kerling Hydropower Plant 8,372 Total 2,940,464