The following requirements shall supplement the Standard Specifications:

Similar documents
C. Foundation stabilization for pipe and utility structures.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

SECTION ASPHALT CONCRETE

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

PUBLIC WORKS DEPARTMENT GENERAL NOTES

SECTION TRENCHING & BACKFILLING

Section Safety Section Cleanup. None Required

SAFEGUARDS DURING CONSTRUCTION

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

Chapter 3: Permit Procedures and Requirements

COUNTY OF SUTTER ENCROACHMENT PERMIT

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

The University of Alabama General Requirements for Purchase Orders Involving Public Works

Construction Specification for General Excavation

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

Table Related Arlington County Standards, Specification and Policies

SECTION GENERAL EXCAVATION

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

SECTION UNCLASSIFIED EXCAVATION AND GRADING

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

SECTION 10 - TRENCHING AND BACKFILLING

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION TRAFFIC REGULATIONS

APPLICATION FOR RIGHT OF WAY PERMIT

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

SECTION EARTHWORK

Union County Vocational - Technical Schools Scotch Plains, New Jersey

CONSTRUCTION SPECIFICATION

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SECTION TEMPORARY FACILITIES AND CONTROLS

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

SHOP DRAWINGS SHALL INCLUDE A COMPLETE BILL OF MATERIALS FOR ALL REINFORCING STEEL, WHICH IS REFERENCED TO THE

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

Water Pollution Control for Work in Sensitive Areas

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2)

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE TABLE OF CONTENTS

SECTION EXCAVATION AND FILL

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

914. "I-1", LIGHT INDUSTRIAL DISTRICT

SECTION TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

GUELPH WATER RECLAMATION HEALTH, SAFETY AND SECTION GUELPH, ON. EMERGENCY PROCEDURES PAGE 1 PROJECT NO

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals.

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

SECTION EXCAVATION AND FILL

DOCUMENT ADDENDA AND MODIFICATIONS

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

Housekeeping Program. 29 CFR Housekeeping, and 29 CFR Fire Prevention.

Excavation Safety Program

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

SECTION TRENCH EXCAVATION AND BACKFILL

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

DIVISION 4100 SITEWORK

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CITY OF MILTON CONSTRUCTION NOTES

.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION 1 GENERAL NOTES

SECTION PORTLAND CEMENT CONCRETE

5/9/ Florida Building Code, Existing Building. Chapters Approved Course Title 2010 Existing Building Code Chapters

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

CHAPTER 3 EXCAVATIONS

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application

Application for Right of Way Permit

Re: Erosion Control Report and Drawings Requirements Accompanying Document

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

APPENDIX A DESIGN SPECIFICATIONS FOR NEW ROAD CONSTRUCTION

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

STREET ADDRESS OF EVENT: Description of Event:

Transcription:

Page 1 of 5 DESIGN STANDARDS FOR: GENERAL CONSTRUCTION REQUIREMENTS This design narrative contains general requirements that must be followed by contractors/developers. This section includes a general overview only. The contractor/developer is responsible for adhering to all required local, State, and Federal laws. The contractor/developer shall attend a preconstruction meeting with the park project manager or designated representative prior to starting work. The Washington State Department of Transportation Standard Specifications for Road, Bridge, and Municipal Construction, latest edition, herein after referred to as the "Standard Specifications," shall govern all aspects of construction, unless superseded in writing by special provisions issued by the City of Bellingham Parks Department. The following requirements shall supplement the Standard Specifications: A. UTILITIES 1. Provide employees with all accommodations required by the State Department of Health and other agencies. These accommodations shall be kept clean, neat, and sanitized, and shall not create any public nuisance. 2. Keep all areas clean, properly dispose of all refuse, and leave each site in a neat and sanitary condition. 3. Provide temporary portable fire extinguishers for project as required by code. 4. Provide and install temporary exit signs, as needed, to ensure a clear direction for emergency exit travel in occupied areas adjacent to the construction project. 5. Outdoor storage and staging operations may not impede egress, restrict fire fighting access, or present a fire exposure to existing buildings. 6. Notify Park s Representative in writing, on each occasion, of the intent to work near existing underground utility services or structures or when a new excavation operation is about to begin. Submit procedure for approval to assure safe and continuous operation of the services. 7. In the event utilities are damaged during construction, temporary services and/or repairs must be made immediately to maintain continuity of services at Contractor/developer s expense. B. TEMPORARY FACILITIES 1. The types of temporary support facilities required may include field offices, storage sheds, sanitary facilities, drinking water, first aid facilities, bulletin board, telephones, clocks, thermometer, project identification signs, clean up facilities, waste disposal service, and similar

Page 2 of 5 miscellaneous general services, all as may be reasonably required for proficient performance of the Work and accommodation of personnel at the site including Park s personnel. 2. Locate temporary support facilities for convenience of users, and for minimum interference with construction activities. All placements shall be subject to review and approval by the Park s Representative. 3. Before project completion, remove all temporary facilities, such as water lines, gas lines, electric conduit and transformers, shoring and crane base, etc. unless indicated otherwise agreed to in writing by the Parks Project Manager. Restore site to original or new conditions, patching and filling as required to match adjacent surfaces. 4. Keep temporary services and facilities clean and neat in appearance. Operate in a safe and efficient manner. 5. Take necessary fire prevention measures. Do not overload facilities, or permit them to interfere with progress. Do not allow hazardous, dangerous or unsanitary conditions, or public nuisances to develop or persist on the site. 6. Coordinate the need and pay for all electrical power and service with the local public utility. 7. Provide and maintain security lighting as appropriate to provide general illumination of work area during nighttime hours. Provide general illumination of work area for all trades. 8. Unless otherwise agreed to in writing by the Parks Project Manager, all water shall be furnished by the contractor/developer. The contractor/developer shall pay all costs of temporary piping, including pressure reducing station, double backflow preventer, removal of piping and restoration of Park s utilities at the completion of the Work. 9. Contractor/Developer to provide self-contained, single-occupant toilet units of the chemical, aerated circulation, or combustion type, properly vented and fully enclosed with a glass fiber reinforced polyester shell or similar nonabsorbent material. 10. Contractor/Developer shall carry a cellular phone at all times while at the project site. Phone service will not be provided. C. TEMPORARY ENCLOSURES 1. Barriers, Safety Guards, and Warnings: Provide for public protection as required by law and ordinance. 2. Keep streets and walks clean and free from obstructions. 3. Provide temporary enclosures to protect Work. Furnish, install, and maintain for the duration of construction all required tarpaulins, barricades, barriers, canopies, warning signs, steps, bridges, platforms, and other temporary construction necessary for proper completion of the Work. Maintain in compliance with all pertinent safety and other regulations. 4. Protect Work, stored products, and construction equipment from theft and vandalism, and protect premises from entry by unauthorized persons. No barbed wire permitted.

D. PARKING Page 3 of 5 1. Parking shall be provided on site to the greatest extent possible. Advise construction workers not to park in neighboring residential areas or in public parking areas. 2. Contractor/developer shall be responsible for obtaining meter hood and paying for all city metered parking spaces. E. WORK AREA 1. Confine operations and storage to the designated work area. 2. Maintain the work area and site in a clean and orderly manner. 3. Conduct operations in a manner that is fire-safe for the work area and adjacent areas. 4. The local fire code is incorporated herein by reference; adhere to all applicable provisions as determined by the local fire department. 5. Dispose of all refuse and waste material off Park s property. 6. Do not stockpile waste material on Park property. 7. Immediately clean up any spilled material. 8. Clean all trash and debris from work area daily. 9. Provide on-site containers for collection of waste materials, debris, and rubbish. Coordinate dumpster location with Park s Representative. 10. Do not use Park s waste containers for construction waste. 11. Dispose of all flammable, hazardous, and toxic waste materials daily. Storage of these materials will not be permitted on site. F. UTILITY LOCATIONS, MARKINGS, CONDUITS & SLEEVES 1. Call for utility locates. 2. Employ and pay for a locator service to locate and mark utilities in addition to the "DIAL DIG" service. 3. Before backfilling over any utilities, provide utility locater tape over all uncovered utilities. 4. Provide conduit sleeves of sufficient size under new pavements as directed by Parks Project Manager. G. SITE CLEARING 1. Limit use of premises to work in areas indicated. 2. Do not disturb portions of site beyond areas in which the Work is indicated. 3. Contact Park Representative 72 hours in advance of clearing activities for approval of site clearing limits. 4. Install tree protection in accordance with design standards and as directed by Park s Representative.

H. EARTHWORK Page 4 of 5 1. Call Park s Representative 48 hours (two working days) prior to beginning construction. 2. Comply with all WSDOT Standard Specifications 3. Stockpile materials on site within clearing limits and at locations approved by Park s Representative. Stockpile material on 6 mil plastic and cover nightly. Protect from weather if not being used. 4. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. 5. Remove stockpile and leave area in a clean and neat condition. 6. Grade site surface to prevent freestanding surface water. 7. Maintain toe of material at least 6 feet from edges of trenches and excavations. Pile so surface water is prevented from flowing into excavations. 8. Provide free access to fire hydrants, water valves, meters; private driveways; and leave clearance to enable the free flow of storm water in gutters, conduits, and natural watercourses. 9. Verify excavation will not undermine footings or supports and cause damage to structures. 10. Protect plant life, lawns, and other features remaining as a portion of final landscaping or interim erosion control. 11. Protect benchmarks, property corners, horizontal control, existing structures, sidewalks, railings, paving, and curbs. 12. Protect pavement or paved areas intended to remain from damage. 13. Identify existing improvements to be salvaged for Park s Representative. 14. Notify Park s Representative where existing grades to be matched creates an adverse affect, such as blocking grading, abrupt change in grade, slopes steeper than allowed, and grades not conforming with ADA. 15. Where subgrade soils are loose, remove to solid bearing and replace material in compacted lifts. 16. Grade areas adjacent to building and structures in a manner that provides positive drainage away from structures and prevents ponding of water at building or structure. 17. Do not fill over ponded surface water or existing subgrade surfaces that are yielding, disturbed, or softened. 18. Suspend placing fill when the climatic conditions will not allow specified placement and fill compaction. 19. Protect exposed site material and subgrade from damage due to excess moisture and trafficking. 20. Dispose of waste, surplus, and unsuitable materials according to laws, regulations, and ordinances off site at a site obtained by Contractor.

I. EROSION CONTROL Page 5 of 5 1. Erosion control shall consist of planning, installing, inspecting, maintaining, and removing temporary erosion and sediment control Best Management Practices (BMPs) as shown on the drawings or as ordered by Park s Representative to prevent pollution of air and water, and control, respond to, and dispose of eroded sediment and turbid water during the life of the project. 2. In the event of conflict between these requirements and pollution control laws, rules, or regulations of other Federal, state, or local agencies, the more restrictive laws, rules, or regulations shall apply. 3. Coordinate stormwater requirements with City of Bellingham Stormwater Utility Engineer. 4. Develop and submit a Contractor s Erosion and Sediment Control Plan (CESCP) 5. Use all means necessary to prevent the erosion of freshly graded areas during construction or until such time that permanent drainage and erosion control measures are fully operational. 6. Install, maintain, and remove all erosion prevention, containment, and countermeasures BMPs during the life of the project. 7. Contain, cleanup and dispose of all sediment, turbid water, and water that does not meet ph water quality standards. 8. The Contractor/developer shall be solely responsible for any damages, fines, levies, or judgments incurred as a result of Contractor, subcontractor, or supplier negligence in complying with the requirements of this section. 9. In the event that temporary erosion and pollution control measures are required due to the Contractor s negligence, carelessness, or failure to install permanent controls as a part of the work as scheduled or are ordered by Park s Representative, such work shall be performed by the Contractor at his/her own expense. 10. In the event that areas adjacent to the work area are suffering degradation due to erosion, sediment deposit, water flows, water with elevated ph above allowable state standards, or other causes, Park s Representative may stop construction activities until the situation is rectified. 11. Before leaving project site, all trucks and equipment shall be inspected for mud and debris. 12. If mud or debris is tracked from the site it shall be cleaned up immediately. 13. All mud and debris shall be removed by vacuum sweeper. The Contractor shall have sufficient working vacuum sweepers on site at all times work is being performed. All sweepers shall have on-board water spray systems that shall be operating at all times. END OF SECTION