Graphs as required by 46 CFR (b)(3) Curve of Loading Rate vs. Pressure Drop

Similar documents
MSC Guidelines for the Review of Inland Tank Barge Cargo Authority

MSC Guidelines for the Review of Oceangoing Tank Barge Cargo Authority Procedure Number: C1-42 Revision Date: March 16, 2012


MSC Guidelines for Review of Oceangoing Tank Barge Cargo Authority Procedure Number: C1-42 Revision Date: 08/01/2018

PRE-FIRE PLAN CERTIFICATION

United States of America Department of Homeland Security United States Coast Guard Certificate of Inspection

a. Each land-based portable or mobile element of a marine vapor control system that connects to or from a vessel.

CHEMICAL TANK VESSEL INFORMATION SHEET (CTVIS)

MSC Guidelines for Review of Ventilation System Plans

Maritime Energy Transport Regulatory Overview and Status

MSC Guidelines for Design Verification Test Procedures Procedure Number: E2-05 Revision Date: 11/09/2011

Revised Ship Inspection Report (SIRE) Programme

MSC Guidelines for Review of IMO High-Speed Craft Code General Arrangements, Structural Fire Protection, and Means of Escape

SECTION B PLAN SUBMITTAL

" v w x 2 II I I 2

DECLARATION OF INSPECTION

Why require the submission of documentation of the initial audit and one full audit cycle when the TSMS certificate verifies TSMS compliance?

Revised Ship Inspection Report (SIRE) Programme

Pre-Publication Draft - September 21, 2016 APD MARINE LOADING COLLECTION EFFICIENCY GUIDANCE

National Maritime Center

Revised Ship Inspection Report (SIRE) Programme

GUIDANCE RELATED TO VESSELS AND WATERFRONT FACILITIES CONDUCTING LIQUEFIED NATURAL GAS (LNG) MARINE FUEL TRANSFER (BUNKERING) OPERATIONS

U. S. Coast Guard Sector

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS

NAVIGATION AND VESSEL INSPECTION CIRCULAR NO BACKGROUND.

Officer in Charge, Marine Inspection Eighth District Outer Continental Shelf

Dry Cargo Residue (DCR) April 2016

DEPARTMENT OF TRANSPORTATION UNITED STATES COAST GUARD

From the desk of G. A. Aaker, Jr., PE.

Title V. Model General Permit Template SERIES 2 LOADING RACKS. Template # SJV-LR-2-1

LNG BUNKER CHECKLIST PORT OF ENERGY IN GOTHENBURG SHIP TO SHIP

SPECIFICATION FOR 20,000 GALLON LIQUID NITROGEN STORAGE TANK D-ZERO PROJECT FERMILAB G. T. MULHOLLAND G. STEPANEK

MARINE SAFETY INFORMATION BULLETIN

MSC Guidelines for Review of Structural Plans for Wooden Vessels

The following definitions apply with regard to requirements specified in this document:

Chemical tanker claims

Marine Vapor Recovery with a Twist

Detachment Chief United States Coast Guard Liquefied Gas Carrier National Center of Expertise

Using the appropriate abbreviation in the boxes below, and indicate ONLY the the manifold connection(s) expected to be KMLT: MANIFOLD

THE REPUBLIC OF LIBERIA Bureau Of Maritime Affairs

Ship Structure Committee Case Study

Tanks built under these specifications shall meet the requirements of and

SECTION CONCRETE ABOVE GROUND FUEL STORAGE

Template Document for the Interim Final Rule 33 CFR

16715 CG-OES Policy Letter No

OIL RECORD BOOK INSTRUCTIONS

Recommendations For Reporting Mobile Refueling Vehicles & Portable Trailer-Mounted Generators At Fixed Facilities

OMMONWEALTH OF DOINICA MARITIME ADMINISTRATION OIL RECORD BOOK

4.0 PLACARDING STUDENT WORKBOOK

RULE GASOLINE AND ROC LIQUID STORAGE TANK DEGASSING OPERATIONS (Adopted 11/8/94)

NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 3-94

June 18, Via Electronic Mail

CONVERSION OF SPECIFIC GRAVITY TO SALINITY FOR BALLAST WATER REGULATORY MANAGEMENT

DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM

Meeting of April 25 th, 2016 Tampa, FL

e-cfr Data is current as of October 16, 2017

Customers: Terminal / Port : Type of Operation: Completion Date:

B Contractor License GUIDE FOR ASSESSMENT TEAMS & APPLICANTS

EPA Issues General Permit for Vessels

Safety Standards for LNG Fueled Vessels

FACILITY RESPONSE PLAN REVIEW CHECKLIST

WORK & RECORD BOOK RATING FORMING PART OF AN ENGINEERING WATCH CANDIDATE S NAME USCG POLICY STCW CODES MSC PROGRAM CANDIDATE S

ARTICLE IV CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

QUALITY ASSURANCE PROTOCOL (QAP)

National Maritime Center

vapor control systems Quality, Dependability, Service. Reputation Built on Valve Concepts, Inc. com A Cashco, Inc.

CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II

U. S. Coast Guard Sector

Cargo Handling Sheet. Neodene 6. Document Date: 22 December 2017 Revision 8

Regulation 23, Exclusive Economic Zone and Continental Shelf (Environmental Effects Discharge and Dumping) Regulations 2015

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc.

Cargo Handling Sheet Neodene 6 Document Date: 01 April 2018 Revision 9 Cargo Handling Sheets are for the use of vessels chartered by Shel Chemicals

RULE PHARMACEUTICAL AND COSMETIC MANUFACTURING OPERATIONS (Effective 10/18/88: Rev. Adopted & Effective 5/15/96)

CRYOGENIC FLUIDS CHAPTER 32

CRYOGENIC FLUIDS CHAPTER 32

VAPOR CONTROL SYSTEMS QUALITY, DEPENDABILITY, SERVICE. REPUTATION BUILT ON. Valve Concepts, Inc. www.

Subpart G Emergency Response Information

RE: AFIN: Permit Tracking No.: 0487-WG-SW-1

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (SIXTH REVISION)

X Regular Inspection Re-inspect: When Necessary Re-inspection Permit Number: 0252-WG-SW-1. Field: Smackover County: Ouachita Basin: Ouachita

vapor control systems Quality, Dependability, Service. Reputation Built on Valve Concepts, Inc. com A Cashco, Inc.

RULE CRUDE OIL STORAGE TANK DEGASSING OPERATIONS (Adopted 11/8/94) b. Has a storage capacity greater than 2,000 barrels.

MOBILE OFFSHORE UNITS

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR )

Subj: CH-2 to 03-03, IMPLEMENTATION GUIDANCE FOR THE REGULATIONS MANDATED BY THE MARITIME TRANSPORTATION SECURITY ACT OF 2002 (MTSA) FOR FACILITIES

Subj: CH-2 to 03-03, IMPLEMENTATION GUIDANCE FOR THE REGULATIONS MANDATED BY THE MARITIME TRANSPORTATION SECURITY ACT OF 2002 (MTSA) FOR FACILITIES

July 10, Cynthia Wade J-LU Ltd. Co. 1 Palm Dr. Texarkana, TX 75503

This document is a preview generated by EVS

PHMSA = Pipelines and Hazardous. RITA = Research and Innovative Technologies Administration

Final Approval to Operate Gasoline Dispensing Facility with Two-Point Stage I and Balance Style Stage II Vapor Recovery Systems - 63rct Market Place

ShipRight Notice for. Linked Supporting Services Anti-Corrosion System Notation, July Issue date: September 2014

REVISED LIST OF CERTIFICATES AND DOCUMENTS REQUIRED TO BE CARRIED ON BOARD SHIPS

Calculate the Costs of Piping System Elements

HAZARDOUS WASTE STORAGE, LESS THAN 90 DAY SITE LEACHATE SUMP AT RUSSELL ROAD LANDFILL

BOW OR STERN LOADING AND UNLOADING (BLU or SLU) FOR OIL CARRIERS, LIQUEFIED GAS CARRIERS OR CHEMICAL CARRIERS

December 21, Dear Mr. Hanson

National Academy of Sciences

Commonwealth of Dominica. Office of the Maritime Administrator

FMB15678 Steel Deck Cargo Barge

Transcription:

Graphs as required by 46 CFR 39.30-1(b)(3) Curve of Loading Rate vs. Pressure Drop Conrad Orange Shipyard Hulls H483, H484 * Pressure Drop in VCS (psig) 1.00 0.95 0.90 0.85 0.80 0.75 0.70 0.65 0.60 0.55 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 Pentane (all isomers) 0.44 lb/ft^3 Gasolines: Automotive 0.24 lb/ft^3 PTY Max Filling Rate GAT Max Filling Rate 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 Maximum Total Liquid Transfer Rate (bbl/hr) Ref: 46 CFR 39.30-1(b)(3) 4.50 Curve of Allowable Back Pressure at Facility Connection Conrad Orange Shipyard Hulls H483, H484 Maximum Back Pressure at Facility Vapor Connection (psig) 4.40 4.30 4.20 4.10 4.00 3.90 3.80 3.70 3.60 3.50 Pentane (all isomers) 0.44 lb/ft^3 Gasolines: Automotive 0.24 lb/ft^3 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 Maximum Liquid Transfer Rate (bbl/hr) PTY Max Filling Rate GAT Max Filling Rate Ref: 46 CFR 39.30-1(b)(3) 14 of 16

Commanding Officer United States Coast Guard Marine Safety Center US Coast Guard Stop 7410 4200 Wilson Blvd., Ste 400 Arlington, VA 20598-7410 Staff Symbol: MSC-3 Phone: (703) 872-6731 Email: msc@uscg.mil 16710/P019275 Guarino & Cox, LLC Attn: Mr. Ryan Ingerick 19399 Helenbirg Road; Suite 203 Covington, LA 70433 Email: r.ingerick@guarino-cox.com 200 x 35 x 12-6 Unmanned Double Hull Type I/II/III Tank Barges (D/O) Grade A (max. 25 psia Reid) and Lower Flammable or Combustible Liquids Identified in 46 CFR Table 30.25-1 or 46 CFR Part 153 Table 2 and Specified Hazardous Cargoes Design Density 8.7 lbs/gal; Maximum Density (slack load) 12.91 lbs/gal Rivers; Lakes, Bays, and Sounds; Limited Coastwise on unmanned fair weather voyages only, not more than 12 miles offshore between St. Marks and Carrabelle, Florida Ref: (a) Conrad Industries Co., Dwg. No. H-483-P5, Rev. No. 3, Vapor Recovery Piping Arrgt., Sheet 1 of 2, dated November 24, 2014 (b) Conrad Industries Co., Dwg. No. H-483-P5, Rev. No. 2, Vapor Recovery Piping Arrgt., Sheet 2 of 2, dated December 10, 2014 (c) Guarino & Cox, LLC, Vapor Control System Calculations, Rev. No. 0, dated November 3, 2014 Dear Mr. Ingerick: In response to your emails dated November 12, 2014 and December 17, 2014 (MSC Document Nos. 1418822 and 1419768) we have reviewed the vapor collection system (VCS) piping plan and the vapor control pressure drop calculations for compliance with 46 CFR Part 39, excluding Subpart 39.4000. The VCS piping plan, references (a) and (b), are Approved. The installation, workmanship and testing shall be to the satisfaction of the cognizant Officer in Charge, Marine Inspection (OCMI). The pressure drop calculations, reference (c), are Examined. Calculations and plans such as these are not normally marked approved, but are used to verify that the system meets the applicable regulations. The following comments apply; those that require action must be addressed to the satisfaction of the OCMI: 1. Based on your calculations, this VCS is capable of recovering vapors of the cargoes listed in enclosure (1) at a maximum vapor-air mixture density of 0.436 lbm/ft 3, at a maximum liquid load rate of 5,000 bbl/hr for Pentane (CHRIS Code = PTY) and Pentene (CHRIS Code = PTX) and 5,500 bbl/hr for all other cargoes, and a maximum liquid discharge rate of 4,500 bbl/hr.

16710/P019275 2. In accordance with reference (b), the set-point of the overfill shutdown system shall be no higher than 6 inches (0.5 feet) below the tank top of each cargo tank at centerline. 3. The oil transfer procedures shall include a table or graph showing the liquid transfer rate versus the pressure drop, as required by 46 CFR 39.3001(c)(4). This information must be taken from the calculations, tables, and graphs contained within reference (c). 4. The tanks share a common vent header, which would allow mixing of various vapors and liquid cargoes. Note this configuration restricts the types of cargoes that can be carried simultaneously. 5. Enclosure (1) contains VCS Category 2, 4, and/or 7 cargoes. Polymerization and residue build-up of these cargoes can adversely affect the operation of the vapor collection system. The barge s owner must develop a method for internal visual inspection to verify that fouling of VCS components is not occurring. In addition, vessel owner must test the Pressurevacuum valves and spill valves prior to each transfer, and ensure vapor piping systems and valves are inspected annually in accordance with 46 CFR 39.2014. 6. Vapor collection hoses carried aboard the vessel, if any, must be designed and marked in accordance with the requirements of 46 CFR 39.2001(h). Equipment used for handling vapor collection hoses must be designed to preclude kinking or collapse of the hose as required in 46 CFR 39.2001(l); hose saddles may be acceptable for complying with this requirement. 7. Several of the cargoes listed in the Vapor Control System Calculations, reference (c), have not been evaluated by the Coast Guard for vapor collection. Because the properties of these cargoes have not been evaluated, the cargoes are not authorized for vapor collection and will not appear on the vessels list of authorized cargoes. If the vessel is required to collect the vapors of a cargo which has not been evaluated for vapor collection you must submit to the Commandant (CG-ENG-5) a written request to have the cargo evaluated as prescribed by 46 CFR 39.1000. 8. In conjunction with this review, we have generated the subject vessel s cargo authority based on the Tank Group Characteristics Loading Form included with your submission. The 46 CFR 151 Cargo List is attached as enclosure (2). 9. At the time of this review, the vessels names and official numbers were not available. Once you provide vessel names and official numbers to this office, the Cargo Authority Attachment (CAA) for each vessel will be made available in the Coast Guard s Marine Information for Safety and Law Enforcement (MISLE) database. The CAA will contain the cargoes found in enclosures (1) and (2). Please note that only the cognizant OCMI can issue a vessel s CAA, which is valid only when referenced by and attached to a valid Certificate of Inspection (COI). The OCMI will verify the carriage authority and vapor control tank group 2

16710/P019275 characteristics we used to create enclosures (1) and (2) are consistent with the vessel s actual construction. Enclosure (3) contains the VCS tank group characteristics and our recommended COI endorsement. As a condition of your participation in MSC s electronic commerce program, you must provide a copy of the approved drawings to the OCMI, along with a copy of the corresponding MSC approval letter. Our Project Number for this vessel is P019275. Please ensure that future correspondence includes the Project Number, and either the Coast Guard (CG) number that appears in the subject line or the Official Number of each barge once assigned. To avoid confusion, the vessel owners are encouraged to provide the CG number to the National Vessel Documentation Center when applying for documentation. If you have any questions concerning our review, please contact Lieutenant Ryan Mowbray at the number listed above. Sincerely, R. C. BECKMANN Lieutenant, U. S. Coast Guard Chief, Vessel and Cargo Branch By direction Encl: (1) Vapor Collection System List of Cargoes; Conrad Orange Shipyard Hulls H-483 & H-484; dated (2) 46 CFR Part 151 Cargo List, Conrad Orange Shipyard Hulls H-483 & H-484; dated (3) VCS PRIS; Conrad Orange Shipyard Hulls H-483 & H-484; dated Copy: Commanding Officer, Coast Guard Marine Safety Unit Port Arthur 3

Marine Safety Center Vapor Control System (VCS) Plan Review Information Sheet (PRIS) Vessel Name New Construction Shipyard Conrad Orange Official Number CG1323256, CG1323257 Hull Number H-483, H-484 1. This sheet consolidates critical VCS parameters for MSC Staff Engineers and CG Field Inspectors dealing with Vapor Control Systems. CG Inspectors should verify the vessel's VCS design is consistent with the information listed in boxes 2, 6, 7 & 8 prior to updating the vapor control endorsement on the vessel's Certificate of Inspection. For cases where the information in the VCS PRIS does not reflect the vessel's design the CG Inspector should contact the MSC's Cargo Authority branch. 2. Tank Maximum Design Working Pressure 6.00 psig Raised Trunk Flush Deck X 3. Authorized Maximum Cargo Transfer Rate(s) 5,000 5,500 4,500 bbl/hr loading (Pentane & Pentene) bbl/hr loading (All other Apv'd Cargoes) bbl/hr discharging 4. Authorized Maximum Vapor-Air Mixture Density 0.436 lbm/ft 3 5. Authorized VCS Categories 1 through 5 6. Cargoes with the highest vapor density and/or pressure drop: a. Cargo Name ISO-PENTANE b. Cargo Name ISO-PENTANE 7. Pressure Vacuum Valve: 8. VCS Pipe Sizes: Manufacturer ERL Settings in psig: Approx. Inside Diameter Size Superac 6" PV II Pressure-side 5.5 Longitudinal Header (inches) 8 CG Approval 162.017/167/4 Vacuum-side 0.5 Transverse Header (Inches) 8 Required Venting Capacity of Pressure-Side of P/V valve Required Venting Capacity of Vacuum-Side of P/V valve 14732 5500 bbl/hr (air) bbl/hr (air) 9. Tank Overfill Protection System (check appropriate box or boxes) a. High Level/Tank Overfill Alarm X Type ERL Level Alert II b. Overfill Control Shutdown X Type ERL Level Alert II Setting in psig c. Spill Valve Type N/A Meets ASTM F1271 N/A d. Rupture Disk Type N/A 10. Closed Gauging Verify the vessel has closed gauging that satisfies 46 CFR 39.20-3 and 151.15-10(c). 11. Instructions/Guidelines for the OCMI: 11a. The following is the Marine Safety Center's recommended COI endorsement: In accordance with 46 CFR Part 39, excluding part 39.4000, this vessel's vapor collection system has been inspected to the plans approved by MSC letter C1-1500200 dated, and has been found acceptable for the collection of bulk liquid cargo vapors annotated with "Yes" in the CAA s VCS column of the vessel s Cargo Authority Attachment. The VCS system has been approved with a pressure side 5.5 psig P/V valve with Coast Guard Approval 162.017/167/4. The cargo tank top is suitable for a maximum allowable working pressure (MAWP) of 6 psi. When the vessel is carrying cargoes containing greater than 0.5% benzene, the person in charge is responsible for ensuring the provisions of 46 US Code of Federal Regulations Part 197, Subpart C are applied. 11b. The MSC approval letter/s must be available at the OCMI's request. 11c. Verify isolation valve at the vapor connection flange is manually operable and designed in a way it is "clearly" open or closed. 11d. Previous applicable approval letters: VCS Approval Letter MSC Letter C1-1500200 dated MSC Plan Reviewer LT R. W. Mowbray