CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

Similar documents
SINGLE FAMILY RESIDENCE COMMON PLAN of DEVELOPMENT or SALE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) For Construction Activities At:

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia Tel.

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Common Plan SWPPP for

Appendix A: SWPPP Template Instructions

Stormwater Pollution Prevention Plan Engineering Department Requirements

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Erosion Control Inspection Form

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

Suggested Best Management Practices (BMPs)

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

City of Glendale Stormwater Management Plan Checklist

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

DIVISION of WATER QUALITY NDPDES PROGRAM

4.0 Material and Waste Controls

SUDAS Revision Submittal Form

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

Stormwater Pollution Prevention Best Management Practices (BMP s)

3/1/2013. Minnesota Erosion Control Association. St. Cloud, Minnesota. (March 8, 2013) While the permit must meet the requirements

Single Family Residential Construction Erosion/Sediment Control Standards

Outdoor Equipment Operations SC-32

City of Waukegan, Illinois

Building Better Storm Water Quality

Division of Water Quality (701)

STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

October 2016 CDRPC Workshop

Blue Book Update Overview

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

Paving and Grinding Operations

Water Pollution Control for Work in Sensitive Areas

Good Housekeeping and Employee Training

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index.

Building & Grounds Maintenance

STORMWATER POLLUTION PREVENTION PLAN

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

Home Remodeling Projects

Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Stormwater Pollution Prevention Training Arlington Public Schools August 8, 2014

SECTION STORMWATER POLLUTION PREVENTION

POLLUTION PREVENTION TEAM MEMBER ROSTER. Leader: Members: (1) Title: Worksheet #1 Completed by: Title: Date: Title: Office Phone: Responsibilities:

Storm Water Pollution Prevention Plan (SWP3) Checklist

Performance Standards Compliance Checklist

Construction Storm Water 2013 Update for NPDES Permit #OHC000004

FF-8 MINOR CONSTRUCTION

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites

Shelbyville, KY Stormwater Best Management Practices

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Large Construction Sites

EROSION CONTROL AND GRADING PERMIT APPLICATION

LAND DISTURBANCE PERMIT

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

Construction Phasing Bad

Appendix O Example Industrial SWPPP Template

Construction Site Inspections

Regulatory Requirements

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

Hazardous Waste Management

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Checklist Stormwater Pollution Prevention Plan (SWPPP)

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT

Material Delivery and Storage

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

Outdoor Storage of Materials

STORMWATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITY

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

Preventing Storm Water Pollution: What We Can Do. ~Fleet Maintenance~

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Stormwater Outreach for Regional Municipalities (STORM) Overview. Maintaining an Updated SWPPP Site Map Required Elements Good Examples Bad Examples

Common Plan of Development Storm Water Pollution Prevention Plan for: Operator(s):

SWPPP Checklist. Project Name: Review Date(s): Reviewer(s): Project Type: Subdivision. Site Plan City Project

SWPPP Inspection Procedures and Form 247 Instructions

Escondido Best Management Practices (BMP s)

Material Delivery and Storage

Radford University MS4 Staff Training. - Good Housekeeping/Pollution Prevention - Illicit Discharge Detection & Elimination

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

AMERICAN FORK CITY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION

Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping

Busch Gardens Tampa BGT 2016 Attraction. Construction Surface Water Management Plan CSWMP Stormwater Discharge From Construction Activity

WATER POLLUTION AND EROSION CONTROL NOTES:

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

CHAPTER 6 - How to Prepare a SWPPP

Nevada Department of Transportation (NDOT)

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS

Storm Water Pollution Prevention Plan (SWPPP) for Small Construction Sites

Storm Water Pollution Prevention Plan for CES Gravel #3800

Arlington s New Stormwater Management Ordinance. Informational Meeting May 28, 2014

Transcription:

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY Activities Information: Project Site Name: Location & Address: City, State, Zip: Latitude: ' " N (degrees, minutes, seconds) Longitude: ' " W (degrees, minutes, seconds) Operator Information: Company/Organization Name: Contact Name: Address: City: State: Zip Code: Phone Number: Email: 24-hour Emergency Contact Name: 24-hour Emergency Phone #: SWPPP Preparation : CERTIFICATION "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Operator Name (print): Title: Signature: :

1.0 SWPPP Documents Located On-Site & Available for Review SWPPP Document Type Located On-Site & Available for Review? Registration Statement Yes Notice of Coverage Letter Yes General Permit (CGP) Yes Site Plan Yes Erosion & Sediment Control Plan (or agreement in lieu of) Yes Stormwater Management Plan (if applicable) Yes 2.0 Authorized Non-Stormwater Discharges SWPPP Document Type Likely Present at Your Project Site? External buildings wash down Yes No Uncontaminated foundation or footing drains Yes No Uncontaminated excavation dewatering Yes No Landscape irrigation Yes No Others (describe) Yes No 3.0 Pollution Prevention Awareness Employees will be given a "walk through" of the site identifying areas of possible pollution and will be shown Erosion and Sediment Controls and Pollution Prevention Practices (identified in Sections 4.0 and 5.0 of this SWPPP) that are applicable to their assigned job duties. A refresher meeting and "walk through" will be conducted on an as needed basis. 4.0 Erosion & Sediment Controls Select all that apply Erosion & Sediment Control Entrance (Std. & Spec. 3.02) Silt Fence (Std. & Spec. 3.05) Culvert Inlet Protection (Std. & Spec. 3.08) Outlet Protection (Std. & Spec. 3.18) Temporary Seeding (Std. & Spec. 3.31) Permanent Seeding (Std. & Spec. 3.32) Sodding (Std. & Spec. 3.33) Mulching (Std. & Spec. 3.35) Others (describe) Estimated Installation As required by. 3.31 Estimated Removal Responsible Party Operator (See Cover Page of this SWPPP) July 1, 2014 Page 2 of 7

5.0 Potential Sources of Pollution & Pollution Prevention Practices Pollutant Generating Likely Present at your Project Site? Sediment Nutrients Heavy Metals ph (acids and bases) Pesticides & Herbicides Oil & Grease Bacteria & Viruses Trash, Debris, Solids Other Toxic Chemicals Pollution Prevention Practice Responsible Party Clearing, grading, excavating, and unstabilized areas Yes No X X (1) Paving Operations Yes No X X X (2) Concrete washout and cement waste Yes No X X X (3) Structure construction, stucco, painting and cleaning Yes No X X X X (4) Dewatering operations Yes No X X X (5) Material delivery and storage Material use during building process Yes No X X X X X X X (6) Yes No X X X X X X (7) Operator (see Cover Page of this SWPPP) Solid waste disposal Yes No X X (8) Sanitary waste Yes No X X X (9) Landscaping operations Yes No X X X X X (10) Others (describe) Yes No [X] [X] [X] [X] [X] [X] [X] [X] [X] (11) July 1, 2014 Page 3 of 7

Pollution Prevention Practices: (1) Clearing, grading, excavating and un-stabilized areas - Utilize erosion and sediment controls to prevent sediment laden or turbid runoff from leaving the construction site. Dispose of clearing debris at acceptable disposal sites. Apply permanent or temporary stabilization, sodding and/or mulching to denuded areas in accordance with the erosion and sediment control specifications and the general VPDES permit for discharges of stormwater from construction activities. (2) Paving operations - Cover storm drain inlets during paving operations and utilize pollution prevention materials such as drip pans and absorbent/oil dry for all paving machines to limit leaks and spills of paving materials and fluids. (3) Concrete washout and cement waste - Direct concrete wash water into a leak-proof container or leak-proof settling basin that is designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. (4) Structure construction, stucco, painting and cleaning - Enclose, cover or berm building material storage areas if susceptible to contaminated stormwater runoff. Conduct painting operations consistent with local air quality and OSHA regulations. Mix paint indoors, in a containment area or in a flat unpaved area. Prevent the discharge of soaps, solvents, detergents and wash water from construction materials, including the clean-up of stucco paint, form release oils and curing compounds. (5) Dewatering operations - site dewatering from building footings or other sources may not be discharged without treatment. Sediment laden or turbid water shall be filtered, settled or similarly treated prior to discharge. (6) Material delivery and storage - Designate areas of the construction site for material delivery and storage. Place near construction entrances, away from waterways, and avoid transport near drainage paths or waterways. (7) Material use during building process - Use materials only where and when needed to complete the construction activity. Follow manufacturer's instructions regarding uses, protective equipment, ventilation, flammability and mixing of chemicals. (8) Solid waste disposal - Designate a waste collection area on the construction site that does not receive a substantial amount of runoff from upland areas and does not drain directly to a waterway. Ensure that containers have lids so they can be covered before periods of rain, and keep containers in a covered area whenever possible. Schedule waste collection to prevent the containers from overfilling. (9) Sanitary waste - Prevent the discharge of sanitary waste by providing convenient and well-maintained portable sanitary facilities. Locate sanitary facilities in a convenient location away from waterways. (10) Landscaping operations - Maintain as much existing vegetation as practicable. Apply permanent or temporary stabilization, sodding and/or mulching to denuded areas in accordance with the erosion and sediment control specifications and the general VPDES permit for discharges of stormwater from construction activities. Apply nutrients in accordance with manufacturer's recommendations and not during rainfall events. (11) Others - If applicable, describe your Pollution Prevention Practice. July 1, 2014 Page 4 of 7

6.0 Stormwater Management Controls Select all that apply Stormwater Management Control Post-development Stormwater Management Controls provided by a Larger Common Plan of Development or Sale Rooftop Disconnection Sheetflow to Vegetated Filter (1 or 2) Grass Channel Rainwater Harvesting Permeable Pavement (1 or 2) Infiltration (1 or 2) Bioretention (1 or 2) Others (describe) Estimated Installation Responsible Party Common Plan Operator Operator (See Cover Page of this SWPPP) 7.0 Spill Prevention & Response Most spills can be cleaned up following manufacturer specifications. Absorbent/oil dry, sealable containers, plastic bags, and shovels/brooms are suggested minimum spill response items that should be available at this location. 1 st Priority: Protect all people 2 nd Priority: Protect equipment and property 3 rd Priority: Protect the environment 1. Check for hazards (flammable material, noxious fumes, cause of spill) - if flammable liquid, tum off engines and nearby electrical equipment. If serious hazards are present leave the area and call 911. LARGE SPILLS ARE LIKELY TO PRESENT A HAZARD. 2. Make Sure the spill area is safe to enter and that it does not pose an immediate threat to health or safety of any person. 3. Stop the spill source. 4. Call co-workers and supervisor for assistance and to make them aware of the spill and potential dangers. 5. If possible, stop spill from entering drains (use absorbent or other material as necessary). 6. Stop spill from spreading (use absorbent or other material) 7. If spilled material has entered a storm sewer; contact locality's storm water department. 8. Clean up spilled material according to manufacturer specifications, for liquid spills use absorbent materials and do not flush area with water. 9. Properly dispose of cleaning materials and used absorbent material according to manufacturer specifications. July 1, 2014 Page 5 of 7

Emergency Contacts: Normal Working Hours: DEQ Tidewater Regional Office (757) 518-2000 Nights, Holidays & Weekends: VA Dept. of Emergency Management (804) 674-2400 24 Hour Reporting Service Local Contacts: Virginia Beach Planning/Permits & Inspections Office (757) 385-4211 Public Safety Non-Emergency (757) 385-5000 8.0 Inspections & Corrective Action Log (make additional copies as necessary) Qualified Inspector Company/Organization: Contact Name: Phone #: Qualifications: Inspection Schedule Discharges to surface waters: Once every 7 days; or Once every 14 days and no later than 48 hours following any measurable storm event. Discharges to impaired waters, surface waters within a TMDL watershed, or exceptional waters: Once every 4 days; or Once every 7 days and no later than 48 hours following any measurable storm event. Inspection : Best Management Practices (BMPs) Erosion & Sediment Controls (Section 4.0) Pollution Prevention Practices (Section 5.0) Stormwater Management Controls (Section 6.0) In Compliance with SWPPP? YES NO YES NO YES NO Corrective Action Needed; Responsible Party Corrective Action Taken Inspector Name: Operator Name: Signature: Signature: : : July 1, 2014 Page 6 of 7

9.0 Grading & Stabilization Activities Log Grading Initiated Description of the Grading (including location) Grading Ceased Stabilization Measures Initiated Description of the Stabilization Measures (including location) 9.0 SWPPP Modification &Update Log Modification Description of the Modification/Update Modification Prepared By (Name & Title) July 1, 2014 Page 7 of 7