Henri Fennell, CSI/CDT ABX 2015

Similar documents
Henri Fennell, CSI/CDT ABX 2015

WeatherSmart Air Barrier Installation Guide

Building Envelope Solutions, Inc. Identifying solutions for better building performance

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

Brick Walls MTI. Rainscreen Retrofit for. Flood Recovery Hurricane Recovery Restoration Flood Resilient Retrofit. Guide to Wet Flood-Proofing

FirstEnergy Program Overview

Flood Resistant Construction Using Closed-Cell SPF

Rain. Building Science. Rain is the largest source of moisture We need better control for better insulation and airtightness Rain penetration control

2013 COMMERCIAL PRODUCTS

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

How do you install yours?

Foundations. Issue. Slab-On-Grade Liquid Water Control (See Figure 2-2) Goals. Guidance

BUILDING ENCLOSURE AIR TIGHTNESS TESTING Course Number: BCLUNA018-01P

R-Matte Plus-3: Insulation for the Building Envelope

Best Practices in Foam Plastic Installations By: Henri Fennell, CSI/CDT. Copyright Materials

GAF EnergyGuard Polyiso Wall Sheathing

Magnum Board Section Digicon Information Inc. Page 1

SECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT

Building Science Control Layer Glossary. Façade Visible exterior face of a building, usually vertical or nearly so, but imprecisely used.

A. Section includes fluid applied, vapor permeable membrane air barriers.

DuPont Tyvek Air Barrier Installation Guidelines. Canadian Version. Version 2

SECTION REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION

Avoiding Air Barrier Pitfalls When sub-trade activities are not in sync with air barrier requirements, installation can go poorly.

Inspection of New One- and Two- Family Dwellings

BREATHABLE MEMBRANES. Canada Inc. Water Vapour Permeable, Air Barriers for Sloped Roofs & Rain Screen Wall Systems

8/14/2015. Course Description. Course Objectives AIR, WATER, AND MOISTURE MANAGEMENT IN LIGHT COMMERCIAL BUILDING ENVELOPES

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

HP+ Wall System X Series Technical Installation Manual

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

A Closer Look Inspection Service 2015 IECC Residential DFW area handout

Quality Control of Air Barriers During Construction

SECTION INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF)

DuPont Tyvek Wall Underlay Install Guide

SECTION SELF-ADHERING SHEET FLASHING

NOVAWRAP ASPIRE Q & A

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

SRP-AirOutshield UV Issued:

Stone and Masonry Veneer

Insulation manufacturer to submit dew point analysis free of charge for typical wall section. Analysis by:

Water control Vapor control and drying Room for growth

Where to Draw the Line with Thermal Boundaries

Boston Society of Architects Building Envelope Committee 52 Broad Street Boston, MA 02109

Architectural Wall Products Guide Specifications

3/24/2017. Kohta Ueno. Building Science of Walls. March 24, Background Rhode Island AIA Presentation 2

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

ROOFING APPLICATION STANDARD (RAS) No. 109

2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

Perm-A-Barrier VPS (Vapor Permeable Sheet)

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

A.ENVELOPE AIR SEALING

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

Wall Selection Guide Section 1.1

SECTION FLUID-APPLIED VAPOR PERMEABLE MEMBRANE AIR BARRIER SYSTEM ASSEMBLY (August 2013)

Boston Society of Architects Building Envelope Committee 52 Broad Street Boston, MA 02109

Energy-Efficient Facilities: Building Envelope Design. Wall Systems. Copyright Materials. Course Description

Assessing the Impact of US Housing. Retrofits. Building Carbon Emissions. Building Energy Use. buildingscience.com

ELEVATION FOR DETAIL REFERENCE ONLY

Background. Building Science of Walls. Environmental Separator. What Separation Roles? 1/25/2018. January 25, 2018

A. Meet at Project site <insert number> days before starting installation.

FACE CFP - HORIZONTAL PANELS - OPTION 'B'

2015 MICHIGAN UNIFORM ENERGY CODE Effective: February 8, 2016

Moisture Considerations for Insulated Building Assemblies

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Product Brochure. Masonry Drainage and Ventilation Products

ROOFING APPLICATION STANDARD (RAS) No. 109

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants.

Residential Building Inspections

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

12 - V0 CFP-12 PANEL INDEX. Delta Series CONCEALED FASTENED PANELS BUILDING PRODUCTS VERTICAL PANELS

ELEVATION FOR DETAIL REFERENCE ONLY

HP+ Building Enclosure Systems. Affordable Solutions for Title 24 and Beyond

Insulated Composite Panels Designed for Brick Back-up

Exterior System installation instructions

DUPONT TYVEK MECHANICALLY FASTENED AIR AND WATER BARRIER INSTALLATION GUIDELINES FOR BUILDINGS GREATER THAN 4 STORIES AND HIGH PERFORMANCE

Deep Energy Retrofit is a path to ZNE How does all of this support zero netenergy

BULLETIN FROM THE FIRST COAST CHAPTER ICC~BOAF

SC-01 Cross-Section. Cement Board Substrate Master Wall Mesh and Base Coat Superior Finish

The Devil is in the Details Learning Objectives! Targets and codes have raised awareness People know you need

Compliance for Continuous Insulation, Water Resistive Barriers & NFPA-285 What you need to Know

New EIF System Gives Contractors More Control over Quality Control

Construction Standards PAGE

DuPont. Tyvek Sheathing Membrane Installation Guidelines. Version 2. Canadian Version

Keene Building Products

Guide Specification for the OSI QUAD Window and Door Flashing System

Quality Insulation Installation (QII) Insulation Installation (Page 1 of 4)

MID-RISE DESIGN & CONSTRUCTION

Course # T6 Achieving a High Performance Air Barrier System Proper Design, Installation and Field Quality Control. Air Barrier Association of America

GA APPLICATION OF GYPSUM SHEATHING

Evolution of Wall Design for Controlling Rain Penetration

Magnum Board Coatings

Boundaries and Barriers

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENT BOARD SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

SECTION (07100) - DAMPPROOFING AND WATERPROOFING

Transcription:

Henri Fennell, CSI/CDT ABX 2015 Henri is an architect and building envelope specialist with over forty years of experience in the construction industry. He was a pioneer in the solar industry, introduced the installation technique for fieldapplied closed-cell closed-cavity-fill polyurethane foam and has designed and constructed a net-zero energy research structure in Antarctica. He has four energy-related U.S. patents. Net zero in Antarctica The Big Dig

HCF foam experience 1. First spray foam project was in 1971 2. Foam manufacturing from 1973 to 1979 3. Foam contracting and BE consulting from 1979 to 2009 Developed the method for injecting closed-cell foam on site Installed ~ 5 million pounds of foam 4. Foam and BE commissioning from 2009 to present 5. Noteworthy foam projects include: 1977 net-zero solar project in Boston, The Big Dig, 4 American Ski Grande Hotels in the Northeast, Net-zero energy weather station in Antarctica, The Guggenheim Museum 6. Two US patents and numerous technical papers related to foam & foam QA

The inside-out method Case study - S. Londonderry Elementary School (2004) Standard installation requirements: Spray-applied polyurethane foam (SPF) capability open walls Specialty installation requirements: Injected polyurethane foam (IPF) capability concealed locations behind structural members and between floors Diagnostic and/or QA requirements: adhesion testing, water testing, foam processing quality verification test capabilities Specialty foam product: 2.1# SPF and IPF foam formulations Specialty coating: Thermal barrier required in exposed areas Specialty accessory products: Drainage membrane, drainage mat in some applications

The Inside-out method for exterior cavity walls By way of introduction to this method, it was developed for moisture/mold remediation in an existing brick cavity-wall project where the back-up wall sheathing had become wet due to various airborne moisture transport mechanisms. Since that project, it has been used in similar retrofit situations that had flashing and drainage plane material failures. It is applicable to multi-story buildings and to projects with wood-framed construction.

The inside-out method for exterior brick cavity walls Alternative method was developed in 2004 to avoid removing the brick façade to replace the drainage plane, air barrier, and insulation in a New England school. South Londonderry Elementary

Major remediation project mold inside the brick cavity wall Initial cavity wall inspection area. Problems noted included: weep holes blocked, mortar deterioration, failing wall flashing, no vapor barrier on the interior side of the drainage plane.

The original problem: Through-wall air handler units were open to the brick cavity. Mold found in the cavity on the paper-faced drywall sheathing was determined to be the source of mold in the classrooms.

The key to this method is to manage the water that passes through the brick cladding (the rain screen) as you would in new construction, while installing the drainage plane from the inside of the building. In new construction, the back-up wall is installed and the airtight, vapor tight, and waterproof thermal envelope is installed from the outside before the brick ties are installed and the brick is laid. In the reverse access scenario, the back-up wall is dismantled from the inside, exposing the back (inside) of the brick cladding. In most cases the through-wall flashing remains in tact.

The goals of a newly installed system are as follows: Manage water in the cavity wall to prevent water intrusion to the inside. Provide air leakage control. Provide vapor control. Provide adequate insulation within the existing available cavity size.

The rules of the inside-out method: Preparation 1. Clean out the bottom of the brick cavity and make sure the weep holes are open, inside and out. 2. Install protection mesh to protect the weep holes. 3. Do not remove the structural components, including the brick ties and their fasteners. 4. Repair any damaged through-wall flashings. 5. Isolate all through-wall passages from the brick cavity. Windows, doors, louvers, etc. Mechanical penetrations 6. Prime or etch the exterior face of the metal studs or steel structural elements to assure bonding of the SPF.

Brick and metal studs after removing the wet sheathing and mold. Brick ties were preserved where possible. The existing conditions Copper through-wall flashing was found at the base of the wall

Horizontal section showing the existing brick and framing, the drainage plane location, and the profile of the SPF between the studs

This test was performed to verify the cure lift approach to maintaining a capillary break on the brick side. This method relies on the tendency of spray foam to lift during the cooling process if the substrate-side is unrestrained.

The rules of the inside-out method: Drainage plane installation 1. Cut strips of the membrane (and spacer material if used) to fit between the framing members. 2. Install the spacer material against the brick if used. 3. Install the drainage plane membrane starting at the top of the wall (on the top floor if it is a multi-story building). 4. Lap the sections of membrane (if not one piece) to shingle them to shed water from the outside. Use strips of tape to position the membrane if required. 5. Tuck the bottom of the membrane down and to the outside of all through-wall flashings (windows, doors, louvers, relieving angles, etc.) 6. There should be narrow vertical spaces where the brick is exposed at each line of brick ties.

Goals replace the thermal envelope system, maintain the structure, and manage water entering the brick cavity Install the spacer material against the brick if used. Install the spacer material to the bottom and on the outside of the flashing.

Goal: Maintain a capillary break behind the drainage plane The S. Londonderry project used Cedar Breather to assure a capillary break space behind the drainage plane. Subsequent projects successfully use the cure lift approach to maintain the capillary break.

This building was a one-story structure with brick only on the bottom ten feet. Multi-story structures create floorlevel transition problems that this building doesn t have. Insulated metal panels Brick facade

Existing metal wall panels and wall base flashing above the brick Drainage plane hung on clips on the inside of the metal panels Drainage plane installed on the outside of the through-wall flashing

The inside-out drainage plane installation Install the drainage plane membrane starting at the top of the wall Lap the sections of membrane (if not one piece) to shingle them to shed water from the outside. Use strips of tape to position the membrane if required.

The rules of the inside-out method: Spray foam installation 1. Follow all manufacturer installation and quality control requirements. Verify that all processing parameters are within the manufacturer's tolerances. Isolate and ventilate the work zones. Maintain at least 4 ACH during and after the work. 2. Perform strip test shots and verify foam quality. 3. Install the SPF in vertical lines behind the studs to seal around the brick ties and where the drainage plane membranes meet. 4. Seal (flash coat) along flashing transitions and around penetrations (mechanical penetrations, relieving angle supports, etc.). 5. Fill in the wall bays after the picture frame areas are fully set up. Use lift thickness as recommended by the manufacturer. 6. Perform any other required air sealing or insulation measures.

Goal: Install an air and vapor tight insulation system Install the SPF in vertical lines behind the studs to seal around the brick ties and where the drainage plane membranes meet. Flash coat the membrane to the through-wall-flashing before building up the insulation thickness

Goal: Install an air and vapor tight insulation system Existing brick Capillary break Drainage plane membrane Existing brick tie Existing brick tie fastener Profile of SPF Existing metal stud

Goal: Install an air and vapor tight insulation system Fill in the wall bays after the picture frame areas are fully set up. Use lift thickness as recommended by the manufacturer.

Perform any other required air sealing or insulation measures SPF was used to seal major air leakage at the wall panel-to-roof deck transition Ready for drywall below. Ready for a 15-minute thermal barrier coating above the ceiling

The rules of the inside-out method: Post-spray foam verifications (before the drywall) 1. Maintain ventilation for the recommended cure and reoccupancy period (usually 24 to 72 hours). 2. Perform water tests on the wall assembly to identify any leakage. 3. Now is the time to make any repairs - before the drywall has been installed! 4. Verify that any through-wall appliances are sealed to the through-wall flashings. 5. Monitor energy performance when possible.

Verification: Owner s water test used to verify rain screen drainage

Finished installation

Energy Improvement vs. Cost for this project South Londonderry (renovation area ~ 38,000 sq. ft.) The energy use for this building has been reported to be 40% lower over the past three years! Energy improvements by the contractor were about $1.28 per square foot of floor area. Most green design is moving capital from the mechanical systems to the building enclosure system. Commercial construction is at the worst, a net zero proposition. We should be able to get a green building and not pay more for it, but this requires a good building enclosure and the mechanical system must be sized properly. James Petersen, Petersen Engineering