The Six-Inch Layer Compaction Method

Similar documents
This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.

SECTION TRENCHING

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

Ontario ENGINEERING STANDARD SPECIFICATION 1.0 PURPOSE 2.0 MATERIALS

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

SECTION TRENCHING & BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING

SECTION EXCAVATION, BACKFILLING AND COMPACTING

DIVISION 4100 SITEWORK

SECTION EARTHWORK

SECTION BUILDING EARTHWORK

SECTION 14 EMBANKMENT

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

C. Foundation stabilization for pipe and utility structures.

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

SECTION EARTHWORK

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

SECTION FILL AND BACKFILL

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION EROSION CONTROLS

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION EROSION CONTROL DEVICES

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

SECTION SOILS REPORT

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION EXCAVATION AND FILL

Section Fill Placement Tender No. [ ] Page 1

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

SECTION BITUMINOUS CONCRETE PAVING

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION EXCAVATION AND FILL

EXCAVATION AND BACKF1LL

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed.

SECTION EMBANKMENT

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

EARTHWORK. C. Handling, storage, transportation, and disposal of excavated material

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

SPECIFICATIONS - DETAILED PROVISIONS Section Grouted Rip-Rap C O N T E N T S

Special Provision No. 421F01 April 2006

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION 02215BP TRENCHING AND BACKFILLING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

CONSTRUCTION SPECIFICATION FOR GRADING

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SECTION ASPHALT CONCRETE

Construction Specification for General Excavation

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.

MagnumStone Specifications Gravity

EXCAVATION & BACKFILL SPECIFICATION

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

SECTION EXCAVATION, TRENCHING AND BACKFILL

TRENCH EXCAVATION AND BACKFILL

SECTION AGGREGATES

LANDSCAPE RETAINING WALLS

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

EDITORIAL REVISION May Process Industry Practices Civil. PIP CVS02100 Site Preparation, Excavation, and Backfill Specification

SECTION TRENCI-JING PART 1 GENERAL

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

SECTION TRENCHING, BACKFILL AND COMPACTION

Section 25 Aggregate Subbase

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

1.2 REFERENCES.1 American Society for Testing and Materials International (ASTM)

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Transcription:

1/7 1.0 PURPOSE This specification describes the minimum requirements for the backfilling of trenches or the construction of berms primarily for the installation of buried pipelines, cables, ducts and the like. This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Building code. 2.0 DEFINITIONS "The Six-Inch Layer Compaction Method" means the spreading of backfill material in uniform full width layers not more than 6 inches in depth after compaction. "Backfilling Operation" means the activity required to fill surface depressions or to backfill excavations. "Sound" or "suitable" as applied to fill materials means free from deleterious matter, having a reasonably uniform gradation which permits compaction to a stable mass, and having the characteristics specified for the particular materials, all after handling, rehandling, processing and reprocessing where necessary. "Unstable" or "unsuitable" as applied to fill material means too wet, too dry, frozen or containing ice, snow, organic or other deleterious matter, or having poor characteristics for grading and compaction, or having other characteristics that may result in undesirable settlement or movement of the fill or within the fill, or otherwise not meeting the requirements of the specifications. However, this definition permits drying, dewatering, watering, thawing and any other processing or reprocessing to make the material stable and suitable prior to incorporating it into the fill. "Fill" and "backfill" are deemed to have the same meaning. "Service Line Testing Procedure" means the testing of installed service lines according to requirements of applicable regulatory agencies and the Vale Representative. Over-excavation means excavation beyond the authorized zone or the zone required to build the structure as specified

2/7.0 GENERAL.1 STOCKPILING OF MATERIAL The Slopes of stockpiled materials and bermes where the height is in excess of 4 feet (1.22 meter) must possess their own technical report or plans produced by a qualified professional, including the following items: Physical characteristics of the mound/slope; Total height; Elevations of base and crest; Overall slope angle; Height of earth banks; Width of periodic horizontal strips; Height of slopes between periodic horizontal strips; Slope angles between periodic horizontal strips; Operational lifespan; Area occupied; Degree of risk; Vegetation or synthetic protection measures on earth slopes exposed to the weather; Possible obstructions to the operation of machinery/equipment that may be positioned in areas close to slopes or other earthworks, in terms of the dynamic effects that their operation may have on the mounds; Earth banks used as access routes must meet traffic safety criteria. Stockpile backfill material within designated areas. Stockpile granular material so as to prevent segregation and change in moisture content. Should any material become segregated, remix the material to provide uniform gradation. Remove excess backfill material not required for other purposes and dispose of at a designated location. Rough grade those materials in the disposal areas to promote drainage and to give a tidy appearance to the satisfaction of the Vale Representative. Exercise care at all times to prevent earthfill materials from becoming contaminated by clay and other types of deleterious materials. 4.0 BACKFILL 4.1 BACKFILL MATERIALS Backfill materials and compaction are as specified on the project drawings.

/7 Conform to the requirements of Vale Specification SPEC-11004 entitled "Earthfill Materials". 4.2 GENERAL Do not place backfill on frozen, snow-covered, ice covered or wet ground. Maintain minimum overburden cover as specified on the project drawings. Co-ordinate fill operations with other Work. Do not place fill until subgrade has been compacted to the required density determined by ASTM D698 (Standard Proctor Test) or ASTM D1557 (Modified Proctor Test). Do not cover any subgrade or work until authorized by the Vale Representative but otherwise place in the fill as soon as possible. Prevent damage and disturbance to subgrade, other work and existing buildings and installations. Keep heavy equipment at a safe distance, clear of structures and other installations. Within the safe distance place fill by hand or other suitable means and compact it by means of hand guided power rollers or tampers operated to avoid damage to the structures and installations. Eliminate boulders and rock fragments larger than 6 inches, when earth or fragmented rock fill is permitted within 2 feet of structure, on the top of piping, electric ducts and cable. Fill uniformly on all sides around structures and other installations not designed as retaining walls, and prevent unbalanced loadings. For earth and granular fill, deposit the fill material as near as practical to its final location and spread it in accordance with the Six-Inch Layer Compaction Method. Make each layer the full width of the fill required at its elevation, with the layer horizontal except for a slight slope of approximately 2% to promote surface drainage in the event of rain while the layer is exposed and except as required to suit the required elevations of the completed fill. Where earth fill material contains boulders or rock fragments, place and work the materials so that all such solid pieces are well distributed and all interspaces are completely filled. Eliminate such solid pieces, over 6 inches in their greatest dimension, from fill placed within 1 foot of the surfaces of earth fill. For earth and granular fill, compact each layer to the required density before placing further material on it. Adjust and control the moisture content to within plus or minus 1 percent of

4/7 the optimum, adding water or drying the fill material as and when necessary. Add water and dry the fill material by means of suitable equipment capable of producing uniform results throughout the fill material. For concrete fill other than concrete bedding, place and cure the concrete in accordance with CSA-A2.1. Produce a dense surface but do not trowel or otherwise make the surface smooth. Co-ordinate backfill operation with service line testing procedure. Continue backfilling so that no more than 200 ft. of service line remains exposed at any time except where sections must be left open for a short period of time to facilitate further construction. Backfill over excavated zones by lean concrete having 15 MPa strength unless otherwise approved by Vale representative. 4. SHEETING, BRACING AND SHORING Do not leave sheeting, bracing and shoring in place without the Vale Representative prior approval. Submit a written request for approval, to the Vale Representative. If the Vale Representative gives approval, sheeting, bracing and shoring may be left in place. Where sheeting, bracing or shoring are left in place, cut off and remove to a depth of ft. minimum below finished surface, unless otherwise instructed. If instructed, remove installed sheeting, bracing and shoring by withdrawing it in stages consistent with the progress in placing and compacting fill such that no movement occurs in the sides of the excavation. Completely and promptly fill voids formed during the withdrawal, compact the fill using rammers suitable for working in the confined spaces. Co-ordinate the activities to ensure adequate support is always in place. 4.4 BEDDING Remove all surface organic material, rock and debris prior to laying bedding material over virgin or previously filled areas. Use bedding materials as specified on the project drawings and conform to the requirements of Specification SPEC-1101 - "Bedding Materials".

5/7 Place bedding material in accordance with the Six-Inch Layer Compaction Method. Use Granular "B" Type II bedding material with 100% of material passing the 26.5mm sieve in lieu of Granular "A" bedding material where dewatering of trench becomes impossible, or where minerock or ripped slag fill is used as substrate. 4.5 BACKFILL IN CUTS THROUGH BUILT-UP AREAS Place backfill material over bedding in trenches situated under roads, parking lots, walks, finished landscapes, slabs on grade, railway tracks, or the like, as specified on the project drawings using the Six-Inch Layer Compaction Method. Restore excavations to their original state with respect to all courses and toppings. Ensure finished surfaces are free of bumps and depressions and correctly sloped and cambered. 4.6 BACKFILL IN CUTS THROUGH AREAS OTHER THAN BUILT-UP AREAS Place backfill material over bedding in trenches situated in general areas by pushing or rolling into place avoiding the practice of allowing "free-fall". No compaction is required unless specified otherwise on the project drawings. Overfill trench to produce mound equal in height to 1/4 of the width of trench. 4.7 METHOD OF PLACING EMBANKMENT FILL Build up fill material on each side of previously placed bedding material. Deposit it layer for layer at each side alternatively until the bedding material is covered. Complete construction of embankment over bedding. No compaction of embankment fill material is required unless specified otherwise on the project drawings. 5.0 SUBMITTALS Submit to the Vale Representative when requested: 5.1 SAMPLES A sample not less than 100 pounds, typical of each type of fill material from each proposed source. With each sample, submit results of testing proving the material complies with the gradation and physical requirements specified. The Vale Representative s approval of any sample will not mean approval of the entire source. All materials from any source are subject to further sampling, testing and approval/rejection, whether incorporated into the work or not.

6/7 5.2 Test Reports and Certificates Test reports showing the results of gradation, moisture content, compaction, physical requirements and other test. 6.0 INSPECTION AND TESTING Inspect and test the subgrade and fill materials to determine suitability of materials, moisture content and density of materials in place. 7.0 REFERENCE DOCUMENTATION The following documents are related to this specification and shall be used to their latest revision: SPEC-11004 SPEC-1101 CSA -A2.1 ASTM D698 ASTM D1557 ASTM D698 SPEC-1101 Earthfill Materials Buried Pipelines Bedding Materials Concrete Materials and Methods of Concrete Construction Standard Test methods for laboratory compaction characteristics of soil using standard effort (12,400 Ft-LbF/FT (600 KN-m/m )). (Standard Proctor Test) Standard Test Methods for Laboratory compaction characteristics of soil using modified effort (56,000 Ft-LbF/FT )) (Modified Proctor Test) Standard Test Method for in-place density and water content of soil and soilaggregate by nuclear method (shallow depth). Bedding Materials

7/7 8.0 REVISION AND TRANSITION NOTES Revision notes describe: what was changed, and if applicable, why it was changed, and the plan to implement the change, including whether changes are retroactive. Note: The revision notes are a summary of the changes and may not necessarily be a complete list. Rev 1 Description Document format and number changed due to Vale Engineering Document Program changes in 2011. Previous Standard number was 1106-02.01.611 Rev. Revision by Approved by Issue Date YYYY/MM/DD K.Clausen A.Alaeddine 2012/04/0 2 Approved for use in Thompson, MB - No changes K.Clausen A.Alaeddine 2012/08/09 Document Reviewed Format updated Regional approvals removed - Spelling and duplicate reference documentation corrected. K.Clausen A.Alaeddine