SUPPLIER QUALITY SCOPE AND FACILITY QUESTIONNAIRE. Bantrel Co. Project #:

Similar documents
H.C. VIDAL LTEE SUPPLIER'S DATA MANUFACTURING AND QUALITY CONTROL 5700 PHILIPPE TURCOT MONTRÉAL (QUÉBEC) CANADA, 4HC 1V6

WELDING ENGINEERING FABRICATION

ACCREDITATION OF MANUFACTURERS AND INSTALLERS OF PRESSURE PIPING PARTS AND SYSTEMS

econ Bloomfield, CT Facility South Windsor, CT Facility

MEMBER REZAYAT GROUP OF COMPANIES

ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS


GENERAL SUMMARY AND FABRICATION CAPACITIES

SO YOU RE THE NEW WELDING ENGINEER

Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS

Guide for the preparation of quality programs for licensing of companies performing BPE regulated work.

SECTION WELDING

ACCREDITATION OF FITTING MANUFACTURERS

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities

Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS

SECTION METAL WELDING

Engineering Construction Fabrication Maintenance SHOP SURVEY

TUV / IICS 3.1 CERTIFIED WELDING INSPECTOR & API 577 WELDING INSPECTION & METALLURGY

REFERENCE SYLLABUS. for WELDING EXAMINER & WELDING EXAMINER IN TRAINING CERTIFICATES OF COMPETENCY EXAMINATIONS

This procedure applies to Pike construction activities. This procedure may also be applied to Subcontractors when invoked by Contract documents.

Industrial Products. Our Innovation. Your Advantage.

Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS

MEC-QW-E-2005 QA/QC Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Quality Control Manual Submission Information

Quality Control Manual Submission Information

Steel Inspection Tips for Every Building Owner and Contractor

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines

NB-435 Rev. 1 Page 2 of 5

QUALITY CONTROL MANUAL

Section 14. Welding Field Welding 1. Welding Processes 6. Stud Welding 9. Welding Positions 11

partner-manufacturer in Central Asia

Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS

nalcofabtech.com A Nalco Champion Company

CSA W : The Changes. June 2014

Who We Are. Located near Port, Rail and Road transportation links, Maritime Welding Inc. can deliver world-class steel fabrication services worldwide.

Section 13. Welding Field Welding 1. Welding Processes 6. Stud Welding 9. Welding Positions 15

Welding of Large Diameter Pipelines: Design, Processes, Procedures Specifications for Welding Steel Water Pipe

ANSI/AWS D An American National Standard. Structural Welding Code Sheet Steel

SUPER STEEL... SUPER SERVICE...

ROUSH ESE INSPECTION PLAN

CITIC HEAVY INDUSTRIES CO., LTD.

Engineering Field Service ASME Repairs B31.3 piping Bundle Extraction Maintenance

ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS

Pipeline Systems PLSC0017 Requirements for Welder Qualifications in Accordance with ASME Section IX

AMENDMENTS TO OPSS 1802 (JAN 95) MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE SUPPLY, STORAGE, AND DELIVERY OF WELDED STEEL PIPE

High Country Fabrication (HICO)

METAL PRODUCTS PIPELINE ENGINEERING. Engineered Products for the Pipeline Pigging and Flow Assurance Industry

REFERENCE SYLLABUS. for WELDING EXAMINER & WELDING EXAMINER IN TRAINING CERTIFICATES OF COMPETENCY EXAMINATIONS

Certificate of Accreditation

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

Materials and Qualification Procedures for Ships

MEC-Q-E-2007 QC Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

TECNOLOG s.a. APIN Boilers Ofic. Ave Bolivia #1122/ Ave Las Calderas 330, Pta. Hermosa, Lima,

NATURAL GAS COMPRESSOR STATION PIPELINE WELDING AND RELATED FACILITIES. Engr. Md. Saidur Rahman 1,*

Custom Fluid Handling Process Equipment. HCS Group Manufacturing, Division of Ontario Inc

Flame and Plasma Cutting

About Us. Apart from BHEL, our list of clients includes reputed names in their respective fields.

Canadian Welding Bureau Welding Procedure Qualification AWS D1.1 vs CSA W47.1

CONTRACT MANUFACTURING

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

Exceptional Turnaround From A Proven Partner in Materials Testing

Application Document Submittal for AISC Certification - Fabricators and Manufacturers

STATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENT 1011 ODOT REVISION TO AASHTO/AWS BRIDGE WELDING CODE D and Interims.

Welder Level 2 Rev. December, 2016

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472. September 2018 Effective January 1, 2019 PREFACE

Rupak Choudhary. Having responsibility of coordinating multiple projects and directing outside test laboratories and contract welding facilities.

PRECISION MACHINING & MANUFACTURING SERVICES

HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL

Course: Quality Assurance Module 5 Welders/Welding personnel

Pressure Piping Construction Requirements QMS written description verification CHECKLIST AB-518b

KTC Huntersville New Supplier Application Packet

M. F. Sullivan. 9/27/2016 Dr. Sandor Somogyi

WELDING TECHNOLOGY. American River College Catalog

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472

Conformity Assessment. Section III Nuclear Requirements Buenos Aires, Argentina May 2017

WELDING CLASS DESCRIPTIONS NEW STUDENTS may take any of the first four classes listed below These classes have NO Prerequisite Requirements.

Manufacture of Material Handling Equipment

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

Rycroft Process Solutions 1 PROCESS SOLUTIONS

OIL TECH SERVICES, INC.

ACCREDITATION OF BOILER AND PRESSURE VESSEL REPAIR OR ALTERATION ORGANIZATIONS

COMPANY PROFILE APRIL 2016

Common Operating Problems

SECTION PREFABRICATED PIPE BRIDGE(s)

Exceptional Turnaround From A Proven Partner in Materials Testing

Your single source for design engineering, specialized fabrication and related services

Application for an Ontario Certificate of Authorization For Ontario based businesses CSA N285.0 Nuclear Components

S C E F. Mid - Atlantic States

Reinforced Thermoset Plastic Corrosion-Resistant Equipment

Application for an Ontario Certificate of Authorization For businesses based Outside Ontario CSA N285.0 Nuclear Components

Expediting. Research of suppliers. Vendor Assessment. Inspection Testing. Qualification of suppliers. Inspection Audit

Services. Engineering Inspection and Laboratories SERVICES - 1 -

Monolithic Isolation Fittings

Pressure Points. Governing Code Edition Section I Table of Contents

YOUR ONE STOP FABRICATION SOURCE

Corporation SEAMLESS PIPE

GE Oil & Gas Quality Management System Pressure Control Supplier Quality Requirements - Outsourced Manufacturing Services SQ-08 Rev: 2.

Washington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program

Transcription:

Bantrel Co. Project #: COMPLETED BY: DATE: SUPPLIER NAME: D & B NUMBER: CONTENTS 1.0 GENERAL INFORMATION 2.0 PERSONNEL 3.0 QUALITY PROGRAM 4.0 SUPPLIER / CONTRACTOR INFORMATION 5.0 SCOPE OF FABRICATION 6.0 FACILITIES 7.0 PROCEDURES 8.0 EQUIPMENT 9.0 TESTING FACILITIES AND EQUIPMENT 10.0 SHOP LOADING / CAPACITY 11.0 MANUFACTURING LIMITATIONS / RECOMMENDATIONS 12.0 SUPPLIERS AUTHORITY 13.0 RESPONSE INSTRUCTIONS FORM A4304 (2014-06-04) P AGE 1 OF 20

1.0 GENERAL INFORMATION 1.1 Name of Supplier: 1.2 Supplier's manufacturing plant location(s): 1.3 Manufacturing plant mailing address: 1.4 Telephone: Fax: E-Mail: 1.5 How long has this manufacturing facility/plant been in operation: 1.6 Principal products manufactured at this location: 1.7 Financial Details: Provide the following information: 1.7.1 Bonding and/or Credit Capacity: $ 1.7.2 DUNS number: 1.7.3 Dun & Bradstreet Rating: 1.7.4 Previous Year s Sales Volume: $ 1.7.5 Payment Terms - Indicate what your traditional terms of payment are: 1.8 Electronic Communication: Provide details on the degree to which you could communicate with the project team electronically. Indicate software in use for design and project management. Also, advise if you have video conferencing facilities: FORM A4304 (2014-06-04) P AGE 2 OF 20

2.0 PERSONNEL 2.1 Principal Management Personnel In Administration, Engineering, Production, Quality Assurance and Quality Control (attach Organization Chart): Name Title 2.2 Number of Engineering Employees: A. Graduate Engineers: B. Draftspersons: C. Speciality Raters: (e.g., Heat Exchanger) D. Others: FORM A4304 (2014-06-04) P AGE 3 OF 20

2.3 Number of Shop Employees: A. Supervisory: B. Production: Machining Assembling Welding Testing Planning Estimating Purchasing Expediting Packing/Shipping Other (specify) C. A.S.M.E. Code Qualified Welders: Number Process Type of Material for which Qualified D. Quality Assurance/Quality Control: Quality Assurance Personnel Quality Control Personnel NDT Technicians FORM A4304 (2014-06-04) P AGE 4 OF 20

E. Technical Services: Installation Supervisors Start-up Supervisors Commissioning Specialists 3.0 QUALITY PROGRAM 3.1 Do you have a QA/QC Program Manual? Yes: No: If yes, state scope (i.e., products covered, manufacturing areas affected). Please enclose a copy of the manual. 3.2 State which standards such as ISO 9000, NQA-1, ASME Section I & VIII, (etc.,) your program is designed to meet. 3.3 Is your company certified to ISO 9001 9002 9003 1800 If no, are you planning to apply for an ISO Certification? Yes: No: 3.4 Do documented procedures exist to support the QA/QC manual? Yes: No: If no, how is your QA/QC program implemented? 3.5 Does the QA/QC Manager have any responsibilities other than for QA/QC? Yes: No: If yes, please specify. FORM A4304 (2014-06-04) P AGE 5 OF 20

3.6 What are the responsibilities of the QA/QC Manager's immediate supervisor? 3.7 Describe your program for training company personnel in the QA/QC program requirements. How is your staff made aware of changes to the program? 3.8 Describe your training and certification program for inspectors. 3.9 List Certificates of Authorization and/or Stamps you hold and the issuing authority. Has use of any Code Stamp ever been refused or suspended? If so, state which ones, give reasons and dates. 3.10 Do you operate a formal review/audit of the QA/QC program? Yes: No: How are findings identified, documented and resolved? 3.11 Describe your corrective action process as it relates to resolving the cause of any nonconformance or deficiencies. FORM A4304 (2014-06-04) P AGE 6 OF 20

3.12 Indicate whether or not the following or any other special processes are performed in-house or are subcontracted. Welding Heat Treatment Coating Materials Testing Non-destructive Testing Process In-House Yes / No Subcontract Yes / No 3.13 Do you qualify your suppliers and subcontractors? Yes: No: If yes, how? NOTE: IF WELDING IS PERFORMED IN-HOUSE, PLEASE ANSWER QUESTIONS 3.14 AND 3.15. IF NDE IS PERFORMED IN-HOUSE, PLEASE ANSWER QUESTION 3.16. 3.14 Is all welding being performed in accordance with approved written welding procedures? Yes: No: If no, what portion is being performed without approved procedures? Is a record maintained of approved welding procedures and revisions? Yes: No: FORM A4304 (2014-06-04) P AGE 7 OF 20

3.15 Are welders and welding operators subjected to a qualification test? Yes: No: If yes, are records maintained and available for review? Yes: No: 3.16 Number of ASNT-TC-1A / CGSB Certified Non-destructive Examination Personnel: Method Level I Level II Level III RT MT PT UT ET VT (CSA 178.2/AWS) 4.0 SUPPLIER / CONTRACTOR INFORMATION 4.1 Past Bantrel/Bechtel/Client name work supplied by supplier's shop: PO No. Project Name Material Description Year Completed 4.2 What major clients has supplier done work for in the past 3 years: (name and address, noting the most current first) Client Project Name Material Description Year Completed FORM A4304 (2014-06-04) P AGE 8 OF 20

4.3 Current major work in process or committed: Customer Material Description Quantity Scheduled Completion 4.4 Is subcontracted work subjected to the same quality control as own shop work? Yes: No: N/A: 4.5 Who has responsibility for quality control of subcontracted work? 4.6 Will supplier authorize Bantrel Co. / Bechtel / Client name representatives to visit supplier shop as well as sub supplier shops? Yes: No: N/A: 4.7 Will supplier provide production schedule and status reports? Yes: No: N/A: 4.8 Additional Information (i.e., manpower facilities and equipment; work load; observation of QC system implementation; quality of records and documentation). 5.0 SCOPE OF FABRICATION 5.1 Confirm your firm is qualified to furnish construction to following codes: Authority Sections Divisions Stamps Held A.S.M.E. A.P.I. A.W.S. C.S.A. DIN Others FORM A4304 (2014-06-04) P AGE 9 OF 20

A.S.M.E. Stamp Renewal Dates: State year and addenda of copies of above codes held: Code Year Addenda A. Minimum and maximum sizes handled: Material Minimum T Maximum T Minimum O.D. Maximum O.D. B. Approximate Monthly Tonnage - Production Man/Hours: Tonnage Shop Man-hours 5.2 Engineering/Design: Can you design the following if given Performance Data? A. Heat Exchangers Yes: No: B. Fractionating Tower Yes: No: C. Fabricated Piping Yes: No: D. Structural Steel Yes: No: E. Boilers Yes: No: F. Other Equipment (Name) Yes: No: FORM A4304 (2014-06-04) P AGE 10 OF 20

6.0 FACILITIES 6.1 Approximate total square footage of working space is: A. Supervisory B. Machine Shop C. Assembly D. Testing E. Other 6.2 Building Bay and Crane Area: No. Width Lift Length Capacity Manual Lift Electrical 6.3 Sandblast and Painting: Approximate Total Square Footage: A. Indoor B. Heated C. Covered D. Outdoor FORM A4304 (2014-06-04) P AGE 11 OF 20

6.4 Heat Treating Furnace: Inside Dimension Automatic Control or Manual Number of Thermocouples & Location Number of Readings Recorded Method of Loading Maximum Temperature 6.5 Shipping Facilities: Is the facility serviced by: A. Road Yes: No: Capacity: B. Rail Yes: No: Capacity: C. Water Yes: No: Capacity: D. Air Yes: No: Capacity: 7.0 PROCEDURES 7.1 Quality Control Procedure 7.2 Document Control Procedure 7.3 Packaging and Shipping Procedure 7.4 Code Qualified Welding Procedures Process ASME IX AWS CWB Other S.M.A.W. S.A.W. G.M.A.W. F.C.A.W. G.T.A.W. Other (Specify) FORM A4304 (2014-06-04) P AGE 12 OF 20

7.5 N.D.T. Procedures 7.6 Testing Procedures 7.7 Heat Treating Procedures 7.8 Painting Procedures 7.9 Other (specify) 8.0 EQUIPMENT 8.1 Mobile Cranes: Number Capacity Condition 8.2 Cutting Equipment: Maximum Capacity Number Condition Plate Shears Plate Edge Automatic Flame Cutting Automatic Plasma Cutting Power Cutting Saw End Mill Other (e.g., water jet) FORM A4304 (2014-06-04) P AGE 13 OF 20

8.3 Welding Equipment: A. Welding Equipment: Power Current Range B. Automatic Welding Equipment: Number Type C. Welding Positioners: Number Capacity D. Turning Rolls: Number Capacity E. Other: 8.4 Size and number of level beds for horizontal tower and pressure vessel construction: FORM A4304 (2014-06-04) P AGE 14 OF 20

8.5 Forming Equipment: Hydraulic Press Type Capacity 8.6 Plate Rolls: Type Maximum Plate Thickness Length Minimum I.D. 8.7 Brakes: Type Capacity Plate Thickness Length 8.8 Angle Rolls: Type & Capacity 8.9 Tube and Pipe Bending: Facilities for cold bending including table, machines and limitations: Facilities for hot bending including furnace description and sand loading equipment: FORM A4304 (2014-06-04) P AGE 15 OF 20

8.10 Machine Tools (Number, Maximum, Size and Type): Boring Mills-Vertical Clearance Under Crosshead Boring Mills-Horizontal Lathes Radial Drill Presses Punches 8.11 List any other machines of interest (give number, type and size): Machine Number Type Size 9.0 TESTING FACILITIES AND EQUIPMENT 9.1 Non-Destructive Testing Equipment: X-Ray Machine: Number Capacity Voltage & Penetration: Gamma Ray: Number Capacity FORM A4304 (2014-06-04) P AGE 16 OF 20

Magnetic Particle Inspection Machines: Number Type Liquid Penetrant Inspection Equipment: Type PMI Inspection Equipment: Type Hardness Testing Inspection Equipment: Type Ultrasonic Testing Inspection Equipment: Type: 9.2 Physical Test Equipment: Tensile Testing: Type Capacity Bending Facilities: Impact Testing: Type Capacity Lowest Temperature: 9.3 Pressure Testing Facilities: A. Hydrostatic: Maximum Pressure: PSI B. Air: Maximum Pressure: PSI FORM A4304 (2014-06-04) P AGE 17 OF 20

C. Other: 10.0 SHOP LOADING / CAPACITY 10.1 What is your capacity per month for the coming year in your production shop? First Quarter Second Quarter Third Quarter Fourth Quarter 10.2 What is the present production shop loading committed for the coming one year period? First Quarter Second Quarter Third Quarter Fourth Quarter 11.0 MANUFACTURING LIMITATIONS / RECOMMENDATIONS (Indicate Material, Size, Thickness, Weight Limitations; Shipping Limitations, etc.) 11.1 Vessels: FORM A4304 (2014-06-04) P AGE 18 OF 20

11.2 Columns: 11.3 Exchangers: 11.4 Pipe Spools: 11.5 Other: FORM A4304 (2014-06-04) P AGE 19 OF 20

12.0 SUPPLIERS AUTHORITY Completed and signed on this the day of. 201 For and on behalf of (Supplier) Signature: Name (Print): Title: 13.0 RESPONSE INSTRUCTIONS Once the above information is complete, also complete the Pre-Qualification Form Health, Safety and Environment Questionnaire document found on the Bantrel Suppliers & Contractors (http://www.bantrel.com/suppliers-and-contractors) website listed in the helpful links section. The Contractor & Supplier Registration Workflow document illustrates the working steps to both register and pre-qualify your company. Then Please email your response to Bantrel with both pre-qualification documents attached to the attention of the contact listed in the Key Contacts document found in the helpful links section of the above website. You should receive confirmation that your documents have been received. FORM A4304 (2014-06-04) P AGE 20 OF 20