DRAFT. Renewable Energy Sources

Similar documents
POLISH INCENTIVE SCHEMES FOR RENEWABLE ENERGY GENERATION

Auctions preparation, course, wins. Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office

PIGEO s Detailed Position. on Oversupply of Green Certificates

Indonesia update: Tariff framework for renewable energy

Calculating the Level of the Renewables Obligation

France renewable energy policies

ROMANIAN GREEN CERTIFICATES SYSTEM

THE OUTLOOK FOR BIOMASS ELECTRICITY IN THE UK

Good practice policies promoting efficient biomass use

New market mechanisms for renewables in Poland. Opportunity or threat?

Energy policy support instruments for renewable energy sources: key principles & lessons learnt

Methodology for calculating subsidies to renewables

Legislation in Europe and in Poland concerning RES and energy efficiency

The German Market Promotion Initiatives for Renewable Energies

Energy from Renewable Sources Act

The goals for renewable energy share of all energy

Section 6 - Renewables

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

2001~2011 : FIT: Feed-In-Tariff 2012~present : RPS Spot market : auction, once a month (

New England State and Federal Laws and Regulations and the Electric Power Sector

Germany: Energy Briefing

Renewable Energy Sources: National Targets and Legal Framework

Act no of October 27, 2016 Promotion of Renewable Energy Act Act no. 418 of April 25, 2016 the Electricity Supply Act

New England States Committee on Electricity

Country profile: Austria

The legal framework of electricity generation from biomass/biogas in Greece

Danish Offshore Wind Tender Model

Competitive energy landscape in Europe

Remuneration scheme for renewable energy facilities following the last three renewable capacity auctions in Spain

The German Electricity System

Bulgaria Energy efficiency report

Overview of Czech and German Renewable Energy Policies

2012 Indiana Renewable Resources Study

Renewables subsidy schemes in Europe. Energy Economics Summer School, University of Auckland 19-Feb-2018

Supporting and integrating RE-Electricity in Italy The GSE experience IEA DSM Task XVII Seoul, Korea, September 2008

Headline Germany - Experiences with implementing RES E auctions

Phone: Mobile: ENERGY LEGISLATION

Stranded Assets in the Utilities Sector as Europe Moves to a Low Carbon Society

Positioning Nelson Mandela Bay for Renewable Energy Manufacturing Opportunities

Renewable Energy Sources Albania. Ministry of Energy and Industry 2016

Legal and Financial Incentives for Renewable Energy in the Middle East. Joe Huse January

Comparison of Renewable Portfolio Standards (RPS) Programs in PJM States

Energy in Denmark a framework for renewable energy. Lars Georg Jensen Chief Adviser, Energy Systems, Danish Energy Agency Dublin, RE Summit 2016

No. 180/2005 Coll. PART ONE PROMOTION OF ELECTRICITY PRODUCTION FROM RENEWABLE ENERGY SOURCES TITLE I GENERAL PROVISIONS

Energy from waste in Flanders (Belgium) Lecturer: Paul De Bruycker Date: June 12th, 2008 Location: 4th CEWEP Congress, Bordeaux

PARTICULARS OF THE COMPANY

Green Certificate Document which proves that a quantity of 1 MWh of electricity was produces from renewable energy sources.

Towards a sustainable Romanian energy sector: Roadmap to RES in 2030 Deloitte Romania, June 2018

State Policy in the Biogas Arena

Energiewende. Germany s energy system and the status of the energy transition. Sarina Keller. German Aerospace Center Sept 1st,

Consultation on Competitive CfD Allocation Response from the Renewable Energy Association

Renewable & Alternative Energy Resources: What s the difference? 2

RENEWABLE ENERGY INSURANCE WE RE BIG ON A CLEANER FUTURE

How achievable are the UK s 2020 renewable energy targets?

Summary The world's capacity of renewable energies including hydropower is expected to increase from 2,200 GW at the end of 2017 to over 2,600 GW at t

Renewables Industry Confidence Survey

Renewable Energy in Sweden an Overview

Low and Zero Carbon Technologies: OPPORTUNITIES AND THE MCS

Seven temptations of the Polish power sector in 2016

Implementation of Cogeneration Directive (2004/8/EC) in Poland

Renewable energy: Investing in Africa

Massachusetts Solar Carve-Out Program

General overview for investors in Hungary s energy market

EUROPEAN COMMISSION. Brussels, C(2009)2237

Labelling provision in Directive 2003/54/EC

Country case study: RES support in Germany Prepared by Jenny Winkler

TABLE OF CONTENTS 6 RENEWABLES 2017

Published on Market Research Reports Inc. (

A Utility s Experience in Renewables. August 16, 2004

The main features of the Act on granting priority to renewable energy sources (Renewable Energy Sources Act) of 21 July 2004

COMMUNITY POWER FOR THE COMMON GOOD.

Wind Energy The Facts

Overview of renewable energy

The Role of the Regulator in the Promotion and Development of Renewable Energy

>> TRENDS IN INDUSTRIAL WASTE MANAGEMENT:

Legal Framework enabling PV Iran. Mohammad H. Ghafouri Esmaeil Vasaf. Teheran, Dec. 21th, 2015

The new EEG Basis to double the RES-E share until 2020

Outline of the Revised Renewable Energy Act

Context Three numbers and three core global energy challenges: 6.5 million premature deaths each year can be attributed to air pollution 2.7 degrees i

Green Electricity in Austria - Summary 2010

Renewable Energy Sources Act. Progress Report 2007

Green Electricity Report 2011

Renewable energy policy database and support RES-LEGAL EUROPE

Christine Lins Executive Secretary

Community Choice and Renewable Energy

Date: March 23, 2015 Docket #: 4541

Reglementary developments about biogas Gérard DENOYER Renewable Energy Office Ministry for the Ecological and Inclusive Transition

Hungary Ministry of National Development Report

European Parliament plenary vote, 17 January this Directive have the sole function of showing

PPAs: Bridging the Gap between Private Energy Sustainability Needs and Utility Infrastructure. Trey Davis, President, MEDA

Vattenfall Capital Markets Day 2008

Comparative Legal Aspects of Renewable Energy Sources in the Russian Federation and China Ekaterina M. KOLOGERMANSKAYA

SEVILLA, 21st March2007

What will be the new scenario in Italy with the approval of the regulation on biomethane? Davide Valenzano - Federica Ceccaroni

Renewable Energy Sources and Combined Heat and Power. Paweł Płachecki Department of Energy Enterprises RES and CHP Unit

Small scale Hydro Electric Power IPP compliance with legislation and REBID process

Risks And Opportunities For PacifiCorp State Level Findings:

WP 3.3: Policy Roadmap for large-scale biogas implementation in Latvia

Royal Decree 661/2007 of 25 th May, regulating the electricity production under the special scheme

Renewable Energy Policies in Southeast Asia. Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018

Transcription:

Renewable Energy Sources Financial parameters of auctions for renewable energy sources Legal Alert April 2017 On 3 April 2017 two regulations were published in the Journal of Laws which set out the financial parameters of auctions for renewable energy sources ( RES ) that will be held in 2017. The government is planning to spend more than PLN 27 billion (approximately EUR 6.5 billion) on support for producers in auctions, which will generate over 55 TWh of electricity over 15 years. The parameters of the auctions are set out below. Summary In 2017, fourteen auctions will be organized, each of them dedicated to different groups of installations. Nearly 75% of the funds (PLN 20 billion) will be allocated to the New 1. Nearly 63% of all funds (PLN 17 billion) is allocated to the Large 2. So- called stable installations will be the most favored group of installations. The largest part of the funds is allocated to a basket of high-efficiency installations (37% of funds in 4 auctions). Biomass installations are expected to be a dominant group in this basket. Significant funds (35% in 4 auctions) will be allocated to agricultural biogas installations. It is planned to allocate funds to Waste-to-Energy projects, which should assure the construction of installations with nearly 150 MW of total capacity (1 auction dedicated for New, Large ). Part of the funds is also allocated to a basket dedicated to hydro-electric plants, both existing and new ones (3 auctions). Another part of the budget is allocated to a basket for New covering other installations (15% of funds in 2 auctions). In this basket, two auctions are planned: (i) for Small that, according to the government s intention, will result in the construction of 300 MW new photovoltaic projects, and (ii) for Large, where support could be obtained by nearly 150 MW new wind projects. Significant competition is expected in these two auctions. 1 There are RES installations which started production of renewable energy before 1 July 2016 ( Existing ) and after 1 July 2016 ( New ); 2 There are installations with capacity of up to 1 MW ( Small ) and those with capacity of over 1 MW ( Large ); In this issue... Summary...1 Auction support scheme...2 Split of auctions and auction baskets in the Auctions System...2 Budget allocations for 2017...3 Reference prices...4 Possible auction dates...4 The effect of winning an auction and support period...4 Auctions in particular baskets...5 Appendix no 1...8 Appendix no 2...10 Please contact us if you would like to discuss any subject covered in this issue.

participating in an auction cannot apply for higher support than the reference price, which is determined for each year. The reference price is set separately for 21 categories of installations. In 2017, for example this price will be PLN 350 per MWh for Large using wind and PLN 450 per MWh for Small using solar energy. Auctions will be announced by the President of ERO and cannot be organized earlier than 30 days after its announcement. In light of the RES Act, an auction could be organized at the earliest on 24 May 2017, but no announcements regarding auctions have been made to date. Auction support scheme Under the Act of 20 February 2015 on renewable energy sources ( RES Act ), there are two support schemes for RES installations in Poland. Existing can obtain support in the form of certificates of origin ( Green Certificates ) and can sell electricity to designated entities at the officially determined price ( System of Certificates ) 3. New will compete for support allocated in auctions ( Auction System ) organized by the President of the Energy Regulatory Office ( ERO ). The Auction System is dedicated mainly to New, but Existing can also transfer to this System (in such case they lose a right to participate in System of Certificates). This system is intended to assure the future development of RES, but in a controlled and predictable manner this may be pursued through the allocation of budgets to auctions where installations favored by the government start and through the reduction of budgets for auctions for unwanted installations. The increase in RES in Poland and the contemplated impact of auctions in 2017 on the installed capacity of RES is presented in Figure no 1. Split of auctions and auction baskets in the Auctions System Auctions are conducted separately for installations qualified for particular baskets (or bands). There are 5 baskets (two additional baskets will be added from 1 July 2017, but no funds are allocated to them in 2017). The following existing baskets are dedicated to particular RES installations: with a degree of utilization of the installed electricity generation capacity, irrespective of the level of CO 2 emission, of more than 3504 MWh/MW/ year; ( Basket of High-Efficiency ); using, for the generation of electricity, biodegradable industrial waste and municipal Figure no. 1 Increase in renewables capacity (MW) in Poland 1500 1200 900 600 300 0 563 2010 526 2011 1 334 2012 1 095 2013 solid waste of plant or animal origin, including waste from waste treatment systems and waste from water treatment and waste treatment, including in particular sludge, in accordance with the provisions on waste concerning classification of energy recovered from thermal waste treatment; ( Basket of WTE ) in which emission of carbon dioxide does not exceed 100 kg/mwh, with utilization of total installed capacity of more than 3504 MWh/MW/year; ( Basket of Low-Emission ) using only agricultural biogas to generate energy; ( Basket of Biogas ) and other than those specified above ( Basket of Other ); In each of those baskets, separate auctions are organized for Existing 2014 2015 1 446 2016 Auction 2017 Source: data from President of the ERO. The data concerning the capacity from the auction in 2017 presents only the estimation of the Ministry of Energy. 518 941 830 3 From 1 January 2018, only RES installations with a capacity less than 500 kw and agricultural biogas installations will be able to benefit from mandatory purchase of electricity. 2 dentons.com

and New. Moreover, separate auctions are organized for Small and Large. Separate auctions will be organized for socalled upgraded installations, but no budget has been provided in 2017. (as it was in 2016). Therefore, in each year and in each basket, up to 4 auctions are possible and in total up to 20 auctions may be organized, each of them dedicated to different groups of installations (40 auctions including upgraded installations) Budget allocations for 2017 In 2017, the auction budget is PLN 27,177,622,626 and support will be provided for the production of 55 562 607 MWh over the coming years. The individual budgets are presented in Table no 1 below. Conclusions from the above data: In 2017 the auctions will be dedicated mainly to New 75% Figure no. 2 Breakdown of auction funds in 2017: Large v. Small and Existing v. New Small Large 37% 63% of funds is allocated to these installations. The most supported technologies are stable installations, i.e. with predictable generation, mainly from the Basket for High- Efficiency (37% of all funds) and from the Basket for Biogas (35% of all funds). Large 25% 75% Source: Regulation of the Council of Ministers regarding the maximum volume and value of electric energy generated in renewable energy source installations which may be sold by auction in 2016. Old New will be dominant, as 63% of all funds have been allocated to these installations. A breakdown of funds between Large vs. Small and Existing vs. New is presented in Figure no 2. Table no. 1 Budgets of Auctions in 2017 Basket of High- Efficiency Basket of WTE Existing New Small Large Small Large 556,174,673 PLN 1,659,047 MWh (A-3) 3,768,589,370 PLN 10,502,338 MWh (A-4) 308,182,262 PLN 825,000 MWh (A-7) - - - 5,423,952,758 PLN 10,500,000 MWh (A-10) 2,242,015,403 PLN 4,644,000 MWh (A-13) Basket of Low-Emission 631,329,732 PLN 1,484,764 MWh (A-2) - 299,025,631 PLN 540,000 MWh (A-8) 305,387,878 PLN 540,000 MWh (A-9) Basket of Biogas 683,370,550 PLN 1,149,296 MWh (A-5a) 1,260,181,015 PLN 2,118,162 MWh (A-5b) 5,280,863,522 PLN 8,190,000 MWh (A-11) 2,263,227,224 PLN 3,510 000 MWh (A-12) Basket of Other - - 2,182,908,687 PLN 4,725,000 MWh (A-1) 1,972,413,921 PLN 5,175,000 MWh (A-6) dentons.com 3

A more detailed description of each of the auctions is provided in point 8 below. Reference prices An RES installation producer cannot submit at auction a bid that is higher than the maximum reference price per MWh. The reference price is determined for each year, separately for each of the 21 categories (42 if we take into account the additional 21 categories for upgraded installations). This division does not coincide with the division into technological baskets. The reference price is uniform for Existing and New. Parts of the reference prices are determined separately for Small and Large, while others are the same for both categories. Below, we present the reference prices for the installations that are intended to be supported by the government in 2017. A summary of all reference prices is set out in Appendix 1 below. Possible auction dates Under the RES Act auctions are announced and organized by the President of the ERO. The announcement should be published in the Public Information Bulletin of ERO at least 30 days before the day of the auction starting. The auction cannot be conducted earlier than 60 days after publication of the reference prices. The regulation determining reference prices in 2017 entered into force on 25 March 2017, therefore this year s auction can be conducted at the earliest on 24 May 2017 (if the President of the ERO publishes the announcement on 24 April 2017 at the latest). Nevertheless, some media say that the main auctions will be organized in the second half of the year. The effect of winning an auction and support period The producer that won the auction will receive support dependent on the capacity of the installation. Producers that have an installation with installed capacity of <500 kw will be entitled to sell their total electricity offered in the auction at the price established at auction to the designated entity (pay-as-bid mechanism). Producers that have an installation with installed capacity of >500 kw will have the right to cover the difference between the market price and the price established at auction in the scope of the volume offered in the auction (termed return of negative balance ) with the obligation to return the surplus if the market price exceeds the auction price (contract-ofdifference mechanism). The support is not also allocated, when the power exchange prices of electricity are lower than zero PLN (with some additional conditions). The support period for New is determined annually together with reference prices. In 2017 it is 15 years. The support period for Existing is also 15 years, but it is calculated from the date the first electricity is generated Table no. 2 Reference price for certain installations in 2017 No. Type of RES installation Reference price 1. Large onshore wind energy 350 385 2. Waste incineration plants 385 385 3. Dedicated biomass combustion installations or biomass hybrid 415 415 systems with aggregated installed capacity of up to 50 MW 4. Large using solar energy 425 445 Dedicated biomass combustion installations or biomass hybrid 420 5. systems, in CHP with aggregated installed capacity of over 50 MW and up to 150 MWt of CHP 435 6. Small using solar energy 450 465 7. Dedicated biomass combustion installations or biomass hybrid 435 450 systems, in CHP with aggregated installed capacity of up to 50 MW 8. Hydropower Large 480 480 9. Hydropower Small 480 470 10. Small using agricultural biogas 550 550 11. Large using agricultural biogas 550 550 Reference price in 2016 4 dentons.com

and fed to the grid, as confirmed by the issued Green Certificate. If, after winning the auction, at least 85% of the quantity of electricity declared in the bid is not generated, a fine will be imposed calculated on the basis of the not delivered volume of electricity and a half of the auctioned bid price. In the case of installations with an assumed efficiency of 3504 MWh/ MW/year, a failure to reach declared capacity utilization leads to the obligation to return all public aid obtained through auctions. Auctions in particular baskets Below, we present a short description of each basket, stating the types of installation supported in accordance with the government s intention. Whenever the amount is given together with the name of a specific installation, it means the reference price for this installation. The grading of individual installations into baskets is given for illustration purposes only; we cannot guarantee that in fact the indicated types of installation will start in any given auction. Basket of High-Efficiency Four auctions will be organized in this basket, but the funds for Small (both Existing and New) constitute only 9%; the funds for Large dominate. Auctions for Large in this basket are dedicated mainly to plants combusting biomass. It is predicted that the following installations can participate in these auctions: Dedicated co-firing combustion installations ( DCCI ) using biomass, biofuels, biogas or agriculture biogas (325 PLN); Hybrid RES installation with aggregated installed capacity >1 MW (405 PLN); Dedicated biomass combustion installations ( DBCI ) or biomass hybrid systems ( HS ) with aggregated installed capacity of up to 50 MW (both 415 PLN); DBCI or HS in CHP with aggregated installed capacity >50 MW and up to 150 MWt of CHP (435 PLN); DBCI or HS in CHP with aggregated installed capacity of up to 50 MW (450 PLN). Potentially this basked may be joined by investors who plan to develop on-shore wind farms (350 PLN) installing new generation turbines. Some claim that in certain technical configurations it would be possible to achieve efficiency at the level required for this basket. The government s intention is a transfer of nearly 50% of Existing combusting biomass (probably the DBCI, although this intention is not clearly stated), but taking into account the reference price it may turn out that the auction winner will be an installation cofiring biomass with coal (DCCI). Competition in this basket is expected, as due to the declining prices of Green Certificates, a transfer to the Auction System may be financially profitable for Existing. In the scope of Large, New the government is planning to award funds that will result in the construction of approximately 100 MW of DBCI. Funds for Small are allocated to installations using biogas other than agricultural, hence for installations using biogas extracted from a landfill site (405 PLN) and biogas extracted from a sewage treatment plant (365 PLN). In the scope of New, it is planned to construct approximately 5 MW of capacity for each type of these installations. dentons.com 5

Basket of WTE In this basket only one auction for Large, New will be organized. Funds from this basket are intended to provide support for waste incineration plants that produce energy (385 PLN). It is planned that resulting from the auction support will be given to installations with total capacity of 150 MW. According to publicly available information, there are five waste incineration plants in Poland which produce nearly 334 000 MWh/ year (this data is an unconfirmed estimation due to the lack of official information in this respect). Assuming that the winning installation will produce the same amount of MWh every year (which gives production of 309,600 MWh annually), contracting the total volume in this basket will result in an increase in the energy generation of those installations of 92% Basket of Low-Emission In this basket three auctions will be organized, all addressed to hydroelectric installations (480 PLN) able to achieve at least 3504 MWh/MW/year. Hydro-electric installations below this threshold will need to participate in auctions in the Basket of Other. Also, Large offshore wind energy (470 PLN) may potentially take part in auction in this basket if such installations will be able to produce more than 3504 MWh/MW/year. 4 Similarly as in the case of the Basket of High- Efficiency this basket may be joined by investors planning to install on-shore wind turbines (350 PLN) of a new generation, if only the information on sufficiently efficient technical setups is confirmed. In the scope of Existing, it is intended that as a result of the auctions from 2017 and 2016 Figure no. 3 Installed capacity in PV plants in Poland (in MW) 300 250 200 150 100 50 0 1 2 2012 2013 Source: data disclosed by President of the ERO. The data concerning the capacity from the auction presents only the estimation of the Ministry of Energy. In 2016 it was intended to support approx. 100 MW of new power, but only 84 offers were chosen in the auction. The aggregated capacity of these offers is unknown, but as the auction was addressed to Small their aggregated capacity may not exceed 84 MW. approximately 80% of existing, small hydro plants will be transferred to the Auction System. The budget for New will enable the construction of 10 MW of Small and 10 MW of Large (this indicates that offshore wind plants can take part in the auction only hypothetically). Basket of Biogas In this basket four auctions will be organized, each solely for agriculture biogas installations (PLN 550). The government in its rationale of regulations did not indicate the percent of Existing that will be transferred to the Auction System in this basket. In the scope of auctions dedicated to New, it is planned to allocate support to Small with total aggregated capacity of 70 MW and to Large with total aggregated capacity of 30 MW. 21 2014 71 2015 99 100 2016 Auction 2016 300 Auction 2017 Basket of Other In this basket two auctions for New are provided. The auction for Small is addressed to solar energy installations, but other installations can also take part in this auction: Small onshore wind energy (320 PLN); Small using solar energy (450 PLN); Hydro-electric Small (480 PLN) installations with efficiency <3504 MWh/MW/year; The last auction in this basket, in December 2016, was the only auction where the bids outstripped available volume (from 152 bids only 84 were chosen). Keen interest is also expected this year, although funds allocated to the auction are nearly three times larger. It is planned 4 Taking into account that currently known connection conditions for off-shore installations book capacity around the 1000 MW threshold, exceeding many times the assumed budget of auctions, we treat participation of investors based on this technology as purely hypothetical. 6 dentons.com

that support will be obtained by installations with total capacity of approximately 300 MW in this auction. If solar plants obtain the said support, it will mark a significant increase in the capacity of these installations. The installed capacity of solar energy installations in Poland and the contemplated impact of the auction in 2017 on this capacity is presented in Figure no 3. Keen competition is expected in the auction for Large, which is addressed to wind energy plants. The following installations can take part in this auction: Large onshore wind energy (350 PLN); Large using solar energy (425 PLN); Large offshore wind energy (470 PLN) installations with efficiency <3504 MWh/MW/year; Keen competition is expected in this basket, which is dominated by onshore wind energy installations. The reasons for this: firstly, the planned budget provides support for approx. 150 MW, which might be significantly lower capacity than available at existing projects that can submit bids in this auction. Practically, in case of submission of bids in the auction by the New with higher effectiveness than the level used for the calculation by the government the volume of offered electricity from these installations will by proportionally higher. In this case, the support will be allocated to installations within limits closer to 100 MW of new generation capacity. Secondly, the negative approach of the current government to wind farms is not a secret. Therefore it is conceivable that the auction in 2017 will be the last one in a few years with funds allocated to this basket. Moreover, the entry into force of the Act of 20 May 2016 on Investments concerning wind turbines stipulates that a building permit for wind turbines issued on the basis of zoning decisions will expire if the occupancy permit is not obtained for the wind turbine by 1 July 2019. Based on our own knowledge, quite a large number of wind turbines were developed on the basis of zoning decisions (not on the basis of local zoning plans, as required by the abovementioned Act). Therefore, in light of the time required to build wind turbines, this auction may be the last chance some wind farms have of obtaining the state aid they need to ensure financial profitability of the project, in light of the occupancy permit issue. Building permits for many projects face expiry and it may prove impossible to obtain new building permits under the new Act. dentons.com 7

Appendix no 1 Reference Prices obliging in 2017 (in PLN/MWh) No. Type of RES installation Reference price for RES installation Reference price for modernized RES installation 1. Small onshore wind energy 320 320 2. Large onshore wind energy 350 350 3. Offshore wind energy installations 470 470 4. Small using solar energy 450 450 5. Large using solar energy 425 425 6. Small using agricultural biogas 550 550 7. Large using agricultural biogas 550 550 8. using biogas from landfill 405 405 9. using biogas from sewage treatment plants 365 365 10. using biogas other than from landfill or sewage treatment plants 355 355 11. Dedicated biomass combustion installations or biomass hybrid systems with aggregated installed capacity of up to 50 MW 415 415 12. Dedicated co-firing combustion installations using biomass, biofuels, biogas or agriculture biogas 325 325 13. Dedicated biomass combustion installations or biomass hybrid systems, in CHP with aggregated installed capacity of up to 50 MW 450 450 14. Dedicated biomass combustion installations or biomass hybrid systems, in CHP with aggregated installed capacity of >50 MW and 435 435 up to 150 MWt of CHP 15. Waste incineration plants 385 385 16. which solely use bioliquids 475 475 17. Hydro-power Small 480 480 18. Hydro-power Large 480 480 19. Geothermal installations 455 455 20. Hybrid RES Small 455 455 21. Hybrid RES Large 405 405 8 dentons.com

dentons.com 9

Appendix no 2 Summary of auctions in 2017 in the order set by the Minister of Energy No. Basket, type of RES installation Budget Dedicated installations Reference price A-1 Basket for Other Small, New 2,182,908,687 PLN 4,725,000 MWh Onshore wind energy using solar energy Hypothetically: Hydropower installations (efficiency <3504 MWh/MW/year) 320 PLN 450 PLN 480 PLN A-2 Basket of Low-Emission Small, Existing 631,329,732 PLN 1,484,764 MWh Hydropower installations (efficiency >3504 MWh/MW/year) 480 PLN A-3 A-4 Basket of High- Efficiency Small, Existing Basket of High- Efficiency Large, Existing 556 174 673 PLN 1 659 047 MWh 3 768 589 370 PLN 10 502 338 MWh using biogas other than from landfill or sewage treatment plants using biogas from sewage treatment plants using biogas from landfill DCCI using biomass, biofuels, biogas or agriculture biogas Hybrid RES installations DBCI or HS with aggregated installed capacity of up to 50 MW 355 PLN 365 PLN 405 PLN 325 PLN 405 PLN 415 PLN DBCI or HS in CHP with aggregated installed capacity >50 MW and up to 150 MWt of CHP A-5(a) A-5(b) A-6 Basket of Biogas Small, Existing Basket of Biogas Large, Existing Basket for Other Large, New 683 370 550 PLN 1 149 296 MWh 1 260 181 015 PLN 2 118 162 MWh 1 972 413 921 PLN 5 175 000 MWh DBCI or HS in CHP with aggregated installed capacity of up to 50 MW using an agricultural biogas using an agricultural biogas Onshore wind energy using a solar energy Hypothetically: Offshore wind energy installations (effectiveness over 3504 MWh/MW/year) 435 PLN 450 PLN 550 PLN 550 PLN 350 PLN 425 PLN 470 PLN 10 dentons.com

A-7 A-8 A-9 A-10 Basket of High- Efficiency Small, New Basket of Low-Emission Small, New Basket of Low-Emission Large, New Basket of High- Efficiency Large, New 308 182 262 PLN 825 000 MWh 299 025 631 PLN 540 000 MWh 305 387 878 PLN 540 000 MWh 5 423 952 758 PLN 10 500 000 MWh using the biogas other than extracted from a landfill site or a sewage treatment plant using biogas extracted from a sewage treatment plant using biogas extracted from a landfill site Hydropower installations (effectiveness over 3504 MWh/MW/year) Hydropower installations (effectiveness over 3504 MWh/MW/year) Hypothetically: offshore wind energy installations (effectiveness over 3504 MWh/MW/year) Potentially: some new generation onshore wind energy DCCI using biomass, biofuels, biogas or agriculture biogas Hybrid RES installations DBCI or HS with aggregated installed capacity of up to 50 MW DBCI or HS in CHP with aggregated installed capacity of over 50 MW and up to 150 MWt of CHP DBCI or HS in CHP with aggregated installed capacity of up to 50 MW Potentially: some new generation onshore wind energy 355 PLN 365 PLN 405 PLN 480 PLN 480 PLN 470 PLN 350 PLN 325 PLN 405 PLN 415 PLN 435 PLN A-11 A-12 Basket of Biogas Small, New Basket of Biogas Large, New 5,280,863,522 PLN 8,190,000 MWh 2,263,227,224 PLN 3,510,000 MWh using agricultural biogas using agricultural biogas 450 PLN 350 PLN 550 PLN 550 PLN A-13 Basket of WTE Large, New 2 242 015 403 PLN 4 644 000 MWh Waste incineration plants 385 PLN dentons.com 11

Contacts Arkadiusz Krasnodębski Poland Managing Partner, Head of the Energy and Natural Resources practice team in Poland and Europe D +48 22 242 56 63 arkadiusz.krasnodebski@dentons.com Tomasz Janas Partner D +48 22 242 51 04 tomasz.janas@dentons.com Agnieszka Kulińska Counsel D +48 22 242 57 40 agnieszka.kulinska@dentons.com Michał Motylewski Counsel D +48 22 242 56 66 michal.motylewski@dentons.com 2017 Dentons. Dentons UKMEA LLP is a limited liability partnership registered in England and Wales under no. OC322045. It is authorised and regulated by the Solicitors Regulation Authority. A list of its members is open for inspection at its registered office: One Fleet Place, London EC4M 7WS. Any reference to a partner means a person who is a partner, member, consultant or employee with equivalent standing and qualifications in one of Dentons affiliates. CSBrand-2914-Client mailing alerts_eng 20/04/2017 dentons.com