Unitex Systems Checklist

Similar documents
Unitex Systems Checklist

Unitex Base Board Lightweight External Cladding System

HEAD OFFICE 22 Park Drive Dandenong VIC Phone: (03) Fax (03)

UNITEX BASE BOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 758 [2011] Appraisal No. 758 (2011) BRANZ Appraisals

FOCAL POINT RENDAPANEL TM CLADDING SYSTEM

Specifications for Insulation Board wall and ceiling applications

Note:

INSULCLAD EXTERIOR CLADDING SYSTEMS

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

Contents. Timber framing to be installed in accordance with AS:1684 Metal framing to be installed in accordance with BCA Volume: 2

Knauf Wall Liner. Head Track. Brackets. Wall Lining Stud. Fixings. Knauf Plasterboard. Floor Track. 98 Wall Liner

Appraisal Report for. Building Product Accreditation. For the. NuCLAD. polystyrene exterior insulation and finishing system

Typical detail: New roof with breathable underlay

NU-WALL EXTRUDED ALUMINIUM CLADDING. Installation Specifications Vertical orientation (over cavity)

www. unitex.com.au Technical Manual Unitex Base Board System June 2015 Cavity

Concrete Soffit Direct Fix

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

A Handbook of thermal bridging details incorporating aircrete blocks

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

Tundra is created from New Zealand plantation Douglas Fir heart wood. Width x Thickness (mm) Approx. Cover. Vertical Shiplap

SECTION B Steel Frame Wall Systems. Contents. Steel Stud Selection Tables. Introduction. Design Considerations. Installation.

NOVABRIK MORTARLESS CONCRETE BRICK VENEER SPECIFICATION. MASTERFORMAT SECTION (Mortarless Concrete Brick Veneer)

Technical Manual. Harpro Low-Rise Multi-Residential & Houses External Wall System HBG-001, March 2015 Homebuild Global Pty Ltd

EasylationWall. External Wall Insulation System. bringing european innovation

Insulated Lightweight Cladding Systems

BRICKWORK 3.5 BRICKWORK 1 GENERAL

ECO Wall & Floor Panels

A Handbook of thermal bridging details incorporating aircrete blocks

SECTION BRICKWORK PART I GENERAL

SECTION GYPSUM BOARD

11/09/2018 LBP licence classes

ROCKCOTE RESENE MONOTEK SYSTEMS

HomeGuard Precision Termite Management

Real Stone Cladding mm sandstone ashlar. Thin Sandstone Ashlar Catalogue

STRATUM GUARD I AND II An Exterior Insulation and Finish System with Drainage DSC106C. Stratum Guard I and II System Installation Details

CERTIFICATE OF CONFORMITY This product Certificate is issued under Section 269 of the Building Act 2004 for:

DIRECT-TO-FRAME SYSTEM DIRECT-TO-FRAME SYSTEM TECHNICAL DOCUMENT: SYSTEM INSTALLATION & CONSTRUCTION DETAILS

SECTION GYPSUM BOARD SYSTEM

SPECIFICATION GUIDELINE

CONCRETE TILE PAVERS

THERMAL INSULATION SYSTEM

Specification for Solid Timber Flooring Installation, Sanding and Coating

HomeGuard GT Granular Termiticide

FASTER. BETTER. STRONGER. Australia s trusted lightweight building product

Installation & Specification Manual Board Fixing

SECTION BRICKWORK

Technical Data Sheet

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION GYPSUM BOARD SYSTEM

2019 IAQA Annual Meeting

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

Corium Brick Rainscreen System Specifications

Multi-Institutional Academic Health Science & Research Center Evansville, IN

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1

Warmshell External wall insulation system Design guidelines for masonry

SECTION GYPSUM BOARD & SHEATHING SYSTEMS

104 References Comply with applicable portions of current editions of the following Australian Standards:

PUTZ TECHNIK SYSTEM 300

TREAT RISING DAMP AND REDECORATE IN UNDER 24HRS

Unitex Application & Fixing Guide USAGE & INSTALLATION GUIDE

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

K17 Insulated Plasterboard

GAF EnergyGuard Polyiso Wall Sheathing

.1 Provide textured finish system for gypsum or cement board soffit and ceiling surfaces.

PTY LTD. Paskaseal SRB. Screed Replacement Base

Fire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.

INSULCLAD EXTERIOR CLADDING SYSTEMS DESIGN AND INSTALLATION MANUAL

WeatherSmart Air Barrier Installation Guide

1 P a g e w w w. s m o k e c o n t r o l. c o m. a u

tra-load Damp Proof Courses Product and Systems Overview

Form Block V I C / S A

SEPARATING WALLS CLASS 1A

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

HILTI CP 674 Cavity Closure For Rainscreen / Cladding Systems

K-SERIES EXTERNAL INSULATION & FINISH SYSTEM_

External Thermal Insulation Composite System Insulation below ground level

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

K18 Insulated Plasterboard

AS Interpretation of External Waterproofing as it applies to Melbourne, Class 1 buildings

URSA TF Roll URSA GLASSWOOL.

USG BORAL WET AREA SYSTEMS. Product. Scope. Building Regulations. Appraisal No. 955 (2017) BRANZ Appraisals

WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED.

CERTIFICATE OF CONFORMITY

ENVELOPE The Ultimate In Performance In A Dry-Joint System RAINSCREEN (RS) SYSTEM TECHNICAL MANUAL

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY

TECHNICAL DOCUMENT: SYSTEM INSTALLATION & CONSTRUCTION DETAILS

SECTION GYPSUM BOARD

SCYon tm THE BUILDING MATERIAL OF THE FUTURE

GypLyner (walls) Metal framed wall lining system. GypLyner.

GreenClad tm Insulated Facade System TECHNICAL AND INSTALLATION MANUAL

MLC MASONRY AND BRICK PLASTER SYSTEM. Product. Scope. Appraisal No. 839 [2013] Appraisal No. 839 (2013) BRANZ Appraisals

TECHNICAL MANUAL. Wall System Descriptions and Building Details. May 13, 2013 V1.3

Thermal Laminate Board.

ENVELOPE The Ultimate In Performance In A Wet-Sealed System ROUT & RETURN (RR) SYSTEM TECHNICAL MANUAL

Union County Vocational - Technical Schools Scotch Plains, New Jersey

NRG Greenboard Insulated Wall Cladding System

SPECIFICATION GUIDELINE

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

PRODUCT OVERVIEW NOVEMBER NEW Secura flooring sizes on pages 23 and 25

Transcription:

CERTIFIED BAL-29 CERTIFIED BAL-40 1/108876 Unitex Systems Checklist Builders & Building Surveyors YOUR WALLS OUR PRIDE

Overview Unitex is proudly an Australian manufacturer, utilising local technology with our own in-house chemists, designing innovative products suitable for the Australian market. A family owned business, with the founding directors continuing to lead the company with innovative product lines. Unitex is considered by Australia-wide industry experts as the premier product coatings system for external façades. This has been achieved by more than 30 years of history in coatings, mouldings and insulation cladding (Unitex Base Board awarded BRAC, BRANZ and CodeMark system accreditations) for award winning commercial and housing projects nation wide. Our customers value the technical on-site expertise of our in-house trained Technical Sales staff. Along with over 100 years combined knowledge and hands-on experience from the senior team, this know-how assures our customers of guaranteed first class product quality and service across the entire organisation. Building Surveyors 1. For your proof of compliance of the specified Unitex Base Board System to the NCC (also known as BCA) ensure you have obtained from the Builder both the signed Unitex Site Completion and Compliance Form and the signed Unitex Product Purchase Conformance Sheet. 2. Refer to the Unitex Technical Manuals at www.unitex.com.au for a step-by-step process with regards to installation and application of Unitex product systems. 3. Please contact Unitex Head Office on 1800 RENDER for any further queries. Overview & Building Surveyors

Render and Texture System Render and Texture System 1. Read in full and understand the Unitex Granular Marble Pty Ltd Application & Fixing Guide for Unitex Masonry Coatings Systems (available online at www.unitex.com.au/application-manuals) for the application of Renders and Textures. 2. Ensure the masonry or cladding system substrate is acceptable, i.e. clean, dust-free and dry (moisture meter test, <12%WME), for the Unitex Render System to the specific substrate. 4. Prior to Installation, the Installer is to provide the Builder with Unitex Product Purchase Conformance Sheet for site specific stated square meter contract. (Unitex requires Builders email contact and the site address). 5. Prior to installation, the Installer protects all windows, openings and adjoining surfaces etc with plastic proprietary system. 6. Ensure all substrate weep holes have been installed by a brick layer and carry through the render (100mm approximately and all in-line and in level, same height and width). Ensure all substrate expansion joints are un-bridged and open and can carry through the render. Cut expansion joints around perimeter at slab/brick junction, weep holes to fit into this joint. 7. Do not back fill soil over Unitex coatings. 8. Render base coats must be applied thickly enough to hide all substrate irregularities and varying absorptions (with or without preconditioning with Unitex Cembond Substrate Sealer). 9. To allow for unknown substrate movement the builder must provide regular expansion and contraction joints in the masonry substrate as required by the building to prevent movement cracking through the render. 10. Unitex feature profiles must be mechanically (and adhesively) fixed through the system to the substrate frame/masonry. 11. Prior to required final pigmented Protective Top Coats (2 coats) of Unitex PTC ensure render & texture totally dry all other trade works (landscaping, tiling etc) are complete to prevent damage and defect in final fresh surface. 12. Contact your dedicated Unitex Sales Representative for Unitex site completion and compliance form sign off (Technical Manager is the only valid compliance signature). Sign off will only be granted once complete payment has been made to Unitex directly and/or Unitex Accredited Contractor. 13. The above stipulated form (12) along with the Unitex Product Purchase Conformance Sheet (4) is to be provided as proof of conformance for the Unitex system on the nominated site to the Building Surveyor.

Base Board Cavity System 1. Read in full and understand the Unitex Granular Marble Pty Ltd Application Manual for the Base Board Cavity System (available online at ww.unitex.com.au/application-manuals). 2. Ensure the substrate frame is acceptable to carry the Unitex Base Board system (true & level, well braced, studs and noggins at less than maximum allowable centres and building paper installed and sealed as per manual). 4. Prior to Installation, the Installer is to provide the Builder with Unitex Product Purchase Conformance Sheet for site specific stated square meter contract. (Unitex requires the builders email address and site address). 5. Prior to installation, the Installer protects all windows, openings and adjoining surfaces etc with plastic proprietary system. 6. Install Unitex Cavity Closer (horizontal) and Unitex supplied battens (vertical) to all studs through breathable building paper. Also install Unitex supplied battens horizontally along top plate to ensure air seal to roof cavity. 7. Ensure protective Base Blocks are fitted to base of all walls both ground floor and upper floors (leaving nil exposed foam). 8. Ensure that the system is installed minimum 75mm above ground level and all Base Boards are installed horizontally. 9. Embed Unitex approved washers minimum 3mm into Base Board surface and stop with Unitex Polymer Render. 10. Base Board Render (BBR 8.5kg) coating thickness must be minimum 5mm over already stopped up fixing washers. 11. To allow for unknown sub frame movement Unitex requires 75% cut-through expansion joints (Unitex Polycarbonate Mastic) to all penetrations, internal corners, between dissimilar substrates, between floor levels, and regularly at 4-6 meter distance around the perimeter of the building (vertically). 12. Unitex feature profiles must be mechanically (and adhesively) fixed through the system to the substrate frame/masonry. 13. Prior to required final pigmented Protective Top Coats (2 coats) of Unitex PTC ensure all other trade works (landscaping, tiling etc) are complete to prevent damage and defect in final fresh surface. 14. Contact your dedicated Unitex Sales Representative for Unitex site completion and compliance form sign off (Technical Manager is the only valid compliance signature). Sign off will only be granted once complete payment has been made to Unitex directly and/or Unitex Accredited Contractor. 15. The above stipulated form (14) along with the Unitex Product Purchase Conformance Sheet (4) is to be provided as proof of conformance for the Unitex system on the nominated site to the Building Surveyor. Base Board Cavity System

Base Board Non-Cavity System 1. Read in full and understand the Unitex Granular Marble Pty Ltd Application & Fixing Guide for the Base Board Non-cavity System (available online at http://www.unitex.com.au/application-manuals/). 2. Ensure the substrate frame is acceptable to carry the Unitex Base Board system (true & level, well braced, studs and noggins at less than maximum allowable centres and breathable building paper installed and sealed as per manual). 4. Prior to Installation, the Installer is to provide the Builder with Unitex Product Purchase Conformance Sheet for site specific stated square meter contract. (Unitex requires the Builders email address and site address). 5. Prior to installation, the Installer protects all windows, openings and adjoining surfaces with plastic proprietary system. 6. Ensure protective Base Blocks or Unitex approved aluminium channels are fitted to base of all walls both ground floor and upper floors (leaving nil exposed foam). 7. Ensure that the system is installed minimum 75mm above ground level and all Base Boards are installed horizontally. 8. Embed Unitex approved washers minimum 3mm into Base Board surface and stop with Unitex Polymer Render. 9. Base Board Render (BBR 8.5kg) coating thickness must be minimum 5mm over already stopped up fixing washers. 10. To allow for unknown sub frame movement Unitex requires 75% cut-through expansion joints (Unitex Polycarbonate Mastic) to all penetrations, internal corners, between dissimilar substrates, between floor levels, and regularly at 4-6 meter distance around the perimeter of the building (vertically). 11. Unitex feature profiles must be mechanically (and adhesively) fixed through the system to the substrate frame/masonry. 12. Prior to required final pigmented Protective Top Coats (2 coats) of Unitex PTC ensure all other trade works (landscaping, tiling etc) are complete to prevent damage and defect in final fresh surface. 13. Contact your dedicated Unitex Sales Representative for Unitex site completion and compliance form sign off (Technical Manager is the only valid compliance signature). Sign off will only be granted once complete payment has been made to Unitex directly and/or Unitex Accredited Contractor. 14. The above stipulated form (13) along with the Unitex Product Purchase Conformance Sheet (4) is to be provided as proof of conformance for the Unitex system on the nominated site to the Building Surveyor. Base Board Non-Cavity System

Uni-shape Architectural Profiles 1. Read in full and understand the Unitex Granular Marble Pty Ltd Application & Fixing Guide for Unitex Architectural Profiles (available online at www.unitex.com.au/application-manuals) for the application of Uni-shape Architectural Profiles. 2. Ensure the substrate frame or masonry surface is acceptable, i.e. stable, clean, true & level, and dry, prior to installation. 4. Prior to Installation, the Installer is to provide the Builder with Unitex Product Purchase Conformance Sheet for site specific stated meter contract. 5. Prior to installation, the Installer protects all windows and openings with plastic proprietary system. 6. Uni-shape Architectural Profiles are installed after Unitex Render Levelling System is complete but prior to Unitex texture coat and final Unitex PTC application. 7. Measure from wall and prior to installation pre drill Uni-shape Architectural Profiles on flat level surface. 8. Once mechanically installed ensure fixings are adequate and all perimeter Profile to wall surface junctions are correctly sealed both behind and front with Unitex Polycarbonate Sealant. 9. To allow for substrate movement all Profile and Profile junctions must be installed to act as true expansion joints with backer rods and Unitex Polycarbonate Mastic (see manual fixing instructions). DO NOT bridge over wall expansion joints (i.e. cut-through). NB: UPC Patching Putty is only used for patching of screw holes and patching surface blemishes. 10. Ensure the Uni-shape Architectural Profiles are coated only with Unitex PTC (plus sand) to colour of your choice (2-coat minimum). 11. Contact your dedicated Unitex Sales Representative for Unitex site completion and compliance form sign off (Technical Manager is the only valid compliance signature). Sign off will only be granted once complete payment has been made to Unitex directly and/or Unitex Accredited Contractor. 12. The above stipulated form (11) along with the Unitex Product Purchase Conformance Sheet (4) is to be provided as proof of conformance for the Unitex system on the nominated site to the Building Surveyor. Uni-shape Architectural Profiles

Uni-shape Architectural Columns (non load bearing) 1. Read in full and understand the Unitex Granular Marble Pty Ltd Application & Fixing Guide for Unitex Architectural Columns (available online at www.unitex.com.au/installation-manuals) for the application of Uni-shape Architectural Columns. 2. Ensure the Installer is Unitex Accredited at quotation stage and nominates the complete system on the 3. Prior to Installation, the Installer is to provide the Builder with Unitex Product Purchase Conformance Sheet for site specific stated contract. 4. Ensure the Uni-shape Architectural non-load bearing Columns are fit for purpose/void size to receive the load bearing member. 5. Make sure Uni-shape Capitals and Bases are co-installed when sleeving structural member and held in place with soft wedge to prevent damage to column. 6. Confirm that the structural member is fixed to soffit and base. 7. Carry through ground surface finishes (ie screeds and tiling etc.) prior to lowering Uni-shape Architectural Column and Bases into position. 8. Ensure the Uni-shape Capital and Base are set evenly and mechanically fixed to the Uni-shape Column. UPC100 (Unitex Patching Compound) to drill holes. 9. Unitex Mastic Seal junction between Uni-shape Column and Rings with Unitex Sealant (nominally 5mm). 10. Ensure the Uni-shape Architectural Columns are coated only with Unitex PTC to the colour of your choice (2-coat minimum). 11. Contact your dedicated Unitex Sales Representative for Unitex site completion and compliance form sign off (Technical Manager is the only valid compliance signature). Sign off will only be granted once complete payment has been made to Unitex directly and/or Unitex Accredited Contractor. 12. The above stipulated form (11) along with the Unitex Product Purchase Conformance Sheet (3) is to be provided as proof of conformance for the Unitex system on the nominated site to the Building Surveyor. Uni-shape Architectural Columns

The information contained in this document is based on data available at the time of writing, which we believe is accurate and reliable. Unitex reserves the right to change the information without prior notice. Registered Trademarks of Unitex Granular Marble Pty Ltd ABN 42 087 324 477 2015 Date of Publication September 2015

Base Board BAL-29 System 1. Read in full and understand the Unitex Granular Marble Pty Ltd Application & Fixing Guide for the Base Board Non-cavity System (available online at http://www.unitex.com.au/application-manuals/). 2. Ensure the substrate frame is acceptable to carry the Unitex Base Board system (true & level, well braced, studs and noggins at less than maximum allowable centres and breathable building paper installed and sealed as per manual). 4. Prior to Installation, the Installer is to provide the Builder with Unitex Product Purchase BAL-29 Conformance Sheet for site specific stated square meter contract. For BAL-29 sign off, all Unitex system components must be delivered to the project site (and recorded). 5. Prior to installation, the Installer protects all windows, openings and adjoining surfaces with plastic proprietary system. 6. Ensure protective Base Blocks or Unitex approved aluminium channels are fitted to base of all walls both ground floor and upper floors (leaving nil exposed foam). 7. Ensure that the system is installed minimum 75mm above ground level and all Base Boards are installed horizontally. 8. Embed Unitex approved washers minimum 3mm into Base Board surface and stop with Unitex Polymer Render. 9. Base Board Render (BBR 8.5kg) coating thickness must be minimum 5mm over already stopped up fixing washers. 10. To allow for unknown sub frame movement Unitex requires 75% cut-through expansion joints (Unitex Polycarbonate Mastic) to all penetrations, internal corners, between dissimilar substrates, between floor levels, and regularly at 4-6 meter distance around the perimeter of the building (vertically). 11. Unitex feature profiles must be mechanically (and adhesively) fixed through the system to the substrate frame/masonry. 12. Prior to required final pigmented Protective Top Coats (2 coats) of Unitex PTC ensure all other trade works (landscaping, tiling etc) are complete to prevent damage and defect in final fresh surface. 13. Contact your dedicated Unitex Sales Representative for Unitex site completion and BAL-29 compliance form sign off (Technical Manager is the only valid compliance signature). Sign off will only be granted once complete payment has been made to Unitex directly and/or Unitex Accredited Contractor. 14. The above stipulated form (13) along with the Unitex Product Purchase BAL-29 Conformance Sheet (4) is to be provided as proof of conformance for the Unitex system on the nominated site to the Building Surveyor. Base Board BAL-29 System

Base Board Non-Cavity BAL-40 System 1. Read in full and understand the Unitex Granular Marble Pty Ltd Application & Fixing Guide for the Base Board BAL-40 System (available online at http://www.unitex.com.au/application-manuals/). 2. Ensure the substrate frame is acceptable to carry the Unitex Base Board system (true & level, well braced, studs and noggins at less than maximum allowable centres and breathable building paper installed and sealed as per manual). 4. For Unitex Base Board Non-Cavity BAL-40 System sign off, prior to installation the following must be completed: the Installer is to provide the Builder with Unitex Product Purchase BAL-40 Conformance Sheet for site specific stated square meter contract. A Unitex Technical Representative must inspect the project site and frame for compliance. All Unitex system components must be delivered to the project site (and recorded). 5. Prior to installation, the Installer protects all windows, openings and adjoining surfaces with plastic proprietary system. 6. Ensure protective Unitex Base Blocks are fitted to the base of all walls both ground floor and upper floors (leaving nil exposed foam). All penetrations are to be similarly protected around the perimeter with made to order sil and architrave Unitex Base Blocks. 7. Ensure that the system is installed minimum 75mm above ground level and all Base Boards are installed horizontally. 8. Embed Unitex approved washers minimum 3mm into Base Board surface and stop with Unitex Polymer Render. 9. Base Board Render (BBR 8.5kg) coating thickness must be minimum 15mm over already stopped up fixing washers. 10. To allow for unknown sub frame movement Unitex requires 75% cut-through expansion joints (Unitex Polycarbonate Mastic) to all penetrations, internal corners, between dissimilar substrates, between floor levels, and regularly at 4-6 meter distance around the perimeter of the building (vertically). 11. Prior to required final pigmented Protective Top Coats (2 coats) of Unitex PTC ensure all other trade works (landscaping, tiling etc) are complete to prevent damage and defect in final fresh surface (total overall coatings thickness, including re-inforced base render and top coat, minimum 17.5mm). 12. Contact your dedicated Unitex Sales Representative for Unitex site completion and BAL-40 compliance form sign off (Technical Manager is the only valid compliance signature). Sign off will only be granted once complete payment has been made to Unitex directly and/or Unitex Accredited Contractor. 13. The above stipulated form (12) along with the Unitex Product Purchase BAL-40 Conformance Sheet (4) is to be provided as proof of conformance for the Unitex system on the nominated site to the Building Surveyor. Base Board Non-Cavity BAL-40 System