A. Identification of proposed services areas and major problems evaluated in the plan.

Similar documents
BIOLOGICAL NUTRIENT REMOVAL PROCESSES

Section 7: Water & Wastewater

Chapter 2 Screening Approach and Criteria

Water Recycling Facility Project

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E.

Memorandum #9 [11/17, DRAFT #3] 1

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

Pennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning

Wastewater Master Plan Status Update. City of Portsmouth, New Hampshire

WASTEWATER FROM CARBON CAPTURE SPECIAL CONSIDERATIONS FOR WASTEWATER TREATMENT

CITY OF TORRINGTON WATER POLLUTION CONTROL AUTHORITY

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer?

City of Newton Department of Public Works Wastewater

Technology Options for Wastewater Treatment. April 24, 2012

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

APPENDIX D PROCESS SELECTION AND SIZING FOR WASTEWATER TREATMENT FACILITY D-1. COST EFFECTIVENESS OF NITROGEN REMOVAL TECHNOLOGIES

City of Greater Sudbury Infrastructure Background Study APPENDIX A.1. Guideline for Sewage and Water Services

TOWN OF FLEMINGTON SANITARY BOARD, a municipal utility

Joint Liquid Waste Management Advisory Committee. D-B Stage 3 LWMP - Phase 1 Conceptual Assessments

Lynn Township Sewer Authority. Corrective Action Plan. March 2007

WATER AND SEWER SYSTEMS ASSISTANCE ACT - ENACTMENT Act of Jul. 9, 2008, P.L. 915, No. 64 Cl. 71 AN ACT

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

by Edward Ollett BEng (Hons) MICE CEng

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

Technology Options for Wastewater Treatment

OPTION ONE: Collective Management of Decentralized Onsite Wastewater Treatment and Disposal Systems

WESTOVER, WEST VIRGINIA. at Westover and environs, Monongalia County, West Virginia. Filed with THE PUBLIC SERVICE COMMISSION of WEST VIRGINIA

CHAPTER 1 INTRODUCTION

Planada Community Services District Municipal Service Review

Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project

Wastewater Treatment & Water Supply Alternatives Analysis

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Public Sewer System Informational Meeting

Section Wastewater Treatment Element

Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology

Cost analysis of water quality standards. Presentation to Minnesota Legislative Water Commission June 15, 2017

QUINCY 1WATER UTILITY TDS CONTROL. Lloyd Emil Voges Brown and Caldwell 701 Pike St. Suite 1200 Seattle, WA

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER:

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY

MAP & PLAN /REPORT: Ronkonkoma Hub Sewer District

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations

NITROGEN REMOVAL GRANT WEAVER, PE & WWTP OPERATOR PRESIDENT THE WATER PLANET COMPANY. Create Optimal Habitats

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116

Municipal Wastewater Management Chapters Branchville Borough

CHAPTER 1 - GENERAL INFORMATION

Section 5: Infrastructure and Utilities

We Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification

CHAPTER 110 SEWAGE DISPOSAL

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives

INFRASTRUCTURE ELEMENT

SEWERAGE AND SEWAGE DISPOSAL SERVICE

WASTEWATER SYSTEM MASTER PLAN

WEST GLENDIVE PUBLIC MEETING

SECTION 1 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS

Texas Commission on Environmental Quality Page 1 Chapter 30 - Occupational Licenses and Registrations

208 Plan Amendment Process for New Wastewater Treatment Facilities. Pima Association of Governments

COMMISSION ADOPTED POLICY Revenue Policy

Bioprocess Intelligent Operating System -Beyond Ammonia Control-

Minnesota Pollution Control Agency

Sanitary Sewer Service Alternatives. Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

Project Name: Add a unique name that appropriately identifies the submission

AnoxKaldnes MBBR. Biological Treatment of Wastewater WATER TECHNOLOGIES

HSA SEWER PROJECT FAQs

DRAFT. Palmer Wastewater Treatment Plant Preliminary Engineering Report City of Palmer, Alaska

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1

Algae-Based Wastewater Treatment. Using Nature to Treat Waste

LIMITED ENVIRONMENTAL REVIEW (LER) Black River Wastewater Treatment Plant Mechanical Bar Screen Project (aka Traveling Bar Screen Addition)

Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants

Table of Contents. Section 7 Alternatives for Conveyance and Treatment

PLAN SUMMARY HARBORCREEK TOWNSHIP SEWER AUTHORITY ACT 537 SEWAGE FACILITIES PLAN

201 Plan Update for the Village of Gettysburg, Ohio (Darke County)

Terra cotta pipe segments 2 feet long. Joints made with Jute Rope Cast iron force main w/ lead joints Brick manholes w/ 24 diameter castings

Design and Construction of Local Public and Private Sewers and Ancillary Facilities

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM

Demonstration of IFAS Technology for Cold Temperature Nitrification in Lagoon WWTFs at Clare and Ludington, Michigan

*** DRAFT - NOT YET FILED ***

1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL

COMPARISON OF SBR AND CONTINUOUS FLOW ACTIVATED SLUDGE FOR NUTRIENT REMOVAL

12.0 ASSESSMENT OF LEACHATE MANAGEMENT OPTIONS 12.1 Overview

RESOLUTION OF TMACOG SUPPORTING OHIO ONSITE SEWAGE RULES

SUMMARY OF COMMENTS/RECOMMENDATIONS

UPDATE. Funding Decentralized Wastewater Systems Using the Clean Water State Revolving Fund ACTIVITY

Public Information Meeting Wastewater Master Plan

Municipal Wastewater Management Chapters Hampton Township

City of Portsmouth Wastewater Division. Wastewater Facilities and Programs. City Council Briefing and Public Input Session

The operator stated that the rollers in one of the drum filters was recently replaced.

Chapter 3 Regulatory Requirements, Policies and Sewer Agreements

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM

by M k h GROVER Degremont

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements

Utility and service uses are subject to the following regulations: (1) Utility or government installation other than listed.

Transcription:

2. Plan Summary The Official Wastewater Facilities Plan for South Middleton Township is summarized in this chapter. The findings, conclusions and recommendations presented are based on all of the information that was studied. Planning for municipal wastewater facilities is an increasingly difficult task, because of limited funding sources and the resultant enormous burden placed on the local population where municipal facilities may be so vitally needed. Therefore, it is very important for municipal officials and their agents to provide a valid and implementable wastewater facilities plan which provides for the existing needs of the community Just as importantly, is must be an integral part of the Township s planning efforts for new development, such that wastewater disposal does not result in future problems. The task faced by South Middleton Township is somewhat of a mixed bag. On one hand it must address provisions for an expanding municipal sanitary sewerage system. On the other hand it must make provisions for adequate long-term operation of on-lot wastewater treatment and subsurface disposal systems. This plan designates potential service areas for future growth and provides appropriate service area and total population projections. It is fortunate that the township has an extensive municipal sanitary sewerage system. However, one challenge lies in providing sufficient conveyance and treatment capacities to provide for the anticipated growth at an affordable cost. Another challenge for the township is in the form of providing the necessary municipal collection and conveyance facilities to serve areas that may experience inadequate performance of on-lot disposal systems and how to do it affordably. It is one thing for new development to privately construct sewerage facilities and incorporate them into the regional system. It is quite another challenge to sewer existing rural development as it involves involvement by the municipal authority and significantly increased governmental and financial demands. A. Identification of proposed services areas and major problems evaluated in the plan. There are four major sewer services areas within South Middleton Township. Area I is located in the Boiling Springs (Area I-A) and the area north of Boiling Springs along Forge Road east of Carlisle (Area I-B). This are drains to the South Middleton Township Municipal Authority s wastewater treatment plant. Area II is the area south and west of Carlisle and is broken into 10 subwatersheds (Area II-A through Area II-J). This area drains to the Borough of Carlisle wastewater treatment plant. Area III is the area within South Middleton Township that surrounding Mount Holly Springs and drains to their plant. Area IV is an area that was re-routed from the Mount Holly Springs area to the South Middleton Township Municipal Authority plant via a force main (see Previous Wastewater Planning below). The sewer service area map is provided in Appendix G. PS-1

The major problem evaluated in this plan is that the sewer service areas from 1992 are not consistent with the Township s current Comprehensive Plan and Zoning Ordinance. The sewer service areas from the 1992 Plan covered the areas that were typically served by public sewer (e.g. higher density residential, commercial, and industrial users). However, there have been several revisions to the Comprehensive Plan and Zoning Ordinance since that time. As a result, there are several areas outside of the designated sewer service areas that are adjacent to areas with public sewer and zoned for uses typically served by public sewer. This plan will update the areas to be more consistent with the current Comprehensive Plan and Zoning Ordinance, as well as examine those areas in regards to available and future capacity available to service those needs. The analysis also will show that the plant should be utilized as a 1.5 million gallons per day facility and justify upgrades to the facility. Beyond the bounds of the Sewer Service Areas, those areas served by on-lot systems continue to be under the jurisdiction of the Township s Sewage Management Program (see Appendix H). Documentation of the implementation and continued enforcement is contained herein. At the sewage treatment plant, this report also outlines the South Middleton Township Municipal Authority s (SMTMA) compliance with their new NPDES permit which will require the removal of nutrients. Currently, only secondary treatment is required. A feasibility study is in included as Volume 2 of this plan. There is one area that is not presently sewered and should be considered for a future sewer expansion. This extension may done in conjunction with an adjacent future development or it may occur independently. Thus, the purpose of this report is to provide all necessary and available information in the form of a single document which can be used as the basis for sewage facilities planning for the South Middleton Township sewerage system, consistent with the current Comprehensive Plan and Zoning Ordinance, for now and the future. B. Alternative(s) Chosen The alternative chosen to address the inconsistency of the previously approved 1992 Plan with the current Comprehensive Plan is to evaluate those potential sewer service areas within and adjacent to existing sewer service areas. A projection of the possible sewer loading from each of those areas was evaluated, and a comprehensive approach was developed to ensure that those uses typically served by public sewer would be able to do so without and future problems. In order to develop a solution to the compliance with the new NPDES permit, several alternatives were examined. A pilot study was completed, and a treatment alternative was selected. This analysis is contained with the study entitled Enhanced Biological Nutrient Removal Wastewater Treatment Feasibility Study for South Middleton PS-2

Township Municipal Authority dated June 2010 (Final). This is attached as Volume 2 of this plan. To summarize, the following alternatives were examined: 1. 4-Stage Bardenpho Process 2. 5-Stage Bardenpho Process 3. Modified Ludzack-Ettinger Process (MLE) 4. Wuhrman Process 5. Oxidation Ditch Process 6. Vertical Loop Reactor Process 7. 3-Stage Phoredox Process (A20 Process) 8. Modified University of Cape Town Process (MUCT) 9. Integrated Fixed Film Activated Sludge Process (IFAS) 10. Westbank Process 11. Sequential Batch Reactor Process (SBR) 12. Step Feed Process 13. Moving Bed Biofilm Reactor Process (MBBR) 14. Membrane Biological Reactor Process (MBR) 15. BioChem Technology It was determined that Enhanced Biological Nutrient Removal technology should be used, and a five stage IFAS/MBBR process was selected as the preferred alternative. In addition, the study examined the feasibility of the Authority using Nutrient Trading. It was not recommended to pursue purchasing credits as an alternative. However, it was recommended that the Authority investigate the possibility of selling excess credits for Phosphorus and Nitrogen once the upgrade is complete. The study also recommends several preliminary and tertiary treatment alternatives, as well investigates bio-solids handling and processing alternatives, to complement the upgraded plant. For those areas outside of the sewer service areas, a Sewage Management Program was implemented and continues to be enforced. As per regulations, preliminary hydrogeologic studies have been required for areas in the Township underlain by limestone geology and for those areas within ¼ mile of wells tested for high nitrates. A map showing those areas of the Township, based well testing from both 2000/2001 and 2010, is shown in Appendix Z. In addition, as per the approval of the 1992 Plan, certain areas of the Township have been restricted from development relying on on-lot system sewage disposal (See Appendix J). There should be no reason to lift this moratorium. There is one area that is not presently sewered and should be considered for a future sewer expansion. This extension may done in conjunction with an adjacent future PS-3

development or it may occur independently. The area in question contains twelve homes on the west side of Fairview Street south of Manhole CC-10 (see map in Appendix E). This would include an extension of approximately 1,150 feet of main and three manholes. C. Costs The cost of providing sanitary sewers in the areas designated as sewer service areas, but are not currently sewered, will be provided by developers as the land is developed. A detailed cost estimate for the upgrade to the existing South Middleton Township Municipal Authority plant is included in Attachment H of the feasibility study (attached as Volume 2 of this plan). The estimated cost of the plant upgrade and associated improvements is estimated to be $12,551,000. For the expansion of the sewer on Fairview Street, the cost is estimated to be $150,000. The Authority will either draw the money from existing reserves or will borrow the money through a drawdown type bank loan. D. Municipal Commitments The South Middleton Township Municipal Authority (SMTMA) has applied for a H 2 OPA WSSW grant for $8.3 million dollars of the total estimated cost. If successful in being awarded the total requested grant amount, this will leave the municipal commitment of $4,251,000. In the interim, the Authority will solicit proposals from local lending institutions in anticipation having to fund the entire $12,551,000. The Township will need to guaranty the amount of the borrowing in order to secure the best possible interest rates. For the estimated $150,000 project on Fairview Street, the Authority will either draw the money from existing reserves or will borrow the money through a drawdown type bank loan. This is if the adjacent development does not complete the project. PS-4

E. Implementation Schedule The schedule for implementing the plant upgrade and extension of sewer on Fairview Street is as follows: ACTIVITY Submit Act 537 and Special Study Update (Feasibility Study) September 30, 2010 PROJECTED DATE Submit WQM Part II Permit Application September 30, 2011 Award First Contract for Phased Construction Construction Progress Reports September 30, 2012 Quarterly Issue Certification of Substantial Completion (Plant Fully Operational) September 30, 2014 Compliance with Effluent Limitations September 30, 2015 Sewer homes on Fairview Street 2021 PS-5

3. Municipal Adoption See Appendix B 4. Planning Commission Comments See Appendix C 5. Publication See Appendix D 6. Comments and Responses The only written comments we received on the draft plan were from the South Middleton Township Municipal Authority regarding the sewer extension on Fairview Street. The comment and response is included in Appendix E. 7. Implementation Schedule See Section 2.E on previous page 8. Consistency Documentation See Appendix F PS-6