TRAFFIC ENGINEERING DIVISION

Similar documents
TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

VIRGINIA DEPARTMENT OF TRANSPORTATION Documents Required to be Signed and Sealed

STRUCTURE AND BRIDGE DIVISION

COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION CONSTRUCTION DIRECTIVE MEMORANDUM

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION

STRUCTURE AND BRIDGE DIVISION

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

LOCATION AND DESIGN DIVISION

Page 1D-1 Revised language to link from Project Management Manual to Project Management Online Guide.

Land Use Regulations Update. Robert W. Hofrichter Assistant Administrator, Maintenance Division December 3, 2008

CONSTRUCTION DIVISION (CD)

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

STRUCTURE AND BRIDGE DIVISION

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

VDOT s Arterial Preservation Efforts VASITE Annual Meeting June 29, 2017

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, March 10, 1998

LOCATION AND DESIGN DIVISION

STRUCTURE AND BRIDGE DIVISION

2017 Highway Safety Improvement Program Call

STRUCTURE AND BRIDGE DIVISION

Transportation Connectivity, Accessibility and Economic Opportunity Study

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Chapter DESIGN EXCEPTION PROCESS

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

100 Design Controls and Exceptions

10 Stockton 4. Guard Rail and Impact Attenuator Installation. HSIP Cycle 7

PWC Neighborhood Services Conference. February 20, 2016 Aleksandra Tuliszka Assistant Transportation and Land Use Director

TRAFFIC STUDY GUIDELINES

Updated Traffic Impact Analysis Regulations Administrative Guidelines

RIDOT S Statewide Roadway and Asset Data Collection Project

100 Introduction Functional Classification Traffic Data Terrain & Locale Design & Legal Speed...

INNOVATIVE INTERSECTIONS. Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES

Introductions. ASHE Technical Session June 11, Chesterfield County Transportation Department. McCormick Taylor, Inc.

Vermont State Standards and Complete Streets

Traffic Impact Study Guidelines. City of Guelph

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

Business Plan for FY14 FY15

APPENDIX A GUIDELINES FOR THE USE OF BARRIER/CHANNELIZING DEVICES IN WORK ZONES INTRODUCTION

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

RESOLUTION NO

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

SECTION 6. ROAD CONSTRUCTION STANDARDS

Elkton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

City of Berkeley. Guidelines for Development of Traffic Impact Reports

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

Table of Contents Local Agency Guidelines Section B August 2011

ALTERNATIVE PROJECT DELIVERY DIVISION

TRAFFIC PLANNING & ENGINEERING. Part of a diversified family of solutions. jmt.com

2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES

Updated Traffic Impact Analysis Regulations Administrative Guidelines

TRANSPORTATION IMPACT STUDIES

Transportation Performance Measures Safety Target-Setting

Grottoes. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

MEMORANDUM. ~ ~ //. -L/'j L!E.

APPENDIX A GUIDELINES FOR THE USE OF BARRIER/CHANNELIZING DEVICES IN WORK ZONES INTRODUCTION

Traffic Impact Analysis Guidelines. Town of Queen Creek

Traffic And Highway Engineering 4th Edition Solution Manual Free

State of Good Repair (SGR) Program Bridge Prioritization Formula. Structure and Bridge Division

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the

Article 16 Traffic Impact Analysis

Functional Classification

CHAPTER 1 INTRODUCTION

Chapter 4: Developing the Recommendations

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

2017 TRANSPORTATION POLICY STATEMENT

supports the needs of the community and businesses to identify and advertise businesses and activities; and

Actively Managing Your Work Zones: The 6B Solution

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

CONSTRUCTION DIVISION (CD)

Updated August 1, 2016

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No TS-06 September 26, 2013

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Route 670 Connector Road

INCIDENT MANAGEMENT TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSM&O) FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SIX

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS JOB DESCRIPTION

Work Breakdown Structure Element Dictionary Preliminary Engineering

SECTION 10 UTILITIES

ROAD SAFETY AUDIT GUIDELINES. Table of Contents

EXHIBIT A SCOPE OF SERVICES CONSULTANT SERVICES DISTRICTWIDE TRAFFIC SIGNAL RETIMING FINANCIAL PROJECT ID:

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

TRAFFIC CONTROL STANDARDS

Traffic Impact Study Requirements

From Policy to Reality

PRIVATE ROAD AND DRIVEWAY STANDARDS Development Standard #1 (Rev 7/18)

LOCATION AND DESIGN DIVISION

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Comprehensive Transportation Study for Glencoe, MN

SECTION TRAFFIC REGULATIONS

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Special Provisions for Pavement Open Cuts

Transcription:

VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Administrative and Engineering SPECIFIC SUBJECT: Sealing and Signing of Traffic Engineering Plans and Documents by Licensed Professional Engineers APPROVAL: /original signed by/ Raymond J. Khoury, P.E. State Traffic Engineer Richmond, VA July 5, 2017 NUMBER: IIM-TE-362.2 SUPERSEDES: TE-362.1 DATE: July 5, 2017 SUNSET DATE: N/A Changes are shaded. CURRENT REVISIONS: Removed language regarding 2009 effective dates Removed language regarding signing (without sealing) by exempt engineers. This exemption expired on June 30, 2010. Changed signal warrant studies to signal justification reports, consistent with IIM-TE-387. Clarified existing requirement that red light photo enforcement Engineering Safety Analyses be signed and sealed. Other minor revisions as shown in shading. This memorandum defines the requirements for signing and sealing of traffic engineering-related Plans and Documents (hereinafter referred to as Products ) by licensed professional engineers, as per 54.1-402.1 of the Code of Virginia and the regulations of the Department of Professional and Occupational Regulations (DPOR). The following Traffic Engineering Products are to be sealed and signed: 1) Traffic Engineering Studies and Recommendations a) Speed Limit Studies use standard speed study report (includes seal & signature box) b) Signal Justification Reports c) Traffic Impact Analysis conducted by VDOT - insert seal & signature box in d) Red Light Running Photo Enforcement Engineering Safety Analysis - insert seal & signature box in. See VDOT s photo red website for more information. Page 1 of 5

2) Advertised Construction Plans use standard seal and signature blocks on plan sheets as shown in Attachment A. a) Traffic Control Device Plans i) Pavement Marking Plans ii) Sign Plans iii) Traffic Signal Plans iv) Roadway Lighting Plans b) Transportation Management Plans (per the latest effective revision of IIM-LD- 241/IIM-TE-351; for both Construction and Maintenance projects preparer of TMP will seal & sign) i) Includes changing speed limit for Work Zones use form from the latest effective revision to TE Memorandum 350 (includes seal & signature box) 3) Traffic signal design and modification insert seal & signature box in Attachment B into 1 st page header of document a) New signal phasing and changes to signal phasing (See Note E) b) New clearance timing and changes to clearance (yellow and all-red) timing 4) Safety studies requiring detailed engineering and/or detailed crash analysis or corridor traffic safety studies (See Note A) - insert seal & signature box in 5) Guardrail recommendations - guardrail design - use standard seal and signature blocks on plan sheets as shown in Attachment A. 6) Studies and Recommendations for Through Truck Restrictions, Other Truck/Vehicle Restrictions, and Truck Routings (See Note B) use standard through truck restriction report for Through Truck Studies as per 46.2-809 (includes seal & signature box) 7) Operational / Capacity Analysis (See Note D) - insert seal & signature box in 8) Traffic Control Device-related additions or modifications to the Road and Bridge Specifications and Road and Bridge Standards - insert seal & signature box in detailing the new or modified standard. Note that traffic control device standards, specifications, and insertable sheets in effect on July 1, 2009 are grandfathered and not sealed. Notes: A. A review of crash data and the physical characteristics of the roadway that includes an evaluation of potential engineering countermeasures (physical roadway improvements and/or use of traffic control devices) to reduce the potential for crashes at that location or along that section of road. The resulting product (may be a simple design sketch) shall be sealed and signed. B. Through truck restrictions, other truck/vehicle restrictions, and truck routing studies involve a review of crash and traffic data and the physical characteristics of the roadway to be restricted or recommended for routing to truck or vehicle traffic, and where appropriate include the consideration of criteria adopted by the Commonwealth Transportation Board (CTB) or federal requirements for designated (STAA) truck routes. The study includes a recommendation to the CTB or Commissioner of Highways or other authority to approve or deny the proposed truck/vehicle restriction or designated (STAA) truck route on that particular roadway. Page 2 of 5

C. A review of the volume and types of traffic and the physical characteristics of the roadway that includes capacity analysis or traffic flow simulation and considers potential roadway or traffic control improvements to improve traffic flow through the location or section of roadway. D. New left turn signal phasing and changes to left-turn signal phasing requires a sealed and signed Engineering Assessment that documents the engineer s rationale for selecting the left-turn phase mode. This Engineering Assessment is independent of the sealed and signed traffic signal plans. The Engineering Assessment may include an evaluation of intersection geometry, crash data, traffic volumes, and/or other features impacting safety and operations at or near the signalized intersection. The content and requirements of the Engineering Assessment are at the discretion of the VDOT District. Traffic Engineering Division s Guidance for Determination and Documentation of Left Turn Phasing Mode document and Left-Turn Phase Selection Engineering Assessment Workbook may be used to document left turn phasing decisions in a clear and consistent manner. This Engineering Assessment requirement is limited to leftturn signal phasing, and is not applicable to right-turn signal phasing, pedestrian phasing, and phase sequencing (i.e. lead, lag, lead/lag, etc.). The following Traffic Engineering Products do not require sealing and signing: 1. Pedestrian / Bicycle Facility studies 2. Street Lighting Warrant studies 3. Investigations and field reviews resulting in sign and/or pavement marking installation following established policy and standards, i.e. warning signs, guide signs, route shields, edgeline, centerline, pavement messages, etc. 4. Planning level studies (i.e. Feasibility Studies, Small Urban Plans, State Highway Plans, Regional Long-Range Plans, Corridor Studies) 5. Temporary Traffic Control plans that only reference the Work Area Protection Manual. 6. Signal timings for minimum and maximum green, and changes to cycle lengths, splits, and offsets. 7. Road Safety Assessment reports. For locally administered projects, please refer to the Locally Administered Projects Manual. Page 3 of 5

Attachment A The upper right corner next to the project information block is the preferred location of the blocks for sealing and signing. Drawing/Example not to scale. Note: Signature Blocks are not part of the sheet cell. They are separate cells that can be placed inside the sheet cell. The edit test command can be used to modify text as needed. While the preferred orientation horizontal, these blocks may be placed vertically, or in an alternate location if necessary. INTERIOR PLAN SHEETS UPPER RIGHT CORNER VDOT IN-HOUSE & CONSULTANT PLANS SEALING AND SIGNING OF PLANS Page 4 of 5

Attachment B This seal & signature block should be placed on the first page of traffic engineering reports and studies not having a standard report template, preferably in the upper right corner. The electronic seal is placed in the upper box and the electronic signature with date stamp is placed in the center box using VDOT s electronic signature software. Before placing the electronic signature, edit the bottom box to indicate the office location of the signer, e.g. Richmond, Virginia; Salem, Virginia; etc. VDOT - Traffic Engineering [Office Location] Traffic Engineer Page 5 of 5