Single Family Residential Construction Erosion/Sediment Control Standards

Similar documents
APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

LAND DISTURBANCE PERMIT

Best Management Practice (BMP) Guidance Manual

Building Better Storm Water Quality

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

Appendix B Construction SWPPP Short Form

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS

EROSION CONTROL AND GRADING PERMIT APPLICATION

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

SECTION EROSION AND SEDIMENTATION CONTROLS

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

Division of Water Quality (701)

2010 California Green Building Standards Code. Residential and Non-Residential Development

City of Glendale Stormwater Management Plan Checklist

Erosion Control Inspection Form

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Construction Site Inspections

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

Rock Sock (RS) Rock Sock height.

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Residential Building Plan Review Additions and New Home Construction

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Performance Standards Compliance Checklist

Re: Erosion Control Report and Drawings Requirements Accompanying Document

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Please print or type.

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

Erosion & Sediment Control (ESC) for Builders

STORMWATER POLLUTION PREVENTION PLAN

Common Construction-Site BMPs Quick Reference Guide

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

Construction Phasing Bad

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

IN T R A / M IN T R A M

Common Plan SWPPP for

Figure Inlet protection (Source: Minnesota DOT)

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

Storm Water Pollution Prevention Plan (SWP3) Checklist

PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR. Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

SECTION 903 EROSION CONTROL

The Good, The Bad, and The Ugly

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

DIVISION of WATER QUALITY NDPDES PROGRAM

Storm Drain Inlet Protection

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

PART 1 GENERAL REQUIREMENTS

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

WAKULLA SITE PLANNING

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

CITY UTILITIES DESIGN STANDARDS MANUAL

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

Storm Water Pollution Prevention Plan For Kendall s 2 nd Addition Street & Underground Utilities Improvements

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

CITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

Erosion Control Blankets

Construction Stormwater Best Management Practices

SECTION EROSION AND SEDIMENTATION CONTROL

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

City of El Centro. Erosion and Sediment Control Plan Review Checklist. Reviewer: Review Date:

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Organic Filter Tubes. Fe= (Depends on soil type)

Stormwater Pollution Prevention Plan Engineering Department Requirements

Diversion Dikes. Fe=0.95

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

Planning & Building Department. Requirements for Erosion and Sediment Control

Construction Site Runoff Inspections and Enforcement

Water Pollution Control for Work in Sensitive Areas

VILLAGE OF HODGKINS 8990 LYONS STREET, HODGKINS, ILLINOIS OFFICE: FAX:

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS

SECTION TRENCHING, BACKFILL AND COMPACTION

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value

York County STORMWATER LUNCH & LEARN

New Administration Building

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

A. Each Contractor shall comply with the requirements outlined in these documents.

Chapter 2: Selecting Best Management Practices (BMPs)

SECTION EROSION AND SEDIMENTATION CONTROLS

Transcription:

Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended to address all circumstances that can occur during construction. The goal of this booklet is to educate home builders so we can eliminate or reduce the amount of sediment that leaves construction sites and is deposited in the City s streets and storm sewers. Since our streets and storm sewer convey storm water to lakes and rivers, it is important that we keep these sediments and pollutants off our streets and out of our storm sewer system so they will stay out off our lakes and rivers. For lots that are part of a larger subdivision which has a NPDES Storm Water Permit, the homeowner must complete the MPCA Subdivision Registration form. A copy should be submitted to the City before the building permit is granted. The SWPPP that is going to be used on the site should also be submitted and this must be adhered to. All building construction must meet the requirements of the City s Erosion and Sediment Control Ordinance. Best Management Practices: Also know as BMP s, these include but are not limited to temporary construction entrances, silt fence, seeding, erosion control blankets, construction phasing or any other device or procedure that helps reduce erosion and sediment loss. Installation Sequencing: The following is the order in which most BMP s must be utilized. 1. Grass Buffer Strips Ensure that the existing grass buffer strip along the curb lines are not disturbed. If a grass buffer is not established, it should be completed immediately. 2. Inlet Protection Ensure that all storm inlets that receive runoff from your lot have protection. 3. Perimeter Control Devices such as silt fence, wattles, or straw bales must be installed on all areas where runoff leaves your site. 4. Temporary Construction Entrance A stabilized entrance made of rock or gravel shall be installed for access to the property. All vehicles entering the site shall use the construction entrance. 5. Grading/Excavating All BMP s should be installed prior to any grading or excavation. Dewatering for any trenching or excavation must be done in such a manner as not to deposit sediment downstream. Filter bags, sedimentation basins or some other means of removing sediment from dewatering water must be used prior to discharging water off site. Discharge water should be clear. 6. Stockpiles Perimeter control should be installed around all stock piles. They should be stabilized if they are not actively being worked. 7. Backfill and rough grading Care should be taken to avoid disturbing the grass buffer strips. 8. Maintenance All BMP s should be maintained so the devices are functioning properly. All sediment should be removed from the streets, gutters and inlets within 24 hours of the rain event. 9. Final Grading All BMP s should be left in place until the site has vegetation established. 10. Seeding or Sodding The right of way along the curb (boulevard) must be sodded, seeded with erosion mat, seeded with sprayed fiber mulch or seeded with anchored straw mulch within 5 days of final grading completion. All other disturbed areas must be seeded within two weeks of completion. Single Family Residential Construction Erosion/Sediment Control Standards (January 2008) Page 1 of 5

Permit Holders Responsibility 1. If lot is part of a subdivision, permit holder must comply with NPDES permit and SWPPP for the lot. 2. Ensure that adequate BMP s are in place and functioning to until the project is complete. 3. Provide periodic inspection of BMP s at least once a week and after significant rainfalls. 4. Maintain all BMP s in working order. Remove sediment from inlet protection, perimeter control and other devices as needed. 5. Removes all sediment that is deposited on streets or adjacent lots within 24 hours of discovery. Maintenance requirements: 1. Maintains the grass buffer behind the curb at all times. 2. All perimeter control that is collapsed, torn down, or ineffective, is replaced or repaired. 3. Remove sediment from perimeter control devices when sediment reaches 1/3 the height of the device. 4. Remove sediment from inlet protection when it accumulates. Inspections City The City of Brainerd will conduct erosion and sediment control inspections in conjunction with routine building inspections to ensure that the appropriate erosion and sediment control measures are in place and properly secured. If the property is under an MPCA NPDES Permit (Subdivision Registration), the Crow Wing County Soil & Water Conservation District, working in conjunction with the MPCA, may also inspect the site for compliance. The first inspection will occur during the footing inspection. It is expected that the grass buffer strip be maintained, inlet protection and perimeter control be installed, stockpiles protected, and construction entrance installed. BMP s that are not installed or installed improperly will result in the footing inspection to be denied. If sediment is found to be eroding off the construction site, a stop work order may be issued until the sediments are removed and the proper BMP s have been established. At all subsequent inspections, the BMP s will be subject to inspection to make sure they are working properly. BMP s that are not installed or installed improperly will result in the inspection to be denied. If sediment is found to be eroding off the construction site, a stop work order may be issued until the sediments are removed and the proper BMP s have been established. Upon final completion of the project the entire site must be stabilized. This can be done through sodding or seeding the site. Only when vegetation is established can the sediment control devices be removed. Construction BMP s The following few pages give a few examples of the type of BMP s that should be on every site. Additional BMP s may be required depending on the site, its topography, location, layout, etc. For additional information on BMP s visit the City of Brainerd s website at www.ci.brainerd.mn.us/engineering/stormwater. On the storm water page there is information and links to information on additional BMP s that can be used to prevent erosion and control sediment. Single Family Residential Construction Erosion/Sediment Control Standards (January 2008) Page 2 of 5

Boulevard Vegetation Examples The City of Brainerd requires that during new home construction, the boulevard area (the right of way behind the curb to the beginning of the lot line) be vegetated or stabilized the entire time during construction. If the lot has already been graded and has turf established, then all that is required during construction is to leave a 10 grass strip behind the curb when the excavation for the house begins. If this area has not been seeded or if work is required in the boulevard, then this area should be seeded and covered with erosion mat, fiber mulch, anchored straw, or with sod within 5 days of finishing work in the boulevard. This boulevard vegetation acts as a buffer strip and helps prevent sediment from being discharged into the streets and storm sewer. The following methods can be used to maintain or develop the boulevard vegetation and can also be used to develop permanent vegetation on the entire site. The following examples meet the requirements of temporary cover on the site Seed with Erosion Mat Erosion mats are typically 6 or 8 feet wide and 90 feet long. They are made of wood or straw fibers and are covered with a photodegradable net. The mat is held down by staples. The mat provides cover and erosion control until grass is established. Seed with Anchored Straw is shown above in the photo. The straw helps stabilize the soil until grass begins to grow. The straw must be disked anchored to prevent the wind from blowing the straw off site. Seed with Fiber Mulch The mulch provides cover to the soil until the grass grows. Seed with Sod This method provides instant cover to disturbed areas and is the best method for establishing permanent vegetation. Temporary Construction Entrance Each building site must have a designated construction entrance. The entrance shall be graveled or covered with crushed rock. All vehicles that access the site should use the construction entrance. A rock or graveled entrance prevents sediment from being tracked off site from vehicles. Any sediment that is tracked off site must be removed within 24 hours of discovery. The entrance should be maintained by adding rock or gravel if large volumes of sediment accumulate. The drawing on the right shows a typical plan of what a construction entrance should look like. Source: MPCA Stormwater Construction Inspection Guide Single Family Residential Construction Erosion/Sediment Control Standards (January 2008) Page 3 of 5

Perimeter Control Perimeter control is required on all downstream areas on the site where runoff could leave the site. Items that can be used for perimeter control include silt fence, wattle (bio rolls), seeded top soil berm, or straw bales. Silt Fence is the most common type of perimeter control used. To be effective the silt fence must be installed properly. To install correctly, the bottom of the fence must be installed in a 6 inch deep trench and anchored with soil as shown in the detail. Wattles, also known as biorolls or sediment logs, are made of straw or wood fiber bound by a net to form a shape of a tube. They are typically 6 to 12 inches in diameter are usually 8 to 10 feet long. The wattles are held in place by placing a stake. The wattles are easy to install and work great for providing perimeter control next to sidewalks or curb and gutter. Straw bales work as excellent perimeter control to prevent sediment from running into wetlands or low areas. Single Family Residential Construction Erosion/Sediment Control Standards (January 2008) Page 4 of 5

Inlet Protection Inlet protection is required on all storm sewer inlets located downstream of the construction site where runoff from the site may enter. The inlet protection must be installed prior to disturbing the ground, and only removed when vegetation on the lot is established. Miscellaneous Items Other pollution control items that need to be addresses during construction include site waste control, concrete washout, and dewatering. During construction, all construction waste on the site should be put in an approved container. Care should be taken to prevent debris and garbage from being blown off site. Hazardous materials such as gas, oils, paints and solvents should be stored in proper containers to prevent leaks and should be disposed of properly. Concrete washout on the site should be at a location which will not discharge off site. Washing concrete out into the street or into storm water inlets is considered an illegal discharge. Dewatering is another area construction item that needs to be addressed. All water from dewatering practices must be clear before it is discharged off site. If the water is turbid or sediment laden it must be treated with appropriate BMP s before discharging offsite. This may include using a filter bag, dewatering into a sedimentation basin or into a grass swale where the water can infiltrate into the ground. And sediment laden water that is discharged off site is considered an illegal discharge. Questions: If you have any question regarding erosion and sediment control on you site or on the City s requirements please contact the Engineering Department at 218 828 2309. Single Family Residential Construction Erosion/Sediment Control Standards (January 2008) Page 5 of 5