H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

Similar documents
H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed.

ROOF MOUNT KIT OWNERS MANUAL

This topic describes: 1. Packing an EX 8200 series Switch on page 1 2. Packing EX 8200 Switch Components for Shipping on page 4

INSTALLATION MANUAL KOCH

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

ROOF MOUNT KIT OWNERS MANUAL

Pre-Fabricated Roof Curbs

Multi-Piece Shower with Trench Drain

Multi-Piece Shower with Trench Drain

DETAIL INSTRUCTION No. 1

Rough-in frame and flush-mount panel installation instructions

BioPrism Solid Surface

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Multi-Piece Shower with Trench Drain

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

TABLE OF CONTENTS. Vacuum Cleaner. Model No. MC-CG Bagless Canister Red North America

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

INDUSTRIAL CURTAINS INSTALLATION INSTRUCTIONS CHAIN SUPPORT MOUNTING

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)

SKATEWHEEL FLOW RACK

SK2000 Boltless Pallet Rack Installation and Assembly Manual

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

Bravo Platform Unpacking Guide

OmniFlex 300 Plus Installation Instructions

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

Pre-Fabricated Roof Curbs

PC-PH SERIES BTUH

Low-Profile Multi-Piece Shower with blue, high-density polyurethane bottom

HALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel

INDUSTRIAL CURTAINS INSTALLATION INSTRUCTIONS BEAM FLANGE MOUNTING

ODYSSEY FLOOR MODEL. Owner s Manual. O-6400-F shown rev 118

TOP CAP Snaps into bottom track Aluminum - trimmed to length. RAMPS Covered by carpet ABS plastic and MDF QUESTIONS? CALL US AT !

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

SK3000 Structural Pallet Rack Installation and Assembly Manual

Site Preparation... 2

EXIRA EXPOSED PIPE SHOWER INSTALLATION

Raised Basement. Mechanical Installation Guide

DO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING

1 PVC or ABS drain with strainer

Installation Instructions

E. Fume hood to have set baffling system. No adjustable baffles allowed.

Liner Replacement Instructions:

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

HALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

210 Series UL Listed Modular Vault Panel Installation Procedures January 15, 2009

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Shower Pan Extension Installation Guide

SERVICE MANUAL. PW & RPW Series Proofer / Retarder Installation Instructions - NOTICE -

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

Universal Elevator Mount Owners Manual

Installation Manual. Modular Bar Die. Krowne Metal Corporation 100 Haul Rd. Wayne, NJ Toll Free: (800) Fax: (973)

GROUND MOUNT INSTALLATION MANUAL

Multi-Piece EasyStep Product Installation Instructions

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

Installation Manual. Retractable Ceiling Column Models 8301 & 8301PC

Niagara / DLG-85 Shower Cabin Installation and User s guide

Multi-Piece EasyStep Product Installation Instructions

PC-PH SERIES 2 TON. Installation Instructions

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

V Series 20ft. Modular Wall Design 17

SQUARE SUN TUNNEL INSTALLATION INSTRUCTION

SECTION NON-STRUCTURAL METAL FRAMING

TRUCK HOIST A TOP Safety Requirements Please Read!

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Power Distribution Module Replacement Instructions

RIGID SOLAR INSTALLATION MANUAL

Quick-release pins swing the rack open from left to right to simplify installing and maintaining your equipment.

The better way to build TM. Installation Manual NAILBASE PANELS

In-Wall Slide-out OEM INSTALLATION MANUAL

TETON PATIO COVER INSTALLATION INSTRUCTIONS

USER S OPERATING AND INSTRUCTION MANUAL

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

Cornerview Shower Enclosure & Base

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS

Risk of fire and electrical shock. DISCONNECT POWER AT ELECTRICAL PANEL before installing or servicing this product.

OZARK PATIO COVER INSTALLATION INSTRUCTIONS

SECTION PLASTIC-LAMINATE-CLAD COUNTERTOPS

VertiGreen Modular Living Wall System Installation Instructions (VGM-06 and VGM-10 Wall Mount)

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

JASPER. PAGE 2: 2x2 T-GRID INSTALLATION. PAGE 3: 2x2 SRI SHEETROCK INSTALLATION. PAGE 4: 2x2 IEM INSTALLATION

V-STACK36 Vertical Stacker

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS

Thank you for purchasing our product. *Please read these instructions and follow them step by step.

Aluminum Headache Rack

ALCOVE - SLIDING Alcove Shower System Installation Guide for Liner Style & Accent Liner Style Showers

Installation. Natrix

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions.

DEXERDRY INSTALLATION INSTRUCTIONS - PAGE - 1

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V

SECTION I -- IRONWORK

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

Other HEMCO Products. HEMCOR Lab Planning Solutions. HazMax Floor Mounted Fume Hood. Installation, Operation, Maintenance Manual

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

Transcription:

Installation Instructions Supreme Air BENCH FUME HOOD with Combination Sash H07 H09 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH07-SA 07/06 Part Number: IMAN-H07

FUME HOOD END PANEL LIGHT FIXTURE Installation Instructions Supreme Air Bench Hood Fume Hood with Combination Sash END PANEL TOP FRONT PANEL #8 x 3/4" Pan Head Screw w/nylon Screw Cap (6) required #8 x 3/4" Pan Head Screw 3/4" Plastic Plug Button (4) required (each end) LOWER DEFLECTOR VANE FUME HOOD WORKSURFACE #6 x 3/8" Jackson Head Screw (2) required 1/4"-20 x 3/4" R.H. Bolt w/nylock Nut (4) required DEFLECTOR CLAMP(S) SASH CABLE Figure 1 SASH ADJUSTMENT (loosen screws to adjust) 1/4" -20 x 3/4" R.H. Bolt w/nut & Washers SASH FRAME WEIGHT BOX Detail 2A Figure 2 CABLE CONNECTOR Detail 2B IIH07-SA 07/06-2

Packing List On Pallet Fume Hood Sash Weight Box Sash Panels (2 cartons) Hardware Package Installation Instructions Supreme Air Bench Hood Fume Hood with Combination Sash Hardware Package (10) Nylon Screw Caps (EXTRAS) (10) 3/4" Plastic Plug Buttons (2 EXTRAS) (3) Deflector Clamps Fume Hood Worksurface is packaged separately. Preparation 1. Place, level, and install the Base Unit Assembly that will support the Fume Hood as shown on page 4. 2. Attach the Fume Hood Worksurface to the Base Unit Assembly at the corners using epoxy cement or similar adhesive. Worksurface should be centered on units and overhang the front by 1 1 /2". Worksurface must be level. Shim beneath as needed. Top may not extend all the way to rear wall. 3. Uncrate Fume Hood taking care to sort and inventory all parts. 4. Remove End Panels from Fume Hood and remove screws holding Fume Hood and Weight Box to pallet. (Save End Panel screws to reattach End Panel later.) 5. Remove all packing from Fume Hood and any tape holding parts in place for shipping. Installation Fume Hood is packed fully assembled except for Weight Box and Sash Panels. The Light Fixture, Top Front Panel, and Lower Deflector Vane may be removed to fit through narrow doorways and/or for easier access. Generally electrical fixtures and plumbing fittings are shipped installed, but may be shipped loose depending on job requirements. Fittings may also be pre-wired and/or pre-piped. Fixtures are not shown on assembly diagram as quantities and locations vary to meet individual requirements. 6. Install Glass Sash Panels per instructions on page 5. 7. Check that Sash Cables are properly routed over front pulleys, around rear pulleys, and through the Sash Adjustment pulleys. (see Figure 2) 8. Attach Weight Box to cables using one (1) 1/4" -20 x 3/4" R.H. Bolt, Nylock Nut, and two (2) Flat Washers (bolt, nut, and washer shipped attached to cable ends) 9. Loosen Sash Adjustment pulley bolts and slide pulleys as needed to level sash. Re-tighten when adjusted.! CAUTION When raising Sash make sure Sash Panels are closed. 10. Using as many workers as needed, lift assembled Fume Hood and place on leveled Worksurface. Make sure hood is pushed back as far as possible and centered on Base Unit Assembly. 11. Attach the spacer tabs on the bottom of the Lower Deflector Vane to the Worksurface using the Deflector Clamps. 12. Coordinate connections of service fittings, electrical fixtures, and ductwork with the respective trades (i.e. mechanical, electrical, HVAC). After connections are complete, replace interior Access Panels, if removed, and the exterior End Panels. Cover screw holes in End Panels with 3/4" Plastic Plug Buttons. 13. Check Sash again for level and smooth movement. Adjust as needed. To level, loosen pulley screws on Sash Adjustment mechanism and slide pulleys as necessary. (see Detail 2A) To adjust Sash side-to-side, loosen screws on back of Sash Handle and slide the Cable Connectors as needed. (see Detail 2B)! CAUTION When adjusting side-to-side, make sure sash frame edges clear the front pulleys. 14. Inspect the complete installation, remove any dust, dirt, or other debris. Check all moving parts for proper operation, and adjust or lubricate as necessary. IIH07-SA 07/06-3

Installation Instructions Base Unit Assembly for Bench Type Fume Hoods Rear Wall Pipe Space FUME HOOD Cupsink Worksurface BASE CABINET 1/" 1 2 overhang REAR FILLER (optional- install as required) KEMSTRUTS (install as required) Screws (4) required one each corner FACE FILL (optional- ins as require 8" 22" Floor Detail 1 Fume Hood Base Cabinet Location BASE UNITS PLUG BUTTONS Preparation ADJUSTMENT BOLT (accessible thru cabinet bottom with straight blade screw driver) Detail 2S Steel base cabinets are leveled using the adjustment bolts located in the cabinet base. 1. Locate and mark hood and base cabinet locations making sure area is clear of obstructions and debris. Be sure all conduit, duct work and service lines have been run and are ready for final connections. Kemstruts and other pipe or worksurface supports should be installed before the base cabinets are moved into place. 2. Locate the high point of the floor within the area that the base cabinets will be installed. Installation 3. Starting with the base cabinet on the highest point on the floor, move the first cabinet into location as shown in Detail 1 and according to project drawings 4. Using a four foot carpenters level, level the cabinet; side-to-side, front-to-back, and diagonally. (see Detail 2S and 2W to the left for leveling methods) Blocks or cleats may be used to fasten cabinets to floor or walls to insure cabinets don t move during installation. 5. Move the next cabinet into position and clamp it to the first cabinet, making sure that the cabinet faces and tops are flush. 6. Level the cabinet, as in step 4. WOOD SHIM (cut off flush with cabinet when leveling is complete) Detail 2W Wood base cabinets are leveled using wooden shims, available at any lumber yard or home center. 7. Using four (4) screws, as listed below, fasten the two cabinets together at all four corners of the end panels. Use #8 x 1-1/4" Flat Head screws for wood cabinets. Use #8 x 1/2 Truss Head Sheet Metal screws for steel cabinets. (pilot holes must be drilled in the steel cabinets before driving screws) 8. Complete hood installation and all mechanical connections before installing any required fillers or scribes. It is recommended that the polyethylene liner be removed from Acid Storage cabinets during installation to allow fastening to adjacent cabinets and ease plumbing connections. Be sure to replace when installation is complete. IIH07-SA 07/06-4

Parts List (4) 1/4" Laminated Safety Glass Sash Panels with Shoe attached (8) Rollers (8) Plastic Guides Installation Instructions Supreme Air Bench Hood Fume Hood with Combination Sash PLASTIC GUIDE SASH FRAME UPPER TRACK FINGER GROOVE PLASTIC GUIDE SHOE SASH SASH GLASS 1/4" LAMINATED SAFETY GLASS ROLLER Figure 1 SHOE ROLLER LOWER TRACK Figure 2 Sash Panel Installation 1. Remove Sash Panels from cartons (packed 2 per carton), and locate package(s) of Rollers and Plastic Guides. 2. Snap (2) Rollers into bottom of Sash Panel Shoes. Locate Roller about 1/2" in from each end. 3. Press Plastic Guide onto top edge of Sash Panel. Locate ends of Guides even with edge of Glass. 4. Place Sash Panels into Sash Frame by first inserting top of Panel into Upper Track, then lowering onto Lower Track. Place two Panels in back and two in front with finger grooves located as shown in Figure 1. Sash Panels should be placed in Sash Frame before Sash Weight is attached.! CAUTION Sash Panels should be closed when raising and lowering Sash. IIH07-SA 07/06-5

43 1 2 3 5 4 10 35 9 8 7 26 40 30 32 38 11 17 20 31 12 28 13 37 16 15 14 21 18 45 46 30 41 27 19 35 24 23 36 20 30 29 39 6 25 1 43 44 22 42 33 34 46 2 DUPLEX RECEPTACLE 45 1 LIGHT SWITCH 44 1 FACE PLATE MOUNTING STRAP 43 1 BLANK FACE PLATE, ST/STEEL 42 28 PLUG BUTTONS, 3/4" DIA. HOLE 41 1 RIGHT REAR CABLE RETAINER 40 1 LEFT REAR CABLE RETAINER 39 1 BYPASS BLOCK SUPPORT ANGLE 38 1 SASH WEIGHT ASSEMBLY 37 1 FUME RETAINER 36 1 LIGHT 35 2 ACCESS PANEL 34 2 END PANEL 33 1 FRONT PANEL ASSEMBLY 32 1 SASH ADJUSTMENT PLATE 31 1 SASH ADJUSTMENT BRACKET 30 8 2" DIA. PULLEY 29 1 LIGHT GLASS 28 1 DUCT COLLAR 27 1 RIGHT REAR PULLEY BRACKET 26 1 LEFT REAR PULLEY BRACKET 25 2 FRONT PULLEY BRACKET 24 1 SASH ASSEMBLY 23 1 DEFLECTOR VANE WELDMENT 22 1 RIGHT FACIA 21 1 LEFT FACIA 20 2 SASH TRACK ASSEMBLY 19 1 BYPASS BLOCK OFF PANEL 18 2 BYPASS BLOCK PANEL ANGLE 17 1 SLOPING BAFFLE STRAP 16 1 SLOPING BAFFLE 15 1 UPPER BAFFLE 14 1 LOWER BAFFLE 13 1 BYPASS PANEL 12 1 LIGHT ANGLE 11 1 TOP LINER PANEL 10 1 LOWER CENTER CLEAT 9 2 SLOPING CLEAT 8 3 UPPER CLEAT 7 2 LOWER SIDE CLEAT 6 1 RIGHT SIDE LINER PANEL 5 1 LEFT SIDE LINER PANEL 4 1 BACK LINER PANEL 3 1 TOP BACK LINER ANGLE 2 1 BOTTOM BACK LINER ANGLE 1 2 END FRAME WELDMENT PRT QTY DESCRIPTION HO7 -H09 Fume Hood - Parts Listing IIH07-SA 07/06-6