The State of Wind Energy in New England

Similar documents
ISO New England Regional Electricity Outlook

2030 Power System Study Report to the New England Governors 2009 Economic Study: Scenario Analysis of Renewable Resource Development

New England Electricity Outlook

The Transformation of the New England Electric Grid and the Importance of Situational Awareness Tools

Regulatory Issues and Smart Grid Transmission Solutions

New England States Committee on Electricity

Managing the Rapid Transformation of New England s Energy Resources

New England Power Sector Overview

Infrastructure Needs: Electricity-Natural Gas Interdependencies

ISO New England Overview and Regional Update

Managing the Reliability of the Electric Grid While the Power Industry Undergoes Rapid Transformation

SPP at a Glance. Located in Little Rock. Approximately 600 employees

From Restructuring to Decarbonization: Operational and Market-Design Challenges in New England

Overview. IEEE Boston Chapter ISO New England Inc.

New England s Changing Energy Landscape

Danielle Powers. June 3, 2010

Electric Transmission in Northern NH

Expanding Transmission Capacity: Options and Implications. Jennifer Curran Director Transmission Strategy April 30, 2009

Green Line Overview. system with transfer capability of 660 MW or more (e.g.,1200 MW) miles submarine cable, 1 foot in diameter)

Advancing Renewable Alternatives

The Anbaric Pipeline of Transmission Projects. New England

New England 2030 Power System Study

WATER AND WIND QUÉBEC S CLEAN, RENEWABLE ENERGY RESOURCES

Congestion Assessment and Resource Integration Studies. A Report by the New York Independent System Operator

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION

What You Need to Know Before Requesting Interconnection

Presented by: Danielle S. Powers. The Canadian Institute s Atlantic Power Symposium. June 15, 2011

Preliminary Assumptions for Economic Studies DRAFT. Planning Advisory Committee June 16, Wayne Coste Principal Engineer

A Forward Clean Energy Market for New England?

Eastern Wind Integration and Transmission Study

Atlantic Link: An Update. June 6, 2017

Energy Imbalance Market Overview

Integration of Renewable Energy Sources in the Electricity System - Grid Issues -

Sheffield- Highgate Export Interface SHEI. Frank Ettori July 12, 2017

Business Practice Manual for Distributed Generation Deliverability. Version

New England State and Federal Laws and Regulations and the Electric Power Sector

Emerging Trends In North American Energy: Focusing On New England s Electricity Market

Mid-Continent Independent System Operator (MISO) Overview. INCMA February 15, 2017

Meeting Natural Gas/Electricity Challenges in New England

Greater Philadelphia Chapter of the Association of Energy Engineers

Agenda. Natural gas and power markets overview. Generation retirements and in developments. Future resource mix including large hydro

Carbon Charge Proposal Evaluation PREPARED BY: PREPARED FOR: DATE:

Overview of the Sheffield-Highgate Export Interface (SHEI)

Eastern Interconnection Planning Collaborative

New York Independent System Operator System Reliability Impact Study Criteria and Procedures

Impact of Variable Generation on the Vermont Transmission Grid. Chris Root Vermont Electric Power Company, Inc.

NPCC 2016 New England Interim Review of Resource Adequacy

Illinois State Institute for Regulatory Policy Studies Conference

Impact of Regional Greenhouse Gas Initiative and Renewable Portfolio Standards on Power System Planning

HYDRO-QUÉBEC ELECTRICITY: CLEAN, RENEWABLE AND RELIABLE. November 2015

EDP Renewables North America

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

PJM Analysis of the EPA Clean Power Plan

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Recognizing the Value of Existing Hydropower June 25, 2009

Transmission Expansion Advisory Committee

Meeting Natural Gas Demand Demand Response A New England Perspective

Rule 21 Tariff / Process Overview 6/17/2015

Renewable and Clean Energy Scenario Analysis and Mechanisms 2.0 Study. Phase I: Scenario Analysis Winter 2017

Opportunity Cost of Flexible Ramping Constraint. Draft Final Proposal

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

Written Statement of Thomas Rumsey Vice President External Affairs New York Independent System Operator

EVALUATION OF MIDWEST ISO INJECTION/WITHDRAWAL TRANSMISSION COST ALLOCATION DESIGN. Prepared by Scott Harvey and Susan Pope

Renewable Resources and Wholesale Price Suppression. August 2013

Memorandum. To: ISO Board of Governors From: Yakout Mansour, President and Chief Executive Officer Date: October 20, 2008 Re: CEO Report

Stakeholder Comments Template. Subject: Small and Large Generator Interconnection Procedures Draft Final Proposal and Meeting

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

Designing Energy Solutions

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

Policy Direction for Alberta s Capacity Market Framework

OPPORTUNITIES AND BARRIERS. EESI Briefing. June 13, 2008

Making Sense of U.S. Energy Markets

Regional Planning at Midwest ISO. Mr. Clair Moeller Vice President, Transmission Asset Management

Dave LaPlante Vice President, Markets Development September 18, 2002

2018 Vermont Long-Range Transmission Plan. Public Review Draft

Greening the Grid. Challenges & Opportunities. Tom Rumsey. Transition to a Green Economy

NALCOR ENERGY. Comments on Draft Request for Proposals for Clean Energy and Transmission

2010 RTO Metrics Report: NESCOE Data Summary

ISO/RTO Metrics Initiative

THE AEP INTERSTATE PROJECT FAQs

CAISO s Plan for Integration of Renewable Resources

PJM Interconnection. Drexel University Great Works Symposium May 13, 2010

Business Practice Manual for The Transmission Planning Process

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF NATIONAL HYDROPOWER ASSOCIATION

PG&E s WDT Interconnection Reform Principles Document

Solar Integration into the PJM Grid

Growing Wind. Final Report of the NYISO 2010 Wind Generation Study. John Adams Principal Electric System Planner New York Independent System Operator

Integrating High Levels of Variable Renewable Energy Sources

Great Basin Transmission ITP Submission to California ISO. May 2018

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

EAGLE MOUNTAIN Hydro Electric Pumped Storage Project

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

The Role of Transmission The Electrical Interstate Highway System

August 31, 2015 PROCUREMENT OF RESOURCES PURSUANT TO PUBLIC ACT NOTICE OF PROCEEDINGS AND OPPORTUNITY FOR PUBLIC COMMENT

Impacts from Peak Load Reductions in Markets and Long-Range Planning

PJM Renewable Integration Study. Ken Schuyler Renewable Energy in West Virginia June 5, 2014

Stakeholder Comments Template. Subject: Small and Large Generator Interconnection Procedures Draft Final Proposal and Meeting

Storage as a Transmission Asset Stakeholder Comment Template

Black Start and System Restoration Phase 2. Draft Straw Proposal

Transcription:

JUNE 9, 2017 PORTLAND, MAINE The State of Wind Energy in New England Everyone Knows Its Windy The State of Wind Energy Alan McBride DIRECTOR TRANSMISSION STRATEGY & SERVICES

Wind Power Has Emerged in New England, With Significantly More Interest from Developers Renewable portfolio standards and other public policies have helped stimulate wind development Over 1,100 MW of large scale wind have begun commercial operations over the past few years The ISO has implemented wind power forecasting and enhanced opportunities for wind resources to offer into the energy market Wind (MW) 1,100 Existing 6,200 Proposed Nameplate capacity of existing wind resources and proposals in the ISO-NE Generator Interconnection Queue; megawatts (MW). 2

New England Has Significant Wind Potential But Additional Transmission is Needed Areas of Greatest Electricity Demand Wind Zones Population and electric demand are concentrated along the coast in central and southern New England 12,000 MW of onshore and offshore wind potential* Transmission will be required to connect potential wind resources to load centers in New England * Source: New England 2030 Power System Study, Report to the New England Governors, 2009 Economic Study: Scenario Analysis of Renewable Resource Development (February 2010) 3

Massachusetts Sets Timeline For Off-Shore Wind Off-shore wind-related legislation passed into law last year in Massachusetts Draft RFP for off-shore wind to be finalized by June 30, 2017 No less than 400 MW but up to 1,600 MW of aggregate nameplate off-shore capacity Bids will include costs for both generator lead lines and optional additional capacity For delivery by June 2027 4

New England s Transmission Grid Is the Interstate Highway System for Electricity 9,000 miles of high-voltage transmission lines (>115 kv) Wind generators in northern New England have connected and are seeking to connect to remote areas that are electrically weak Developers have proposed multiple transmission projects to access renewables The system is more developed in central and southern New England because that is where the load is concentrated New York Hydro Québec New Brunswick 5

Infrastructure Will Be Needed to Deliver Energy from Proposed Resources All Proposed Generation Developers are proposing to build roughly 13,650 MW of generation, including nearly 6,400 MW of gas-fired generation and more than 6,200 MW of wind Wind Proposals ME 3,663 MW Natural Gas 47% Wind 46% VT 30 MW NH 28 MW MA 10 MW Other 7% Source: ISO Generator Interconnection Queue (May 1, 2017) FERC Jurisdictional Proposals Only; Nameplate Capacity Ratings Offshore wind MA 2,480 MW Source: ISO Generator Interconnection Queue (May 1, 2017) FERC Jurisdictional Proposals; Nameplate Capacity Ratings 6

Challenges for On-Shore Wind in Northern New England Wind technology provides limited transmission system support Although technologies are improving, wind does not provide significant system voltage/reactive or stability support Resources seek to connect in a marginal manner to weak parts of the system, often where there are local and regional constraints Poor voltage and stability performance Extremely high reactive power losses First-in wind generators have exhausted limited existing system margins, resulting in more significant system upgrades for subsequent generators Wind interconnecting as an energy resource competes for transmission use based on bid price In some areas of the system, wind competes with wind and other renewable resources, sometimes with the same owner 7

Background: Clustering In the Interconnection Process Transmission Interface Constraints in Maine* * Source: 2016 Maine Resource Integration Study, Scope of Work, Presentation to Planning Advisory Committee, March 2016 The ISO is able to process generator interconnection requests in a timely manner throughout most of the region On average, system impact studies are completed within a year of request Transmission constraints in northern and western Maine, however, have resulted in a backlog for requests to connect in those areas Clustering of interconnection requests is not currently an option under the ISO tariff, unlike with other ISOs/RTOs In the past, some developers and stakeholders were hesitant to move toward clustering Proposal to be filed with FERC when commission has a quorum 8

Addressing the Backlog of Wind Proposals In the Interconnection Queue in Maine In 2015, the ISO began a two-phase discussion with stakeholders to address the factors contributing to the Maine queue backlog First Phase Queue improvements were approved by FERC in April 2016 Improvements designed to make wind and other inverter-based generator projects more studyready Reactive performance requirements for wind generators New technical data requirements for wind and inverter-based generators Second Phase Interconnection process improvements focusing on how to address identified infrastructure issues Clustering methodology improvements worked through stakeholder process Maine Resource Integration Study underway 9

With Stakeholder Feedback and Support the ISO Has Developed An Approach to Cluster Study Wind Projects Provide a mechanism to expedite interconnection processing in circumstances where the ISO determines that a backlog would be likely to persist with the continued application of the serial queue process A cluster approach will be triggered by the ISO s identification of the following circumstances in the queue 1. There must be a backlog of two or more requests in the same part of the regional transmission system, and 2. The ISO must have identified that none of the applicable interconnection requests will be able to interconnect, either on an individual basis or as a cluster, without incurring significant transmission upgrades 10

Choices at the Beginning of the Phase 2 Study All eligible interconnection requests that are located in the same electrical part of the transmission system will be identified in the Phase 1 Cluster Enabling Transmission Upgrades (CETU) Regional Planning Study By the cluster entry deadline, eligible projects will have the following choices: 1. Enter the cluster 2. Move to the bottom of the queue in the same relative queue order as other eligible projects that make this choice (no new $50,000 Interconnection Request deposit) 3. Withdraw the Interconnection Request, and receive a refund of the unspent portion of the $50,000 IR deposit 11

ISO Proposal: Upgrade Cost Allocation Direct allocation of direct-connect costs Example: generator lead that would connect generator to the CETU CETUs will be allocated to each cluster project using a distribution factor methodology Network upgrades (other than the CETU(s)) will be allocated to each cluster project using a distribution factor methodology All upgrade costs paid by interconnection customers No regional or local rate-payer support for interconnection upgrades Late-comer provision allows for headroom reimbursement by projects that interconnect after the original CETU funding 12

Scope of 2016 Maine Resource Integration Study Analyze new 345 kv transmission in parallel with the existing network Study seeks to connect the areas with the largest quantity of requested new wind generation interconnections Evaluations include interconnecting with, or bypassing, existing lines and substations 13

The ISO Is Improving the Ability of Intermittent Resources to Participate in the Wholesale Markets Flexibility to Offer Negative Prices Allows generators, like wind, the opportunity to operate during low-load conditions when they otherwise might be curtailed Updated Elective Transmission Upgrade (ETU) Rules Improve the interconnection study process for ETUs and ensure these resources are able to deliver capacity and energy into the wholesale electricity markets Flexibility to Operate Up to a Certain Level Allows the ISO to better manage transmission congestion in a way that will maximize the use of low-cost renewable resources and alleviate the need for curtailments Known as Do-not-Exceed Dispatch Order 14

Developers Are Proposing to Move Renewable Energy to New England Load Centers As of May 1, 2017, seventeen elective transmission projects had been proposed in the ISO Interconnection Queue, totaling more than 14,000 MW of potential transfer capability, including: Large-scale hydro resources from eastern Canada, and Onshore wind resources from northern New England Projects seek to address public policy goals, not reliability needs Map is representative of the types of projects announced for the region in recent years In addition, offshore wind resources are emerging in southern New England Source: ISO Interconnection Queue (May 1, 2017) 15

Recently Announced Retirements Offer Reasonable Interconnection Spots For Southern Off-shore Wind Robust transmission system in southern New England can allow wind power to flow throughout the system 16

Closing Thoughts New England has abundant wind potential and state policy initiatives have the potential to stimulate investment in infrastructure to integrate wind power resources Significant transmission investment would be needed to interconnect large-scale wind power in northern New England Connecting wind near strong parts of the power system can help reduce transmission bottlenecks Clustering proposal is designed to expedite development of wind resources in constrained areas 17

18