ADDENDUM 1 BID , CHARLES POINT TRAIL CONSTRUCTION

Similar documents
CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

ELLIOTT WAY IMPROVEMENTS

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

SECTION CONSTRUCTION SERVICES

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

Request for Proposal Topographic/Property Line Survey

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

Replace BID SCHEDULE with attached revised BID SCHEDULE.

STATE UNIVERSITY CONSTRUCTION FUND

Request for Proposal Topographic/Property Line Survey

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

Division 33. Utilities

ADDENDUM NO. 1 CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID # August 21, 2014 PREPARED BY:

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016

ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS. All Plan Holders and Prospective Bidders

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

November 29, CITY OF PLANT CITY Purchasing Division (813)


ADDENDUM TO THE CONTRACT. for the. Switzer Creek Subdivision Contract No. E ADDENDUM NO.: FOUR CURRENT DEADLINE FOR BIDS: September 23, 2015

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018

Department of Transportation Mitchell Region Office

Stormwater Management The District exercises regulatory authority for Stormwater Management in the City of Edina.

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

CONSTRUCTION PLAN CHECKLIST

ENGINEERING MEMORANDUM

CONTRACT ADDENDUM # 1

CITY OF LONGWOOD. Fostering citizen trust and cultivating a prosperous community ADDENDUM II. June 6, 2016

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Town of Scarborough, Maine

to provide timely and accurate information, we make no 385 S. Goliad Street

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

General Rules and Regulations

TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02


TENDER WELLCOX ACCESS ROAD ADDENDUM 1

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

study for 2018 include:

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

CHARLES COUNTY GOVERNMENT ITB NO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) TEMI DRIVE CONSTRUCTION

ADDENDUM NO. 1 Page 1 of 7

Port KC RFP NORTHLAND PARK BUILDING V

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CIRCLE K SUB-CONTRACTOR BID FORM

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS

Addendum No. 1 Issue Date: March 29, 2016

RE: Addendum No CR2297 (Cooks Bayou) Bridge Replacement. Please accept this as Addendum No. 4 for the above referenced project.

ADDENDUM #3 ( CORRECTED FINAL) TO BID # BID NUMBER: ISSUE DATE: Thursday, April 05, 2018

IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

2018 Utility & Street Reconstruction

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

Addendum No. 1 Page 1 of 2


MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

Section 403. DRAINAGE STRUCTURES

PUBLIC WORKS/ENGINEERING DEPARTMENT

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT

10:00 AM, Wednesday, April 8, 2015

Naperville Public Library. Parking Lot Work Naper Blvd. Library & 95 th St. Library

S1.0 FLOATING DOCK PLANS AND DETAILS S2.0 FLOATING DOCK SECTIONS AND DETAILS. Drawing C1.0 - Revised and attached Replace in entirety

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

A new Proposal Form is being issued with this Addendum, the following is an explanation of the changes, disregard originally issued form.

Task Order Authorization

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES

Table Related Arlington County Standards, Specification and Policies

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

Pier C North Damaged Pile Repairs. Pre-Bid Meeting April 24, :00 AM. Agenda Items

HORIZON MEADOWS MINOR DEVELOPMENT PERMIT AMENDMENT LOT 1, BLOCK 3 OF HORIZON MEADOWS SUBDIVISION FILING NO. 1

Case Recommendation: Approve the request for a Special Exception for property known as West 100 with the following conditions:

Maine Turnpike Authority

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

CUSTOM HOMES, ADDITIONS TAYLOR BUILDING & COMMERCIAL DESIGNS 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA SPIRIT LIVING GROUP APN

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

YES, we received Addendum No. 1

Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

FDOT REF. ITEM DESCRIPTION

Transcription:

ADDENDUM 1 BID 2018-003, CHARLES POINT TRAIL CONSTRUCTION ISSUED 5/25/2018 Summary: Below, questions and answers from the May 17, 2018 Pre-Bid Meeting and Site Walk. All attachments referenced below are appended hereto. QUESTION 1 Who is responsible for detection of underground utilities? ANSWER The Contractor is responsible for requesting utility markout (NYS Codes Rule 753) extending onto public property. It is the Contractor s responsibility to notify the City and the property owner prior to any on-site activity. The Contractor is responsible for the cost of utility location. Please refer to General Conditions for additional detail. 2 During the site visit, comments were raised regarding the drainage and washout area at the southern end of the RESCO property and long-term effects related to the Trail. See Attachment 1 RESCO Utility Plans The existing downspout off of the nearby structure currently discharges onto the proposed asphalt walkway trail. The plans call for discharging water runoff over the newly-stabilized area. Over time, the washout may re-occur. In-field changes may be required to remedy this issue. See Attachment 1 - RESCO Utility Plans 3 How far do the boardwalk s concrete pillars extend? 4 What is the material for the peninsula trail section? Also refer to Construction Plan Drawings from Bid materials package. The plans do not call for removal. Rather, the plans call to cut down piers to 1 below proposed slab (see sheet C3 of Construction Document Plans). Full removal of the footings may cause stability issues. The plans call for stone screenings for the path, the same as the material proposed under the benches and trashcans.

5 Permanent fencing will be necessary near the southern storage area where it meets the boat storage area on parcel 32.19-1-2. This will add another 270 linear feet of fencing to the 630 linear feet.900 6 Storage area for material and equipment. See Attachment 2 Fencing See Attachment 3 Updated Bid Forms: Base Bid Sheet [C5]; Itemized Bid form [Bid Item #30. Regarding the storage areas, there are two locations for materials/equipment storage. The first is on City property at the Charles Point Park in the grassy area directly abutting the property line for parcel 32.19-1-3.1. As indicated on the Construction Plan Drawings, the Civil set of drawings clearly indicates the locations of both the construction area (via a temporary easement already acquired between the City and the property owner) and the permanent easement area, or location of the proposed trail. There is to be no work outside of either the temporary or permanent easement areas. Further, the City will work with the selected Contractor to determine the most appropriate schedule. 7 Is the Contractor responsible for designing the signs? 8 Is a permit required for lane closures on John Walsh Boulevard? See Construction Document Plans, Civil Section No, the Contractor is responsible for the fabrication and installation of the signage. The City will provide the appropriate text, graphics, logos, etc. to the Contractor. See General Conditions, Front End documents. This project has been explained and discussed with Westchester County Department of Public Works (WC DPW). Further, the City has the necessary form related to work in this area. It is the Contractor s responsibility to completely and dully fill out and submit the information to the WC DPW and acquire all permits necessary for work, including lane closures. See General Conditions, Front End documents.

H DY 9. {\W0.8;\T1.44;MATCHLINE B-B} U UMH 9.5' APPROX. LOC. CATCH BASIN CURB INLET 9.6' APPROX. LOC. ELECTRIC BOX 9.5' 20 15 10 5 0 20 40 60 GRAPHIC SCALE 1 inch=20 feet 9.4' BC:7.5' N/F CITY OF PEEKSKILL INDUSTRIAL DEVELOPMENT AGENCY DRAWING KEY 32.19-1-2 TC:7. BC:7.5' 5 JOHN E. WALSH BLV'D 1 CHARLES POINT PARK 9.5' 6.7' BC:7.9' BM MAG NAIL TOP TIE WALL ELEV.=9.3 2 BC:7.9' SEWER MANHOLE RIM: 8.41' WHEELABRATOR 7.9' S TC:8.5' BC:8.0' 8.5' MARINA 3 6. 5.3' 8.1' 5. 6.7' 8.3' 7.2' 4 BERTOLINE 6.5' 6' 4.7' 7.2' BC:6.9' CATCH BASIN RIM: 6.79' 7.5' 6.5' BC:8.7' 5 LENTS COVE JOHN WALSH BOULEVARD SIGN (NO PARKING) LENTS COVE PARK 6. 6. BC:9.1' 7.1' 7.5' 5.2' 7.0' 8.1' BC:8.3' 4' NO. DATE REVISION DRAWN CHK'D REL'D BC:9.2' TC:9.4' \pxqj;{\fsimplex c0;this DOCUMENT WAS PREPARED FOR THE NEW YORK STATE DEPARTMENT OF STATE WITH FUNDS PROVIDED UNDER TITLE 11 OF THE ENVIRONMENTAL PROTECTION FUND.} LAYOUT PLAN 3 OF 5 12' {\W0.8;\T1.44;MATCHLINE C-C} 10.0' \pxqj;alterations BY ANY PERSON IN ANY WAY, OF ANY ITEM CONTAINED ON THIS DOCUMENT, UNLESS ACTING UNDER DIRECTION OF THE LICENSED ENGINEER WHOSE PROFESSIONAL SEAL IS AFFIXED HERETO, IS A VIOLATION OF TITLE VII, SECTION 69.5 (b) OF NEW YORK STATE LAW. DRAFT 11/27/2017 DAPHNE A. GALVIN NY PROFESSIONAL ENGINEER Lic. No. 096343 358 Fifth Avenue, Suite 1001 New York, NY 10001 NY Certificate of Authorization No. 103397 Tel.: 212.845.9283 Fax.: 646.652.5382 CHARLES POINT MULTI-USE WATERFRONT TRAIL SITUATED IN CITY OF PEEKSKILL, WESTCHESTER COUNTY, NEW YORK Date 08/31/2017 Scale:(H) 1" = 20' (V) N/A Drawn By BZ Designed Checked Released BZ DG DG Job No. Drawer Number 801911100000 000-000 Drawing Name: 03-C6-C10-SITE.dwg

H DY BC:9.2' TC:9.4' 12' {\W0.8;\T1.44;MATCHLINE C-C} 10.0' 6' 2' 10.7' 12.4' 13.0' WOOD DOCK 6' 12' 13.0' N/F DDJT BERTOLINE ASSOCIATES, LLC 4.7' 32.19-1-1 20 15 10 5 0 20 40 60 7 JOHN E. WALSH BLVD. 4' 0' GRAPHIC SCALE 1 inch=20 feet TC:11.6' 12.3' BC:11.4' 3.2' 0' INV. 18" CLAY PIPE ELEV.: 1.11' TC:11.5' DRAWING KEY 12.0' 2' TC:11.4' 1 CHARLES POINT PARK 11.2' 4' CATCH BASIN CURB INLET RIM: 10.8 3. TC:11.7' BC:11.3' TC:11.9' 2 WHEELABRATOR TC:11.6' 11.7' BC:11.2' MARINA 3 INV. 18" CMP ELEV.: 7.61' BM SM. SPK. IN ROOT ELEV.=10.19' 4.0' 4' 4' 6' 8.2' 9.5' 9.3' 7.2' 11.9' 11. 4 BERTOLINE 0' 9.7' 10.7' 11.1' 11.4' DRAINAGE MANHOLE RIM: 10.70' 5 LENTS COVE JOHN WALSH BOULEVARD 8. 10.5' LENTS COVE PARK 7.5' 8.6' 9.0' 6.4' 4' 0' 2' 2.6' INV 24'' CMP ELEV.: 2.36' 11.6' 10.5' 10.9' 11.6' D 10.7' ELECTRIC BOX 7.6' TC:10.4' BC:9.9' 6.4' 5.7' 4.0' 3.6' 6' TC:9.0' ELECTRIC MANHOLE INV. 12" CIP ELEV.: 0.15' 2' 4. BC:9.0' TC:9.4' 5.0' 3.9' TC:8.3' BC:8.1' BC:8.5' POLE TC:7.3' BC:6. INV 1'CIP ELEV.: 0.71' 3.3' 7.2' 6. 7.2' 6.1' 5.5' 6.9' TC:6.7' BC:6.5' INV. 12'' CIP ELEV.: -0.29' INV 24'' CMP ELEV.: -0.16' 6.0' 6' TC:6.4' NO. DATE REVISION DRAWN CHK'D REL'D \pxqj;{\fsimplex c0;this DOCUMENT WAS PREPARED FOR THE NEW YORK STATE DEPARTMENT OF STATE WITH FUNDS PROVIDED UNDER TITLE 11 OF THE ENVIRONMENTAL PROTECTION FUND.} LAYOUT PLAN 4 OF 5 L E N T S C O V E \pxqj;alterations BY ANY PERSON IN ANY WAY, OF ANY ITEM CONTAINED ON THIS DOCUMENT, UNLESS ACTING UNDER DIRECTION OF THE LICENSED ENGINEER WHOSE PROFESSIONAL SEAL IS AFFIXED HERETO, IS A VIOLATION OF TITLE VII, SECTION 69.5 (b) OF NEW YORK STATE LAW. DRAFT 11/27/2017 DAPHNE A. GALVIN NY PROFESSIONAL ENGINEER Lic. No. 096343 358 Fifth Avenue, Suite 1001 New York, NY 10001 NY Certificate of Authorization No. 103397 Tel.: 212.845.9283 Fax.: 646.652.5382 CHARLES POINT MULTI-USE WATERFRONT TRAIL SITUATED IN CITY OF PEEKSKILL, WESTCHESTER COUNTY, NEW YORK Date 08/31/2017 Scale:(H) 1" = 20' (V) N/A Drawn By BZ Designed Checked Released BZ DG DG Job No. Drawer Number 801911100000 000-000 Drawing Name: 03-C6-C10-SITE.dwg

Bid Sheet Charles Point Multi-Use Waterfront Trail City of Peekskill, NY BID NO. 2018-003 ITEMIZED PROPOSAL ITEM APPROXIMATE PAY ITEM UNIT BID PRICE AMOUNT BID NO. QUANTITIES UNIT DESCRIPTION DOLLARS CTS. DOLLARS CTS. 23 125 S.Y. FULL DEPTH ASPHALT PAVEMENT 24 800 L.F. PAVEMENT MARKINGS 25 600 L.F. CONCRETE CURB 26 140 L.F. RECONSTRUCT CONCRETE GUTTER 27 18 UN. CONCRETE WHEEL STOP 28 525 L.F. GUIDERAIL 29 600 L.F. HIGH CHAIN LINK FENCE WITH SCREENING 30 630 L.F. HIGH CHAIN LINK FENCE COMPLETE THIS FORM USING BLACK INK ONLY C-4 (4 OF 17)

BID PROPOSAL FORM TOTAL BASE BID Items 1 through 56 Total Base Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) ALTERNATE A: CHARLES POINT PARK RESTROOM Items A1-A18 Total Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) ALTERNATE B: PENINSULA TRAIL with POLE-MOUNTED LIGHTING Items B1-B19 Total Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) ALTERNATE C: PENINSULA TRAIL with BOLLARD LIGHTS Items C-C19 Total Bid for all labor, equipment, materials and installation: Total $ Total (Price in words) (Signature of partner or corporate officer) ATTEST: (Corporate Seal) (Secretary of Corporate Bidder) C-5