PHYSICAL EDUCATION September 30, 2010

Similar documents
PHYSICAL EDUCATION February 3, 2014

CONSTRUCTION TRADES LABORATORY September 30, 2010

AUTOMOTIVE SERVICE TECHNOLOGY September 30, 2010

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

4.1.3 Project Manual

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

FACILITY COMPONENTS - ELEMENTARY SCHOOL

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

Facility Improvements

OAK PARK AND RIVER FOREST HIGH SCHOOL POOL PROGRAM VERIFICATION. Design Update September 24, 2015 SEPTEMBER 15, 2015

FACILITY COMPONENTS - MIDDLE SCHOOL

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

Facility Assessment Report, Montgomery Independent School District

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

Bureau of Indian Affairs

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.

Gerald Desmond Bridge Replacement

Appendix J - Custom Uniformat for EDU Migration

New Ringgold Middle School. Project Slideshow August 26, 2017

Timberglen Recreation Center Summary

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Collins Middle School

FRAMING INSPECTION GENERAL

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Minuteman Regional Vocational Technical School

Corsicana High School

Assessment Report Burgess Park Gymnasium. Summary

Quad/Graphics 295,000 Square Feet on Acres Dickson, Tennessee

Velma F Thomas Early Childhood Center

NYC Department of Education

NC State University Design and Construction Guidelines Division 00 Planning & Design Space Planning

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

TABLE OF CONTENTS Public Safety Building

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Independence Adult Center

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643

NYC Department of Education

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo

Santa Teresa High School

James Lick High School

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659

PLUMBING FIXTURES. I. The following guideline shall be used when determining the minimum required number of the plumbing fixtures:

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643

Frederic Chopin Elementary School

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Louis A Agassiz Elementary School

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

NYC Department of Education

PUBLIC RESTROOMS, DESIGN INTENT Los Angeles World Airports

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

Element Z General Design Requirements Room Standards

Chino Valley Unified School District Monthly Construction Update

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

NYC Department of Education

Division 09 FINISHES TABLE OF CONTENTS

KIPLING SCHOOL RENOVATION AND EXPANSION PHASE 2 KIPLING, SASKATCHEWAN

260,000 SF Building Profile

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HIDDEN VALLEY ELEMENTARY SCHOOL

(n) All furniture and equipment used in any school building or a part of a building used for school purposes shall be durable and easily cleanable,

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621

BRADDOCK ROAD YOUTH CLUB

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile

TABLE OF CONTENTS. (Δ = Rev 06/08)

Chapter 11. Dwelling Units and Sleeping Units

Whitley Shower Locker Toilet Facilities

Charles H Wacker Elementary School

A. All tackboards shall be mechanically fastened to walls; gluing shall not be allowed.

Table of Contents Chapter 1 INTRODUCTION Chapter 2 DEFINITIONS Chapter 3 DELIVERABLES Chapter 4 BASIS OF DESIGN

NYC Department of Education

OFFICE Space STANDARD SPECS Page 1

NYC Department of Education

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

STANDARD PLAN RELEASE SUMMARY(SPR) Facilities Management Department

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632

Thurgood Marshall Recreation Center Summary

2) These Standards are available on the University s website at:

OPERATI LATRINES. Standard Range Types

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

Division 13. Special Construction

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

SECTION NON-STRUCTURAL METAL FRAMING

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

NYC Department of Education

Transcription:

PHYSICAL EDUCATION September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements listed below: 2 Locker/Dressing s 2 Shower/Drying s 2 P.E. Toilet s 1 Multi-purpose Classroom 1 P.E. Storage /Laundry 1 Gymnasium Floor 1 Gymnasium Seating (2,000 seats) 2 Staff Shower/Toilet s 1 Male Teacher Planning 1 Female Teacher Planning 1 Weight 1 Wrestling/Gymnastics/Dance 1 Training /First Aid 2 Public Toilet s (men/women) 1 Lobby 1 Utility Field 6 Playcourts II. PROGRAM FURNITURE AND EQUIPMENT Refer to the Furniture and Equipment List for Owner-provided furniture and equipment. III. SPECIAL CONSIDERATIONS 1. Heating/Ventilation/Air Conditioning Locker/Dressing s, P.E. Toilet s and Shower/Drying s are to be heated and ventilated only, no air conditioning. Provide an air curtain at the entrance into each Shower/Drying. Provide exhaust for Owner-provided laundry equipment in the PE Storage /Laundry 2. Acoustical Provide acoustical wall panels in the Gymnasium. 3. Floor Provide wood sports flooring at the Gymnasium main court and practice court areas. Provide sealed concrete along the walls under the stacked bleachers. Provide an impervious floor finish in each Locker/Dressing, Shower/Drying, and in all Toilet s. Provide non-skid rubberized flooring in the Weight, see SDHC standards. Provide standard flooring elsewhere, in accordance with the General Design Requirements section. PhysicalEd1

4. Walls Provide full-height ceramic tile in each Locker/Dressing, Shower/Drying, and in all Toilet s. Provide 16 linear feet of wall-mounted safety pads on the end walls of the Gymnasium. The Gymnasium is to be designed so that a distance of at least 10 (ten) feet is provided between the basketball court and the wall at each end. 5. Ceiling Provide an exposed, painted structure in the Gymnasium and in the P.E. Storage/Laundry. Provide plaster ceilings in each Locker/Dressing, Shower/Drying and in all Toilet s. Provide a 15 high ceiling in the Wrestling/Gymnastics/Dance. 6. Lighting Provide a sports lighting system with two light levels in addition to standard fluorescent lighting in the Gymnasium. Provide stumble light switches at each entrance into the Locker/Dressing s. Provide all other light switches within the Teacher Planning s. Provide safety wire guards on all Gymnasium light fixtures. 7. Windows Do not provide exterior windows in any Physical Education space. Provide an observation window, the entire length of the wall, from each Teacher Planning into the associated Locker/Dressing. 8. Doors Provide double doors at the Wrestling and PE Storage /Laundry, and elsewhere where required for exiting. Provide standard doors elsewhere, in accordance with the General Design Requirements section. 9. Water Site Provide irrigation of the 50,000 square foot Utility Field. Provide a water fountain in the vicinity of the Playcourts. Shower/Drying s Provide eighteen (18) showerheads in the Boys' Shower/Drying area, and one (1) private shower stall with curtain. Provide sixteen (16) private showers stalls with curtains in the Girls' Shower/Drying. Provide a master water and temperature valve for shower control in each Teacher Planning. Public Toilet s (each) Provide the number of toilet fixtures and wall-mounted lavatories with cold water as required for the projected occupancy. Provide one (1) hose bibb and floor drains, number as required. PhysicalEd2

9. Water (continued) Staff Shower/Toilet s Provide one (1) shower, one (1) wall-mounted lavatory with hot and cold water and one (1) toilet in the Womens' Staff Shower/Toilet. Provide one (1) shower, one (1) wall-mounted lavatory with hot and cold water, one (1) toilet and one (1) urinal in the Mens' Staff Shower/Toilet. Provide floor drains as required. P.E. Toilet s (each) Provide the number of toilet fixtures and wall-mounted lavatories with cold water as required for the projected occupancy. Provide one (1) hose bibb and floor drains, number as required. Gymnasium Provide four (4) electric water coolers, one (1) pair to be located at each end of the Gymnasium. Locker/Dressing s (each) Provide one (1) electric water cooler. Provide one (1) hose bibb and floor drains, number as required. Lobby Provide two (2) electric water coolers, located near the Public Toilet s. Training/First Aid Provide water supply and drain(s) for the Owner-provided whirlpool and icemaker. Provide one (1) sink with hot and cold water. P.E. Storage /Laundry Provide water supply and drain for the Owner-provided laundry equipment. 10. Communications Provide a clock, speaker and intercom handset in the Wrestling/Gymnastics/Dance, Weight, Multi-Purpose Classroom, and in each Teacher Planning. Provide a clock and speaker in the Lobby, Wrestling/Gymnastics/Dance, Training/First Aid, and in each Locker/Dressing. Provide two (2) clocks and speakers with wire guards in the Gymnasium. Provide plexiglas lenses on all clocks in student occupied PE areas. Provide an intercom pushbutton (no handset) in the Gymnasium. In addition to the intercom system above, provide a complete public address system in the Gymnasium, in accordance with SDHC standards. Provide a data outlet with adjacent power outlet in the Gymnasium, in accordance with the General Design Requirements section and SDHC standards. Provide a voice/data outlet with adjacent power outlet in each Teacher Planning, in accordance with the General Design Requirements section and SDHC standards. Provide scoreboard controls, microphone outlet and power outlet in a flush-mounted floor box located at mid-court, adjacent to the first bleacher riser. Provide a TV bracket with DVD/VCR bracket, CCTV jack, and adjacent power outlet in the Multi-Purpose Classroom, in accordance with SDHC standards. PhysicalEd3

10. Communications (continued) Provide a CCTV jack and adjacent power outlet in the Weight, and Wrestling/Gymnastics/Dance (no bracket), in accordance with SDHC standards. Provide four (4) CCTV jacks with adjacent power outlets in the Gymnasium, mounted 18 above the floor, in accordance with SDHC standards. Communication devices are not to be provided on the end walls of the Gymnasium where the safety pads are provided. 11. Electrical Gymnasium Provide the motorized basketball backboard controls in a lockable panel in the Gymnasium, located so as to be within sight of the backboards. Electrical devices are not to be provided on the end walls of the Gymnasium where the safety pads are provided. Locker/Dressing s (each) Provide four (4) duplex outlets located above the countertop. Provide outlets for two (2) Owner-provided vending machines. P.E. Storage /Laundry Provide appropriate power for the Owner-provided laundry Equipment. 12. Gas and Air Not applicable 13. Safety Standard, in accordance with the General Design Requirements Section. 14. Fencing Provide a chain link fence around the Playcourts, in accordance with SDHC standards. Provide four (4) P.E. backstops at the Utility Field, located as directed, in accordance with SDHC standards. 15. Service Drives Not applicable 16. Parking Locate the Gymnasium so as to be easily accessible from the student parking lot. 17. Contractor-Provided Equipment and Casework Staff Shower/Toilet s Provide twenty (20) 12" wide x 15" deep x 30" high lockers in the Mens' Staff Locker/ Shower/Toilet, supported on a 4 high concrete pedestal with a ceramic tile base. Provide twenty (20) 12" wide x 15" deep x 30" high lockers in the Womens' Staff Locker/ Shower/Toilet, supported on a 4 high concrete pedestal with a ceramic tile base. Provide one (1) 18" wide x 60" high framed mirror in each Staff Locker/Shower/Toilet, bottom to be mounted 18 above the floor. PhysicalEd4

17. Contractor-Provided Equipment and Casework (continued) Girls' Locker/Dressing Provide one (1) 96" long x 18" deep countertop with a full-width mirror above, countertop to be 36 above the floor. Provide (600) 12" wide x 15" deep x 12" high P.E. lockers, with hasp for a removable padlock. These lockers are to be arranged in (100) six-tier vertical sections, in accordance with SDHC standards. Provide (100) 12 wide x 15 deep x 36 high dressing lockers, with hasp for a removable padlock, located every third tier. These lockers are to be arranged in (50) double-tier Provide (150) 18" wide x 15" deep x 36" high athletic lockers, with hasp for removable padlock, located every third tier. These lockers are to be arranged in (75) double-tier Provide heavy-duty benches as required. Provide four (4) 18" wide x 60" high framed mirrors, bottom to be mounted 18 above the floor. Boys' Locker/Dressing Provide one (1) 96" long x 18" deep countertop with a full-width mirror above, countertop to be 36 above the floor. Provide (600) 12" wide x 15" deep x 12" high P.E. lockers, with hasp for a removable padlock. These lockers are to be arranged in (100) six-tier vertical sections, in accordance with SDHC standards. Provide (100) 12 wide x 15 deep x 36 high dressing lockers, with hasp for a removable padlock, located every third tier. These lockers are to be arranged in (50) double-tier Provide (150) 18" wide x 15" deep x 36" high athletic lockers, with hasp for removable padlock, located every third tier. These lockers are to be arranged in (75) double-tier Provide heavy-duty benches as required. Provide four (4) 18" wide x 60" high framed mirrors, bottom to be mounted 18 above the floor. ix (6) linear feet of base and wall cabinets, to include the sink and one (1) adjacent bank of graduated drawers, countertop to be 36" above the floor. Gymnasium Provide two (2) motorized fold-away main basketball goals with plexi-glass backboards, in accordance with SDHC standards. Provide four (4) motorized fold-away secondary basketball goals with wood backboards, two (2) per side line, in accordance with SDHC standards. Provide bleacher seating for 2,000 students (equal quanitity each sideline), and essential accessories, including the scorers table. Provide the maximum possible space between the first bleacher riser and the sideline of the main court. Bleachers are to comply with SDHC standards. Provide a 6 high x 18 wide safety wall mat permanently mounted to the wall at each main basketball goal. Provide two (2) scoreboards, to be located at each end of the Gymnasium, in accordance with SDHC standards. Playcourts Provide basketball goals and tennis posts as required, in accordance with SDHC standards. PhysicalEd5

18. Contractor-Provided Instructional Aids Multi-Purpose Classroom Provide a 12' wide x 4' high markerboard with a 4' wide x 4' high tackboard on one (1) side, bottom to be mounted 36" above the floor. Provide a wall-mounted audio-visual projection screen, approximately 70 x 70, centered over the markerboard. 19. Other Considerations Provide six (6) Playcourts, in accordance with SDHC standards. Provide a sidewalk connecting the Playcourts with a main campus sidewalk. Provide regulation marking of all fields and Playcourts in accordance with SDHC standards. Arrange lockers around the perimeter of the Locker/Dressing s if possible. If freestanding locker islands are required, they are to be arranged so as to allow a clear view from the Teacher Planning into the aisles. Provide a 50,000 square foot utility field, to be roughly 225 feet x 225 feet. PhysicalEd6

Staff Locker/Shower/Toilet SPACE RELATIONSHIPS Staff Locker/Shower/Toilet Shower/Drying Teacher Planning to playfields Teacher Planning Shower/Drying P.E. Toilet Boy s Locker/ Dressing Girl s Locker/ Dressing P.E. Toilet Training/ First Aid Interior Circulation P.E. Storage / Laundry Weight Gymnasium Floor and Gymnasium Seating Multi-Purpose Classroom Wrestling/ Gymnastics/ Dance Women s Public Toilet Lobby Men s Public Toilet PhysicalEd7