When submitting the edited forms to the A/E for approval, provide an additional copy that clearly notes any changes that have been made in the text.

Similar documents
B. Coordinate all Roof Assembly components with work before and after. See especially:

GE Enduris* 3500 silicone roof coating Roof Restoration Warranty - 10 Year

1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500

*************************************************************************************************************

Total Performance WARRANTY for T. Clear Roofing Products. For a period of ten (10) years from the date of completion (

Tuscaloosa Police Station

GAF Scheduled Maintenance Checklist

TOTAL ROOFING SYSTEM WARRANTY

Residential Warranty. Thank you!

FORMS ROOFING SYSTEM COMPONENTS. 1. Contract Number: 2. Building Number and Location: 3. NAVFAC Specification Number: 4. Deck Type: 5.

FORMS ROOFING SYSTEM COMPONENTS. 1. Contract Number: 2. Building Number and Location: 3. NAVFAC Specification Number: 4. Deck Type: 5.

FORMS ROOFING SYSTEM COMPONENTS. 1. Contract Number: 2. Building Number and Location: 3. NAVFAC Specification Number: 4. Deck Type: 5.

FORMS ROOFING SYSTEM COMPONENTS. 1. Contract Number: 2. Building Number and Location: 3. NAVFAC Specification Number: 4. Deck Type: 5.

SECTION SINGLE-PLY ROOFING SYSTEM

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

Roof Inspection Report

Commercial Roof Cover Maintenance and Repair Risk Engineering Your Business Insurance Specialists

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

PRODUCT SUMMARY INDEX

Project Number BID NO. CAG 18 2 ROOF REPLACEMENT FOR HARFORD COUNTY PUBLIC SCHOOLS NORTH HARFORD ELEMENTARY. Addendum # 2

MAINTENANCE INSPECTION GUIDE

63 + Fix Your Roof... And Fix Your Cost

1. Clean the existing totally adhered or mechanically attached roof membrane: TPO, EPDM, Hyplon,

Roof Inspection Report

Duro-Last Roofing System. Protecting Your Investment

DIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING

C. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation.

Stucco Moisture Inspection Report

SECTION FLASHING AND SHEET METAL

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CARLISLE OWNER S MANUAL

REROOFING ANALYSIS OF K-12 BUILDING. Unified School District 306 Gypsum, Kansas

THERMOTEK ACRYLIC ELASTOMERIC SYSTEM OVER MODIFIED BITUMEN AND/OR BUR MEMBRANE

ROOFING SYSTEM WARRANTY. System Warranty Revisions & Alterations Procedure Care & Maintenance Instructions

ADDENDUM NO. 3 February 28, 2017

TELEPHONE: (215) Addendum No. 1

ROOF MITIGATION STRUCTURE EVALUATION FORM. For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018)

OWENS CORNING Limited Lifetime Warranty for EnergyComplete System. OWENS CORNING Limited Lifetime Warranty for EnergyComplete Sealant

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

WICOMICO COUNTY BOARD OF EDUCATION

SECTION 07530CP EPDM MEMBRANE ROOFING

SAM HOUSTON STATE UNIVERSITY DIVISION 07 THERMAL & MOISTURE PROTECTION SECTION ROOFING SYSTEMS DESIGN AND CONSTRUCTION STANDARDS February 2016

DIVISION 7 THERMAL & MOISTURE PROTECTION

C. All roofs shall be installed according to manufacturers guidelines. Corrections due to workmanship shall be at contractors expense.

Policies & Guidelines

DOWSIL TM SILICONE BUILDING SEALANTS WEATHERSEAL LIMITED WARRANTY

Care & Preventative Maintenance Guide Liquid Applied Coatings and Roofing Systems 8/2016

250 West 96th Street - Indianapolis, IN * * FAX

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION

University of New Hampshire Scholars' Repository

A. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual

A. Coordinate Roof Assembly roof insulation work with work before and after. See especially:

SECTION ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011

Warranty and Inspection Requirements & Procedures

VAPROLIQUI-FLASH. Liquid Applied Waterproof Flashing Material INSTALLATION INSTRUCTIONS

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION

6. ENGINEERING SYSTEMS REQUIREMENTS B30 ROOFING B30 GENERAL SYSTEM DESCRIPTION

ADDENDA #3- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services

Duro-Last Roofing, Inc. 525 Morley Drive Saginaw, MI 48601

Dated 3/28/14 SECTION SINGLE PLY ROOFING

ASHLEY AVE. PARKING GARAGE CHILLER TOWER ROOF REPAIRS

Design and Construction Standards SECTION MODIFIED BITUMEN ROOFING SYSTEM

SECTION CLAY BARREL TILE ROOFING. A. American Society for Testing and Materials (ASTM):

SECTION LIGHTWEIGHT INSULATING CONCRETE

THERMOPLASTIC-POLYOLEFIN ROOFING (TPO)

The Alabama Building Commission has adopted the 2006 International Energy Conservation Code as the State Energy Conservation Code

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

Light-Metal Roof Edge, Raised

13340 FIBERGLASS REINFORCED PLASTIC (FRP) ENCLOSURE

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

SECTION PREPARATION FOR RE-ROOFING

SECTION CLAY BARREL TILE ROOFING Removals Flashing and Sheet Metal.

SECTION THERMOPLASTIC MEMBRANE ROOFING. C. Flashings. D. Roofing cant strips, stack boots, roofing expansion joints, and walkway pads.

PUBLIC NOTICE CITY OF BEXLEY ARCHITECTURAL REVIEW BOARD and/or BOARD OF ZONING AND PLANNING

ROOF OWNER'S OPERATION AND MAINTENANCE MANUAL

Prepared By. Accent Building Sciences Inc. For

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

2 + 3 A-2.0 A A-2.1 A-2.0 A A '-8" A-2.0 A-2.0 A-2.0 SIM. A-2.0 A-2.0 A-2.0 SIM. A-2.0 SIM.

RECOMMENDED DESIGN SPECIFICATION

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

333-90TH STREET DALY CITY. CA ADDENDUM #1 CONTRACT BID DOCUMENTS FOR DOELGER SENIOR CENTER BOILER REPLACEMENT (101 LAKE MERCED BOULEVARD)


SOLAR COATING SYSTEMS ACRYLIC RENOVATION ROOF 4.5. Specification for Built-Up Roofing SUMMARY

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)

SOLAR COATING SYSTEMS SYSTEM EMULSION /ACRYLIC. Specification for Built-Up Roofing MULSION/A 1.01 SUMMARY

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

Lapolla RCS 5000 Restoration Coating System For EPDM roof systems Guide Specification

ACFoam -III Specifications Atlas Roofing

RESIDENTIAL ROOFING APPLICATION & PACKET INFORMATION

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION

PRODUCT CONTROL SECTION

CMP WellRoof Brochure

STATE OF NORTH CAROLINA B DEPARTMENT OF ADMINISTRATION February 1, 2013 PURCHASE AND CONTRACT DIVISION A MARCH 8, 1995

ROOF REPORT 3130 TCHULAHOMA

1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500

RAY-CORE Structural Insulated Roof and Wall Panels

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS

Update In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING

Transcription:

07501 ROOF ASSEMBLY SPECIAL WARRANTY FORMS ****************************************** Specifier: This section contains two forms that will be used by the Contractor to prepare its Notice of Intent and Special Warranty of the Roofing Assembly required in 07500. This section is referred to in, and completes, 07500. This page is a cover sheet for the text of the Notice of Intent form and the Special Warranty form that follow. Identification of the project, the date, and the participating parties shall be provided by the Contractor as the forms are filled out for this Work for approval by the A/E. When submitting the edited forms to the A/E for approval, provide an additional copy that clearly notes any changes that have been made in the text. When copying to execute the forma, delete the footers in this Spec Guide and replace with page numbering in the fashion of Page 1 of 5 for the Notice of Intent, and again for the Special Warranty. ****************************************** project number RA Special Warranty Forms 07501 1

ROOF ASSEMBLY PRODUCER S NOTICE OF INTENT TO ISSUE WARRANTY, herein called Roof Assembly Producer hereby gives notice to: Owner: Miami-Dade County Public Schools (the Board hereafter) Address: 1450 NE 2nd Ave, Miami FL 33132 of its Notice of Intent to Issue its Roof Assembly Producer s warranty to the Board for Name of Project: Project No. Street address: Zip Name of General Contractor: stating its intent provide its limited warranty of the Roof Assembly, supplied and installed following the Construction Documents for the named Project. A. Definition of Roof Assembly: Thermal and moisture protection work above and beyond each structural roof deck, as needed for good performance of the roof membrane and its flashings and to prevent the entry of moisture, air, heat, high winds, rain and storm-driven water. 1. Roof Assembly work includes providing and warranting of such items as roof insulation, steel roof blocking (SRB), SBS modified bitumen roof membrane and base ply flashings, vents, walkway treads and pads, counterflashings, surface-mounted flashings, stucco stops, edge strips, copings, cleats, cants, crickets, scuppers, roof drains, gutters, conductor heads, exterior rainwater conductors (metal downspouts), roof drain flashings, copings, expansion joint assemblies, rooftop penetration flashings, rooftop umbrellas & hoods, loose curbs and rooftop pipe supports, and flashing for items that pass through the roof membrane. 2. Roof Assembly work also includes the roof membrane producer s and installer s coordinating, supplying, setting, fastening, making waterproof and warranting of roofrelated work such as roof drains, roof hatches, smoke vents, edge guards, as well as PVC rainleaders that carry roof water to the storm sewer or other point of discharge. 3. Roof Assembly work also includes the roof membrane producer s and installer s coordinating and flashing of roof-related work such as rooftop equipment supports and curbs, penetrating items (such as pipes, ducts, conduit and wires), the setting of rooftop equipment such as fans, screens and antennas, and the setting of rooftop equipment having integral curbs, all in such a way that the waterproof quality of their installation is covered in the Special Warranty of the roof assembly. B. Required Additions to Producer s Customary Warranty. 1. Conditions at Worksite. State that the Producer s Representative is aware of Miami- Dade County weather conditions, the Project s surroundings and environment, and the design for construction underlying and adjacent to the roofing. 2. Construction Documents. State that the Producer s Representative has examined the Board s Construction Documents (Drawings, procurement requirements, Conditions of the Contract and Specifications) for the Project before the bid date. 3. Repairs by Owner. Board shall have the right to make emergency repairs to stop leaks (active or incipient) to prevent damage to building and its contents without voiding this Roof Warranty. 4. Notification. Board will notify the Producer s roofing installer of its requests for both leak repairs and non-emergency repair of defects. Board will keep a record of such notifications. 5. Eleventh month inspection by Producer. Producer s Representative and Roofing Installer shall conduct a post-construction field inspection between 11 and 12 months after date of Substantial Completion of the Project, in the presence of the A/E and project number RA Special Warranty Forms 07501 2

Board. Producer shall submit copies of the written report within 7 days of inspection to the Board s Maintenance Department. 6. Participation of Surety. The Producer s Surety shall participate in ensuring execution of this Roof Assembly Producer s Intent to Issue Roof Warranty as well as the Roof Assembly Producer s Warranty. 7. Approval of Installer for this Project. The Producer states that the installer listed below has been approved as qualified to install steel blocking, roof membrane and sheet metal parts of the Roof Assembly and to coordinate the installation of other parts such as insulation, hatches, curbs, supports, and penetrations. C. Required Modifications to Producer s Customary Warranty. 1. Delete uplift-resistance limitations for gale-, hurricane-, and tornado winds up through 146 mph. Only damage from winds above 146 mph may be excepted from warranty. 2. Retain criteria Category C, Wind Load Classification III, and 1.15 Importance Factor (all as defined in ASCE 7 wind uplift resistance requirements). 3. Delete restrictions to use of lightweight concrete. Delete restriction against application of roofing over the lightweight insulating concrete / styrene board assembly. (The properties of the LWIC assembly are specified in section 07503 of the Specifications.) 4. Include 20 year warranty on Roof Assembly. Provide 20 year warranty, with no dollar limit, no deductibles, with single source responsibility, and that includes all products, accessories, equipment and labor needed to repair or replace defects in Roof Assembly. 5. Include list of components of Roof Assembly as listed in Definition of Roof Assembly above. 6. Include extent of warranty. Cover total labor, equipment and material for the limited warranty period, including cost of repairing or replacing damage to the Roof Assembly, down to the roof deck, for such damage as from water leaks, wind uplift, and any other causes except those specifically excluded below. 7. Include causes of damage that are NOT included in extent of limited warranty repair. The Producer may, in its limited warranty, add the following exclusions of responsibility for: a. Major repairs or modifications to the Roof Assembly after installation for which the Producer has not been notified nor given approval b. Failure of Board to give Producer written notice within 30 days after a leak or major defect is discovered or should have been discovered exercising normal diligence. c. Failure of the Board to exercise ordinary care to limit damage after a leak or major defect is discovered and before the Producer can reasonably be expected to assess damage and make repairs. d. Failure of the Board to maintain the Roof Assembly by regularly removing plants, vegetation, leaves, trash, debris and other foreign objects, failure to keep drains unclogged, failure to prevent more than necessary traffic across the roof, failure to maintain flashings in watertight condition. e. Defects, movement and failures in structure that harm roof performance. f. Damage from accident, fire, lightning, chemical / oil / grease attack, abuse, misuse, vandalism, rodent / insect infestation, and lack of maintenance. g. Damage to the roof membrane caused by falling objects, dropped heavy equipment, or objects that are blown on the roof by winds over146 mph. h. Damage to roof membrane resulting from installation of non-roof Assembly structures, insulation, machinery or equipment without notification of and approval by Producer. i. Damage to roof membrane resulting from Board s use of the roof as a storage, eating, instructional, or recreational area. project number RA Special Warranty Forms 07501 3

j. Change in a school facility s use to storage or industrial purposes. k. Consequential damages to building interior from roof leaks and storms. l. If repair by Producer is needed, Board shall bear the expense of removing and replacing structures, equipment and traffic surfaces built over the roof membrane. project number RA Special Warranty Forms 07501 4

Name of Contractor Project: Date Bid: Name of Contractor Intending to employ Roof Assembly provider and Roof Membrane installer: Street Address: Zip Telephone: Florida Contractor Number E-mail address of contact person: Name of approved Roof Assembly and Roof Membrane producer: Street Address: Zip Telephone: Florida Contractor Number Name of Producer s Representative E-mail address of contact person: Name of Producer s approved Roof Membrane installer: Street Address: Zip Telephone: Florida Contractor Number E-mail address of contact person: Name of Producer s Surety for Intent to Provide Roof Assembly Warranty and for Roof Assembly Warranty: Street Address: Zip Telephone: E-mail address of contact person: project number RA Special Warranty Forms 07501 5

By signing this Intent to Provide Roof Assembly Warranty, the Producer s Representative certifies that he/she represents the Roof Assembly Producer and that he/she has the authority to make the above representation to the Board and fulfill the terms of the specified Special Warranty. This Intent to Provide Roof Assembly Warranty has been executed on, (month) (day) (year) Name of Roof Membrane and Roof Assembly producer: Street Address: Zip By: Date: (Signature of Producer s Representative) (Printed name of Producer s Representative [PR]) (Title of PR) Witness: Date: Producer s seal: project number RA Special Warranty Forms 07501 6

ROOF ASSEMBLY PRODUCER S SPECIAL WARRANTY Owner: Miami-Dade County Public Schools (hereafter the Board ) Address: 1450 NE 2nd Ave, Miami FL 33132 Building Project: Type of Roof Membrane: Area of Roof Membrane: Squares Type of Roof Deck: Type of Insulation: Name of Roof Assembly Producer (hereafter the RAP ): Date of Roof Assembly Completion: Date of Final Roof Assembly Inspection: Name and Address of Inspector: D. The Roof Assembly under this Special Warranty s single source responsibility consists of: 1. The provision (supplying and installing) of such items as steel roof blocking (SRB), lightweight insulating concrete (LWIC) and other roof insulation, SBS modified bitumen roof membrane and base ply flashings, walkway treads, counterflashings, surfacemounted flashings, stucco stops, edge strips, copings, cleats, cants, crickets, scuppers, gutters, conductor heads, exterior rainwater conductors (downspouts), rooftop penetration flashings, roof drain flashings, expansion joint assemblies, rooftop umbrellas and hoods. 2. Responsibility for coordination- and installation-only under this Special Warranty s extends to such items as roof drains, roof hatches, smoke vents, rooftop equipment curbs, equipment supports, portals, rooftop screen supports, roof edge guards, other items that pass through the roof membrane, and downspout-to-storm water system rain conductors, each of which is supplied and warranted by other producers. E. Scope of Roof Assembly work: 1. Providing and warranting of such items as roof insulation, steel roof blocking (SRB), SBS modified bitumen roof membrane and base ply flashings, walkway treads and pads, counterflashings, surface-mounted flashings, stucco stops, edge strips, copings, cleats, cants, crickets, scuppers, roof drains, gutters, conductor heads, exterior rainwater conductors (metal downspouts), roof drain flashings, copings, expansion joint assemblies, rooftop penetration flashings, rooftop umbrellas & hoods, and flashing for items that pass through the roof membrane. 2. Roof Assembly work also includes the roof membrane producer s and installer s coordinating, supplying, setting, fastening, making waterproof, and warranting of roofrelated work such as roof drains, roof hatches, smoke vents, edge guards, as well as PVC rainleaders that carry roof water to the storm sewer or other point of discharge. 3. Roof Assembly work also includes the roof membrane producer s and installer s coordinating and flashing roof-related work such as rooftop equipment supports and curbs, penetrating items (such as pipes, ducts, conduit and wires), the setting of rooftop screens and antennas, all in such a way that the waterproof quality of their installation is covered in the Special Warranty of the roof assembly. 4. See SPECIAL WARRANTIES in 07522 RA MODIFIED BITUMEN ROOFING for items covered by Roof Assembly Special Warranty. project number RA Special Warranty Forms 07501 7

F. RAP warrants, subject to the following terms and conditions, that the Roof Assembly provided by RAP will remain in an intact and watertight condition, free from leaks and defective materials and installation, for a period from the date of Roof Assembly completion and extending until 20 years after the date of Substantial Completion of the building Project. RAP s Special Warranty shall have no dollar limit, no deductibles, no restriction on placing Roof Assembly over lightweight concrete, and no restriction for wind velocities up to and including 146 mph. RAP further warrants that the Roof Assembly is free from defects in products and installation at the time of installation and that the products in the roofing membrane, base flashing, roof traffic treads conform to RAP s specifications. This limited warranty extends only to the Board, the original owner, and is not transferable or assignable to subsequent owners without the prior written consent of RAP. G. Under this limited warranty, during the Special Warranty period RAP will make repairs in the Roof Assembly, down to the roof deck, to correct leaks and defects, resulting from defective materials and faulty or improper installation, at its own expense, including labor and materials..rap will also make repairs in the roof membrane and base flashing to correct defects that develop during the Special Warranty period, including deterioration, cracking, holes, fissures, fishmouths, delamination or slippage, air or vapor pockets but not damage inflicted by use, abuse, accident or storm at its own expense, including labor and materials. Defects are defined as patent or latent conditions in Roof Assembly products or installation that reduce the structural integrity, thermal performance, watertight integrity, or the service life of the Roof Assembly or any of its components. H. RAP disclaims liability or responsibility for specifications, design or construction of the Project outside the Roof Assembly. I. If and when any repairs by RAP to components of the Roof Assembly are required under this Special Warranty, the expense of removing and replacing equipment and structures that are above the defective components shall be borne by the Board. J. RAP shall have no obligation under this limited warranty to make any repairs unless each of the following events has occurred: 1. RAP shall have been paid in full for its materials. 2. The Roof Assembly shall have been installed following RAP s specifications and procedures by a roofing firm approved in advance by RAP and using materials that have been approved in advance by RAP. 3. Repairs and modifications to the Roof Assembly made after installation shall be as approved by RAP. 4. Upon discovery of a leak, the Board will promptly take emergency protective action to minimize damage from the leak to building and contents. Leak shall include in addition to active water intrusion incipient leaks, such as any penetration, opening or defect in roof membrane or base flashing that can be reasonably expected to admit water into the roof insulation or the building s interior in the next rain. 5. The Board shall have given RAP written notice within 30 days after any leak or defect is discovered or should have been discovered in the exercise of reasonable diligence and ordinary care. RAP shall take corrective action, including correction of Board s emergency repairs if needed, within 24 hours after receiving the Board s written notice of leaks and incipient leaks, and within 15 days for written notice of other defects. 6. The completed installation of the Roof Assembly shall have been inspected by an inspector authorized by RAP and shall have been certified by him to be in conformity to project number RA Special Warranty Forms 07501 8

RAP s specifications; as modified to meet the requirements of the Construction Documents. 7. The Board shall have maintained the roof Assembly by regularly removing plants, vegetation, leaves, trash and debris, and other foreign objects, keeping all drains unclogged and properly working at all times, preventing excessive traffic across the roof, and maintaining sealant pans and flashing in a watertight condition. 8. The Board shall have allowed RAP and/or the roofing installer free access to inspect the Roof Assembly during the term of this limited warranty. Access to the Roof Assembly shall have been permitted and facilitated upon RAP s request on reasonable notice, and during daylight hours on weekdays. 9. In the event that any repairs are required for any of the reasons listed above, the expense of removing and replacing metal or wood traffic surfaces or other structures built over the Roof shall be borne by the Board. K. THIS LIMITED WARRANTY DOES NOT COVER THE FOLLOWING CONDITIONS. THE ROOF ASSEMBLY PRODUCER SHALL NOT BE LIABLE FOR ANY LEAKS OR DEFECTS THAT RESULT FROM ANY OF THE FOLLOWING CONDITIONS OR EVENTS THAT ARE BEYOND THE CONTROL OF THE RAP: 1. Natural disasters and Acts of God, including floods, lightning, hail, dust, earthquakes, and hurricanes of more than 146 mph wind velocity. 2. However, gales or hurricanes equal to or less than 146 mph in wind velocity, according to ASCE 7, are covered, and RAP shall be liable for any leaks or damage that result. 3. The term hurricane shall include windstorms, rainstorms, cyclones and tornadoes, the agreed wind velocity of which shall be as measured, according to ASCE 7, at whichever of the following is closest to the Project: Miami International Airport, The National Hurricane Center, or any other recording anemometer in Miami-Dade County that tests after the windstorm as being suitably calibrated to record velocities within 5 percent of those recorded by the recording anemometer at MIA. 4. Structural defects or failures, including, but not limited to, any defect, failure, or movement of any substrate material underlying the Roof Assembly; 5. Damage to the Roof Assembly caused by movement of metal work not a part of the Roof Assembly; 6. Damage resulting from any installations on the roof or through the roof membrane;. 7. Repairs, modifications, or alterations to the Roof Assembly after its completion unless done in a manner approved in writing by RAP; 8. Damage to the Roof Assembly caused by falling, thrown or blown objects; 9. Damage to the Roof Assembly resulting from its use as a storage or work area, recreational or observation area, instruction area, gathering area, or from any similar cause other than occasional or necessary traffic across its surface: 10. Damage to the Roof Assembly caused by the installation of a sprinkler system, water or air conditioning equipment, equipment screen, radio or television antenna, satellite dish, solar or wind energy collectors, framework or supports, sign, water tower, or other object or structure installed on the roof membrane without the prior written approval from RAP of the methods, materials and installation used; 11. Damage caused by accident, fire, abuse, misuse, mistreatment, insect infestation, rodents, vermin, vandals, and improper or negligent maintenance; 12. Damage or consequential damage to building contents caused by any leaks resulting from water infiltration from any portion of the building structure not a part of the Roof Assembly, chemical attack, or leaks resulting from negligent or improper building design, specification, or construction; project number RA Special Warranty Forms 07501 9

13. Damage resulting from chemical attack of the Roof Assembly s products by exposure to chemicals including, but not limited to, chlorofluorocarbons, solvents, hydrocarbons, gasoline, jet fuel, acids, corrosives, salts, turpentine, oil, fat, grease, smoke, or fumes. 14. Damage caused by change in use of the building without prior written approval of RAP. L. Roof Equipment. In the event that any repairs are required, the expense of removing and replacing metal or wood traffic surfaces or other structures built over the roof shall be borne by the Board. This includes removing equipment piping and conduit within 2 ft above the surface of the roof membrane. M. Repairs by Board. The Board shall have the right to make emergency repairs to stop leaking without voiding this Roof Assembly Special Warranty. Board will notify the Producer s roofing installer about its emergency repairs so that Producer can inspect and correct to its satisfaction. N. Inspection by Roof Assembly Producer at End of the Project s Correction Period. Producer s Representative and Roofing Installer shall conduct a post-construction field inspection between 11 and 12 months after date of Substantial Completion of the Project, in the presence of the A/E and the Board s representatives. Producer shall submit copies of the written report within 7 days of inspection to MDCPS Maintenance Department. O. Participation of Surety. The Producer s Surety listed below shall participate in ensuring execution of the work in this Roof Assembly Warranty and the Roof Assembly Warranty itself. P. Approval of Installer for this Project. The Producer states that the installer listed below has been approved as qualified to install blocking, roof membrane and sheet metal parts of the Roof Assembly and to coordinate the installation of other parts such as insulation, hatches, curbs, supports, and penetrations. Q. This limited warranty shall be construed according to the laws of the state in which RAP s home office is located. R. No payment shall be made hereunder by RAP to the extent that any sums are paid by any corporation affiliated with RAP on account of a claim against such affiliated company arising out of the same facts. project number RA Special Warranty Forms 07501 10

S. THIS LIMITED WARRANTY IS ISSUED WITH THE FOLLOWING RIDERS WHICH ARE MADE A PART HEREOF BY REFERENCE: By signing this Roof Assembly Special Warranty, the Representative of the Producer certifies that he/she represents the Roof Assembly Producer (RAP) and that he/she has the authority to make the above representation to the Board and fulfill the terms of the specified Special Warranty. This Roof Assembly Special Warranty has been executed on (month) (day) (year) Name of Roof Membrane and Roof Assembly Producer (RAP): Street Address: Zip Telephone: E-mail address of contact person: By: Date: (Signature of Producer s Representative) (Printed name of Producer s Representative [PR]) (Title of PR) Witness: Date: Seal: project number RA Special Warranty Forms 07501 11

Name of Roof Membrane and Roof Assembly installer: By: Date: (Signature of installer s representative) (Printed name of representative) (Title of representative) Street Address: Zip Telephone: Florida Contractor Number E-mail address of contact person: Witness: Date: Name of Producer s Surety for Roof Assembly Warranty: Street Address: Zip Telephone: E-mail address of contact person: /// project number RA Special Warranty Forms 07501 12