Gathering engineering and supplier data for oil and gas projects

Similar documents
Delivering Business Results Today by Using Tomorrow s Field Optimisation Engine

Share Fair November Garry Lewis, Business Development Director Roy Choudhury, Supply Chain Director

Optimization of a Groundwater Wellfield Subject to Regulatory Constraints

Managing The Data Life Cycle

ESCRI-SA Energy Storage for Commercial Renewable Integration South Australia

Integrated Surface Water and Groundwater Modelling for Oil Sands Reclamation

ASSET MANAGEMENT SERVICES

Technical and Economic Challenges of Biomass and Waste to Syngas

Phosphate in Australia

HISC Performance Validation of DSS Welds for Large-Strain, HP/HT Subsea Applications

Eduard Marfà, EMEA Portfolio Marketing. Energy & Utilities Overview

Business Case Our Challenge. Asset lifecycle definition of engineering information to support Operation, Maintenance and Projects

SAP ERP to SAP S/4HANA 1709 Delta Scope Solution Capability: Production BOM Management

For personal use only

For personal use only

Optimize Enterprise Asset Productivity with Comprehensive Master Data Governance

Markit delivers an end-to-end solution that supports client reporting processes.

Streamline Retail Processes with State-of-the-Art Master Data Governance

2017 Geo Business Seminar

Deliverables list for Projects in the fertilizer industry

Engineering Data Lifecycle Management 18/08/2011

mysap Product Bundles

Design, Integration and Project Management of Complex Engineering Projects. Alexander Walsh Executive General Manager Engineering at ASC Pty Ltd

SAP Digital Product Innovation Innovations in 2017

Project Production Institute Challenges and Myths of Offsite Fabrication for Mega Projects

SAP ERP to SAP S/4HANA 1709 Delta Scope Solution Capability: Closing Operations

LE Donna Scott

SAP ERP to SAP S/4HANA 1709 Delta Scope Solution Capability: Warranty Management

SAP ERP to SAP S/4HANA 1709 Delta Scope Solution Capability: Time Sheet

BIM 2016 and the NEC. Simon Rawlinson, 20 April 2015

FY18 RESULTS PRESENTATION

BIM Management Training Course One Day Course on the fundamentals of BIM Management. ciobacademy.org

Water and Wastewater Plant Design Solutions. Achieve Lower Total Cost of Ownership with BIM Methodologies

Efficiently Develop Powerful Apps for An Intelligent Enterprise

Augmented Reality, IoT and the Connected Product Experience

Overview of Technical Skills and Competencies

Optimization of infill drilling locations

For personal use only

Charles River Software as a Service (SaaS)

PETRATHERM LIMITED ABN

PETRATHERM LIMITED ABN

Management Update: Application Outsourcing Trends for 2003 and 2004

SmartSPEND. KBR SmartSPEND SM. The Economic Approach to Project Development and Execution that Delivers Maximum Project Returns

Air Cooled Condensers

SmartPlant Materials Handling

PP&M Technology Update IMEX CHUCK GILL, VICE PRESIDENT, Business Development Americas

CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Wednesday 24 th September Cardiff

CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Monday 22nd September 2014 Swansea

BOLD STRATEGY ROADMAP. Christophe De Hauwer, Chief Strategy and Development Officer

Management Update: The Sourcing Life Cycle Can Be Key to Business Operations

WELL ENGINEERING SERVICES

Powering the Digital Supply Chain of One SAP SE or an SAP affiliate company. All rights reserved.

BIM guide for members of the Institution of Mechanical Engineers

The specialty company

OZ Minerals Update. Geoff Deans, Group Manager Social Performance. A modern mining company 29 AUGUST 2018

From Integrated Engineering to Integrated Operations...

Emergence of the Main Information Contractor (MIC) in the Era of Large-Scale Capital Projects

Copyright Infor. All Rights Reserved.

Ambition AXA Investor Day June 1, 2011

TG 16 SOUTH AUSTRALIAN WATER CORPORATION

For personal use only. Company Update

Click to edit Master title style

Contents Working with Oracle Primavera Analytics... 5 Legal Notices... 10

Interconnection Feasibility Study

Why SAP Ariba is essential Presented by Ludovic DENIS, Account Executive, LoB Procurement CEE, SAP Ariba 12 October 2016

Return To Scene Digitalising Industry

Industry Guidance on Records Review for Re-affirming Transmission Pipeline MAOPs

PROCUREMENT UPDATE BIM - BUILDING INFORMATION MODELS

COM R. Anderson, J. Disbrow

Information Management on BP s projects for PCA meeting. David Hodgson Feb 2012

HPS vs. LED Indoor Cannabis Cultivation. Lasse Schulze (Ph.D.)

SAP ERP to SAP S/4HANA 1709 Delta Scope Solution Capability: Extended Warehouse Management

SAP Fieldglass Datasheet SAP FIELDGLASS VENDOR MANAGEMENT SYSTEM (VMS) CAPABILITIES AND BENEFITS OVERVIEW

Presenter. A Plant Data Management platform that makes differences

IAG House, 388 George Street, Sydney. Retrofitting for Energy Efficiency 2 February 2012

Enterprise Asset Management. Enterprise Asset Management 1

Understanding Information Challenges for Brownfield Assets and Greenfield Projects

XXXXX. Bremner Trio Small Hydro Project. Interconnection Facilities Study and Project Plan

Open Text and Microsoft

Is your supplier risk management keeping pace with your strategic

New Solutions for Government Human Services

The Role of Engineering Tools in the Rise of Smart Connected Products

Delivering a DCC Service in a Time of Business Change. Document Control

INGENIA ASLAT Our experience at your service

Employer s information requirements (EIR) An overview of facilities management requirements

SAP Fieldglass Datasheet SAP FIELDGLASS SERVICES PROCUREMENT STREAMLINING STATEMENT OF WORK ENGAGEMENTS

GLOBAL ENERGY FORUM. Managing Large EPC Projects with Data at Your Fingertips. Maurice Tayeh. February 20 th, 2014 Houston, Texas

Cognitive Procurement

For personal use only. Annual General Meeting 23 August 2016

Strategic Issues Workshop Improving Brownfield Projects

Little book of BIM edition

IM Scope of Work for Contracts

XXX Development. Facility Feasibility & Option Selection Plan

Tech-Clarity Perspective: How Top Auto Companies Realize Innovation and Manage Complexity

Compete Better: Share More

ICT investment trends in South Africa

Business Centre Supply Chain Manager

Software Global Customer Conference

White paper Energy companies achieve operational excellence through digital transformation

Interconnection Feasibility Study

Transcription:

Gathering engineering and supplier data for oil and gas projects Past, Present and Future Dave Kent Lead Data Coordinator Offshore Engineering Data Event

Welcome Dave Kent Lead Data Coordinator WorleyParsons IM group Over 10 years experience based on IM/Data handover working for EPC Contractors on Oil and Gas projects in the UK & overseas. WorleyParsons is a leading provider of professional services to the resources & energy sectors and complex process industries. Our services cover the full asset spectrum both in size and lifecycle from the creation of new assets to services that sustain and enhance operating assets. From small Brownfield services contracts to mega Greenfield projects, WorleyParsons has the skills and technologies to address all challenges. WorleyParsons extensive experience ensures that we provide project solutions with the lowest total lifecycle cost while meeting each customer s specific requirements.

Agenda 1. Brief history of engineering & design 2. Project evolution 3. Data ownership and project & data lifecycle 4. Data collection scope and depth 5. Intelligent ways of gathering data 6. Why gather data this way?

1. A brief history of engineering & design Paper drawing/document-centric working Building an offshore platform involved a huge workforce producing mountains of technical drawings, schedules and datasheets.

1.1 A brief history of engineering & design 2D CAD/electronic document centric working During the 1980s the first PC and UNIX based CAD (computer aided design/drawing) hardware and software packages were used by engineering companies to produce CAD drawings.

1.2 A brief history of engineering & design 3D CAD centric working & Intelligent discipline tools Building and annotating 3D models allowed better visualisation and early identification of clashes. Intelligent discipline application tools allowed more efficient working & produces standard deliverables more easily.

1.3 A brief history of engineering & design Data collection & data relationships allows intelligent tools to empower users to view understand, interact and enrich the data.

2. Project Evolution Old model SEGREGATED PHASES FEED - Front End Engineering & Design EP Engineering & Procurement C - Construction O&M Operations & Maintenance Documents & drawings Front End engineering Documents & drawings only to build plant Accept plans & kit Build plant, create As-built drawings Scrape and collate data & drawings to be able to maintain plant Critical Data

2.1 Project Evolution New model connected phases for the whole lifecycle Critical Data Collect data on long lead items Collect data to engineer, build, operate and maintain plant Accept data & kit, build plant, create Asbuilt drawings & data Receive collated data to be able to maintain plant Recording data that the item is decommissioned

2.3 Project Evolution What is a class? Parent class: Vehicle Child or Sub-class: Car Child or Sub-class: Bicycle Attributes: engine Fuel Manual/Automatic number of wheels number of seats etc Attributes: number of wheels Number of seats: 1

2.3 Project Evolution What is a class library? What is a tag?

3. Data ownership and Project & Data Life-cycle 3.1 Project and data lifecycle

4. Data Collection Scope & Depth Project Initiation Bird s eye view before getting into detail Perform a Risk Assessment Evaluate scope early on

4.1 Data Collection Scope & Depth Project Initiation Evaluate class library Choose Appropriate Class library for Project type Review with Operations & Maintenance Try to avoid re-work Avoid increased costs

4.2 Data Collection Scope & Depth Reasons to uniquely identify an item with a tag number In a plant there are uniquely identified items, information is required for to reference for: Specifying and ordering Construction and commissioning Spares & Servicing requirements. Connectivity requirements. Operating requirements. Safety requirements. Non-serviceable (but inspected items) items like cables & pipe-lines Tags within software / signalling Soft tags in DCS/PLC systems.

4.3 Data Collection Scope & Depth An example of unique identification Distribution Board

4.4 Data Collection Scope & Depth Potential pitfalls for data collection

4. Data Collection Scope & Depth Training, engagement, alignment and whole team buy-in

5. Intelligent ways of gathering data Data Enrichment

6. Why gathering data this way? 6.1 Compelling reasons to gather data this way Increasingly stringent requirements Schedule

Summary Gathering engineering and supplier data for oil and gas projects Perform a bird s eye view before getting entrenched in detail Perform a formal risk assessment Try to ensure you understand your client s expectations at the beginning. Establish and evaluate scope and schedule early on Evaluate class library Ensure that class library is appropriate for project type Training, engagement, alignment and whole team buy-in Manage tag/asset register (ensure there is only one Master!) Collect data in a timely fashion Question traditional deliverables Check consistency and quality (consider using a 3 rd Party CMS company)

QUESTIONS? Dave Kent Lead Data Coordinator WorleyParsons IM group WorleyParsons Information Management Consultancy Services can help you to realise your concept

DISCLAIMER This presentation has been prepared by a representative of WorleyParsons for the Aberdeen Offshore Engineering Data Event 2013. The presentation contains the professional and personal opinions of the presenter, which are given in good faith. As such, opinions presented herein may not always necessarily reflect the position of WorleyParsons as a whole, its officers or executive. Any forward-looking statements included in this presentation will involve subjective judgment and analysis and are subject to uncertainties, risks and contingencies many of which are outside the control of, and may be unknown to, WorleyParsons. WorleyParsons and all associated entities and representatives make no representation or warranty as to the accuracy, reliability or completeness of information in this document and do not take responsibility for updating any information or correcting any error or omission that may become apparent after this document has been issued. To the extent permitted by law, WorleyParsons and its officers, employees, related bodies and agents disclaim all liability direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of WorleyParsons and/or any of its agents) for any loss or damage suffered by a recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.