Capitol Expressway Light Rail Project Supplemental Environmental Impact Statement ANNOTATED OUTLINE

Similar documents
Environmental Setting

ENVIRONMENTAL IMPACT STATEMENTS - COUNCIL ON ENVIRONMENTAL QUALITY REGULATIONS CHECKLIST

Intent to Prepare a Supplemental Draft Environmental Impact Statement for the Capitol

Chapter 3 Affected Environment, Environmental Consequences, and Mitigation Measures

Section 3.11 Land Use

12 Evaluation of Alternatives

Final Environmental Impact Statement Addendum: Agreement for the Central Corridor Light Rail Transit Project through the University of Minnesota,

TRANSPORTATION IMPACT ANALYSISGUIDELINES

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT

Table of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation

Cumulative and Secondary Impacts

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Appendix. Sample EA/EIS Scope of Work

Contents. S. Executive Summary... ES Overview of Purpose & Need

Draft Alternatives and Screening Criteria

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Chapter 5. Congestion Management Program. Chapter 5

11 Joint Development Regulatory Context and Methodology

Performance Dashboard

REGULATIONS For Implementing The Procedural Provisions Of The NATIONAL ENVIRONMENTAL POLICY ACT

I-20 East Transit Initiative

Evaluation of Alternatives

Chapter 1 Executive Summary

Unified Corridor Investment Study Performance Dashboard

RECLAIMING NEPA. Lucinda Low Swartz, Esq. 1 Environmental Consultant Kensington, Maryland

Performance Dashboard

Environmental Scoping Information Report

5.3 Air Quality and Greenhouse Gas Emissions

Future Build Alternative Traffic Forecasts and Level of Service Analysis

6.0 Indirect Effects and Cumulative Impacts

Intent to Prepare an Environmental Impact Statement for the South Bay Metro

Regional Connector Transit Corridor Project Draft Environmental Impact Statement/ Draft Environmental Impact Report

Wyandanch Intermodal Transit Facility

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

4.0 Coordination and Consultation 4.0 Coordination and Consultation

2016 RTP/SCS Performance Measures Update Technical Working Group

I-20 East Transit Initiative

Chapter 4 Cumulative Effects

OPTIONAL STATIONAVIATION/MANCHESTER

Revised Final Environmental Impact Report/ Environmental Assessment for the Wilshire Bus Rapid Transit Project

PRACTITIONER S HANDBOOK

6.2.2 Environmental Consequences and Mitigation Measures

DEPARTMENT OF DEFENSE DEPARTMENT OF THE NAVY

Transportation Conformity Guidance for Qualitative Hot-spot Analyses in PM 2.5 and PM 10 Nonattainment and Maintenance Areas

CHAPTER 2 DESIGN REFINEMENTS

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

3.10 Hydrology and Water Quality. Environmental Setting

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

A. INTRODUCTION B. NOISE ANALYSIS METHODOLOGY

City of Los Angeles 2010 Bicycle Plan First Year of the First Five-Year Implementation Strategy & Figueroa Streetscape Project Draft EIR

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE FINAL ENVIRONMENTAL IMPACT STATEMENT

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

Chapter 5 Transportation Draft

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1

SECTION 1: INTRODUCTION

Appendix L Greenhouse Gas 4-part Strategy

Environmental Impact Statement; Lone Star Regional Rail Project Williamson, Travis, Bastrop, Hays, Caldwell, Comal, Guadalupe, and Bexar Counties, TX

Section 4.8 Climate Change

Section 7 Environmental Constraints

Environmental Setting, Impacts, and Mitigation Measures

Frequently Asked Questions about Integrating Health Impact Assessment into Environmental Impact Assessment

ATTACHMENT 3. Background:

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

(Image of a moving Muni light rail vehicle in the Geneva Yard at night)

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

[Federal Register: December 7, 2005 (Volume 70, Number 234)] [Notices] [Page ] From the Federal Register Online via GPO Access

Green Line extension Project Fall 2009

RESOLUTION NO

Chapter 1. Introduction

Table Energy Consumption in California by Sector, 2000 and 2004

Executive Summary. TCAG 2014 Regional Transportation Plan

City of Berkeley. Guidelines for Development of Traffic Impact Reports

That will also contribute to achievement of a number of objectives and policies in the Regional Policy Statement.

Columbia Pike Transit Initiative

Corridor Advisory Group and Task Force Meeting #19

Grassy Mountain Gold Project

Indirect and Cumulative Effects

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Lynnwood Link Extension 2013 Draft EIS Comments and Responses

TRAFFIC STUDY GUIDELINES

Transportation A Conversation on Regional Transportation. Tacoma City Manager April 15, Update to the Regional Transportation Plan

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017

Background. Purpose of This Phase of Project Development

Menlo Park Planning Commission Draft EIR Public Hearing June 20, 2016

NEPA and Design Public Hearings

Category 3, BART Capacity, Access and Parking Improvements. Contra Costa Transportation Authority STAFF REPORT Page 2 of 5 The Authority directed staf

Chapter 5 - Transportation

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures

SUMMARY OF IMPACTS NEW IMPACTS AND PROPOSED MITIGATION

14.0 TRANSPORTATION PLANNING RULE COMPLIANCE

Executive Summary. and appendices, as well as. can be obtained by calling (206) or by sending an e mail to

Purpose of the Public Hearing

AMENDED RECORD OF DECISION. by the Federal Transit Administration. Dulles Corridor Metrorail Project Fairfax and Loudoun Counties, Virginia

CHAPTER 2.0: INTRODUCTION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

Factor Potential Effects Mitigation Measures

Transcription:

Capitol Expressway Light Rail Project Supplemental Environmental Impact Statement ANNOTATED OUTLINE The purpose of this annotated outline is to focus the content of the Environmental Impact Statement (EIS) so the researchers, analysts, section writers and reviewers know what information and level of detail to include in the Draft Supplemental EIS. In addition, this annotated outline specifies where public and agency comments on the scope and content of the Draft Supplemental EIS will be addressed. In the spirit of 40 CFR 1502.8, this document will be prepared in plain language and use appropriate graphics so that decisionmakers and the public can readily understand them. Clear prose will be used throughout, technical jargon minimized and design arts maximized for public access and comprehension. Pursuant to 40 CFR 1502.7, the text of chapters 5-8 of the Draft Supplemental EIS shall not exceed 150 pages. Capitol Expressway Light Rail Project Page 1

1. Title Page 1.1. Project Name 1.2. Type of Document 1.3. Date 1.4. Logos 2. Cover Sheet 2.1. List of responsible agencies including the lead agency and any cooperating agencies. 2.2. Title of the proposed action that is the subject of the statement, State and County where the action is located. 2.3. Name, address and telephone number of person at the agency who can supply further information. 2.4. A designation of the statement as a draft or final supplement. 2.5. One paragraph abstract of the statement: What is proposed? What are the environmental impacts? 2.6. Date comments must be received. 3. Executive Summary The summary shall stress the major conclusions, areas of controversy (including issues raised by agencies and the public during the scoping process), and the issues to be resolved (including the choice among alternatives). The summary should not exceed 15 pages. 3.1. Background (give a brief description, not more than a paragraph or two, of the planning process leading to the proposed action including earlier environmental documentation) 3.2. What is the purpose and need for the action? 3.3. What alternatives were evaluated? 3.4. What are the major impacts of the alternatives? 3.5. What coordination occurred with the public and other agencies 3.5.1. Briefly summarize and reference the scoping process, report and coordination plan. 3.5.2. What were the issues raised and the areas of controversy? Capitol Expressway Light Rail Project Page 2

3.6. Regional location map 3.7. Table comparing major impacts of alternatives in matrix format. 4. Table of Contents 5. Purpose and Need Briefly (according to CEQ, normally in one page or less) specify the underlying purpose and need for the proposed alternatives. 6. Alternatives Analysis Briefly explain that the alternatives analysis is intended to provide information to local officials on the benefits, costs, and impacts of alternative transportation investments. The record of the alternatives analysis serves as the foundation for establishing the range of alternatives that must be considered in the statement. 6.1. What alternatives were initially considered? 6.1.1. Brief description of all alternatives considered. 6.1.2. Full discussion of alternatives that were evaluated in detail. 6.1.3. Brief discussion of alternatives that were eliminated from detailed study. 6.2. Describe the process for selecting the alternatives evaluated in the Draft EIS published in April 2004? 6.3. State the reasons for eliminating the Baseline (TSM) Alternative, which consists of enhancements to bus service above existing and planned levels, from the Draft Supplemental EIS. 6.3.1. VTA is planning to add Bus Rapid Transit as a locally funded project to the Capitol Expressway corridor in advance of light rail. As a result, it is no longer considered an alternative, but a planned project. 6.4. Identification of the Preferred Alternative. This section will identify the preferred alternative, including possible sites for new or expanded maintenance facilities. 6.5. Table/Matrix of alternatives 6.5.1. No-Build Alternative 6.5.2. Build Alternative Capitol Expressway Light Rail Project Page 3

6.6. List of federal permits, licenses, and other entitlements needed. 6.7. Supporting planning documents that describe the alternatives analysis will be incorporated by reference only, per 40 CFR 1502.21. 7. Affected Environment, Consequences and Mitigation This section will concentrate on and direct attention to important issues where there are adverse impacts, or community or agency concerns that were communicated during the scoping process. Other issues will be summarized or simply referenced commensurate with the adversity of the impact. Listed below are the issues that will be described in detail in the Draft Supplemental EIS: 7.1. Transportation This section will analyze the effect of the removal of the HOV lanes on local and regional roadways, including the effect on the travel time of automobiles and buses. Based on previous environmental studies, adverse impacts are anticipated at several intersections. 7.2. Air Quality and Climate Change This section will analyze the air quality impacts from operation and construction of the project. The analysis will include the effect of the removal of the HOV lanes on greenhouse gases. 7.3. Energy This section will analyze whether existing and planned facilities will provide adequate power supply for the project and region. This analysis will include an evaluation of cumulative energy demand and supply. Based on previous environmental studies, adverse impacts are anticipated to peak electrical transmission. 7.4. Environmental Justice This section will analyze the effects of the proposed action on low-income and minority populations, including mobility. Based on previous environmental studies, the proposed action is anticipated to disproportionately affect these populations. 7.5. Noise and Vibration This section will analyze existing and future cumulative noise levels (includes noise from both light rail and other sources, such as automobiles, planes, etc). Based on previous environmental studies, it is anticipated that there will be adverse impacts as a result of noise during construction, and vibration during both construction and operation. Measures will be evaluated to reduce these adverse impacts, particularly on sensitive receptors or low-income or minority communities. Capitol Expressway Light Rail Project Page 4

7.6. Safety and Security This section will evaluate pedestrian safety at street crossings, especially at Ocala Avenue, where there are schools nearby. 7.7. Construction Impacts This section will evaluate the effect of construction on the environment, including air quality and people with respiratory problems. This section will also assess opportunities to incorporate industrial materials recycling into the project design. 7.8. Maintenance Facility This section will describe possible sites and associated impacts of maintenance facilities, or describe impacts of proposed expansion of existing facilities. 8. Financial Considerations This section provides information not related to environmental quality that is relevant and important to a decision on the proposed action. It will include a discussion of the 2000 Measure A Sales Tax Measure and the effect of lower than projected revenues on the schedule for implementation of transportation improvements in the Capitol Expressway Corridor. 8.1. Capital Costs 8.2. Operation and Maintenance Costs 8.3. Financial Feasibility and Local Financial Commitment 9. List of Preparers 10. Agency and Community Participation (List of Agencies, Organizations, and persons to whom copies of the statement are sent.) 11. References 12. Appendices Capitol Expressway Light Rail Project Page 5