BUILT-UP REINFORCED BITUMEN MEMBRANE WARM DECK ROOF COVERING Two layer, EXCEL/SPOT fully adhered waterproofing system

Similar documents
J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings

Specification. Project Name: Project reference: Written: by: Cathal Quinn Tel:

LIQUID APPLIED WATERPROOF ROOF COATINGS

LIQUID APPLIED WATERPROOF ROOF COATINGS

LIQUID APPLIED WATERPROOF ROOF COATINGS

NBS SECTION J41 - SCOPE OF WORKS

Outline NBS Specification. Protec System to PVC Single Ply (Waterproofing Only)

Outline NBS Specification. Protec System to Felt (Waterproofing Only)

LIQUID APPLIED WATERPROOF ROOF COATINGS

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces.

NBS SECTION J42 - SCOPE OF WORKS

LIQUID APPLIED WATERPROOF ROOF COATINGS

Sample Specification for the application of De Boer Duo HT 4 Slates/F C180 Two-Layer waterproof warm roofing membrane system to concrete.

LINE SOLO ALPAL TRAFIC. High performance SBS waterproofing. trusted by professionals

roofing ROOFING Design of the base ROOFING DETAILS

SECTION 07530CP EPDM MEMBRANE ROOFING

Sarnavap 5000E SA Vapour Control Layer

MODIFIED BITUMINOUS SHEET AIR / VAPOUR BARRIERS SELF ADHESIVE

ONDULINE MINI 18. The stylish Do it Once roofing upgrade for your garden buildings.

Roofing. Carrier Membrane SA. Self-adhesive Carrier Membrane. Product Description. Tests. Product Data. Form. Storage

J42 Specification. Suggested Sarnafil J42 Specification for: Example - Adhered PVC Specification (G410-ELF - Fleece Backed) Our Reference:

NURAPLY 3PM ROOFING MEMBRANE INSTALLATION CHECKLISTS

GRP Flat Roofing Edge Trims

Construction. S-Vap 5000E SA Self-adhesive Vapour Barrier. Product Description

ITEM 458 WATERPROOFING FOR STRUCTURES

Tecnatorch SBS Roof Waterproofing System

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

SOPREMA JARDIN Double Layer Torch-on membrane For water proofing roof gardens and planters

National Master Specification (NMS) Section SECTION INCLUDES.1 Materials and installation for modified bituminous roofing.

Installation Instructions ALUTRIX 600 ALUTRIX FR

GENERAL FIX LIGHTWEIGHT, non-penetrating FaSTEnInG SYSTEM

Gas Protection System Components

tra-load Damp Proof Courses Product and Systems Overview

Self Adhesive EPDM TRAINING MANUAL

FLEXITHERM Double layer with Graphite Core Insulation

PowerDeck F. PIR insulation for Warm Flat Roofs. Product Guide

Euroroof Flat Roofing Membranes

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.

SRP-AirOutshield ROOF Issued:

RUBBERGUARD LIQUID APPLIED WATERPROOFING

Flat roofs. Flat roof design. 2.3 Flat Roofs

Specification. Project Name: Project reference: Written: by: Cathal Quinn Tel:

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

Sika-Trocal C200 Adhesive. Sika-Trocal C200 is an adhesive to bond certain insulation boards on approved substrates.

Floors Walls Roofs. Jabroll. APPLICATION: Flat and Curved Roofs PRODUCTS: Vencel Resil Limited

11 FLAT ROOF CONSTRUCTION

4422WT SEALCO ECOTUFF TPO SUPERROOF WATERPROOFING MEMBRANE

4422WE SEALCO EPIROOF & EPISPAN EPDM MEMBRANES

SECTION BUILT-UP BITUMINOUS WATERPROOFING

tra-load Tanking Membranes Product and Systems Overview

Polymeric membrane for roof waterproofing

Architectural Roofing

Euroroof +44 (0)

TORCH-FREE BITUMEN MEMBRANE DETAILING

INSTALLATION INSTRUCTIONS KÖSTER TPO

CI/SfB (47) February Single-Ply Roofing

Insulation Adhesive The fast and reliable solution for bonding insulation materials

PROTEUS HOT MELT WATERPROOFING MANUAL

Euroroof +44 (0)

Steeldeck Self-protected waterproofing Main area and upstand descriptions Self-protected waterproofing systems for non-accessible roofs on steeldeck

Roofing. Sarnavap 500E. Vapour control layer. Product Description. Tests. Product Data. Form. Storage

Debotec Torch-on Membranes

Flat Roofing. Product Guide. Traditional Felt. Pour & Roll Membranes. Torch Applied Membranes. Self-adhesive Membranes

Flat Roofing. Product Guide. Traditional Felt. Pour & Roll Membranes. Torch Applied Membranes. Self-adhesive Membranes

SRP-AirOutshield UV Issued:

Desmopol Application Guide onto Ply/OSB Deck

A. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual

Contents. Timber framing to be installed in accordance with AS:1684 Metal framing to be installed in accordance with BCA Volume: 2

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

The XtraFall system provides a high performance precision solution to thermal insulation and water drainage on flat roofs.

Roofing. Sarnacol Adhesive for Insulation Boards. Product Description. Product Data. Polyurethane-based humidity-hardening one-pack adhesive

4422WT SEALCO ECOROOF ECOTUFF TPO GREEN ROOF WATERPROOFING MEMBRANE

Enviroflex Liquid-Applied Roof Waterproofing

Terokal TK 395 The fast and reliable solution for bonding insulation materials

Roof Replacement. Notes: T-1 (Title Page) 709 Bull Street Columbia, South Carolina. University of South Carolina. Callcott Social Science

Installation Guidelines INOFIN FR

1 PVC or ABS drain with strainer

Construction. Sarnafil TS Polymeric membrane for roof waterproofing. Product Description

Thermal insulated roofing SYSTEM

ROOF RENOVATION OVERSHEETING SYSTEM

A WARM ROOF CONCEPT INCORPORATING A ROOF GARDEN WITH A TWO LAYER DUO LANDSCAPE WATERPROOFING SYSTEM.

SSL-175. Specifications

DL-200. Specifications

SECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES

Sarnavap 1000E is an unsupported vapour control layer based on PE-LD (Low Density Polyethylen).

EVALUATION REPORT Boral Roofing /MonierLifetile 7575 Irvine Center Drive Suite 100 Irvine, CA

CI/SfB Oct 12. (47) Ln. Uniclass L524. System HIGH PERFORMANCE, TORCH-ON ROOFING SYSTEM RESILIENT, FLEXIBLE, LONG LASTING

.1 Provide submittals in accordance with Section Submittal Procedures.

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].

Light-Metal Roof Edge, Raised

Polyfoam Floorboard For thermal insulation of floors

ALLNEX DAMP PROOF AND TANKING MEMBRANES. Product. Scope. Appraisal No. 805 [2013] Appraisal No. 805 (2013) Amended 26 January 2018.

SMART ROOFS AFFORDABLE HOUSING LEISURE HOUSING STORAGE BUILDINGS BARNS GARAGES & CARPORTS GARDEN OR WOOD SHEDS.

SECTION THERMOPLASTIC MEMBRANE ROOFING. C. Flashings. D. Roofing cant strips, stack boots, roofing expansion joints, and walkway pads.

Transcription:

J41 Reinforced bitumen membrane roof coverings To be read with Preliminaries/General conditions. TYPES OF COVERING 110A BUILT-UP REINFORCED BITUMEN MEMBRANE WARM DECK ROOF COVERING Two layer, EXCEL/SPOT fully adhered waterproofing system A comprehensive waterproofing system comprising two reinforced bituminous membranes fully adhered to straight cut or tapered plastic thermal insulation applied to profiled metal deck. Surface treatments, primers and vapour control layers are available where required. System manufacturer: Axter Ltd, West Road, Ransomes Europark, Ipswich, IP3 9SX Tel: 01473 724056, Fax 01473 723263, email info@axterltd.co.uk, internet www.axter.co.uk Two layer high performance roof waterproofing system. Reinforced bitumen membranes should only be applied over a continuous substrate which provides full support. Substrate Materials used to form the roof deck in flat roofs should be those listed in BS 6229 : 2003 and conform to the relevant requirements in BS 8217 : 2005. Substrate: Profiled metal deck. - Preparation: Primer: Supply and prime all necessary surfaces with Axter VERNIS ANTAC ST quick drying primer and allow to dry. - Vapour control layer: VAP-AL SK, a high strength reinforced aluminium-cored membrane with fine sand on the top surface and removable release paper on the underside and selvedge. or VAP IND self-adhesive aluminium surfaced membrane. - Attachment: To be loose laid and positioned prior to the removal of the release paper from the underside of the roll. In ambient temperatures below 10 C full adhesion may require the application of light heat to the top surface of the installed membrane. Thermal insulation: Standard board, Axter Ltd's HYTHERM ADH rigid urethane foamed board to thickness to meet required U-value of W/m 2 /ºC laid in Axter Ltd's MASTIC HYRENE, PU adhesive or hot bitumen. or Tapered insulation, Axter Ltd's HYTHERM tapered EPS insulation boards, scheme reference No. laid in Axter Ltd's MASTIC HYRENE, PU adhesive or hot bitumen. Page 1 of 6

Waterproof covering: - System manufacturer: Axter Ltd, West Road, Ransomes Europark, Ipswich, IP3 9SX, Tel 01473 724056, Fax 01473 723263, email info@axterltd.co.uk, internet www.axter.co.uk - First layer: HYRANGER SPOT S3V, a woven glass reinforced SBS modified self-adhesive bitumen membrane (3.68 kg/m 2 nom.) with a macro-perforated film on the top surface and removable release paper to the underside and selvedge. - Attachment: To be laid loose and positioned prior to removal of release paper from underside of roll. Adhesion is secured by installation of capping sheet but temporary adhesion may be achieved by spot heating the surface of the HYRANGER SPOT S3V. - Cap sheet: EXCEL HRS colour to choice, a combined polyester and glass fibre (180 gm/m 2 ) reinforced self-finished membrane (5.90 kg/m 2 nom.), manufactured with ALPA mix binder or PAXALPHA metal foil (aluminium, copper or stainless steel) finished reinforced polymer (SBS) modified bitumen membrane - Finish: foil - Attachment: This layer must be fully bonded by torching and on all laps a 2mm bitumen bead must be visible. - Flashings and detail work: Same as top layer but with the addition of Axter Ltd's 35 PY Angle Strip positioned centrally at the base of all upstands. Surface protection: Not required. Accessories: see below. PRODUCTS 320A PRIMER Type: VERNIS ANTAC ST quick drying primer. Characteristics when tested to BS EN 13357. - Volatile solvent content (minimum): 54% ± 2% by mass. - Viscosity (maximum) (STV at 25 C, 4 mm orifice): 15 to 30s. 327A BONDING COMPOUND Type: MASTIC HYRENE cold bonding bitumen PU adhesive or hot bitumen. Restriction: For heat sensitive insulation materials, use cold bonding compound. 345 PERIMETER TRIMS Type: GRP. Manufacturer: As for bitumen membrane. - Product reference: AXTRIM. Colour: To choice. Size: As drawing ref. no. - Lengths (maximum): 3 m. - Page 2 of 6

410 EXPANDED POLYSTYRENE (EPS) WARM DECK ROOF INSULATION To BS EN 13163. - Product reference: HYTHERM tapered EPS. Grade: UHD. Recycled content: not known. Edges: Rebated. Thickness: As drawing ref. no. Facing: None. 420 RIGID URETHANE FOAM WARM DECK ROOF INSULATION Standard: Rigid polyisocyanurate foam (PIR) roofboard to BS 4841-3. - Product reference: HYTHERM ADH. - Grade: 28-36 kg/m³ Edges: Square. Thickness: To meet required U-value. Facing: Coated glass tissue. 480 PIPE COLLARS Manufacturer: Contractor's choice. - Product reference: as drawing ref. no. Size: As drawing ref. no. 485 ROOF VENTILATORS - Product reference: as drawing no. Size: as drawing no ref. no. EXECUTION GENERALLY 515 ADVERSE WEATHER General: Do not lay coverings in high winds, wet damp conditions or in extremes of temperature unless effective temporary cover is provided over working area. Unfinished areas of roof: Keep dry. Protect edges of laid membrane from wind action. 530 APPLYING PRIMERS Coverage per coat (minimum): 0.2 L/m². Surface coverage: Even and full. Coats: Fully bond. Allow volatiles to dry off thoroughly between coats. Page 3 of 6

SUBSTRATES/ VAPOUR CONTROL LAYERS/ WARM DECK ROOF INSULATION 610 SUITABILITY OF SUBSTRATES Substrates generally: Secure, clean, dry, smooth, and free from frost, contaminants, voids and protrusions. Preliminary work: Complete including: - Grading to correct falls. - Formation of upstands, kerbs, box gutters, sumps, grooves, chases, expansion joints. - Fixing of battens, fillets and anchoring plugs/ strips. Moisture content and stability of substrate: Must not impair roof integrity. 670 LAYING VAPOUR CONTROL LAYER Attachment: Securely bond to substrate. Side and end laps: 75 mm minimum, fully bitumen sealed. Joints in second layer (where applicable): Stagger by half a sheet. Penetrations: Fully seal using bonding or taping methods recommended by manufacturer. Edges of insulation at roof edges, abutments, upstands, kerbs, penetrations and the like: enclose, with vapour control layer: - Dressed up sufficiently, providing 25 mm (minimum) seal when overlapped by the roof covering; or - Turned back 150 mm (minimum) over the insulation and sealed down. 680 LAYING WARM DECK ROOF INSULATION Setting out: - Long edges: Fully support and run at right angles to structure. - End edges: Adequately support. - Joints: Butt together. - End joints: Stagger. Bedding: Full bed of bonding compound. Mechanical fixing: Not required. Protection to exposed edges of insulation: Reduced thickness treated timber batten, outer edge chamfered at changes in level. Completion: Boards must be in good condition, well fitting and stable. WATERPROOF MEMBRANES/ ACCESSORIES 710 LAYING REINFORCED BITUMEN MEMBRANE GENERALLY Direction of laying: Unrolled up the slope. - Where practicable, install so that water drains over and not into laps. Side and end laps: As recommended by bitumen membrane manufacturer. Head and side laps: Offset. Intermediate and top layer/ capsheet: Fully bond. Successive layers: Apply without delay. Do not trap moisture. Strips of bitumen for 'linear' details: Cut from length of roll. Completed coverings: Firmly attached, fully sealed, smooth, weatherproof and free draining. Page 4 of 6

715 LAYING REINFORCED BITUMEN MEMBRANE ON ROOFS PITCHED MORE THAN 5 Timber battens: Fix flush with surface in substrates that will not securely accept nails. - Locations: To BS 8217, table 5. - Size: 50 mm wide x thickness of insulation. Setting out: Parallel to roof slope, with successive layers carried over ridges. - Lengths (maximum): As recommended by bitumen membrane manufacturer. - End laps: Half stagger and align on alternate bitumen membranes. Additional fixing of bitumen membranes: As recommended by bitumen membrane manufacturer. 740 TORCH-ON BONDING OF REINFORCED BITUMEN MEMBRANES Bond: Full over whole surface, with no air pockets. Excess compound at laps of top layer/ capsheet: Leave as continuous bead. 747 SELF-ADHESIVE BONDING OF REINFORCED BITUMEN MEMBRANES Bond: Full over whole surface, with no air pockets. 750 LAYING MINERAL FACED REINFORCED BITUMEN MEMBRANES Lap positions and detailing of ridges, eaves, verges, hips, abutments, etc: Submit proposals. Setting out: Neat, with carefully formed junctions. Lap bonding: Carry out only at prefinished margins or prepared 'black to black' edges. Excess bonding compound at laps: Remove whilst still warm. 755 LAYING METAL FACED REINFORCED BITUMEN MEMBRANES Lap positions and detailing of ridges, eaves, verges, hips, abutments, etc: Submit proposals. Setting out: Neat with carefully formed junctions. Excess bonding compound at laps: Remove whilst still warm. face: Do not mark, crease or stain. 780 WELTED DRIPS Material: as top layer. - Length: Form using maximum length strips. - Height at external gutter (minimum): 75 mm. Welt tail: Nail to face of drip batten. Fold neatly. Welt: Bond together, carry minimum 100 mm onto roof. Overlap with top bitumen membrane. Page 5 of 6

785 FIXING PERIMETER TRIMS First/ Intermediate layers bitumen membrane: Lay over roof edge upstand. Project free edge 25 mm from wall or fascia. Trim: - Setting out (minimum): 3 mm clear from wall or fascia. - Fasteners: mm stainless steel countersunk wood screws to BS 1210. - Fixing: 30 mm from ends and at 300 mm (maximum) centres. Jointing sleeves: Fix one side only. Corner pieces: Purpose made. Completion: - Contact surfaces: Prime. - Joints: Cover with 150 mm long pads of bitumen membrane, bonded to trim. Completion of bitumen membrane: - Top layer/ Capsheet: Butt joint to rear edge of trim. - Cover strip: Fully bond to trim and top layer/ capsheet of bitumen membrane. Carry over roof edge upstand and lap 75 mm onto roof. Cover strip material: As top layer/ cap sheet bitumen membrane. COMPLETION 910 INSPECTION Interim and final roof inspections: Submit reports. 940 COMPLETION Roof areas: Clean. Outlets: Clear. Work necessary to provide a weathertight finish: Complete. Storage of materials on finished surface: Not permitted. Completed membrane: Do not damage. Protect from chemicals, traffic and adjacent or high level working. Page 6 of 6