Public Works Department -

Similar documents
DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

Transportation Concurrency

Transportation Concurrency

RE: A Traffic Impact Statement for a Proposed Mixed-use Development at 400 Windmill Road

Future Build Alternative Traffic Forecasts and Level of Service Analysis

TENW MEMORANDUM. Project Description. Trip Generation

Chapter 5 Transportation Draft

Article 16 Traffic Impact Analysis

TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT

Chapter 4: Transportation and Circulation

10.0 Congestion Management Process

Essex Junction Highway-Rail Grade Crossing Study

TRAFFIC STUDY GUIDELINES

Traffic Impact Study Requirements

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

1.1 Purpose of the Project

% U<p. Memorandum SAN JOSE CAPITAL OF SILICON VALLEY. FROM: Jim Ortbal Harry Freitas TO: HONORABLE MAYOR AND CITY COUNCIL

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

4.9 TRANSPORTATION AND CIRCULATION

Appendix O Level of Service Standard and Measurements

January 17, Ron Waldthausen Platte Valley LLC 1378 Promontory Bluff View Colorado Springs, CO 80921

CITY OF SAN MATEO GENERAL PLAN MITIGATION MONITORING AND REPORTING PROGRAM

Contents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11

Greenhouse Gas Emission Reduction Strategies

Section 7 Environmental Constraints

Evaluation of Alternatives

12 Evaluation of Alternatives

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L)

Chapter 5 - Transportation

What is the Dakota County Principal Arterial Study?

Chapter Five: Transportation

Washington State Association of Counties. County Overview: WTP Advisory Committee County Transportation Overview

Chapter 6 Freight Plan

Technical Memorandum. 720 SW Washington Suite 500 Portland, OR dksassociates.com. DATE: July 12, 2017

Chapter 8. Transportation Element

Technical Briefing Report

BCEO TRAFFIC IMPACT STUDY GUIDELINES

Traffic Impact Analysis Guidelines. Town of Queen Creek

City of Berkeley. Guidelines for Development of Traffic Impact Reports

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES

Mendocino Forest Products Grading For Industrial Land Improvements

Chapter 2 Transportation Element Goals, Objectives and Policies

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

PROJECT SUBMISSION FORM

CHAPTER 2: MODELING METHODOLOGY

RE: A Traffic Impact Statement for the Proposed Fall River South Development

EXAMPLES OF COMPREHENSIVE PLAN POLICIES HOW TO ESTIMATE THE BENEFITS OF THE CTR PROGRAM

Progress Report Regional Express & Bus Rapid Transit Program

Transportation and Utilities

Nashville Regional Freight & Goods Movement Study Phase III

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

Briefing for: MOA Freight Advisory Commission. January12,

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence

2006 TRANSPORTATION IMPACT FEES REPORT

MEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates

King County Intelligent Transportation Systems

Town of Lakeshore TRANSPORTATION IMPACT STUDY GUIDELINES

CHAPTER 3.0 CIRCULATION ELEMENT

CHAPTER 4. Existing Roadway Conditions. Highway Element. Kanawha County Putnam County

City of Los Angeles 2010 Bicycle Plan First Year of the First Five-Year Implementation Strategy & Figueroa Streetscape Project Draft EIR

Memorandum. 921 SW Washington Street, Suite 468, Portland, OR tel fax

Traffic Impact Study Guidelines. City of Guelph

CHAPTER 8 TRANSPORTATION ELEMENT

Executive Summary. Study Background

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (ZONING PETITIONS)

The Hampton Roads Region

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

TRANSPORTATION MOBILITY PLAN GUIDELINES

TSM/TDM (Transit and Roadway Efficiency) Concept - Analysis and Results

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

EXECUTIVE SUMMARY. The cities of Bellevue, Kirkland, Issaquah, and Redmond, commenced a two-year cooperative study in fall 2001 to

The TIS is to be signed and sealed by a Florida Registered Professional Engineer.

TRANSPORTATION IMPACT STUDIES

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

PORT OF FERNANDINA TRUCK CIRCULATION STUDY

PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT

CITY OF SARNIA TRANSPORTATION MASTER PLAN: TRANSPORTATION IMPACT STUDY GUIDELINES

M D 355 [FR E D E R IC K R O A D] OVER

3.12 TRANSPORTATION AND TRAFFIC

Proposed Council Changes to Comprehensive Plan

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Chapter 4 Construction Effects and Mitigation

Performance Measures for Transportation Planning Part 1

A+ ACADEMY HIGH SCHOOL

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

Final Initial Study/Mitigated Negative Declaration Indianola Subdivision Project City of Sanger, Fresno County, California

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Database and Travel Demand Model

3.6 GROUND TRANSPORTATION

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Congestion Management Process 2013 Update

on Access Management Howard Preston CH2M HILL 7 th Annual Conference

2017 TIGER DISCRETIONARY GRANT APPLICATION

Transcription:

Gregg Denis Law Mayor Public Works Department - Zimmerman, P.E., Administrator June 4, 2018 Ms. Fereshteh Dehkordi King County Department of Permitting and Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, WA 98065-9266 RE: Proposed Lakeside Maple Valley Asphalt Plant, GRDE 17-0069; PREA 16-0193 Dear Ms. Dehkordi: Thank you for providing the City of Renton the opportunity to review and comment on the proposed Lakeside Maple Valley Asphalt plant at 18825 SE Renton Maple Valley Road (SR 169) on the south side of SR 169 in unincorporated King County, as shown in the Figure 1 site vicinity map. The City of Renton has concerns about the impacts additional traffic trips associated with this project will have on SR 169, its intersections to the west of the project and also on 154 th Place SE which currently suffers severe congestion during the morning and afternoon peak travel hours. The proposed asphalt plant is located 1.4 miles east of the Renton city limits, and 2.3 miles east of the intersection of SR 169 and l54 Place SE. The June 19, 2017 Level 1 Traffic Impact Analysis prepared by TENW indicates that a total of 460 new weekday daily trips will be introduced by the project, with 45 trips occurring during the weekday morning peak hours and 32 trips occurring during the weekday afternoon peak hours. With credits for the existing use applied, the project is estimated to generate 295 weekday daily trips. The Analysis states there will be a total of 360 paving truck movements (190 in and 190 out) weekdays between 6:00 a.m. and 6:00 p.m. An estimated 60% of these trips (114 in and 114 out) will be to and from the west on SR 169. We are concerned that these truck trips will exacerbate the backups and gridlock that already occur at the intersection of 154 th Place SE with SR 169 during the peak hours (see attached aerial photo). Currently a significant amount of westbound traffic on SR 169 during the morning peak hours turns north on 154 th Place SE and heads up the hill. Frequently motorists in the queue of vehicles waiting to make the right-hand turn get impatient of the delay, and instead turn left onto l52 Avenue SE in Renton and make U-turns to head up the hill. This creates a dangerous situation that has required us to post No U-Turn signs along l52 Avenue SE, and to provide heavy police enforcement at this intersection. In addition, we receive frequent complaints of traffic congestion and backups and dangerous conditions for motorists trying to enter the street from their driveways from residents living along 154 th Place SE. We also receive complaints about traffic congestion and speeding along SE l42 Street andl44 Avenue SE in Maplewood Heights (unincorporated King County) and 156 th Avenue SE and Jericho Avenue NE in Renton. 1055 South Grady Way, Renton, WA 98057 rentonwa.gov

Ms. Fereshteh Dehkordi Page 2 of 2 June 4, 2018 Renton performed an origin and destination traffic study to determine the impact of cut-through traffic in Renton. Cut-through traffic means traffic using streets in Renton to bypass the heavily congested state routes, 1-405 in particular. The study showed that in the morning peak travel period, 68% of the traffic turning right from SR 169 onto 154 th Place SE is cut-through traffic with origins and destinations outside of Renton (see attached graphics). In the afternoon peak travel period, 30% of the traffic using 154 th Place SE is cut-through traffic. The TENW Traffic Impact Analysis shows that at the proposed new site access driveway on SR 169, the northbound (exiting site) movement during the afternoon peak hour is anticipated to operate at level of service (LOS) E. The City of Renton s Transportation Element of our Comprehensive Plan (page 28 attached) applies a standard of LOS D to arterials and collectors, which would apply to this portion of SR 169 if it were located within the city limits. The proposed Lakeside Maple Valley Asphalt Plant would be certain to exacerbate an already bad situation on SR 169, 154 th 152 Place SE, nd Avenue SE, SE l42 Street, 144 th Avenue SE and 156 th Avenue SE both in Renton and in unincorporated King County. The problems of backed up traffic along SR 169 and 154 th Place SE, and speeding, congestion, hazardous driveway conditions and illegal U-turns along these and the other streets mentioned, would be worsened by the addition of paving trucks using these arterials and collector streets to bypass backups on 1-405. We doubt these impacts could be adequately mitigated, and therefore oppose the siting of an asphalt plant in the proposed location. With our shared interest in the Cedar River, we urge you to consider the impacts of the proposal on the four wetlands and three streams located on the subject property. Each of the three streams (A, B and C) flow into the Cedar River. Wetland A is the headwater of Stream B, and the right-of-way wetland (located within SR 169) connects to Stream C. Environmentally critical areas disturbed during site remediation should be restored and protected, and adequate buffers should be required of the proposed development in order to prevent adverse effects to the Cedar River. Thank you for the opportunity to review and comment on this project. Sincerely, GreggZim an,p.e. Public Works Administrator cc: Dave upthegrove, King county council Member Reagan Dunn, King county council Member Denis Law, Mayor Renton city council Robert Harrison, chief Administrative Officer Jim Seitz, Transportation Systems Division Director chris Barnes, Transportation Operations Manager Jennifer Henning, Planning Director 1055 South Grady Way, Renton, WA 98057 rentonwa.gov

Trcifiic Impact Anaysk LaIesde indushies SR 169 p. A1 Figure 1: Frojecl Sire Vicinity EQTTO SCALE TENW June 19, 2017 Page 3

City of Renton Print map Template ; t, I Notes None 0 j City and County Boundary Parcels c:eee:z:: 1_ 12 0 256 5l2Feet NGS g84 Web MercatorAuxiIiary_Sphete -Reiitili Finance & IT Division Information Tachnology - GIS RenIonMapSupport@RentorTwaov 611/2018 Thm n-ap p a user gmad stasc natpu from an nemet maptnn see and 5 far rererence cnfy Dara layers tsat appear an tips map may or may mat be accurate current or otherw,e r!table Ti-uS MAP IS NOT TO BE USED FOR NAVIGATION

Cut Through Traffic Routes o - f.-4i Pk NE 81Vd u-i z 0) > to D Co If hi Origin/Destination Node Simplified Travel Route! Direction NE 4th St I tti GO1 Couro 11%, e 7/ t. Renton 0 Public Works

AM Cut Through Traffic Per Route Origin/Destination Node Simplified Travel Route! Direction Renton 0 CITY OF Public Works

PM Cut Through Traffic Per Route Origin/Destination Node Simplified Travel Route! Direction Renton C) Cliv OF PubHc Works

approval or that an adopted strategy is in place to Action ordinances facilities are in place at the time of development vehicular trips per City-adopted Planned Policy T-44: Ensure adequate transportation POLICIES 5. Adopted planned action areas: Track Community Planning Areas use and growth strategy, establish a citywide The general mode categories include: motor vehicle trips, transit trips, and non-motorized mode with capital improvements and programs. level of person trips by mode, and support each A. Citywide Person Trips: 8ased on the City s land Policy T-48: Apply the following multimodal LOS modes in concurrency determinations. that maximizes mobility, is coordinated with level of transportation facilities, programs and services contributes its fair share of the cost of needed to mitigate growth related transportation meets concurrency requirements. standards at a citywide level, community planning area level, and development level: Policy T-45: Ensure that new development Policy T-46: Maintain a multimodal level of service Policy T-47; Incorporate multiple transportation 4. Kennydale/Highlands/East Plateau Planning Areas 3. Talbot/Benson/Fairwood Community by the following areas to monitor if growth is 2. Valley Community Planning Area Community Planning Areas different pattern than planned, consider the effect on operational LOS and determine if the Comprehensive Plan land use, LOS or capital investments should be amended. Plan investments. If growth is occurring in a concurrency review process, track person trips B. Community Planning Area Trips: Through the 1. West Hill/City Center/Cedar River provide adequate facilities within six years. impacts. service standards of adjacent jurisdictions, and trips. occurring in relation to the Land Use Element and planned Transportation and Capital Facility C. Operational LOS: Through the SEPA review 1. Arterials and Collectors: Except as listed in INVENTORY CITY OF RENTON COMPREHENSIVE PLAN PAGE 28 supported by transit and other non-single occupant 27th/Strander Corridor into Tukwila. than 10 million tons per year), T2 freight corridors principles. Avenue, Rainier Avenue, Grady Way, SR Mobility Plan, hereby incorporated by reference, 900 and SR 515. p.m. peak hour LOS falls below LOS E. Policy T-49: Encourage development that can be Truck and rail freight are important to the regional For the above Corridors and Centers, Center Village neighborhood context. Apply urban design businesses in the City of Rentori. Safe and efficient movement and distribution of FREIGHT Policy T-50: Design transportation facilities to fit the Policy T-51: Support continued development of the vehicle modes. Specific Corridors: Carr Road, Logan Centers: Renton Urban Center and Mitigated for the following: increasing transit or other modes) when Apply a standard of Level of Service E 2. Alternative Arterial and State Route LOS: C.2, apply a standard of LOS D. impacted by a proposed development: congestion should be mitigated (such as standard at intersections that could be process, apply the following operational LOS goods is important for attracting and retaining and local economy. The Washington State Freight identifies Ti freight corridors (those carrying more TRANSPORTATION ELEMENT