City of Carson City 3505 Butti Way Carson City, NV PUBLIC WORKS SOLAR PV SYSTEM PROJECT EXECUTIVE SUMMARY

Similar documents
Alternative Energy Concept Plan San Bernardino Community College District

Summary of Net Metered Projects as of June 30, Small Net Metered Projects as of 6/30/2016 Small Group Host Projects as of 6/30/2016

AN ASSESSMENT OF ENERGY AND EMISSIONS PERFORMANCE OF BUILDINGS AT TEACHERS MUTUAL BANK LTD

Reducing Built Environment Greenhouse Gas Emissions in Thurston County. Summary January 2016

Energy Policy 2013 Annual Update

Solar Funding Options

An End User Perspective on the Cost of Solar Photovoltaic Energy Systems Installed by Commercial Organizations. Kenton D. Swift May 14, 2012

Energy Use and the University of Kentucky Info Sheet and Frequently Asked Questions

Running the Electric Meter Backwards: Real-Life Experience with a Residential Solar Power System

Business Programs: Commercial and Industrial Renewable Energy Loan Program. Technical Application and Instructions

ENERGY AUDIT REPORTS SUMMARY

Energy Innovation. At Kaiser Permanente

White Tag Certificates - Trading Energy Efficiency as a Commodity

City Facilities and Operations

Gaining Synergies Through Energy Provider Participation in Implementing Codes and Standards

City of St Cloud Sustainable Energy Options. August 9, 2010

B3 Benchmarking. B3 Building Benchmarking. Program Overview.

Environmental and Energy Conservation Programs. April 16, 2009

Full Name Unit/Department Phone Lauren Reilly

Energy Policy 2015 Annual Update

Maine Solar Energy Rebate Program 2007 Annual Report. December 1, 2007

Incentives. After work is complete:

solar photovoltaics (PV)

Public Benefit Mandates and Programs AB 2021 Goal Setting

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

Geothermal Heat Pump Technology. What s new in the business of capturing the. Energy We Already OWN

Berkeley Climate Action Plan: Tracking our Progress Building Energy Use Community-wide Greenhouse Gas Trend

Home PV System Design

Rate Design and Resource Planning

Preparing Your Prop 39 Application: The TerraVerde Energy Report Card

EVALUATION OF PSEG LONG ISLAND ENERGY EFFICIENCY & RENEWABLE ENERGY PROGRAMS. Presentation to LIPA Trustees REV Committee

Jeremy Lawton Susac May 20,

Minnesota Department of Natural Resources 500 Lafayette Road, St Paul, MN 55155

Preliminary Solar Photovoltaic Assessment for Gavilan College

Executive Summary of the 2015 Resource Management Plan Results:

LOCAL GOVERNMENT PARTNERSHIP CITY OF BEAUMONT

Voluntary Renewable Energy Markets 101

State Electronics Challenge 2008 Partner Accomplishments

New Jersey s Clean Energy Program

RI Energy Programs- Update. Energy Efficiency Programs Tom Coughlin Program Manager National Grid

LONG ISLAND LONG ISLAND

Energy Policy 2012 Annual Update

TOWN OF NEWPORT SOLAR PROJECT A 2-MEGAWATT DC NET-METERED PV SYSTEM

Levelized Cost of New Generation Resources in the Annual Energy Outlook 2012

The CSI Site. Research Studies. Value? Depends on who you are: How to Determine the Value of a Solar Investment

Customer Energy Efficiency Solutions

8/31/2016. Global carbon dioxide emissions. Electricity. Global carbon dioxide emissions. Fires: Fuel, cooking, land clearance.

included Included in FTSE4Good Index Carbon emissions (CO 2 Carbon Disclosure Project performance band FTSE Russell/JSE Responsible Investment Index

Overview of Illinois Public Act

U.S. EPA s Green Power Partnership:

Solar Power and the Future. Bryan Whitcomb General Manager, Solar Star Project October 18, 2016

Strategies for measuring and reducing your carbon footprint

AEP Ohio. Combined Heat and Power (CHP) May 24 th, 2017 Steve Giles Vice President Alternative Energy Hull & Associates, Inc.

Powering solar-ready rooftops with PV panels

Your Path to Energy Savings. New Residential Construction

Value? Depends on who you are: The CSI Site

Municipal Energy Planning Made Easy

PACIFICORP: PRIVATE GENERATION RESOURCE ASSESSMENT FOR LONG TERM PLANNING

BIZ Solar Fort Collins ClimateWise Biz Ed Program Series

THE ZERO ENERGY POOL SOLAR ELECTRICITY + POOL HEATING NATIONAL

Memorandum. Components of Avoided Costs

Request for Proposals for Photovoltaic System Installation

2.2. Energy and Emissions

Photovoltaic Systems II. EE 446/646 Fall 2013

Project Overview REV 1 BR

A TOOL TO MARKET CUSTOMER-SITED SMALL WIND SYSTEMS

I D E A E X C H A N G E U T I L I T Y AND C O M M U N I T Y C O N N E C T I O N. Denver Regional Council of Governments May 20, 2015

2016 Sustainability Summit Los Angeles Business Council

Somali Renewable Energy 2016 Forum

Trevor Houser. Visiting Fellow, Peterson Institute for International Economics. Peterson Institute for International Economics Washington, DC

ENERGY MANAGEMENT PLAN. Davenport Community Schools Davenport, IA June 22, 2017

2015 Economic Planning Study Assumptions

RENEWABLE ENERGY PURCHASING SYNDICATES OCTOBER 23, 2017

THE CASE FOR EXPANDING BENEFICIAL ELECTRIFICATION WITH GROUND SOURCE HEAT PUMPS

APWA Congress Solar Feed-in Tariff the Gainesville Way

NABCEP PV Technical Sales Job Task Analysis

Customer Sited Solar PV & The Impact of Grid Interactive Systems

Energy Conservation and Energy Production Financing The Georgia Environmental Conference August 22, 2014

Residential Roadmap to Renewable Energy Living

MISO Distributed Generation (DG) Presentation. October 27, 2015

SUBMITTED TO: Tahoe Truckee USD Donner Pass Road Truckee, CA (530) SUBMITTED BY:

/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// Scaling up

The Competitive Cost Position of Thin Film Module Technologies In High Temperature and Low Light Conditions

PREPARED FOR: ARIZONA PUBLIC SERVICE Updated Solar PV Value Report

The Schatz Energy Research Center

EXAMPLE TARIFF MID-SIZE COMMERCIAL

SOLAR th ASES National Solar Conference May 17-22, Phoenix, AZ Session: Creative Innovations with Small Scale PV An Integrated Design Approach

Solar System Analysis

Partnership programme with pacific ocean islands. Partnership programme with pacific ocean islands

Solar Generations. Digital University of Nevada, Las Vegas. Larry Burton Nevada Power. Aug 15th, 3:50 PM - 4:10 PM

Repetition. Universität Karlsruhe (TH)

Environmental Performance Report. City of Portland, Maine

Click to edit Master title style. Entergy New Orleans 5 MW DG Scale Aggregated Solar PV Project

ALL PARTIES MUST SIGN SECTION F.

Frequently Asked Questions

EXAMPLE TARIFF DOMESTIC

Compactness ratio : 1.2. Openings ratio : 26% (thermic envelope / inhabitable area) Smaller is better 1.9 = bad < 0.8 = good

Solar Electric Investment Proposal

The Role of Energy Efficiency: National Status and Implications for Maine

Transcription:

City of Carson City 3505 Butti Way Carson City, NV 89701 PUBLIC WORKS SOLAR PV SYSTEM PROJECT EXECUTIVE SUMMARY January 31, 2011

TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 2 2 PROJECT INFORMATION... 4 Background Information... 4 Project Timelines... 4 3 ENVIRONMENTAL IMPACT... 5 Page 1 of 5

1 EXECUTIVE SUMMARY PacificWest Energy Solutions, Inc. (PacificWest) is pleased to provide the City of Carson City with the Project Summary Report documenting the project milestones and performance results of the solar photovoltaic system installation that was recently implemented at the Public Works facility. This program was jointly developed by the City of Carson City and PacificWest staff to reduce overall operating costs, introduce sustainable energy production, and positively impact the environment. Various funding sources were obtained and utilized to successfully complete the installation of project measures. A summary of the cost savings achieved by the program is listed below: The calculated cost savings are considered somewhat conservative using an 80% derate factor of the overall system availability and inherent equipment losses. The solar photovoltaic model used assumes that the facility electrical billing demand is not affected by the system due to the existing utility rate schedule in place. If peak loads at the facility are reached typically during the higher productions hours of the solar photovoltaic system, additional cost savings may be achieved. Annual production levels will vary depending on weather, maintenance of panel surfaces, and system uptime. The long term impacts and cost savings of the solar photovoltaic system has been illustrated in the following chart assuming a conservative utility rate escalation of 3% annually. Page 2 of 5

The subsequent sections of this report provide more detailed information regarding the comprehensive solar photovoltaic system program and analysis methods. They include: Project Information detailing project background information and milestones, Financial Analysis, Environmental Impact, Solar PV Energy Savings Analysis with supporting documentation for all calculations, Construction Drawings, and Equipment Information. PacificWest would like to thank the City of Carson City and its entire staff for allowing us the opportunity to present the Project Summary Report and for contributing greatly to the overall success of the program. Should you have any questions or need additional information please do not hesitate to contact us. On behalf of all the staff at PacificWest, it has been a pleasure creating this partnership and completing this successful project with the City of Carson City. Page 3 of 5

2 PROJECT INFORMATION Background Information City of Carson City and PacificWest Energy Solutions, Inc. recently partnered together in a comprehensive professional services agreement that provided design, construction management, and commissioning of a solar photovoltaic system to provide energy and operating cost savings, renewable power generation, and reduce the City s carbon footprint. The facilitie(s) that were affected by the project are listed below. Facility Public Works Address 3505 Butti Way The measures that were implemented by the project are listed as follows: Measures Solar PV System Description Design, Bid, Construction Manage, and Commission a 123 KW DC Solar Photovoltaic System. Obtain NV Energy Rebates and Assist with Coordination of EECBG Grant Funds & Required Reporting. Project Timelines Measures Description Contract Date Professional Services Agreement 3/18/2010 Design 3/19/2010 5/31/2010 Rebate Application 3/19/2010 6/30/2010 Bid 7/12/2010 7/30/2010 Construction Period 8/25/2010 12/10/2010 Rebate Delivered 12/17/2010 Final Certificate of Completion 3/3/2011 Page 4 of 5

3 ENVIRONMENTAL IMPACT Please see attached sheet(s). Page 5 of 5

ENVIRONMENTAL IMPACT Public Works Solar PV System Carson City Supply Power To 11 Homes Equivalent To Planting 3,154 Trees Annual Energy Savings Equivalent To Removing 23 Cars Reduce CO2 Emissions By 123 Metric Tons Source: EPA Energy Savings Environmental Savings CO2 Conversion Table 170,624 KWH 123 CO2 Equivalent Metric Tons 0 Therms 23 Cars 1 KWH 0.000718 11 Homes 1 Therm 0.005 3154 Trees 1 Car 5.46 1 Home 10.99 1 Tree 0.039 Source: Environmental Protection Agency http://www.epa.gov/cleanenergy/energy-resources/refs.html