Brinkman Precision, Inc. Supplier Quality Requirements. Document No. BPI 1000 Rev. C

Similar documents
FORM Rexnord Industries, LLC Aerospace Division. Subject: Supplier Quality Assurance Requirements

Helical Products Company

Electro-Miniatures Corp. 68 West Commercial Ave. Moonachie New Jersey Phone: Fax:

Quality Management System

PURCHASING QUALITY CLAUSES

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

SUPPLIER QUALITY REQUIREMENTS (SQR S)

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Procurement Quality Assurance Requirements

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

SUPPLIER QUALITY REQUIREMENTS (SQR S)

These requirements apply to all suppliers:

Supplier Quality Requirements

Supplier Quality Requirements

QUALITY CLAUSES. Real Time Logic, Inc Academy Ridge View, Colorado Springs, CO Phone: (719) Fax: (719)

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

002 Supplier Quality System Compliance with Rocker Quality System for Suppliers is required for this Purchase Order.

PURCHASE ORDER REQUIREMENTS (Quality Assurance Provisions)

TURBO MACH A DIVISION OF VT SAA

QUALITY CONTROL INSTRUCTION

VOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS

Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found on our website at

TT Electronics Integrated Manufacturing Services Supplement to Purchase Order Quality Clauses TT Electronics Purchase Order

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Supplier Quality Requirements (ASQR)

THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS

In addition to specific quality clauses listed in the body of the Purchase Order, the following General Clauses apply

Quality Flow-Down Requirements to Suppliers

Supplier Quality Requirements (SQR)

SUPPLIER QUALITY REQUIREMENTS

Ahlers Aerospace Quality Procedures Manual

The Following Clauses are applicable only as noted on the Purchase Order, either by Quality Clause Code or Itemized Quality Clauses:

Quality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)

Quality Flow-Down Requirements to Suppliers

Quality Honeycomb Supplier Quality Requirements

MAGNETIC COMPONENT ENGINEERING, INC.

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

SUPPLIER QUALITY MANUAL

Orbel Corporation AS9100D Supplier Flow Down Requirements

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

MAGNETIC COMPONENT ENGINEERING, INC.

PROCUREMENT QUALITY CLAUSES

Requirements for Suppliers

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

AEROFAB PURCHASE ORDER QUALITY CLAUSES

NAMMO TALLEY INC QUALITY CODES

(A.2) DURING PERFORMANCE OF THIS ORDER, YOUR QUALITY CONTROL SYSTEMS AND MANUFACTURING PROCESS ARE SUBJECT TO REVIEW, VERIFICATION,

Supplier Quality Codes

Procurement Quality Requirements

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

Supplier Quality Assurance Requirements Manual

Clauses applicable only when specified by Q-number on the purchase order.

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

SHELTON INDUSTRIAL PATTERN INC.

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

Altech Machining, Inc. Terms and Conditions

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

Terms and Conditions Form OL-668 Rev l

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

Trident Precision Manufacturing

Quality Control Manual Revision 5 1/21/2011

Supplier Quality Clauses

Meggitt Oregon Purchase Order Quality Notes

PROCUREMENT QUALITY PROVISIONS Revision G January 9, 2017

Quality Assurance Procurement Clauses and Flow Down Requirements

PURCHASE ORDER QUALITY CLAUSES

Purchasing PURPOSE SCOPE

Purchase Order Quality Requirement Clauses

PURCHASE ORDER TERMS & CONDITIONS

PURCHASE ORDER TERMS & CONDITIONS

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

Supplier Quality Requirements(SQR s) SECTION 1

2. GENERAL REQUIREMENTS

SUPPLIER QUALITY CODES

Purchase Order and Quality Clauses

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

Supplier Quality Requirements

PI Purchase Order QC Codes

QUALITY CLAUSE CODES

Supplier Quality Requirements Manual AEC-300

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

ThinKom Purchase Order Quality Provisions Number: Q4000 Revision: D

CiDRA External Provider Quality Standards

Special Purchase Order Clauses

AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 5

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

PROCUREMENT QUALITY ASSURANCE SPECIFICATION 7 REV. H

KLINGE COATINGS. 3.1 Deviation A deviation addresses material, which has not been produced or has a known material substitution.

TERMS AND CONDITIONS

LT Industries SQFR 101

Supplier Quality Procurement Requirements (SQPR) DATED: 01/31/2018

The Supplier shall have a quality management system that conforms to any one of the following, as applicable:

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

ALVA MANUFACTURING PURCHASE ORDER QUALITY CLAUSES

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

Transcription:

Brinkman Precision, Inc. Supplier Quality Requirements Document No. BPI 1000 Rev. C This document establishes product assurance requirements for all products and services ordered under the Purchase Order of this part to assure that such products and services conform to the required levels of quality and reliability. Note that supplies purchased on this order are intended for use in applications, such as Aerospace that require a high level of quality and reliability. Standard Requirements: Seller s Quality Control System. The Seller shall implement, document and maintain an inspection/quality control system in compliance with the following clauses. Seller s inspection/quality system shall be subject to compliance as audited by Buyer s Product Integrity Representative. Seller shall be required to notify Buyer of any significant changes to their quality management personnel. The Seller, as the recipient of the contract, is responsible for meeting all contract specified technical and quality requirements, whether the Seller performs the work or the work is performed by the Seller Sub-Tier source. The Seller cannot use Sub-tier sources to perform work on products and or services scheduled for delivery to Brinkman Precision without the approval of Brinkman Precision. When approved, the Seller shall include (Flowdown) on Purchase orders or Contracts to his Sub-tier sources, all applicable technical and quality requirements of the Brinkman Precision Contract, including when applicable, the requirements to control key characteristics and/or key processes, and the Quality expectations from herein that are applicable. a) Inspection System. The Seller s inspection system shall be complaint to the Buyer s quality system survey based in ISO:9000 and/or AS9100. b) Receiving Inspection. Supplies purchased by the Seller for use in Buyer s orders shall be subject to receiving inspection upon receipt to assure conformance to Buyer s Purchase Order requirements. Such as supplies, shall be adequately identified and/or controlled to prevent commingling with other supplies. c) In-Process Controls. The Seller shall employ a system for controlling product and the associated processes throughout manufacturing. This may be accomplished via a manufacturing outline, part traveler, shop routing or other suitable method which details the planned step by step operation sequence and inspection points and includes provisions for controlling the drawing/specification revision status during the manufacturing process. Changes to processes or product must be submitted to Brinkman Precision, Inc prior to implementation. Most parts by nature of their design have no blind areas (that are less than 45 degrees line of site) or internal passageways where foreign particles could be trapped. However, there are parts where blind areas exist or other passageways where extra precautions must be taken. To assure that parts are completely clean, these areas must have extra precautions

taken. The supplier must have a manufacturing/quality procedure that prevents the shipment of parts with foreign material. d) Calibration. The Seller shall implement and maintain a system for control and use if inspection equipment based on ISO 10012. All inspection equipment shall be calibrated against certified standards that have know valid relationships traceable to National Standards. e) Non-conforming Material. The Seller shall implement and maintain a system for control of non-conforming material a system for assuring prompt action to correct the cause of non-conforming material and a system for withholding and separating non-conforming material from normal production pending production. Red dykem or paint shall only be used on scrap parts. Parts submitted for MRB shall not be red dykem or painted until disposition is scrap. f) Final Inspection. In all instances, prior to shipment to the Buyer, the Seller shall perform a final inspection as required to substantiate the Buyer s requirements. Documented in-process inspection may be used as substantiation for reduced final inspections. g) Record Retention and Documentation. All manufacturing and inspection data, collected as documentation for part acceptance is to be retained by the Seller and its suppliers for a minimum of ten (10) years, Records are to be documented in a manner or medium that if altered, would be obvious that changes were made. Permanent ink shall be used. No erasures or white-out is allowed. h) Specification Compliance. Seller shall have on file adequate data showing that all components and materials used in the articles furnished against the Purchase Order comply with the physical and chemical properties required. Seller further warrants that unless otherwise specified, the articles to be furnished shall be in compliance with all applicable specifications including process and Government specifications current as of the date of this order. Seller agrees that data attesting to the above shall be retained on file for a period of ten (10) years after final payment under this order, and shall be available to the Buyer when requested. i) Preparation of Certifications. The Seller is responsible for the integrity of the certification/document that is provided per the purchase order requirements. All special process/nondestructive specifications noted on the drawing(s) shall be certified individually. This shall be accomplished by listing each specification and its corresponding approved metallurgical laboratory number (MCL) on the certification supplied by the company performing the special process. j) Inspection by Buyer. All work performed shall be subject to inspection, surveillance and test by the Buyer at all reasonable times; including the period of performance, and at all places, including that plant or plants of the supplier or that of any Sub-Tier supplier engaged in the performance of work to fulfill this purchase order. k) Approved Abrasives. The recommended abrasive materials utilized for stock removal are silicon carbides, tungsten carbides, and boron carbides. Any abrasives leaving surface embedded oxides or nitrides are not permitted unless otherwise specified in writing by the Buyer. Abrasives which are not permitted include, but not limited to, Aluminum Oxide, Aluminum Zirconia, Garnet, Almandite and Nitrides. Contact Buyer for additional information.

l) Certificate of Conformance (C of C). The supplier shall provide with each shipment a written statement titles Certificate of Conformance that complies with the requirements of this document. All certificates and test reports shall include the typed or printed name and acceptable signature of the authorizing company official. The following methods are the only approved and acceptable methods for applying signatures to certificates: a. actual signature rendered by ink. b. Facsimiles of actual signature such as rubber stamps; or c. Machine or computer graphics generated facsimile signature When quality or inspection stamps are used in lieu of signatures, such stamps shall clearly identify the issuing organization and the authorized individual to whom the stamp is assigned. The issue, use and control of such stamps shall be governed by documented procedures in the Supplier s Quality Management System. Seller use of electronic signatures on documents certifies that the Seller adheres to the following requirements; a. application of electronic signature is under the direct control of the person whose name appears on the document b. An electronic signature is only applied at the location or facility where the person is located and the individual must have direct access to the products or services, and supporting data to monitor the process, perform inspections and ensure that the products or services conform to all Contract requirements, and c. The preparation of electronic documents and application of electronic signatures is governed by documented procedures in the Suppliers Quality Management System to ensure the validity and integrity of all electronic documents. m) Protection of Materials in Transit. All articles delivered on this order shall be packed adequately to prevent damage in shipment or storage. Uses of newsprint and glassine bags are prohibited. All packages shall be properly identified. n) Supplier Furnished Material. Seller who furnishes raw material shall provide samples of material as specified. This material sample(s) must be submitted to the Buyer s facility immediately upon Seller receipt of the purchased raw material. When submitting raw material sample(s), provide a copy of the material s mill certification referencing the part number(s) to be made, the heat code number and purchase order number that the product will be shipped against. Physical, mechanical and chemical properties of all raw materials incorporated into Seller s product shall be considered quality characteristics. The Seller s quality system shall provide assurance that these characteristics are verified and maintained throughout the entire manufacturing cycle. The Seller shall furnish physical, chemical and mechanical test reports as applicable per the specifications covering raw material on this order. The certifications shall be denoted with the statement conforms to all drawing and/or specification requirements and shall be signed by the Seller s cognizant quality person.

Furnish physical and chemical test reports and material certifications as applicable in accordance with the specifications covering raw material on this order. o) Audit Right Reserved. The Buyer, the Customer, the Government, the FAA and/or any other regulatory agencies reserve the right to audit the Seller s books and records and have the right to inspect at the Seller s plant any and all materials and systems. p) Inspection Gaging. Seller is held responsible for the protection and care, other than normal wear, of all inspection gaging that may be loaned by the Buyer to facilitate performance of work on this order. Said gaging, or replacement gaging of equal quality shall be returned in acceptable condition upon completion of order or upon demand or notice, whichever comes first. Seller is required to maintain gaging per requirements unless order states that said gaging is subject to recall for Buyer calibration. q) Software Requirements. Software used in the manufacturing, design, inspection, and test of items shall be controlled in accordance with the current revisions of the industry standards ISO9000-3. r) Lot Control. Product made from more than one lot of raw material shall be processed and documented in a manner that maintains traceability to individual heat numbers. Lot control shall be further maintained so that when special processes, such as heat treatments, hard coating, etc. are performed on a portion of the original lot, each individual process application to that segment of the lot shall require a unique traceable lot identifier for subdivided lot. Special process lots shall be controlled by batches and each batch shall have an individual batch/run number. Lot control of special process runs that exceed one day s production shall require approval from the buyer. s) Non-Traditional Gaging and Measurement Techniques. Any gaging method that cannot be reasonably verified by a standard inspection method including layout requires the Buyer s approval prior to use. Any use of tooling as an inspection method or any non-commercial test software also requires calibration and an independent method of verification of accuracy prior to use. t) Delivery of Suspect Discrepant Hardware. Should the Seller discover that there is sufficient reason to suspect defective materials have been delivered to the Buyer, notification of the known facts shall be made to the Buyer within twenty-four (24) hours of discovery. u) Special Process Requirements. When the Seller or the Seller s Sub-Tier performs any special processing to the Buyer s product or provides a special process service, this information must be provided to the Buyer for approval before the special process work is conducted. v) First Article of Inspection. The Seller shall have a system, as appropriate for the inspection, verification, and documentation of the first production article. w) Heat Treating and Brazing. Heat Treating and Brazing Processing Controls shall apply to any product or services where the Seller or the Seller s Sub-Tier performs brazing and/or heat treating to the Buyer s product per the purchase order requirements. x) Use of International Suppliers. If the Seller elects to subcontract or purchase any manufacturing, special processes and/or raw materials from a non-usa Sub-Tier, this must be communicated to the Buyer before the activity takes place. Ref. DFAR 252.225-7014, Alternate 1. Note: All material certifications must identify the country in which the material was melted.

y) Radiographic Inspection. Shall apply to any Seller or the Seller s Sub-Tier s product requiring radiography per the Buyer s purchase order requirements. The Seller or any Seller Sub-Tiered radiographic procedures shall be approved by the Buyer to the implementation of the service. z) Fluorescent Penetrate Inspection. Shall apply to any Seller of the Seller s Sub-Tier s product requiring Fluorescent Penetrate Inspection per the Buyer s purchase order requirements. The Seller or any Sub-Tiered Fluorescent Penetrate Inspection procedures shall be approved by the Buyer prior to the implementation of the service.