PROCUREMENT AUDIT REPORT FOR 30 PROCURING ENTITIES

Similar documents
PROCUREMENT AUDITS IN 20 PROCURING ENTITIES

LGA PROCUREMENT CAPACITY BUILDING STRATEGY FORMULATION WORKSHOP

VOCATIONAL EDUCATION AND TRAINING AUTHORITY

PROJECT COMPLETION REPORT INSTITUTIONAL SUPPORT FOR GOOD GOVERNANCE PROGRAMME -PHASE 1

Public Procurement Act

BILL NO. 23. (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, Government Bill

Efficiency. Purpose of the Checklist. Description

Public Procurement. SIGMA Policy Brief No. 3: Introduction. Building a National Procurement System

Assessment Of The Value For Money Procurement Process In Local Government Authorities At Morogoro Municipal Council

PUBLIC PROCUREMENT AND SERVICE DELIVERY (5TH SOUTH ASIAN REGIONAL PUBLIC PROCUREMENT CONFERENCE)

Procurement of Non-Consultant Services

AP 515 PURCHASING. Administrative Procedures Manual AP Purchasing

PREQUALIFICATION TENDER FOR SUPPLY OF GOODS, WORKS & SERVICES DESCRIPTION OF THE TENDER

EXECUTIVE SUMMARY. Satisfactory Compliant Practices

AGENCY PROCUREMENT COMPLIANCE AND PERFORMANCE INDICATOR SYSTEM. Performance Monitoring Division GPPB-TSO

Note for Drafting Public Procurement Regulations

Benchmarking Public Procurement 2015

Title: Procurement practices: Insights for governance and principles from. Local and Central Government in Tanzania

Slide Headings Bullet Points Key Messages Time (mins)

UNIVERSIDAD NACIONAL DE COLOMBIA, ECONOMIC SCIENCE DEVELOPMENT RESEARCH CENTRE, BOGOTA, COLOMBIA

Public Procurement Reforms to enhance value for money

Procurement Policies and Procedures

Procurement of Goods, Works and Non- Consultant Services

CHAPTER 1 INTRODUCTION

PROCUREMENT AND SUPPLIES PROFESSIONALS AND TECHNICIANS BOARD (PSPTB)

The United Republic of Tanzania Ministry of Water and Irrigation

Municipality of the District of Lunenburg POLICY

Case Study: Procurement Audit

Thematic review on provisions and practices to curb corruption in public procurement

Section 8 Procurement Procedures

Compliance with Public Procurement Act and its Correlation with Procurement Performance of Senior High Schools in Ghana

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA

Description Number Procurement Standards Sect (b)

LAW ON PUBLIC-PRIVATE PARTNERSHIP IN THE REPUBLIC OF SRPSKA

Tendering & Purchasing

Procurement and Contracting Policy. Date: December 9, BDC Procurement and Contracting Policy 1

Internal Audit. Audit of Procurement and Contracting

UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION (MoWI) NATIONAL IRRIGATION COMMISSION (NIC) KILIMANJARO ZONE

EIB Procurement Policy and Best Practice

Procurement Policy. (June 11, 2015)

Challenges in data collection, consolidation and reporting for local government authorities in Tanzania

MINISTRY OF FINANCE AND ECONOMIC AFFAIRS VACANCIES

OPENING SPEECH BY MR. MOHAMMED A

Contracting for Goods and Services

TANZANIA Food Security Update May 2010

Procurement Requirements under the Uniform Administrative Guidance

ISLE OF MAN GOVERNMENT PROCUREMENT POLICY GD 2017/0026

that these standards can only be delivered effectively by devolution of responsibility to the frontline;

TENDER BRIEFING NOTES TENDER IEC/NW-01/2015 SECURITY SERVICES IN NORTH WEST. 21 April 2015 at 11:00. Protea Office Park, 103 Sekame Street, Mmabatho

E-Government Procurement. Safet Hoxha Kosovo Novembar 2015

Procurement Policy Review Feedback from Consultations with External Stakeholders. Summary of Comments Submitted Online

AUDIT OF CONTRACTING AT THE CANADIAN INTELLECTUAL PROPERTY OFFICE

Presentation on Public Procurement and Asset Disposal Act 2015

Chapter 4 Department of Government Services

Best Practices in Public Procurement

GUIDE GOVERNMENT CONTRACTING AND PUBLIC PROCUREMENT IN SOUTH AFRICA

Project Administration Instructions

A Summary of the Government of British Columbia s Crown Agency Accountability System

Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning

Framework for Using Implementing Partners Procurement System

INTERNAL AUDIT DIVISION REPORT 2018/073. Audit of procurement and contract management at the United Nations Office on Drugs and Crime in Colombia

Elections Ontario IDENTIFICATION: Position Title: Election Clerk Function: Election Readiness. Location: Prescribed Electoral District

Pillar II. Institutional Framework and Management Capacity

CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015

Procurement and Contracting Operations Audit

Chapter 30 Central Services Processes to Use Consultants 1.0 MAIN POINTS

WORLD BANK ASSISTANCE ON PUBLIC PROCUREMENT SYSTEM IN KOSOVO

Recommended mitigating controls

INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING

Illinois State Board of Education Nutrition and Wellness Programs Division. Procurement: NSLP Equipment Assistance Grant

Review of the World Bank s Procurement Policy and Procedures. Global Multi-Stakeholder Consultations August December 2014

Procurement Procedures

REQUEST FOR EXPRESSIONS OF INTEREST

WHY COMPLIANCE WITH DUE PROCESS MATTERS - Mrs Oby Ezekwesili

TORONTO MUNICIPAL CODE CHAPTER 67, FAIR WAGE SCHEDULE A, FAIR WAGE POLICY SCHEDULE A FAIR WAGE POLICY

The Republic of Uganda. STATEMENT BY THE AG.EXECUTIVE DIRECTOR, PPDA AT THE LAUNCH OF THE ANTI-CORRUPTION WEEK IN UGANDA 28 th NOVEMBER 2017

Procurement Policy Review Feedback Summary

As used in this Fair Wage Policy, the following terms have the meaning indicated:

239 Purchasing V4 Current

PUBLIC-PRIVATE PARTNERSHIPS TRANSPARENCY AND ACCOUNTABILITY BILL. No. 605

Procurement Under the New Requirements 1

ABSTRACT MASTER OF ARTS IN PROCUREMENT AND SUPPLY MANAGEMENT

REPUBLIC OF ARMENIA MINISTRY OF FINANCE

In the Column Details of Revenue Insert: Assets Tax Other Financial Institutions

Business Opportunities. and Insurance Board. with the Workplace Safety. Becoming a WSIB Supplier

Yemen Procurement Reforms and e-procuremente

THE UNITED REPUBLIC OF TANZANIA TANZANIA FOOD AND DRUGS AUTHORITY

Electronic Procurement System in Latvia: experience and development

E-Procurement Systems. Presenter: Cornelia K. Sabiiti Public Procurement and Disposal of Public Assets Authority 28 February 2017

PUBLIC-PRIVATE PARTNERSHIP

Presentation: e-procurement operations in the Russian Federation

Infrastructure Transparency Initiative

Section - III Evaluation and Qualification Criteria

Renewable energy: Investing in Africa

Commission Nationale des Marchés Publics (CNMP) National Commission for Public Procurement (NCPP)

10 Success Factors. That Make a Procurement Champion

CACFP - Child Care Centers New Contracting Entity Training. Child Care CACFP. Procurement. Chapter 8. Procurement 8-1

Competitive Procurement Evaluation Process Audit

Assistance to Firefighters Grants

Moving Forward with E-Procurement

Transcription:

PROCUREMENT AUDIT REPORT FOR 30 PROCURING ENTITIES June, 2009

1. Introduction In view of its mandate under Section 7(1)(j) of the Public Procurement Act (PPA), Cap 410, the Public procurement Regulatory Authority (PPRA) carried out procurement audits in thirty (30) procuring entities (PEs) between July 2008 and May 2009 for procurements made during the financial year 2007/08. The audited procuring entities comprised of thirteen (13) Local Government Authorities (LGAs) and seventeen (17) Ministries, Independent Departments and Agents/ Authorities (MDAs). The audits were financed from the Public Financial Management Reform Programme (PFMRP) funds and they were intended to determine whether the procedures, processes and documentations for procurement and contracting are in accordance with the provisions of the PPA, Cap 410 its regulations and the standard documents prepared by PPRA and that procurement carried out achieved the expected economy and efficiency (value for money for the allocated resources), and the implementation of contracts conformed to the terms there of. The primary objective of the procurement audits was to: provide the government with independent information, assurance and opinion about economy, efficiency and effectiveness in the use of public funds; ensure that all eligible suppliers, contractors and service provides are given equal opportunity to compete in providing goods, executing works or providing services, and; ensure that there is integrity, accountability, fairness and transparency in the procurement process. The secondary objective was to identify weaknesses in complying with the provisions in the PPA, Cap 410 and its Regulations to enable appropriate measures to be taken including implementation of appropriate capacity building strategies and improving controls. 2. Procurement Audit Results Generally, the outcome of the audits indicated an average level of compliance of sixty six percent (66%) computed from thirteen established compliance indicators. The average level of compliance for MDAs was seventy two percent (72%) and sixty five percent (65%) for LGAs. The National Assembly attained the highest average compliance level of ninety two percent (92%) while Longido District Council attained the lowest compliance level of twenty percent (20%). The areas where PEs performed above average (Above 50%) were: Establishment and composition of Tender Boards; Advertisement of bid opportunities; Establishment and composition of Procurement Management Units (PMUs); Complying with tender preparation times as stipulated in the Regulations; Independence of functions between AO, TB, PMU, Evaluation Committees and User Departments; Preparation of Annual Procurement Plan; Complying with compulsory approvals; The use of Standard Tender Documents; and Contracts implementation; and Complying with the methods of procurements as stipulated in the Regulations. The areas where PEs Page 1

performed below average were: Publication of award; Record keeping; and Quality assurance and control. The good performance is a result of various strategies which are being implemented by the Authority through various funding including ADB, PFMRP and USAID. Specific strategies include the System for Checking and Monitoring and Capacity Building Strategy. Under the implementation of the system for checking and monitoring, twenty five audited procuring entities were visited before the audits to assess their compliance to PPA, CAP 410 and Regulations, and recommendations were provided to remove/minimize the observed weaknesses. All the visited PEs attained compliance levels of above 50%. The observed performance shows that the previous recommended measures were implemented to an acceptable level. The list of the audited procuring entities and their average compliance levels is shown in Table 1 and the analysis on the general compliance is provided in Table 2. The average performance for all 13 CPIs is shown in figure 1. Table 1: List of Audited Procuring Entities Procuring Entity Page 2 Average Compliance 1. Tanzania Food and Drug Authority 87 2. Institute of Finance Management 89 3. Mtwara - Mikindani Municipal Council 77 4. Mvomelo District Council 68 5. Insurance Supervisory Department 60 6. Lindi Town Council 70 7. Institute of Accountancy Arusha 65 8. Ministry of Livestock Development and Fisheries 81 9. Prime Minister's Office - Regional Administration and 79 Local Government 10. Shinyanga Municipal Council 72 11. National Electoral Commission 80 12. Tanzania Social Action Fund (TASAF) 78 13. Tabora District Council 52 14. Shinyanga Urban Water Supply and Sewarage 53 Authority (SHUWASA) 15. National Insurance Corporation 69 16. Usafiri Dar es Salaam 50 17. Drilling and Dam Construction Agency 78 18. Government Chemist Laboratory Agency 82 19. Temeke Municipal Council 75 20. Tanzania Public Service College 70 21. Serengeti District Council 39 22. Karatu District Council 37 23. Simanjiro District Council 54

24. Longido District Council 20 25. College of African Wildlife Management - MWEKA 35 26. National Assembly 92 27. Regional Administrative Secretariat - Dodoma 72 28. Morogoro District Council 52 29. Singida Municipal Council 60 30. Singida District Council 80 Table 2: Outcome of the Procurement Audits as per the established Compliance Indicators Indicator 1.Establishment and composition of tender boards 2.Establishment and composition of PMUs 3. Independence of functions 4. Annual Procurement plan 5. Compulsory Approvals 6. Advertisement of bid opportunities PERFORMANCE DATA Existence of a tender board in accordance with the requirements of the Act and Regulations Existence of a PMU in accordance with the requirements of the Act and Regulations in which there was no interference between individual functions Prepared and properly implemented annual procurement plan Percentage of tenders/contracts which received all compulsory approvals in various processes Percentage of open bidding procedures publicly advertised Page 3 Outcome of the review 10% of the PEs have not established tender boards in accordance with the PPA and its Regulations 46% of the PEs have not established PMUs in accordance with the PPA and its Regulation 35% of the audited procurements had interference between the individual functions of the Accounting Officer, Tender Boards, PMU and user Departments. 47% of the PEs did not prepare annual procurement plans for the financial year 2008/09 32% of the audited procurements did not receive all compulsory approvals in the procurement processes contrary to the requirements in the PPA and its Regulations 17% of the tenders under open bidding process were not advertised to the public contrary to the requirements of

Indicator 7. Publication of awards 8. Time for preparation of bids 9. Methods of procurements 10. The use of standard tender documents 11. Procurement records 12. Quality assurance and Control 13. Contract implementation PERFORMANCE DATA Percentage of contract awards disclosed to the public complying with the stipulated time in the Act and regulations using authorized methods of procurement in accordance with their limits of application using standard/ approved tender documents with complete records with adequate quality assurance and control systems Percentage of contracts which have been implemented as per the terms of contract Outcome of the review the PPA and its Regulations 57% of the audited procurements indicated that contract awards were not communicated to the public contrary to the requirements of the PPA and its Regulations 10% of the audited procurements indicated that the time provided for the preparation of bids did not comply with the minimum time provided in the PPA and its Regulations 8% of the audited procurements did not use methods of procurement in accordance with their limits of application as provided in the PPA and its Regulations In the 32% of the audited procurements standard tender documents were not used contrary to the requirements of the PPA and its regulations 53% of the audited procurements had either no procurement records or incomplete records. 56% of the audited procurements indicated that there were no quality assurance and control systems. Contracts in 33% of the audited procurements were not implemented as per the terms of the contract. Page 4

Figure 1: The average performance of the 30 PEs on 13 CPIs 3. Analysis of the Audit Results Assessment of the observed major weaknesses revealed the following:- a) Lack of properly established PMUs was contributed by inadequate qualified procurement specialists in the market, and lack of awareness. The major effects include lack of procurement coordination within the Procuring Entities resulting to inefficiency and mis-procurement. It is recommended to speed up professionalization of the procurement cadre, enhancing coordination with training institutions to align their curricula to meet the requirements in the market, and to enhance training and compliance monitoring. b) Non preparation of Annual Procurement Plans (APP) was contributed by lack of qualified procurement specialists in the PMUs, lack of appropriate skills, lack of coordination between PMUs and user departments, reluctance to change and lack of integration of the APPs preparation with budget preparation process. Lack of APPs contributes to inefficiency, lack of control, increased procurement transaction costs, emergency procurements, splitting of procurements to avoid competitive procurement methods and excessive use of minor value procurement method. It is recommended to provide appropriate training (with practical exercises), establish PMUs with appropriate skilled staff, Page 5

integrating preparations of APPs with budget preparation process and enhance compliance monitoring. c) The reasons for not using standard bidding documents (SBDs) were contributed by lack of qualified procurement specialists, lack of awareness on the available SBDs, lacks of skills on how to use SBDs, and some of the SBDs are complex and voluminous compared to the type and value of procurements resulting to high costs of preparing tender documents. The effects of not using SBDs includes unfair contracts awards, complaints and inappropriate allocations of rights, obligations and risks in the contracts resulting to contract disputes, delayed completion of projects, poor quality of works and services etc. It is recommended that PEs be required to establish PMUs with appropriate skilled staff, enhance dissemination of SBDs, and simplifying SBDs to match with the conditions and nature of procurements. d) Poor record keeping was caused by lack/inadequate record management skills, inadequate facilities, inadequate office space, and deliberate misplacement of documents. The effects of poor record keeping include poor management of procurements, corruption, theft and loss of public properties. It is recommended that staff in PMUs be trained on record management, establishing procurement record management system, implementing the Procurement Information Management System and providing adequate facilities and offices to PMUs. e) Lack of quality control and poor contracts management was contributed by inadequate resources (human, financial, supervision vehicles, quality control tools etc), inadequate project supervision skills, lack of guidelines for community based projects, inadequate contracts management skills and corruption. The effects of poor contracts management and lack of quality control includes poor quality of works, goods and services; projects cost and time overrun; payment delays; payment for undelivered goods, works and services; contract disputes; and not realizing value for money. It is recommended that PEs should make sure that adequate resources for project supervision are made available; standard guidelines for procurement under community based projects should be prepared, standard project supervision manual should be prepared in line with SBDs, provide training on contracts management; and implement the recently prepared anticorruption strategy. Page 6

4. The Way Forward Since PPRA s target is to ensure that the average compliance level of procuring entities reaches eighty percent (80%) by the end of the financial year 2010/11, it is imperative to focus the available resources to areas which will bring maximum impact to the capacity of procuring entities in complying with the PPA and its Regulations. These are the areas where compliance levels were below eighty percent (80%). On the basis of the performance indicators, the following areas (with the compliance levels in brackets) need maximum attention in terms of training and monitoring in the next financial year: Establishment and composition of PMUs (54%); Preparation of Annual Procurement Plan (53%) [Improvement in this area will automatically increase compliance in areas such as obtaining compulsory approvals in the procurement processes, advertising of bid opportunities, providing adequate time for bidders to prepare bids, and applying appropriate methods of procurements]; Using standard tender/ contract documents (68%); Records keeping (47%); Quality assurance and control (44%); and Contracts management. In addition, issues on tender evaluation should be addressed by providing proper applied training to PEs staff. Page 7