Owner's Letter of Assurance

Component Goal Performance Measurement Unit. meet the sustainability criteria. described below. described below. from landfills.

Owner's Letter of Assurance

LEED v4 Building Design and Construction Quiz #8 EQ

LEED And Your Indoor Environment

Indoor Air Quality (IAQ) Requirements

SECTION INDOOR AIR QUALITY MANAGEMENT PLAN. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

HUMAN HEALTH & MATERIAL CONSIDERATIONS IN LEED V4

Note year for Reference as Specified in the LEED V Manual.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

MEP Engineer's Letter of Assurance

MEP's Letter of Assurance

Matuto. Global Entry Collection. Manufacturer Brand MasterFormat Number. Mohawk Group Hard Surface Resilient Tile Flooring PRODUCT ATTRIBUTES

Chapter 8: Indoor Environmental Quality

MEP's Letter of Assurance

MEP's Letter of Assurance

Close Up - BC379. Bigelow. MasterFormat Number: Sheet Carpeting

Red List Material Report

High Panel - KC129. Karastan. MasterFormat Number: Sheet Carpeting

Construction Indoor Air Quality (IAQ) Management Plan

New Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction

LEED v4 Technical Bulletin Building Design + Construction

TOXIC MATERIAL REDUCTION

SECTION SUSTAINABLE DESIGN REQUIREMENTS LEED FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

LEED Best Practices Save $$$

TEXAS FACILITIES COMMISSION Edit Date: 4/13/2012 ARCHITECTURAL/ENGINEERING GUIDELINES

SECTION (SECTION 09650) - RESILIENT FLOORING SPECIFIER NOTE:

SECTION Indoor Air Quality Management - LEED for Schools CONSTRUCTION MANAGER EDITION

LEED v4 Technical Bulletin Building Design + Construction

Allowance Table for: General:

UNIVERSITY OF ROCHESTER DIVISION 01 SPECIFICATIONS November 4, 2013 SECTION SUSTAINABLE DESIGN REQUIREMENTS - LEED FOR NEW

Napa County Building Officials Coalition

The 411 on emitting materials Designing Healthy Interiors A. Costello, P.E., LEED-AP

toxicity/ieq: Refer to Division 09 (9) for information on resilient flooring and carpeting. Refer to Division 05 (5) for information on metals.

BIU Büro für integrierten Umweltschutz

ASSA ABLOY Door Security Solutions Contribution Toward LEED v4 Certification

How We Obtained LEED Certification pertaining to the Indoor Environmental Quality Category. Ron Fields, CAFS, NCT General Dynamics C4 Systems

Impact Barrier QT LEED Sheet

CAMP BLANDING JOINT TRAINING CENTER CONSTRUCTION AND FACILITY MANAGEMENT OFFICE ARCHITECT S PROJECT # CFMO PROJECT #

QT 4003 (3mm), QT 4005 (5mm) & QT 4010 (10mm)

Indoor Air Quality Management Plan for LEED

Sugen Building 3 LEED-CI Pilot Project

C-TRAC Meeting # 8 Topic: IgCC Chapter 8: Indoor Environmental Quality Wednesday August 18, 2010, 3 5:30 pm

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES

INDDOR ENVIRONMENTAL QUALITY

Avon Town Hall 10/12/2017 Avon, Colorado Project #: DPA

ATTACHMENT N LEED PROJECT PROCEDURES

SECTION SUSTAINABILITY CERTIFICATION REQUIREMENTS LEED HC V3

SECTION SUSTAINABLE DESIGN REQURIEMENTS

Residential 1 to 3 Story CALGreen (CGBSC) Correction List (To be inserted within the body of the Residential Plan Check Correction List)

GUIDE SPECIFICATION: DUCT LINER

Multi-Institutional Academic Health Science & Research Center Evansville, IN

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

What s New in LEED v4

HPW Protocol Reference Manual

City of Millbrae 2016 CALIFORNIA GREEN BUILDING CODE CHECKLIST FOR NEW NONRESIDENTIAL BUILDINGS

DESIGN & CONSTRUCTION GUIDELINES

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium

CALGREEN NON-RESIDENTIAL BUILDING Checklist

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

GREENGUARD Select SM Standard

Low Emitting Materials

A. The project is intended to achieve LEED Certification at the Silver Level per the U.S. Green Building Council LEED for Schools 2007 rating system.

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

SECTION STRUCTURAL INSULATED PANELS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

LEED 2009 Green Building Rating Systems Information Sheet 06/03/2009

Green Building Initiative Materials Trends & Green Globes

TECHNICAL BULLETIN. MR 7.0 Certified Wood Encourage environmentally responsible forest management.

SECTION SUSTAINABILITY CERTIFICATION REQUIREMENTS LEED NC V3

Pliteq Inc. - LEED Summary

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

In the design development phase, submit finish and material selections to Facilities Management Planning Group for review.

Max Frank GmbH & Co. KG PRODUCT CHARACTERISTICS. Product Rating. LEED Category LEED Credit max. influenced score Degree of fulfillment %

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

First Do No Harm: Are You Creating Health Problems in Your Homes? IBS 2015, Las Vegas, NV

LEED Saving energy with Copaco sunscreens. COPACO LEED

PLYWOOD FLOATING FLOOR

RESILIENT CORK TILE 3 PART SPECIFICATION #Z 624

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

Transcription:

Contractor's Letter of Assurance Instructions WELL Certification and WELL Core and Shell Compliance are determined by onsite Performance Verification and Documentation, including Letters of Assurance from the appropriate professionals overseeing the implementation of a specific WELL feature and component parts during design, construction or operations. The template should be completed, signed and submitted as part of the documentation package. 1. Place a checkmark at every Part completed and leave blank those that are not being pursued or being completed by another team member. 2. Initial every Feature completed and leave blank those that are not being pursued or being completed by another team member. 3. Sign and date at the bottom of this letter. If an individual other than the Contractor is responsible for any of the requirements contained in this Letter of Assurance, he/she is permitted to sign off on the respective requirements but must complete a separate Letter of Assurance for those specific requirements. This individual should submit a different copy of this form and check the boxes as it pertains to his/her own responsibility. On his/her own Letter of Assurance form(s), this individual should sign and complete the final page and include a description of his/her role on the project next to his/her signature. AIR Check Initials 04 VOC reduction PART 1: Interior Paints and Coatings The VOC limits of newly applied paints and coatings meet one of the following requirements: 100% of installed products meet California Air Resources Board (CARB) 2007, Suggested Control Measure (SCM) for Architectural Coatings, or South Coast Air Quality Management District (SCAQMD) Rule 1113, effective June 3, 2011 for VOC content. At minimum 90%, by volume, meet the California Department of Public Health (CDPH) Standard Method v1.1-2010 for VOC emissions. Applicable national VOC content regulations or conduct testing of VOC content in accordance with ASTM D2369-10; ISO 11890, part 1; ASTM D6886-03; or ISO 11890-2. PART 2: Interior Adhesives and Sealants The VOC limits of newly applied adhesives and sealants meet one of the following requirements: 100% of installed products meet South Coast Air Quality Management District (SCAQMD) Rule 1168, July 1 2005 for VOC content. At minimum 90%, by volume, meet the California Department of Public Health (CDPH) Standard Method v1.1-2010 for VOC emissions. Applicable national VOC content regulations or conduct testing of VOC content in accordance with ASTM D2369-10; ISO 11890, part 1; ASTM D6886-03; or ISO 11890-2. PART 3: Flooring The VOC content of all newly installed flooring must meet all limits set by the following, as applicable: California Department of Public Health (CDPH) Standard Method v1.1-2010. 1 Contractor's Letter of Assurance 1

PART 4: Insulation The VOC content of all newly installed thermal and acoustic insulation inside the waterproofing membrane must meet all limits set by the following, as applicable: California Department of Public Health (CDPH) Standard Method v1.1-2010. 07 Construction pollution management PART 1: Duct Protection To prevent pollutants from entering the ventilation system, all ducts are either: Sealed and protected from possible contamination during construction. Vacuumed out prior to installing registers, grills and diffusers. PART 2: Filter Replacement To prevent pollutants from entering the air supply post-occupancy, if the ventilation system is operating during construction, the following requirement is met: All filters are replaced prior to occupancy. PART 3: Moisture Absorption Management To prevent building materials from absorbing water or moisture during construction, the following requirements are met: A separate area is designated to store and protect absorptive materials, including but not limited to carpets, acoustical ceiling panels, fabric wall coverings, insulation, upholstery and furnishings. PART 4: Dust Containment and Removal The following procedures are followed during building construction: All active areas of work are isolated from other spaces by sealed doorways or windows or through the use of temporary barriers. Walk-off mats are used at entryways to reduce the transfer of dirt and pollutants. Saws and other tools use dust guards or collectors to capture generated dust. 13 Air flush PART 1: Air Flush A building air flush is performed while maintaining an indoor temperature of at least 15 C [59 F] and relative humidity below 60%, at one of the following volumes: A total air volume of 4,500 m³ of outdoor air per m² of floor area [14,000 ft³ per ft² of floor area] prior to occupancy. A total air volume of 1,066 m³ of outdoor air per m² of floor area [3,500 ft³ per ft² of floor area] prior to occupancy, followed by a second flush of 3,200 m³ of outdoor air per m² of floor area [10,500 ft³ per ft² of floor area] postoccupancy. While the post-occupancy flush is taking place, the ventilation system must provide at least 0.1 m³ per minute of outdoor air per m² of floor area [0.3 CFM outdoor air per ft² of floor area] at all times. 2 Contractor's Letter of Assurance 2

24 Combustion minimization PART 4: Construction Equipment To reduce particulate matter emissions from both on-road and non-road diesel fueled vehicles and construction equipment, the following requirements are met: All non-road diesel engine vehicles comply with the U.S. EPA Tier 4 PM emissions standards or local equivalent when applicable. Engines may be retrofitted with verified technology (required to be U.S. EPA or California Air Resources Board approved) at the time the equipment is first placed on the job site. All on-road diesel engine vehicles meet the requirements set forth in the U.S. EPA model year 2007 on-road standards for PM, or local equivalent when applicable. Engines may be retrofitted with verified technology (required to be U.S. EPA or California Air Resources Board approved) at the time the equipment is first placed on the job site. All equipment, vehicles and loading/unloading are located away from air intakes and operable openings of adjacent buildings when available. 25 Toxic material reduction PART 2: Flame Retardant Limitation Halogenated flame retardants are limited in the following components to 0.01% (100 ppm) to the extent allowable by local code: d. e. Window and waterproofing membranes, door and window frames and siding. Flooring, ceiling tiles and wall coverings. Piping and electrical cables, conduits and junction boxes. Sound and thermal insulation. Upholstered furniture and furnishings, textiles and fabrics. PART 3: Phthalate (Plasticizers) Limitation DEHP, DBP, BBP, DINP, DIDP or DNOP (often found in polyvinyl chloride [PVC]) are limited in the following components to 0.01% (100 ppm): Flooring, including resilient and hard surface flooring and carpet. Wall coverings, window blinds and shades, shower curtains, furniture and upholstery. Plumbing pipes and moisture barriers. PART 4: Isocyanate-Based Polyurethane Limitation Isocyanate-based polyurethane products are not used in: Interior finishes. PART 5: Urea-Formaldehyde Restriction Urea-formaldehyde presence is limited in the following components to 100 ppm: Furniture or any composite wood products. Laminating adhesives and resins. Thermal insulation. 3 Contractor's Letter of Assurance 3

26 Enhanced material safety PART 1: Precautionary Material Selection At least one of the following requirements is met: d. The project completes all Imperatives in the Materials Petal under the Living Building Challenge 3.0. At least 25% of products by cost (including furnishings, built-in furniture, all interior finishes and finish materials) are Cradle to Cradle Material Health Certified with a V2 Gold or Platinum or V3 Bronze, Silver, Gold or Platinum Material Health Score. At least 25% of products by cost (including furnishings, built-in furniture, all interior finishes and finish materials) have no GreenScreen Benchmark 1, List Translator 1 or List Translator Possible 1 substances over 1,000 ppm, as verified by a qualified Ph.D. toxicologist or Certified Industrial Hygienist. At least 25% of products by cost (including furnishings, built-in furniture, all interior finishes and finish materials) meet some combination of the certifications described in Requirements b and 28 Cleanable environment PART 1: Material Properties High-touch and non-porous surfaces (refer to Table A1 in Appendix C) meet the following requirements: Smooth and free of defects visible to the unaided eye. Finished to maintain smooth welds and joints. Free of sharp internal angles, corners and crevices. PART 2: Cleanability The following requirements are met: No permanent wall-to-wall carpeting is used; only removable rugs, removable carpet tiles or hard surfaces are allowed. The building provides adequate flexible storage space for all permanent, movable items to allow high-touch surfaces to be completely cleared during cleaning. Right angles between walls and windows/floors are sealed. COMFORT Check Initials 81 Sound barriers PART 2: Doorway Specifications Doors connecting to private offices, conference rooms and teleconference rooms are constructed with at least one of the following: Gaskets. Sweeps. Non-hollow core. 4 Contractor's Letter of Assurance 4

COMFORT Check Initials PART 3: Wall Construction Methodology All interior walls enclosing regularly occupied spaces are constructed for optimal performance by reducing air gaps and limiting sound transmission through the following: Properly sealing all acoustically rated partitions at the top and bottom tracks. Staggering all gypsum board seams. Packing and sealing all penetrations through the wall. MIND Check Initials 97 Material transparency PART 1: Material Information At least 50% (as measured by cost) of interior finishes and finish materials, furnishings (including workstations) and built-in furniture have some combination of the following material descriptions: Declare Label. Health Product Declaration. Any method accepted in USGBC's LEED v4 MR credit: Building Product Disclosure and Optimization - Material Ingredients, Option 1: material ingredient reporting. By signing below, I represent that, to the best of my knowledge, all of the responses provided on this form are accurate and made in good faith. Printed Name: Signature: Company: Date: If the individual using this form is not in the role of Contractor, provide a description of the individual's project role, including justification of their ability to sign off on the above requirements, here: Project Role: Explanation: 5 Contractor's Letter of Assurance 5