Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit. Design and Construction Guidelines

Similar documents
Technical Guidelines for Construction near Pipeline Facilities

Permit Application Guidelines

Pipelines in Your Community. Important Safety Information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

TECHNICAL PROCEDURE TABLE OF CONTENTS

APPLICATION FOR PIPE OR WIRE OCCUPANCY

APPLICATION FOR RIGHT OF WAY PERMIT

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

If a new residence s electrical service is not located within 200 feet of existing

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

ROAD CUT PERMIT APPLICATION & INSTRUCTIONS

The Standards referred to shall be the most recent edition.

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

Chapter 3: Permit Procedures and Requirements

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

Specifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums

ENCROACHMENT GUIDELINES

Safety gets the right of way. Your guide to staying safe when working around a pipeline right of way

WASTEWATER REVIEW CHECKLIST. Project Number: Reviewed By: Telephone:

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

TOWN OF HOLLIS, NEW HAMPSHIRE

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT NON-NETWORK SYSTEMS SECTION

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

Appendix A General Conditions to Utility Cut Permanent Restoration

Thank you for your interest in natural gas. We appreciate the opportunity to serve you.

Electric Service Handbook

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

ARRANGE FOR INSPECTION FORTY-EIGHT HOURS IN ADVANCE

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

SECTION MEASUREMENT AND PAYMENT

SECTION TRENCHING & BACKFILLING

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

ARRANGE FOR INSPECTION FORTY-EIGHT HOURS IN ADVANCE

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CITY OF MERIDIAN LAND DEVELOPMENT SERVICES SUBDIVISION PLAN REVIEW CHECK LIST

SPECIAL SPECIFICATION 6664 Level (3) Communications System

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System

Basic Service. This Section provides information regarding a. Introduction

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SECTION 8 SEPARATION OF LINES

CITY OF LA MARQUE, TEXAS CHAPTER 3 WATER SYSTEM DESIGN CRITERIA

Underground Service Requirements and Instructions

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

GUIDELINES FOR SAFE CONSTRUCTION IN THE PROXIMITY OF THE THERMAL DISTRIBUTION PIPING SYSTEM

PUBLIC WORKS DEPARTMENT GENERAL NOTES

City of Redding Construction Standards Index

CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY

Accessory Dwelling Unit Permit Submittal Requirement Checklist (Corte Madera Municipal Code Section 18.31)

BILL AS INTRODUCED H Page 1 of 8. Subject: Utilities; underground; damage prevention system; hot water and

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

DIGGING SAFELY. Damage Prevention is a Shared Responsibility. Steve Cleaver Senior Investigator Dig-in Reduction Team (DiRT)

Gas meter clearances and service installation requirements

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.

Improvement Plan Cost Estimate

Town of Sun Prairie Driveway Permits Standard Operating Procedure

DOCUMENT ADDENDA AND MODIFICATIONS

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

This guide only applies for sewer assets up to and including 225mm diameter.

CONDITIONS EXISTING EXISTING CONDITIONS SURVEY PROVIDED BY EGAN, FIELD & NOWAK ON FEBRUARY 20, PRELIMINARY - NOT FOR CONSTRUCTION

406 - PIPE SEWERS - MTC FORM 406

SECTION VI POTABLE WATER, RECYCLED WATER, AND SANITARY SEWER SYSTEM FACILITY CONSTRUCTION

PUBLIC INFRASTRUCTURE DESIGN STANDARDS

Application for Permit for Installation of Utilities or Placing Underground Construction

Specifications for Electrical Underground Residential Distribution Systems

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER'S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

T a b l e o f C o n t e n t s

OUTLAW AUTOMATION INC. Safety Management System

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS

SPRINKLER SYSTEM Job Ready Checklist

Construction Specification for General Excavation

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

100 Lyn Avenue / PO Box 4610 Pagosa Springs CO (970)

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

Natural Gas Transmission Line SAFETY BULLETIN

Section 403. DRAINAGE STRUCTURES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

Electric Service Requirements & Guidelines

Transcription:

Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit Design and Construction Guidelines

A Guide to Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossinng Permit &30 meter permit. Kinder Morgan Cochin Canada operates a 12" pipeline in Alberta and Saskatchewan. UTOPIA Canada operates a 12" pipeline in Ontario Proximity Permit is required for installing any permanent structure within Kinder Morgan Cochin Canada or UTOPIA Canada s right-of-way. This brochure will assist you in applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity Permit and a vehicle crossing agreement before any motor operated vehicle crosses the pipeline. Damage Prevention Damage prevention is a shared responsibility. Excavation and other ground disturbance activities can damage pipelines. Making contact with a pipeline can have severe consequences ranging from service disruptions to environmental damage and personal injury. Pipeline Markers and the Right-of-Way Our pipelines are located within a right-of-way or road easement that is a narrow stretch of land that provides safe access for monitoring and maintenance of our pipelines. Pipeline markers provide important safety information such as the product carried and Kinder Morgan Cochin Canada / UTOPIA Canada's emergency notification number. Although markers identify that a pipeline is in the area, they do not specify the exact location or depth of the pipeline only a qualified Kinder Morgan Cochin Canada / UTOPIA Canada Technician can do so. Call or Click Before You Dig Before you begin the construction of any facility or any ground disturbance work, contact your local One Call center. If your proposed work is near our pipeline right-of-way, a Kinder Morgan Cochin Canada / UTOPIA Canada representative will call you back to discuss your proposed work and, if required, meet with you onsite to determine the exact location of the pipeline. This service is typically provided at no cost to you. Permit / 2

Permits Kinder Morgan Cochin Canada / UTOPIA Canada's pipelines are regulated federally. Federal regulations require activity near our pipeline right-of-way only take place after we have provided our written consent for the activity. Kinder Morgan Cochin Canada / UTOPIA Canada provides this consent in the form of 30 Metre (100 Foot) Permits and Proximity Permits. 30 Meter Permit A 30 Meter (100 Foot) Permit is required for any ground disturbance work within 30 meters (100 feet) of our pipeline. This permit is required if activity results in a disturbance of soil or ground cover. Examples of ground disturbance activities include, but are not limited to: Heavy/mobile equipment crossings Driving objects into the ground and/or excavation Installing irrigation systems and ditching Landscaping Stump grinding Drilling, digging, compacting, stockpiling or using any equipment causing ground vibrations Proximity Permit A Proximity Permit is required for installing anything of permanent nature within our pipeline right-of-way. This includes, but is not limited to construction or installation of: Roads, driveways, trails or ditches Fences or posts Realtor, political or property development signs Moveable sheds, outbuildings, or other structures Underground utilities Permit / 3

Pipeline Protection Zones Minimum Standards Kinder Morgan Cochin Canada / UTOPIA Canada Representative grade 5m (17 ft.) 0.6m (2 ft.) 0.6m (2 ft.) Work within 0.6m (2 ft.) of pipe No mechanical excavation Hydrovac/shovel only zone Excavations using power operated equipment within 5m (17 ft.) (hot zone) of pipe Require prior hand/hydrovac exposure of pipe 5m (17 ft.) 7.5m (25 ft.) 30m (100 ft.) 7.5m (25 ft.) Work within 7.5m (25 ft.) distance from pipe Kinder Morgan Cochin Canada / UTOPIA Canada Representative must be notified before work starts 30 metre (100 foot) Ground disturbance safety zone permit required 30m (100 ft.) Permit / 4 Permit / 5

Permit / 6

Proximity Permits: Drawing and Design Requirements For the Proximity Permit application, Kinder Morgan requires both a plan view and a profile or elevation view drawing are required. 0 The Plan View Drawing should have at a minimum: Unverified location of the pipeline and right-of-way boundary (the location will be verified onsite by a Kinder Morgan Cochin Canada / UTOPIA Canada Technician) Complete legal land description and the street address of the property (you can obtain the legal land description from your local city hall, municipal office, regional district or county office) Location of proposed works, including dimensions to a reference point such as a legal property line, the pipeline, or the right-of-way boundary Location of all applicable property boundaries as well as road and utility boundaries A north arrow The Profile or Elevation View Drawing should have at minimum: For surface crossings the profile should be taken along the pipeline For underground and aerial crossings, the profile should be taken along the proposed new crossing facility Location of any pipeline and associated depth of cover All horizontal and vertical clearances from the pipeline Permit / 7

Special Project Considerations For certain projects, additional information must be included in your application: Roads and Parking Lots For the Plan View Drawing: All existing buildings within 30 metres (100 feet) of the pipeline. Parking stall layout (no parking or storing of materials is permitted within 3 metres (10 feet) of the pipeline. Location of all access roads For the Profile or Elevation View Drawing: Detail and describe the proposed backfill structure around the pipeline Ensure that all roads and parking lots that cross the rightof-way are completed in accordance with Kinder Morgan Cochin Canada / UTOPIA Canada s Engineering Standard. (Contact local Kinder Morgan Technician for a copy) Depth of Cover: Minimum depth of cover is 1.2 metres (4 feet) from the top of the pipeline to the final road grade. Do not exceed 1.8 metres (6 feet of cover) A Kinder Morgan Cochin Canada / UTOPIA Canada Technician must be onsite for any backfill Inspection Cut-Outs for Parking Lots: Inspection cut-outs shall be installed in the pavement directly over the pipeline every 10 metres (33 feet) The inspection cut-outs should consist of a 150 millimetre (6 inch) diameter cast iron grate in a concrete or rigid PVC collar filled with free draining gravel The layout of the inspection cut-outs may be determined at the time of construction with the Kinder Morgan Cochin Canada / UTOPIA Canada Technician Permit / 8

Railways Specific requirements for new railway crossings will be established on a case-by-case basis. Please contact us directly to discuss your project. Trails The minimum depth of cover shall be 1 metre (3.3 feet) from the top of the pipeline to the final grade and 1.2 metres (4 feet) if the trail is used for vehicle access. Ditches For the Profile or Elevation View Drawing: Include the dimensions of the width at the top of the ditch, the invert width of the ditch, and the depth of the ditch Depth of Cover: The minimum depth of cover required is 1 metre (3.3 feet) from the top of the pipeline to the invert ditch Liners: A description of any ditch liners, including the material type, must be included in your application Permit / 9

Aerial Cable Utilities For the Plan View Drawing: Include the location of all proposed poles, towers, guys, anchors or any other supporting structures in all plan view drawings None of the above is permitted on the right-of-way or its protected limits across a road easement For the Profile or Elevation View Drawing: Provide a dimension of the proposed minimum height of the overhead cable(s) across the right-of-way Cable Information Requirements: Provide a description of the type, size and voltage of the proposed cable(s) Permit / 10

Underground Utilities Clearances For fibre optic cables the minimum vertical clearance is 0.6 metres (2 feet) For most other utilities, the minimum vertical clearance is 0.3 metres (1 foot) For parallel works within a road allowance, the minimum horizontal clearance is 1.5 metres (5 feet) from the edge of the pipe Kinder Morgan Cochin Canada / UTOPIA Canada reserves the right to increase the minimum clearances listed in the application if deemed necessary. Constant Elevation: All underground facilities shall maintain a constant elevation across the entire width of the right-of-way and extend a minimum of 0.6 metres (2 feet) beyond the right-of-way boundaries Cable Information Requirements: Provide the voltage, conduit size, and method of installation in your application Using trenching methods, install the cable within rigid PVC type conduit Encase in concrete Place applicable warning tape across the width of the right-of-way Permit / 11

Pipeline Information Requirements: Pipe material Outside diameter Wall thickness Pipe grade Type of cathodic protection Substance pipeline will be transporting Method of installation For steel pipelines, the installation of a test tap may be required at the crossing to monitor cathodic protection. During the permit application process, Kinder Morgan Cochin Canada / UTOPIA Canada will determine if one is necessary. All costs associated with the test tap installation will be the responsibility of the applicant. Limitations For perpendicular works across the pipeline, the following are not permitted within the right-of-way or its protected limits across the roadway: Junction boxes Kiosks Valves Other similar facilities Manholes Catch basins Meters Permit / 12

Landscaping When submitting your landscaping plans for approval, please include the following: Property lines and length Position and dimensions of your house or building Right-of-way of pipeline location (the location will be verified onsite by a Kinder Morgan Cochin Canada / UTOPIA Canada Technician) Driveways, sheds, fences and any other structures Trees, hedges, lawn areas, and garden beds Kinder Morgan Cochin Canada / UTOPIA Canada requires clear access to the pipeline and right-of-way for monitoring and maintenance. Refer to our Design and Landscaping Guidelines for more detailed information. Fences, Posts and Bollards The minimum clearance from the pipeline centre line to the centre line of a post or bollard is 2 metres (6.5 feet). For applications regarding installing a fence, please include the fence height and construction material with your application. Storing Materials Storing materials of any kind is not permitted within 3 metres (10 feet) on either side of the pipeline. You can store materials outside this area as long as they are easily moved in the event that Kinder Morgan Cochin Canada / UTOPIA Canada needs access to the right-ofway. A Proximity Permit is still required. Permit / 13

Application Process and Approvals APPLICATION APPLICATION PERMIT Obtain a copy of our Pipeline/Right-of-Way Proximity Permit Application from our website https://www.kindermorgan.com/pages/business/ products_pipelines/cochin.aspx Contact your local One Call centre and provide them with details of your planned activity Prepare your application and provide all the required detail for us to access your application Kinder Morgan Cochin Canada / UTOPIA Canada will process the application and will send a copy to the applicant for signature Applicant signs and returns application to the Permit Technician Alberta or Saskatchewan Phone: 1-888-767-0304 or 780.449.5906 E-mail: permits_ab@kindermorgan.com Ontario Danny Cochran Phone 1-574-534-1486 ext 22 or 574-202-1501 danny_cochran@kindermorgan.com Before beginning construction, arrange an onsite safety meeting with a Kinder Morgan Technician. At the meeting the Technician will:» Locate and mark the pipe» Issue a 30 Metre (100 Foot) Permit» Stay onsite for any work within 7.5 metres (25 feet) of the pipeline Permit / 14

With all required documentation, a Proximity Permit can take up to 10 business days to process. Once Kinder Morgan Cochin Canada / UTOPIA Canada has reviewed and approved your plan, a Proximity Permit will be issued for the work detailed in the application (subsequent to any changes in the process). If your scope of work changes, you will need to notify the Permit Technician to approve any changes. Copies of all Permits must be kept at the job site and available when requested by a Kinder Morgan Cochin Canada / UTOPIA Canada representative or government inspector. Permit / 15

Frequently Asked Questions Why do I need a Proximity Permit? A Proximity Permit is required for anything of permanent nature within the pipeline right-of-way. Proximity Permits are also required for landscaping and storing materials. Where do I get a Proximity Permit application from? You can contact a Permit Technician at 1.888.767.0304 or download an application from our website at https://www.kindermorgan.com/pages/business/roducts_pipelines/ cochin.aspx What do I need for my application? To process any application, we require the following: Proximity Permit Application form A copy of all applicable design drawings Permit / 16

Will you provide me with a drawing so I can plan around your pipelines? During the planning stages, we can provide drawings detailing the right-of-way, however, these drawings cannot be used for any ground disturbance activity and you will be required to sign a disclaimer. A Kinder Morgan Cochin Canada / UTOPIA Canada Technician will still be required to be onsite for any work within 7.5 metres (25 feet) of the pipeline. Please contact our Permit Technician to obtain a drawing. Is there a Permit fee? No. We typically provide this service at no cost to you. However, if a Technician is required to be onsite for an extended length of time a charge may be levied. This information will be detailed in the Proximity Permit application process. Do I also need a 30 Metre Permit? Yes. A 30 Metre Permit is required for any ground disturbance work taking place within 30 metres (100 feet) of our pipeline right-of-way. This will be provided to you during the required safety meeting. You will be required to keep both Permits at the work site along with your One Call ticket. When will I find out if my application has been approved? Applications typically take 7 to 10 days to process. You will be notified by the Permit Technician once your application has been approved. Permit / 17

Cochin Canada / UTOPIA Canada Damage prevention is a shared responsibility. Prior approval from Kinder Morgan Cochin Canada / UTOPIA Canada is required for any ground disturbance activity within our pipeline right-of-way. For more information on permits, please contact a Permit Technician in your area: Alberta or Saskatchewan Phone: 1-888-767-0304 or 780.449.5906 E-mail: permits_ab@kindermorgan.com Ontario Danny Cochran Phone 1-574-534-1486 ext 22 or 574-202-1501 danny_cochran@kindermorgan.com If you suspect a pipeline emergency, please contact Kinder Morgan Canada s Emergency Notification Line: 1-800-265-6000 July 2017