Form S1 Geotechnical Report

Similar documents
GUIDELINE FOR GEOTECHNICAL REQUIREMENTS IN STEEP SLOPE AREAS OF DELTA

aster Requirement SPE 105

Guide to the Letters of Assurance in the B.C. Building Code 2006 December, 2010 Edition 5

Guideline for Bridge Safety Management February 2012

FLOOD PLAIN STANDARDS AND REQUIREMENTS. Adopted by City Council on September 16, 2014 Effective January 1, 2015

Town of Eckville/Lacombe County INTERMUNICIPAL DEVELOPMENT PLAN DRAFT ADOPTED: INSERT DATE

Date: March 18, 2016 Meeting Date: March 29, 2016

STANDARDS TO ADDRESS THE ENVIRONMENTAL FACTORS

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS

Tim Tucker, City Engineer Veronica Nebb, Senior Assistant City Attorney Karen Majors, Assistant City Manager Community and Economic Development

Town of Whitby Public Works Department

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION

Appendix D: Guidelines for Geotechnical Investigation

Maple Ridge Erosion & Sediment Control Plan Checklist

D EROSION AND SEDIMENT CONTROL. Table of Contents

A Guide to the Municipal Planning Process in Saskatchewan

7.00 INTRODUCTION... 1

Town of Eckville/Lacombe County INTERMUNICIPAL DEVELOPMENT PLAN

Hillside Protection Regulations Chagrin Falls, Ohio INTENT.

Chapter 2 Parties to the Contract

Joint Structural Division. Standard for. Structural Engineering Services. 2nd Edition

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines

Ordinance No Lot Surface Drainage

Where Community, Business & Tourism Prosper. Tree Removal Permit

Where Community, Business & Tourism Prosper. Tree Removal Permit

City of Mississauga Environmental Impact Studies Terms of Reference 2002

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

CCSD#1 Stormwater Standards

Appendix 3. POLICY & PROCEDURE No

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

Fish Habitat Protection Development Permit Area

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

AMERICAN SOCIETY OF HOME INSPECTORS AUXILIARY STANDARD OF PROFESSIONAL PRACTICE FOR RESIDENTIAL DECK INSPECTIONS DRAFT

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

CITY OF PARKSVILLE. BYLAW NO Consolidated for convenience only to include Bylaw No. 1515

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Overview and key environmental issues

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

B.C. MINIST RY OF TRANSPORTATION. Maintenance Specification Chapter FLOOD CONTROL AND WASHOUT RESPONSE

RFQ Drainage Ditching and Culvert Replacement

VILLAGE OF ANMORE BUILDING AND PLUMBING CODE REGULATION BYLAW NO A BYLAW FOR THE ADMINISTRATION OF THE BUILDING CODE

TOWNSHIP OF TINY LOT GRADING/DRAINAGE PLAN PROCEDURE

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

CITY POLICY POLICY NUMBER: C531 REFERENCE: ADOPTED BY: City Council Council July 2007 SUPERSEDES: Policy C467

Kaipara District Plan: Proposed Plan Change 2 - Fire Safety Rules SUMMARY

Nottawasaga Valley Conservation Authority

2016 San Francisco Building Code AB-082 ADMINISTRATIVE BULLETIN

Guidelines. Forest Sector

Reems Creek Homeowners Association, Inc. P.O. Box 1546, Weaverville, NC

Developing a Letter of Conditional Subdivision Approval

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25

AMENDMENT. Section 3.5 and 3.6 Flood Hazard Area Land Use Management Guidelines

Code of Practice For Timber Management Operations In Riparian Areas

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

GRADING GUIDELINES. Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011

Chapter 506 Environmental Performance Standards

Part 4: Floodplain, Riparian, & Lakeshore Regulations

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies

MINISTRY DIRECTIVE. Program: Provincial Highway Management Directive: B-014. Issuing Authority: Director, Highway Standards Branch

REQUEST FOR QUOTATIONS Crushed Gravel

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

RIPARIAN AREAS REGULATION

Exhibit C Maintenance and Operations Plan For the Concrete Floodwall and Reinforced Concrete Box Culvert Beneath Cape May Drive

DISTRICT OF NORTH VANCOUVER CONSTRUCTION BYLAW 8271, Document:

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

Underground Stormwater Infiltration Model Bylaw

Arbor Vitae Tree Consultants Tree Assessment Report

ONTARIO PROVINCIAL STANDARD SPECIFICATION

DRAFT Agricultural Impact Assessment (AIA) Guidelines

TABLE OF CONTENTS. Executive Summary... i. Introduction...1. Official Plan...4. Development Approval Process...9. Documentation Amendments...

Regional Watersheds Advisory Board. September 20, 2017

Natural Hazards Natural Hazards Explanatory Statement Significant Issues Objectives and Policies...

Francis Drouillard, P.E. Civil Engineer License No. C Shady Lane Novato, CA 94945

Public Disclosure Authorized EXECUTIVE SUMMARY

DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE , 6206, 6207, /09/03

Lantz-Boggio Architects, P.C LBA Project No

Structural Design Issues for Housing and Small Buildings in British Columbia: Information for Local Authorities, Homeowners and Developers

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

RP Municipal Reserves, Parks and Campgrounds

Chapter 5. Natural Features. Environmental Management Mode Land Resources Water Resources Air Quality Preparing for Climate Change

Soil Removal and Deposit Regulation Bylaw No. 3786, 1992

Auditor Approval Forms

Request for Quotations Arras Weir Maintenance

10.1 OBJECTIVES. Note: Refer to Section 6 for Issues, Methods of Implementation, and Environmental Results Anticipated.

HAGAR COURT ARCHITECTURAL GUIDELINES DRAFT 3 September 14, 2004

Charter Township of Garfield Grand Traverse County

BURNABY BUILDING DEPARTMENT

ORD WHEREAS, the public necessity, convenience, general welfare and good zoning practice so require;

Application Centre, Community Planning & Development Contact Us: or July 2018 Page 1 of 5

Construction (only after Final Approval Notice is issued)

Special Provision No. 199S66 March For the purpose of this Special Provision, the following definitions apply:

Transcription:

Submission of a geotechnical report is required for a proposed development on or near a steep slope, such as a ravine or a bluff, in North Delta and Tsawwassen. It is typically required for development applications in Development Permit Areas designated in Delta s Official Community Plan for protection of development from hazardous conditions. It is also required for a building permit application when a building official considers that the land on which construction is proposed is subject to or is likely to be subject to hazardous conditions such as flooding, mud flows, debris flows, debris torrents, erosion, land slip, rock falls, subsidence or avalanche. The geotechnical report must be prepared by a qualified geotechnical engineer and must follow the Guideline for Geotechnical Requirements in Steep Slope Areas of Delta, which is outlined below. The report must address slope stability on the subject lands and surrounding properties, determine if the lands may be used safely for the use intended and if the proposed development may proceed in a safe manner, include a construction management plan, make recommendations for a high quality, safe development with minimal impact on adjoining properties, and provide geotechnical assurances. Guideline for Geotechnical Requirements in Steep Slope Areas of Delta February 2000 (updated November 2013) The purpose of this document is to describe Council policy for slope protection for new developments in Delta. It applies to all development in areas of Delta on or near a steep slope such as a ravine or bluff, common in North Delta and Tsawwassen. The guideline was approved by Council on November 2, 1999. The guideline was subsequently updated in February 2010, to remain consistent with the BC Building Code. During the winter of 1995 / 1996 questions were raised relative to the adequacy of geotechnical investigations and municipal policies for development in steep slope areas of Delta. Events of slope instability along the Tsawwassen Bluff, notably the deep-seated slope failure at 207 Graham Drive, the erosion and slope movements in Cougar Creek Ravine, Kendale Ravine, McAdam Ravine and others, led to these minimum standards for development in steep slope areas. Applicants are encouraged to discuss the geotechnical requirements relating to their property(ies) with the Community Planning & Development Department (CP&D) prior to submitting an application. The guide is intended to provide a minimum standard for geotechnical engineering professionals working in Delta. Prior to retaining a geotechnical professional, the applicant is encouraged to ensure the consultant is aware of these minimum standards. By following this guide, applicants can avoid unnecessary delays. Contact Us: 604-946-3380 or CPD@delta.ca July 2018 Page 1 of 7

INTRODUCTION: This policy applies to all development in areas of Delta on or near a steep slope such as the many ravines and bluffs common to both North Delta and Tsawwassen. While not all inclusive, Delta s Official Community Plan (available for viewing in the CP&D Department and on Delta s website at www.delta.ca) provides a guide to some of these slope sensitive areas of the community as defined by the following development permit areas: SD2, English Bluff (Tsawwassen Escarpment), ND1, Fraser River Escarpment, ND2 Delsom Village and ND4, River Road Village (Sunbury). Delta has strived to accomplish a comprehensive approach to slope stability in order to address the questions raised in the past relative to the adequacy of geotechnical investigations and policies for development in steep slope areas of Delta. A combination of detailed geotechnical engineering reports, attention to the preservation of existing vegetation, specific slope instability performance measures, a variety of measures to share knowledge about the slopes, encouraging accountability and supplementary geotechnical peer reviews are presented to guide the development community. Geotechnical submissions in support of development applications must be of high quality and comprehensive. Supplementary peer reviews will be requested by the City on a case by case basis. SUMMARY: For the purpose of this guide, development includes building permit, development permit, subdivision or zoning amendments. The following issues should be addressed by a qualified geotechnical engineering consultant retained by the applicant. a) A detailed geotechnical review should be undertaken by the applicant s consultant to determine whether the proposed development is feasible in a safe manner. b) Development should take place in a manner which maximizes the retention of existing vegetation and retains all vegetation outside the developed building area. c) Slope stability should be addressed such that: i) There is no net decrease in overall slope stability resulting from the proposed development; ii) There is no greater than a 1 in 2475 probability of significant slope instability in any given year; iii) Off-site slope instabilities are mitigated by the applicant to provide for the safe occupation and use of the lands and adjacent nearby lands; iv) A construction management plan is developed and monitored by the applicants geotechnical engineering consultant; v) The geotechnical engineering consultant has reviewed Delta s Geotechnical Report Library in addition to any other sources of information available to the consultant. d) Additional provisions include: i) The provision of specific geotechnical assurances; ii) A restrictive covenant registered against the property title; iii) The provision of insurance; iv) The provision of bonding to secure on-site and off-site construction works, as deemed necessary; v) Supplementary geotechnical consultant peer reviews as deemed necessary. Contact Us: 604-946-3380 or CPD@delta.ca July 2018 Page 2 of 7

GUIDELINE PROVISIONS: 1. A detailed geotechnical engineering review must be undertaken by the developer s consultant to establish the feasibility of development in a safe manner. The engineering profession, through Provincial legislation, is charged with the responsibility to ensure development proceeds in a manner which limits public exposure to unnecessary hazards through risk to human safety and property damage. A comprehensive geotechnical assessment is required to support development in steep slope areas of Delta. The geotechnical engineering professional should carry out all necessary background research, site investigation, slope stability analysis and reporting in order to enable it to make recommendations which will provide for a high quality, safe development with minimal impact to adjoining properties. 2. Development must take place in a manner which maximizes the retention of existing vegetation and retains all vegetation outside of the developed building area. Vegetation, in the form of ground cover, shrubs or trees, assists in stabilizing the ground surface. Damage to existing vegetation through removal or disturbance can have significant impacts on slope stability. Any removal of vegetation should, therefore, be discouraged in steep slope areas. Where removal of vegetation cannot be avoided in order to accommodate a development an acceptable plan to re-vegetate and re-stabilize affected areas should be provided. 3. Slope Stability shall be addressed such that: a. There is no net decrease in overall slope stability resulting from the development. Development should only occur if it does not adversely impact the stability of the slope, including that of the site and adjoining properties and roadways. While a no net decrease in slope stability is required, there may still be a need to increase slope stabilities of the site and neighbouring lands in order to safely accommodate the proposed development. b. A 1 in 2475 probability of a slope instability in any given year be the minimum acceptable protection against failure and meet the requirements outlined in the BCBC, as amended from time to time. A probabilistic risk assessment of the site and surrounding lands affecting and being affected by the proposed development is required. The minimum standard for protection against failure is a 1 in 2475 probability in any given year with acceptable safety factors. Applicants are required to submit proposals for development permits and building permits in steep slope areas which address the development in terms of a 1 in 2475 year probability against failure for both static and dynamic (including seismic loading) conditions. As the 1 in 2475 year probability of failure is proposed to be a minimum, council, staff or the geotechnical engineer may set or recommend higher standards as determined by the application. In the consideration of subdivision and/or rezoning Contact Us: 604-946-3380 or CPD@delta.ca July 2018 Page 3 of 7

applications, the Approving Officer or Council may set a more stringent, site specific requirement in consideration of adding additional density to sensitive, steep slope areas of the community. Under dynamic loading conditions, deformations in structures should be limited so that serious structural damage which leads to building failure or collapse does not occur. This will necessitate specific attention to this issue by the design team, including the geotechnical engineer, architect and structural engineer. c. Off-site slope instabilities which could adversely impact the safe occupation and enjoyment of the proposed development or of adjacent or nearby lands should be mitigated by the applicant. Critical to the safe use and enjoyment of the developed lands can be the stability of surrounding lands. A geotechnical review in support of an application needs to consider this issue. Where slope stability issues arise due to concerns on neighbouring lands or roadways, which are not part of the applicant s property, the following options may be considered: i) The applicant may be required to stabilize the adjoining property or road. This approach should be reviewed on a case by case basis; or ii) The development may be designed through acceptable clustering, siting or physical design features to limit the potential impact to human safety and property damage on the subject property in the event of an off-site failure. d. A construction management plan developed and monitored by the applicants geotechnical consultant must be provided and adhered to. Steep slopes are often at risk during the construction phase. Excavations, vibrations and heavy equipment typically associated with development must be managed to avoid causing slope instability. In support of addressing this issue, an acceptable construction management plan addressing critical issues for the safe construction of the development is necessary. The plan should be tailored to each particular development by the applicant s geotechnical engineer. Common to the plans should be acceptable discussion of provisions with respect to monitoring of the slope prior to, during and following construction, safe access to the site, excavation and shoring plans, acceptable weather conditions and construction windows and other issues deemed critical by the geotechnical engineer. The slope should be monitored to legal land surveyors tolerances. Consideration should be given to long term monitoring following completion of the project and the installation of slope inclinometers. Full time site inspection by a qualified geotechnical engineer should be provided during all critical stages of development with reports back to Delta. e. The Geotechnical Engineering Consultant be required to review Delta s Geotechnical Report Library. An inventory of geotechnical reports received in support of development applications has been established by the CP&D Department. This inventory will assist geotechnical consultants through sharing of knowledge from previous investigations. Geotechnical engineers are required to confirm they have reviewed this material along with other available sources. In support of continuing to build this Contact Us: 604-946-3380 or CPD@delta.ca July 2018 Page 4 of 7

resource, applicants and their consultants should be aware that geotechnical submissions in support of development applications will become public documents and may be used in the reference library. 4. The Developer and their agents are held accountable: a. Through the provision of specific geotechnical assurances. The applicant s geotechnical engineer should provide specifically worded assurances acceptable to Delta, which indicate, in the engineers professional opinion the site is suitable for the proposed development and will not adversely impact neighbouring properties if certain specified works are undertaken. The assurances, outlined in Attachment A, include specific reference to the fact that the City is relying on the assurances to issue development approvals. These assurances assist in clarifying Delta s expectations of the professional geotechnical engineer. In addition, the geotechnical engineer is made aware of how the information being submitted on behalf of their client will be used and relied upon. b. Through restrictive covenant registered against the property title. Terms of Delta s acceptance of a development application should be incorporated into a restrictive covenant and registered against the property title in order to limit the use of the land. Provisions of such a covenant are outlined in the land title act and community charter and would commonly include limitations on the removal and disturbance of site vegetation, all geotechnical provisions including reports submitted in support of the application and indemnification of the City. These covenants assist in clarifying the basis for Delta s acceptance of an application and convey this information to future owners of the land. Enforcement of the covenant provisions through the construction phase are the responsibility of the owner and the geotechnical engineer through the owners commitments and engineers assurances provided to Delta. Delta has the ability to utilize security deposited in support of the application, as outlined in section d) below, to rectify deficiencies. c. Through the provision of insurance which names Delta as an additional insured. General liability insurance naming Delta as an additional insured and in a form acceptable to Delta as defined by the Delta Highways Bylaw 6922, as amended should be provided by the applicant. Delta is named as an additional insured due to its role in approving the application. The applicant s geotechnical engineer of record should provide proof of a minimum of occurrence based professional liability coverage which does not lapse. This insurance should also name Delta as an additional insured. This may disqualify some geotechnical engineering consultants who cannot obtain this insurance. Contact Us: 604-946-3380 or CPD@delta.ca July 2018 Page 5 of 7

d. Through the provision of bonding to secure the safe completion of on-site and off-site construction works, as deemed necessary. Security can be utilized by the City to correct such unsafe conditions created by the project. The amount of security and time frames for release is the subject of specific considerations associated with the application. In general, the amount of this bonding will relate to the potential risk and scope of potential damage during the construction of the dwelling and slope retention works. e. Geotechnical Report peer reviews be commissioned as necessary. In most cases, Delta requires a geotechnical engineering consultant peer review which will look for conformance with good engineering practice and adherence to these guidelines for development in steep slope areas of Delta. Where a peer review is deemed necessary by Delta, the applicant will be notified. The applicant can expect a significant time delay of approximately 8 weeks, dependent on the availability of an acceptable consultant and the scope of the development project. In order to avoid this additional requirement, applicants and their consultants are encouraged to submit comprehensive thorough geotechnical reports to support their development application. MUNICIPAL ACCEPTANCE: The Development Section of the Community Planning & Development (CP&D) Department will review and comment on geotechnical report submissions in support of development applications in steep slope areas. Once the CP&D Department is satisfied with the submissions, appropriate recommendations will be incorporated into development application approval. Contact Us: 604-946-3380 or CPD@delta.ca July 2018 Page 6 of 7

Geotechnical Standard Assurances Attachment A 1. The geotechnical engineer has carried out all necessary surface and subsurface investigations which that engineer considers necessary to provide the design and supervision undertaking being given; 2. The engineer will provide the design and supervision such that, in the engineers opinion, the development does not and will not compromise in any way the stability of the soil on site or soil on lands which are adjacent or nearby, and will not cause or contribute to such soils becoming susceptible to land slip, land slide, rock fall, mud flow, debris flow, debris torrent, erosion, slumping, settling or other such occurrence; 3. In that engineer s opinion, in the event of any land slip, land slide, rock fall, mud flow, debris flow, debris torrent, erosion, slumping, settling or other such occurrence which occurs after the proposed development is completed, the extent of the property damage and damage to life and limb which occurs is not likely to be in any way greater than the damage or harm which would occur prior to the development taking place; and 4. The engineer s undertaking that he is retained to fully supervise design and construction of the development, and that on completion of the work he will confirm in writing that he has fulfilled his design and supervision undertakings. In the event his retainer is terminated for any reason by his client, the engineer would be obliged to immediately notify the City in writing of that fact. Contact Us: 604-946-3380 or CPD@delta.ca July 2018 Page 7 of 7