FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR s WETLAND MITIGATION PORTFOLIO: INVESTING TODAY FOR TOMORROW S TRANSPORTATION IMPROVEMENT PROJECTS

Similar documents
Florida Inland Navigation District: Permitting and Construction of the M 5 Island Offloading & Crossroads Maintenance Dredging and the NA 1 Upland

PROTECTION OF NATURAL RESOURCES

Technical Memorandum

Analysis of the Vulnerability of Southeast Florida to Sea Level Rise

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting

Maritime Forest Ridge and Marsh Recreation Project

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Natural & Cultural Resources

Althea S. Hotaling 1, Robert A. Swett 2, Thomas T. Ankersen 3, Robert B. Lingle 3, and Charles W. Listowski 4

INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8F

Florida Department of Environmental Protection

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL

Stormwater Successes on a Local and Regional Scale in South Florida

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION

Tampa Port Authority

Prepared by the East Central Florida Regional Planning Council and the Treasure Coast Regional Planning Council for the Florida Department of

Transportation Project Delivery Process & Mitigation

Stevenson Creek Watershed Plan and Project Implementation

- Intergovernmental Coordination Goal, Objectives and Policies.

Kim DeLaney, Ph.D. Strategic Development Coordinator. Overview & Project Approach 1/30/2014. Waterways Forum 3 - Regulation (1/29/2014) 1

City of Delray Beach MS4 Assessment Program: Part V. Monitoring Requirements MS4 Permit No. FLS

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: August 3, 2018 Expires: August 23, 2018

CHAPTER 7. San Dieguito River Flooding Adaptation

Notice No Closing Date: May 2, 2015

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

Options for Reducing Harmful Lake Okeechobee Discharges and Everglades Restoration

Coastal Management ENVIRONMENTAL QUALITY

Shore Protection. Atkins Team Overview. Coastal Engineering Consultant Services for Segment III. Atkins originated in Miami in 1960

CHAPTER 7. San Dieguito River Flooding Adaptation

Department of the Army Permit Application

PUBLIC NOTICE. US Army Corps Of Engineers Wilmington District

Restoration of the Harris Chain of Lakes: Return to Neverland

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

Conservation Element (DRAFT) May 9, 2018 Broward County Board of County Commissioners

Palm Beach County Board of County Commissioners Workshop October 29, Yongshan Wan, Ph.D. P.E. Section Leader Coastal Ecosystems Section

The requirement to address wetland impacts in the environmental assessment and documentation process is driven by wetland regulations.

Ocklawaha River Restoration as Mitigation

REFERENCES AND DESIGN AIDS FOR THE ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME I

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

WEDA 2012 Presented by: Steven M. Cernak, P.E., PPM Chief Executive & Port Director

A State Policy Framework for Adaptation to Climate Change

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018

SHORELINE STABILIZATION AND MARINE FACILITIES PUBLIC WORKSHOP. Town of Jupiter Community Center February 12, :30 PM

NATIONAL OCEAN SERVICE

Marine/Estuarine Sub-Section

D9. Significant Ecological Areas Overlay

Bluff Creek One Water

Public Notice ISSUED: March 18, 2016 EXPIRES: April 18, 2016

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS

The attached letter from the City of Pompano Beach indicates no objection to the requested amendment.

5.15 Wetlands and Other Waters of the U.S.

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: October 1, 2018 Expires: October 19, 2018

MEETING AGENDA ALTERNATIVE SAND SOURCE INVESTIGATION DADE COUNTY, FLORIDA BEACH EROSION CONTROL & HURRICANE PROTECTION PROJECT

PUBLIC NOTICE US Army Corps of Engineers, Honolulu District

MS4 Assessment Program to Satisfy Part V. Monitoring Requirements

Impacts of Sea Level Rise on Ecosystem Services in Florida

The Florida Beaches Habitat Conservation Plan

PUBLIC NOTICE. c/o Mr. Kenneth Fuller 925 Penderlea Highway Burgaw, North Carolina 28425

CONSERVATION & COASTAL MANAGEMENT

U.S. Army Corps of Engineers - Charleston District Checklist for 2017 Nationwide Permit Review Nationwide Permit 3 - Maintenance (10/404)

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No. CENAP-OP-R In Reply Refer to:

JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

Seagrasses & Mangroves

Southeast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011

A. INSTRUCTIONS (Please print or type all answers)

Coastal Wetlands. About Coastal Wetlands. Contact Us. Water: Wetlands. You are here: Water Our Waters Wetlands Coastal Wetlands

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Section V.H. Fresh Water Resources

TIM Strategies for Intracoastal Waterway Drawbridges

Providing local politically supported water access opportunities to the waterways of Virginia s Middle Peninsula

Winter 2018 Newsletter

State Road (S.R.) 12 (Florida Arts Trail PD&E)

Charlotte Harbor SWIM Plan Update Proposed Quantifiable Objectives and Management Actions, January 2019

Bay County RESTORE Act Direct Component Proposals

CHAPTER 2 ALTERNATIVES

Strait Shots Photography, reprints available at straitshots.com

CONTINUING AUTHORITIES PROGRAM (CAP) OVERVIEW

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R

Istokpoga Marsh Water Improvement District. Water Quality Improvement Project. Copper Corrective Actions. Soil Management Plan.

Georgia Coastal Management Program

Maryland s s Critical Area Program

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

J O I N T P U B L I C N O T I C E

JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS AND STATE OF ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

3.0 CUMULATIVE PROJECTS SCENARIO

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5E

Port Manatee Seagrass Mitigation and Management Area

Testimony of Shari T. Wilson, Secretary Maryland Department of the Environment. Before. The Senate Committee on Environment and Public Works

Measuring and Forecasting Total Ecosystem Services Values (TEV) from Habitat Condition Analyses of Habitats in Southwest Florida : The ECOSERVE Method

American Association of Port Authorities

GOALS, OBJECTIVES, AND POLICIES. Preserve, Protect, Restore, and Manage. Balance Between Built and Natural Environments

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 7, 2017

CONTAINER PORT GOALS 10-2

Land and Water Management Division Programs. Department of Environmental Quality

The Inner Niger Delta Project: Environmental, social and economic consequences of dredging the Lower Niger River on the communities

Transcription:

Proceedings of the 2013 International Conference on Ecology and Transportation (ICOET 2013) FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR s WETLAND MITIGATION PORTFOLIO: INVESTING TODAY FOR TOMORROW S TRANSPORTATION IMPROVEMENT PROJECTS Report Prepared by: Ann L. Broadwell, M.S. District Environmental Administrator Florida Department of Transportation 3400 West Commercial Blvd Fort Lauderdale, Florida 33309 Phone: 954-777-4325 ann.broadwell@dot.state.fl.us Report Prepared for: International Conference on Ecology and Transportation 2013 Canyons, Crossroads, Connections Scottsdale, Arizona June 2013

Broadwell 2 ABSTRACT Approaches to wetland mitigation have progressed greatly, from being a roadside scrape down area planted with wetland vegetation to a private industry. These changes to wetland mitigation have been in response to the desire to accelerate project delivery and conduct business in a fiscally responsible manner. The Florida Department of Transportation s (FDOT) Wetland Mitigation Program is a central component of FDOT's project delivery process. Compliance with laws and goals represents a chief component of our agency's state and federal responsibilities and is also a requirement for most state and federal permits and approvals. Late identification and understanding of the need for wetland mitigation can create unnecessary project delivery delays. With over 11 million acres of wetlands, the number of transportation improvement projects that require wetland mitigation has challenged FDOT to be creative in how to best provide mitigation. The State protects wetlands by regulating development in wetland areas, acquiring wetlands and land adjacent to wetlands, and requiring local governments to produce long-range plans for wetland protection. Because FDOT is able to cost effectively provide wetland mitigation, we are able to enhance our ability as a Department to meet both of the objectives we have as the State Transportation Agency to deliver a safe and efficient transportation system while encouraging the economic growth and quality of life of our State's communities, citizens, and visitors. This conference is an opportunity to share this information with others in the industry.

Broadwell 3 INTRODUCTION Wetland mitigation has two important effects on transportation improvement projects time and money. Both of these effects depend upon the transportation improvement project s type and amount of impacts it has on the resource. From sidewalk installation to new bridge crossings, impacts to wetlands are sometimes unavoidable, especially in Southeast Florida where there are approximately 5,500 acres of wetlands. These wetlands range from fresh water herbaceous marshes to estuarine forested mangrove swamps to sea grass beds. In this paper, the different means by which FDOT accomplishes wetland mitigation are discussed. These means include regional, long range planning using offsite mitigation areas, the purchase of wetland mitigation bank credits, and project-specific wetland mitigation. The ability to utilize several different scenarios to provide wetland mitigation for one project is also discussed. DISCUSSION In the past, FDOT would wait until 60% plans were developed, a permit application was submitted, and the resource agencies commented on the permit application before wetland mitigation was discussed. Because these wetland mitigation discussions occurred late in the transportation improvement process, the project schedule was often affected, thus requiring the need to identify a funding source immediately. In the early 90 s, District 4 FDOT partnered with the South Florida Water Management District (SFWMD) on a conservation area known as the DuPuis Reserve, located in Martin County, Florida. There were 850 acres of wetland mitigation credits created for FDOT use but it was limited to 2 of the 5 counties within the District 4 boundary. At a cost of $4,000 an acre, and 850 acres of freshwater wetland mitigation credits at the ready, this started District 4 FDOT on the way to long-range forecasting of wetland mitigation needs. Since that time, FDOT has broadened its ability to plan for wetland mitigation through legislative means by putting in place the ability to achieve regional, long range wetland mitigation planning rather than on a project by project basis through Section 373.4137, Florida Statutes (F.S.). This statute allows FDOT to identify projects requiring wetland mitigation, determine a cost associated with the mitigation, and place funds into an escrow account within the Florida Transportation Trust Fund. The list of wetland mitigation needs is reviewed by the Water Management Districts, the entity given the authority to permit wetland impacts for the Florida Department of Environmental Protection (FDEP). If the WMDs choose to do so, they can request the funds in escrow to develop and implement wetland mitigation projects on behalf of FDOT. The Consumer Price Index dictates the cost per acre, currently at $106,000/acre. Unfortunately, of the two Water Management Districts who can participate in this program, only one is willing to take on wetland mitigation projects for FDOT. Therefore, we still have to continue to develop other options.

Broadwell 4 Important to note is the Florida Water Resources Act (F.S. Chapter 373), which dictates the environmental permitting practices in Florida. When Florida's population began to grow rapidly in the 1950s, policymakers and water managers began to argue for a more cohesive solution to water quality and quantity problems, and for a more integrated regulatory structure at the state level. In 1972, the Florida legislature met during one of Florida's periodic, extended droughts to address growing concerns about deficiencies in the institutional mechanisms for water management. The 1972 legislature responded by enacting the Florida Water Resources Act of 1972. Water resources in Florida are held in public trust; there are no property interests in the resource and a permit is required by the State for any work below the mean high water line. Also available to FDOT is the private Wetland Mitigation Banking Industry. These private sector banks establish the wetland mitigation bank permit; and restore, monitor and maintain the property through the Florida Mitigation Bank Statute (F.S. 373.4136) and the Mitigation Bank Rule (Florida Administrative Code 62-342). In an effort to conduct business in a fiscally responsible manner, District 4 FDOT advertised an Invitation to Bid on the MyFlorida Market Place website, the website used to purchase commodities for all of Florida s State Agencies. Banks were required to competitively bid against each other by submitting a cost per credit by county and wetland habitat type (freshwater herbaceous, freshwater forested, estuarine mangrove, and sea grass). Seven bidders participated, and 6 contracts were awarded based upon the low bid by county and habitat type. Currently, these credits are not assigned to any particular project. All permitting agencies agreed that when the time comes to assign the credits to a project, it will be allowed as long the drainage basin and habitat type are consistent. This bid package allowed District 4 FDOT to purchase 105 credits at $3.9 million. Several habitat types and one county were void of banking opportunities Broward County currently has no mangrove or sea grass wetland bank opportunities. Currently, District 4 FDOT is working on a Broward County survey to determine the feasibility of sea grass and mangrove mitigation in a metropolitan county that has utilized almost all of its urban boundary. We are looking for FDOT-owned surplus waterfront property, privately owned lots and local agency opportunities for the development of a Regional, Offsite Mitigation Area (ROMA) that would provide estuarine wetland restoration opportunities. The shortfall of sea grass mitigation opportunities is not new to District 4. In the past, District 4 entered into a project-specific sea grass mitigation site known as SL 15 located in St. Lucie County. This was a spoil island generated when the Intracoastal Waterway (ICWW) was dredged in order to maintain the Intracoastal Waterway (ICWW) navigation channel, and it was considered publically owned land. This spoil island was completely surrounded by lush sea grass beds, so the potential for recruitment of grasses into the scrape down area was high. The problems encountered with this FDOT mitigation project stemmed from confusion of land ownership and a bid protest from the Design/Build contractors interested in constructing the mitigation site. Once these concerns were resolved, construction commenced and the site became a living laboratory. FDOT entered into a research contract with the University of

Broadwell 5 Florida, Soil and Water Science Department to conduct an Environmental Pedology study. The study involved documenting soil morphologies as they relate to seagrass species, density, and geography; characterizing physical and chemical properties of soils supporting seagrasses and investigating spatial and temporal variability of soils and seagrasses. The results of this study have been used by other FDOT Districts in identifying locations that are appropriate sea grass restoration projects, thus reducing the risk of a failed seagrass restoration project. Although this site was successful and the agencies lifted the monitoring and maintenance requirements in 5 years, it was an expensive venture with many delays. In 2005, District 4 s Work Program listed 5 bridge replacement projects that had the potential to require sea grass restoration for unavoidable impacts to tidally influenced waters. These bridge replacement projects were to be under construction by 2011, so impacts to sea grasses and the cost to mitigate for the impacts had to be analyzed immediately. Once the acres of sea grass impacts were determined, funds were set aside along with the Long Range Estimate (LRE) for the construction of the projects. FDOT was fortunate to identify an opportunity to partner with the Palm Beach County Environmental Resources Management (ERM) on a Lake Worth Lagoon seagrass restoration project. Unlike most local government ERMs, this agency s focus is on restoration of natural areas throughout the county and they have done this with great success. FDOT became a joint applicant in the state and federal permitting process, gaining access to much needed seagrass mitigation credits. The Snook Island Natural Area was an unfinished restoration project that had already produced 100 acres of restored wetland habitat in the Lake Worth Lagoon. In the 1920s, dredging and filling along the edge of this lagoon left deep holes, which over time had accumulated sediments, become devoid of oxygen, and provided little marine habitat value. ERM set about filling deep holes with 1.2 million cubic yards of sand from Peanut Island that had been previously dredged to maintain the ICWW and inlets. Not only does this facility provide wetland mitigation credits, it also provides the following recreational benefits - a 600 foot boardwalk and gazebo, a 650 foot fishing pier, 2 educational kiosks, and three small day-use docks to accommodate six boats including a water taxi. Partners in the project include Palm Beach County, City of Lake Worth, Florida Inland Navigation District, and the Metropolitan Planning Organization/FDOT. With the contribution of $5 million, FDOT will receive over 7 acres of seagrass mitigation, and one acre of mangrove credits. Because 2 of the 5 bridges were designed to completely avoid seagrass impacts, any credits that are not applied to the original 5 bridges will be banked for future transportation improvement projects. This is considered a ROMA and will provide credits into the future. BENEFITS There are times when using a combination of the wetland mitigation options provides the most efficient and cost effective approach. An example of this would be the Indian Street Bridge in Martin County, a new bridge construction project that required an Final Environmental Impact Statement (FEIS). In order to permit the new bridge construction, District 4 used wetland mitigation credits from the DuPuis Reserve, a long range wetland mitigation project, a county-

Broadwell 6 owned offsite wetland mitigation project, an onsite wetland mitigation restoration project and wetland mitigation bank credits. FDOT was the designated non federal agency representing Federal Highway Administration (FHWA) for this Martin County project, and the county was willing to be a co-applicant on the permit applications. The County had restored a site within the vicinity of the new bridge and they were willing to use the credits from this site toward their new bridge construction project. District 4 had purchased wetland mitigation bank credits from a mangrove restoration project so these credits could be used toward the Indian Street Bridge project. Due to a commitment in the FEIS, onsite mitigation had to be provided along the corridor. A mangrove planter was designed along the shoreline of the waterway at the base of the bridge. Having several different mitigation options available to FDOT at one time allowed us to permit the new bridge crossing in less than one year. The bridge is currently under construction with a completion date of October 2013. The Advance Notification was sent out in March 2001. This is a new bridge crossing that went through the NEPA process in 12 years. CONCLUSION The several different wetland mitigation options available to District 4 FDOT ensure timely delivery of transportation improvement projects in a fiscally responsible manner. The time is now to plan for wetland impacts. There is no reason to wait for the permitting process to begin. Advertising to purchase wetland mitigation bank credits does not require a project; the competitive bidding process gets the best price per credit to be used on future projects. Partnering with agencies that have proven success in wetland restoration puts the work in the hands of the experts and allows for projects to be constructed independent of roadway construction schedules. BIOGRAPHICAL SKETCH Ann Broadwell has served as the Florida Department of Transportation District 4 Environmental Administrator since 2003. She is responsible for all NEPA aspects of transportation improvement projects. Part of her responsibilities are the coordination with regulatory agencies concerning listed species and wetland mitigation. She led a team of transportation professionals who were the recipients of the Federal Highway Administration s 2011 Exemplary Environmental Initiative for the Coastal Roadway Environmentally Sensitive Lighting Initiative. Prior to taking on the EA responsibilities, Ann served as the District Construction Environmental Coordinator and Project Manager of the FDOT Sea Turtle Friendly Roadway Lighting project. She has a Masters Of Biology Degree from Florida Atlantic University and has worked for FDOT for 21 years.