Progressive Design Build

Similar documents
Procurement Documents for Progressive Design-Build Projects

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013

45. Feedlot construction delivery

WATERTOWN ELEMENTARY SCHOOLS SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

Alternate Project Delivery Experience at UOSA and PWCSA

Progressive Design-Build Discussion

ALTERNATIVE CONTRACTING METHODS

Construction Manager as Constructor (CMc) Manual

Alternative Delivery for Municipal Water & Wastewater Projects in 2012

Committee Meeting. Procurement Processes for Professional Services and Contractors

Construction Documents Education Program

Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It

Alternative Project Delivery for America s Water Infrastructure

1/4/2014. Alternative Project Delivery Methods 1. Agenda

Construction Family of Documents

Project Delivery Systems

PROVING OUR PROFESSIONALISM

Design/Build Institute of America Rocky Mountain Region Water/Wastewater Committee. Project Delivery Selection Approach

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing

Report on Effectiveness of the Construction Manager at Risk Project Delivery Method

PROFESSIONAL PRACTICE 544

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

Partnering for Alternative Delivery Projects

CM AT RISK VS. DESIGN BID BUILD

Pioneering Alternative Project Delivery in Ohio

Choosing Delivery Method

EJCDC Contract Documents for America s Infrastructure Buy online at

Trinity Well Field and Production Facilities Project Management Using CMAR

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

CMAA has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of this program will be

Professional Practice 544

Contracting Methods and Risk Management

Professional Practice 544

Choosing a Project Delivery Method. A Design-Build Done Right Primer

THE MUNICIPAL WATER AND WASTEWATER DESIGN-BUILD HANDBOOK. Third Edition Expanded to Include Design-Build-Operate

Design-Build Data Sourcebook

LB 889 The Political Subdivisions Construction Alternatives Act

EJCDC Contract Documents for America s Infrastructure Buy online at

SEPARATED PROJECT DELIVERY SYSTEMS

Additional information summarizing the alternatives and development of this recommendation by staff is attached.

Pre Proposal Proposal Meeting

PROJECT DELIVERY METHODS

ECI: Two-Stage Contracts

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide

Best Practices for Exceeding Project Goals and Reducing Risk on Construction Projects

A/E-LED INTEGRATED PROJECT DELIVERY

Progressive Design-Build

Project Delivery Method

INNOVATIVE CONTRACTING GUIDELINES

Facility Basics for Bond Project Communications

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center

Lease-Leaseback Project Delivery Method

AN OWNER S GUIDE TO PROJECT DELIVERY METHODS: CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA

Procurement Guidelines

Alternative Project Delivery Methods and Procurement

PROJECT DELIVERY HANDBOOK

AIA Contract Documents

Chapter 4 State Requirements for Educational Facilities Section 4.1

ConsensusDocs. Catalog. Updated Docs Inside

PWCSA CONSTRUCTION MANAGEMENT AT RISK (CMAR) PROJECT DELIVERY

Construction Project Delivery Methods

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

Phase 1B Report on Water Treatment Plant Improvements Project Delivery Options

SCADA System Procurement Alternatives

A Primer Indianapolis, Indiana June 16, 2010

Stakeholders and project delivery methods

EVOLUTION OF DESIGN BUILD IN THE W/WW INDUSTRY

Continuing Education Credits

RISK REDUCTION IN DESIGN-BUILD

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.

Construction Contracts

Risks Associated with Alternative Delivery Methods. Managing Expectations. Presented by Dan Becker, CCM, PMP, CCE

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

PENINSULA CORRIDOR JOINT POWERS BOARD STAFF REPORT. Executive Officer, Caltrain Modernization Program

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff

Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP)

FACILITY PROJECT BIDDING OPTIONS OVERVIEW

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell:


Job Order Contracting (JOC) ITB JE Overview August 2016

Meeting the Standard of Care in an Evolving Project Delivery Environment

1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Finalize Implementation Plan Conduct Introductory Campus Meetings Kickoff Several Comprehensive Projects Secured Program Managers

School Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018

Tampa Bay Water is a wholesale water

EXHIBIT A. 1) General:

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods

Transcription:

Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E

TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract awarded to lowest bidder based on completed plans and specifications Designer Owner Contractor Subcontractors Designer and Contractor are two separate entities Owner holds separate contracts with each

DRAWBACKS OF TRADITIONAL DELIVERY Owner holds all contracts Owner in the middle of all disputes Low bid can lead to contentious environment or low quality Harder to attract qualified bidders in tight construction market

ALTERNATIVE DELIVERY Also known as integrated project delivery Design-Build (DB) Design-Builder is both engineer and general contractor Typically design to 60% and begin construction Contract pricing is set very early in project Owner Design-Builder Subcontractors Owner holds single contract with one entity responsible for design and construction Designer and Contractor are one contractual entity

WHY DESIGN-BUILD? Single point of responsibility Eliminates conflict between designer and contractor DB entity responsible for performance guarantees Simpler and shorter best value procurement process Encourages innovation in design and construction Control of final construction cost, known upfront

OWNER GETS OUT OF THE MIDDLE One Entity Guarantees Price Schedule Quality Performance Cost Savings Benefits of true integration Less design Less construction administration

MULTIPLE VARIATIONS OF DESIGN/BUILD Design Build Lump Sum/ Bid 2 Step/ Phased/ GMP/ Progressive

COMPARING SEQUENCE OF A DBB VS DB PROJECT DBB Design Bid & Award Construction Construction Bid Price Unknown Until full design completion and Bid True Construction Cost Unknown until change orders done and warranty issues resolved DB Pre-Design & Procurement Design Guaranteed Maximum Price (GMP) Fixed Early during early design development Construction (begins as soon as GMP Fixed)

KEY FEATURES - PROGRESSIVE DESIGN BUILD Planned early communication of schedule and budget restraints Design to Price approach set a firm budget for GMP. Off-Ramp available to change to Design-Bid-Build 3 rd party Owner s Advisor

ROLE OF A PROGRAM MANAGER Impartial Expert Technical Advisor Complete Project Overview

TWO STEP SELECTION PROCESS In accordance with Assembly Bill 642 RFQ RFP Selection Criteria Best Value Refinement of Scope of Work Best and Final Offer

SELECTION PROCESS FOR BEST DESIGN-BUILDER STEP 1 STEP 2 Release Request for Qualifications Receive Statement of Qualifications (SOQ) Review and Evaluate SOQ s Interview Design-Builder Shortlist Design=Builders to Receive Request for Proposals Release Request for Proposals Receive Proposals Review and Evaluate Proposals Interview Design Builders Select Design Builder and Recommend for Contract Award

Progressive Design-Build (PDB) PDB relies on a collaboration between the Owner and Design-Builder with constant communications Risks associated with the project are defined, assigned and controlled by the party having most control on that risk, some may be mutually shared A Risk register is created for the project Design-Builder bids project in packages to subcontractors or by trade and similarly bids for equipment from suppliers Owner Design/Builder Subcontractors

ADVANTAGES OF PROGRESSIVE DESIGN-BUILD Simple and inexpensive procurement process can be completed in a short timeframe Project can be implemented in phases or task orders to save time or keep the project moving Maximizes owner flexibility, involvement and control of the project

PROGRESSIVE DESIGN-BUILD BENEFITS TO OWNER Allows more effective owner input into the scope, features, and operational aspects of the design. Shorter procurement process. Potential for more bids. Flexibility to complete work design to budget based on (available funding). Better chance of adhering designing to budget. OTHER CONSIDERATIONS Cost and schedule for construction are not fixed at the time of initial contract signing. Procurement of long-lead equipment will be delayed until GMP agreement.

PDB EXPEDITES SCHEDULE How does it happen? Early equipment selection Designing around specifics Early work packages Procuring while designing Integrated team (design, construction and operations) Reduced conflicts and interferences Early stakeholder involvement Owning the schedule

DESIGN BUILDER BIDS PACKAGES Clear & Grubbing and Mass Grading of Site Long lead equipment packages Pipelines Concrete and Rebar Mechanical and equipment Electrical and Instrumentation & Controls Civil and Sitework, fencing etc. Buildings Landscaping Other Specialty Work

WHAT S IN A GUARANTEED MAXIMUM PRICE(GMP)? GMP is open book completely accessible to Owner Design Engineering Services to develop design to 60% level to develop a GMP Phase I Design Engineering Services to complete design to 100% and Engineering Services during construction Subcontracted work and equipment packages including long lead time items Project and Construction Management & Supervision, QC General Conditions based on construction duration Contingency & escalation to mid point of construction

GUARANTEED MAXIMUM PRICE DELIVERY METHOD Owner Constructor Architect/Engineer Overruns Allocation Constructor e.g. 90% Cost Savings A/E e.g. 10% Cost Overruns While the owner keeps most of the savings, a portion is reserved for the design-build team as an incentive. Savings Allocation If the DB actors share the overruns, an upper limit normally exists for the A/E s cost liability.

SUMMARY Progressive Design-Build was recommended Single point of responsibility Promotes greatest level of innovation with the schedule benefits of design-build Greater staff involvement in process and equipment selection as well as operational controls Control of budget and collaboration to achieve best value

RECENT WATER DESIGN BUILD COUNCIL MARKET STUDY The median schedule growth after contract award for DB projects is half as large as the schedule growth for DBB projects DB projects finish on or below contract price twice as often as DBB projects Contracts using guaranteed maximum prices (GMPs) are more likely to have no schedule or cost growth as compared to projects with lump-sum contracts There is no significant difference in constructed quality between design-build and design-bid-build projects For more information: www.waterdesignbuild.org