Safety Instructions For Overhead Crane Operators

Similar documents
DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS PART 20. UNDERHUNG CRANES AND MONORAIL SYSTEMS

Standards Summary Sheet

Operator Training Program. PROSTAK Storage Management Systems

Markings, Construction, & Installation B

PAGE 1 OF 10 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S370 Mobile Cranes Procedure REV /14/2012

PALLET LIFTER OPERATOR SAFETY MANUAL

Universal-Fit LIFT HOOK - Model 1371B

Golden Rule #5: Lifting & Mechanical Handling

EASTERN MICHIGAN U N I V E R S I T Y AERIAL WORK PLATFORMS PROGRAM

XVI. Attachment 4a Documented Inspection for Wire Rope Slings. Sling #: Capacity (safe working load): Length:

Scaffolding Procedures

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

Tom Carpenter Crane Maintenance Technician

Savard Labor & Marine Staffing, Inc. Fall Prevention Program Rev3/14

Materials Handling Guideline OHS709

Safety Policy and Procedure

HS709 Materials Handling Guideline

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

DRUM-GRAB INSTRUCTION MANUAL

Lifting Appliances of Ships and Offshore Installations

CAL/OSHA ELECTRICAL HIGH VOLTAGE

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

FORM Critical Lift Plan

Fork Mounted Spreader Bars

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.).

Inspection Procedure Health, Safety & Environment

Scaffolding Safety Procedures

Z5385 V Flying adapter Rigging manual (1.3 EN)

Document Revision Change Table Revision Number

Safe Operating Procedure PALLET JACK

Scaffolding Safety. Scaffolding

General Guidelines. Instructions for Part # WP Safety. It is the user s responsibility to read and follow all instructions.

Slings, Rigging and Lifting Equipment

MATERIAL STANDARD FOR GANTRY AND OVERHEAD CRANES ORIGINAL EDITION MAY. 1997

OWERED INDUSTRIAL TRUCKS (FORKLIFTS) A Berea College Employee Workplace Safety Program

PORTABLE LADDER SAFETY

Chapter 14. Materials Handling. Introduction

Scaffolding. Safety Guide. STOP! Before you climb

BBL-4 FORK-MOUNTED BULK BAG LIFTER USE AND MAINTENANCE MANUAL

1 TON PORTABLE GANTRY CRANE Model LB. PORTABLE GANTRY CRANE Model 94831

OPERATOR S MANUAL. LINKIT Series LKS300/LKS450 Portable Conveyor. InterQuip USA LLC interquip.net DISTRIBUTED BY: OPERATOR S MANUAL

JHA Number 1a. Job Description Hanging new ductwork. Step 1 Unloading of ductwork

Safety Documents > Safety Manual > Scaffolds

Presentation Overview. Background. Coast Crane Company Background. Coast Crane Company TOWER CRANE INSPECTIONS

Z5394 Rigging manual 1.2 en

New Hire s Training. Print Name

Just What OSHA Ordered A quick look at Tuscaloosa s overall crane program.

Installing metal decking, curtain walls, window walls, siding systems, miscellaneous metals, ornamental iron, and similar materials; and

AUTOMATIC FOLDING DOOR

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy

SCAFFOLDING SAFETY PROGRAM

An ISMS Approach To BaBar H&R Safety

FPU SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) SMALL CABINET MODULE (SCM) BOH FPU Field Pack-up Units

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM

STANDARD PRACTICE INSTRUCTION

RECOMMANDATIONS TO MAINTAIN TOWER CRANES IN SAFE CONDITIONS

CPM Constructors. Project Safety Inspection Form. Project Number: Project Location: Project Superintendent: Safety Inspector:

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Fall Protection Program For Working on Flat Roofs

Effective Date: 10-January Table of Contents

Union County Vocational - Technical Schools Scotch Plains, New Jersey

1.0 GENERAL REQUIREMENTS: 1.1 Scope of work:

Scaffold Safety

Load Handling (Hoisting) Policy

Rigging Fundamentals 101 (Rigging Hardware & Slings)

Apprenticeship Curriculum Standard. Powerline Technician. Level 1. Trade Code: 434A

WALL CANTILEVER WORK STATION JIB CRANE

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

"WORKING SAFELY WITH SUSPENDED SCAFFOLDING"

Load Handling (Hoisting) Policy

Scissor Lift Safety for Clients and Employees or ARS

This guide can be used to prepare a specification for incorporating wall bracket jib cranes into a competitively bid construction project.

Forklift Operator Training

k e e p t h e i r l o a d i n g d o c k s s a f e. T h a t s w h y w e v e d e v e l o p e d a

Health & Safety Policy and Procedures Manual SECTION 23 MASONRY CONSTRUCTION

CRANES & MOBILE LIFTING EQUIPMENT

CORNER SLIDE RAIL OPEN PIT INSTALLATION INSTRUCTIONS

TALON Cargo Hook Troubleshooting Guide

A-Series Aluminum Gantry Crane

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

FTLP-SERIES EQUIPMENT PLATFORMS INSTRUCTION MANUAL

Sample Written Program. For. Scaffolds

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

A-Series Steel Gantry Crane

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

Fall Protection Safety Program and Training Materials

Warehouse Safety Checklist

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

ANID GROUP SARL. For. Scaffolds

Aerial Lift and Scaffolding Guidelines

TADANO CARGO CRANE CRANE SPECIFICATIONS

TADANO CARGO CRANE CRANE SPECIFICATIONS

CBX Technologies, Inc. Material Handling Policy

Move It Safely: Avoiding Injury While Moving Materials. Leader Guide

Warehouse & Forklift Safety Manual

Operating Instructions

Working at Heights Policy

TLILIC3008A Licence to operate a slewing mobile crane (up to 20 tonnes)

The following is Copyright 2009 The Queen s Printer, Saskatchewan

Transcription:

Safety Instructions For Overhead Crane Operators Contents Forward -----------------------------------------------------------------------------------------1 Qualifications --------------------------------------------------------------------------------------1 Permits -----------------------------------------------------------------------------------------1 Sample Permit -----------------------------------------------------------------------------2 Training -----------------------------------------------------------------------------------------2 Personal Protective Equipment ---------------------------------------------------------------3 General Conduct of Operators ----------------------------------------------------------------3 Table 2 Shift/Operator Inspection Checks ------------------------------------3 Table 1 Standard Hand Signals for Controlling Overhead and Gantry Cranes ------------------------------------------5 Inspection 6 Maintenance ---------------------------------------------------------------------------------------6

Safety Manual for Overhead Crane Operators Forward An overhead crane operator s job is very important. It is a position of responsibility that you must be authorized to hold. There are rules and regulations you must obey and responsibilities you must accept. This manual may be used as a tool in the overall training and authorization of a prospective overhead crane operator. Employers and employees need to be aware that all cranes are different and may have specific operating, safety, inspection and maintenance requirements. It is essential that you have the manufacturers operating manuals and are familiar with your particular crane. QualificationsThe minimum qualifications for an employee selected to operate a crane are as follows: Have corrected vision that meets the same requirements as vision for a valid Driver s license. Have effective use of all 4 limbs. Be of sufficient height to operate the controls and to have an unobstructed view over the controls into the work area. Have coordination between eyes, hands, and feet. Be free of known convulsive disorders and episodes of unconsciousness. The employee must also have the ability to understand signs, labels, and instructions. The employee must be examined for these qualifications at least once every 3 years. Permits You must be trained and tested before you can operate an overhead crane. Upon passing this test and meeting other operator requirements (including demonstrating proficiency in running the crane) a permit will be issued to you. It is to be carried by you or be available upon request. 1

Sample Permit CRANE OPERATOR PERMIT (Firm Name) Operator s Name Operator s Number Is Authorized To Operate: (Insert Type of Crane(s) Authorized) Restrictions: (Explanation of Restrictions) Date Issued: (Month-Day-Year) Date Expiring (Month-Day-Year) By Issuing Authority: Title Training Training of all operators will include the following: Capacities of equipment and attachments. Purpose, use and limitation of controls. How to make daily checks. The energizing sequences, including pneumatic, hydraulic, and electrical sequences. Start-up and shutdown procedures. Emergency shutdown procedures. General operating procedures. All basic signaling procedures, including hand, radio, or telephone signals, where required. Practice in operating the assigned equipment through the mechanical functions necessary to perform the required task. Maximum rated capacity of the crane. Training of all riggers will include the following: Maximum capacity of the crane. Rigging procedures. Company rules and regulations. 2

Personal Protective Equipment When your employer conducts a personal protective equipment hazard assessment.( Personal Protective Equipment), they should include overhead cranes in their review. An operator and any employee directing a lift must use the PPE required in the area. If the top of the load is lifted to a height greater than 5 feet, then the load is considered an overhead hazard and head protection needs to be worn. When an employee is performing maintenance on an overhead or gantry crane, and a standard barrier or platform is not provided, the employee must wear an approved safety harness and lanyard, or a fall arrest device as prescribed in Construction Safety Standard, Part 45. Fall Protection. General Conduct of Operators At the beginning of each shift during which a crane is used, a visual inspection must be made in accordance with Table 2 below. A visual inspection is limited to that which can be made from a catwalk or other safe observation point. Any defects must be reported to a supervisor. TABLE 2 Shift/Operator Inspection Checks Inspection Item Description of Inspection Check Points Tagged Crane or Hoist Check that crane or hoist is not tagged with an out-of-order sign. Control Devices Test run that all motions agree with control device markings. Brakes Check that all motions do not have excessive drift and that stopping distances are normal. Hook Check for damage, cracks, nicks, gouges, deformations of the throat opening, wear on saddle or load bearing point, and twist. Refer to the manual furnished by the original manufacturer of the crane. Hook Latch If a hook latch is required, check for proper operation. Wire Rope Check for broken wires, broken strands, kinks, and any deformation or damage to the rope structure. 3

Reeving Limit Switches Oil Leakage Unusual Sounds Warning and Safety Labels Housekeeping and Lighting Check that the wire rope is properly reeved and that rope parts are not twisted about each other. Check that the upper limit device stops lifting motion of the hoist load block before striking any part of the hoist or crane. Check for any sign of oil leakage on the crane and on the floor area beneath the crane. Check for any unusual sounds from the crane or hoist mechanism while operating the crane or hoist. Check that warning and other safety labels are not missing and that they are legible. Check area for accumulation of material, trip or slip hazards, and poor lighting. A hoisting limit switch on a crane or hoisting device must not be used as an operating control, unless the crane is also equipped with a backup limit switch. A load must not be lowered below a point where less than 2 full wraps of wire rope remain on the hoisting drum. If there is doubt concerning the safety of a crane or hoisting means, the operator must immediately stop the crane, and report the condition creating the doubt to the supervisor. In the event of power failure, the operator must place all controllers in the off position. When an operator leaves a crane unattended he or she must land any attached load, place the controllers in the off position, and open the main switch. Before closing a main switch the operator must make sure all controllers are in the off position. The main switch does not need to be opened on a pendant-controlled crane if the crane is left unattended for short periods. An operator must only respond to signals from the employee directing the lift. Except for an emergency stop signal, which must be obeyed when given from any employee. The signals given to an operator must conform to table 1 below. 4

Table 1 Standard Hand Signals For Controlling Overhead And Gantry Cranes HOIST. With forearm vertical, forefinger pointing up, move hand in small horizontal circle LOWER. With arm extended downward, forefinger pointing down, move hand in small horizontal circle. BRIDGE TRAVEL. Arm extended forward, hand open and slightly raised, make pushing motion in direction of travel. TROLLEY TRAVEL. Palm up, fingers closed, thumb pointing in direction of motion, jerk hand horizontally. STOP. Arm extended, palm down, hold position rigidly. EMERGENCY STOP. Arm extended, palm down, move hand rapidly right and left. MULTIPLE TROLLEYS. Hold up one finger for block marked 1 and two fingers for block marked 2. Regular signals follow. MOVE SLOWLY. Use one hand to give any motion signal and place other hand motionless in front of hand giving the motion signal. (Hoist Slowly shown as an example.) MAGNET IS DISCONNECTED. Crane operator spreads both hands apart palms up. 5

An operator must not carry a load over another person. A crane must not be used to make a side pull (except where it has been specifically authorized by a qualified person after making specific determinations). Compressed gases can only be lifted by a cradle or enclosed platform. An employee cannot ride a hoisting device, such as a magnet, hook, ball, or load. The only exception is a work platform that meets all the requirements in the Construction Safety Standard Part 10. Lifting & Digging Equipment. When attaching or moving a load, the operator, rigger, or hooker must make sure of all of the following: The hoisting rope or chain is free of kinks or twist and not wrapped around the load. The load is attached to the load block hook by means of a sling or other approved device. The sling and load will clear all obstacles or obstructions. The load is balanced and secured before lifting the load more than a few inches. Multiple lines are not twisted around each other. The hook is brought over the load in a manner to prevent swinging. There is no sudden acceleration or deceleration of the moving load. Inspection The inspection procedure for cranes in regular service is divided into 2 general classifications: Frequent inspections are done monthly to quarterly or at intervals of 100 hours of use, whichever comes first. Periodic inspections are done annually or at intervals of 500 hours of use, whichever comes first. 6

The inspections cover topics outlined in the standard or manufacturers guidelines. Maintenance The employer must maintain a crane and its accessories in a condition that will not endanger an operator or other employee. A preventative maintenance program will be established and the program will be based on the manufacturer s recommendations and for the application as reviewed by a qualified person. Before adjustments or repairs are made on a crane, all of the following precautions must be taken: The crane will be moved to a location where it will cause the least interference with other moving equipment on the track or rails and operations in the area. Controllers will be placed in the off position. The main switch will be placed in the off position or open position and LOCKED OUT, except where power is necessary to adjust or service the crane. A warning sign or out of order sign will be placed at the operator control station. Illumination of 15 footcandles intensity will be provided while maintenance is performed on the crane. 7