Stage 3 CSG water monitoring and management plan 1.0

Similar documents
1.0. Stage 2 CSG water monitoring and management plan

14.0. Ensuring responsible CSG water management and beneficial use

Arrow Update. Arrow Research. Groundwater monitoring and modelling. Demonstrations at Theten. Arrow Update. Domestic gas expansion activities

Community Information Session Surat Basin

ARROW ENERGY UPDATE COMMUNITY INFORMATION SESSIONS SEPTEMBER 2018

8.0. Springs monitoring and management the Joint Industry Plan

Arrow Energy. Surat development update. December 2017

12.0. Exceedance thresholds and determining response actions

QGC STAGE 3 WATER MONITORING MANAGEMENT PLAN 2015 ANNUAL REPORT

COAL SEAM GAS WATER AND SALT MANAGEMENT STRATEGY

Coal Seam Gas Groundwater Field Day. AgForce Projects Moura Tuesday 18 March 2014

Arrow Energy. Surat operational update. July 2016

Western Downs. A Future begins QUPEX Event

CTSCo s Surat Basin Carbon Capture and Storage Project

4.0. Surat QCLNG bore baseline program status

FACT SHEET. QCLNG pipeline The Narrows crossing. QCLNG and Australia Pacific LNG projects. The Narrows pipeline specifications.

Appendix K DERM database preliminary assessment

Arrow Energy Arrow in the Surat

Industrial land demand forecasting for supply chain business supporting Queensland s resources sector

Consultation Regulatory Impact Statement

Environmental Impact Statement Surat Gas Project

SUPREME COURT OF QUEENSLAND

Jordan Accommodation Camp Removal following Sale

ARROW ENERGY SURAT GAS PROJECT. April 30 May 10

A Risk to Groundwater from Coal Seam Gas Extraction in the Surat Basin

Coal Seam Gas: Context, Issues and (some) Solutions

15.0. Brine and salt management

FACT SHEET. QCLNG pipeline. Stringent standard. Pipeline specifications. Landholders and community. Route selection

3. PROJECT DESCRIPTION

CSG GROUNDWATER FIELD DAY [WORKBOOK]

Australia Pacific LNG submission to the Senate Rural Affairs and Transport Committee: Inquiry into the management of the Murray-Darling Basin impact

Appendix U Draft exceedence response plans

Appendix X.6 Queensland Government CSG Water Management Policy

BOWEN BASIN MINING CLUB

PROTECTING WATER RESOURCES

Background. Much of the CA is directly underlain by the Walloon Coal Measures (WCM) which are the target of proposed coalbed methane (CBM) development

Energy and demand projections

Western Surat Gas Project Water Monitoring and Management Plan

2. Project Justification and Feasible Alternatives

Surat Gas Project. Noise and Vibration Impact Assessment

Santos Gas Field Development Project (GFD Project)

Bowen Gas Project. EIS Community Information Sessions. June Arrow s Moranbah Compression Station Bowen Basin

PRODUCED WATER TREATMENT AND REUSE IN QUEENSLAND, AUSTRALIA. Introduction

Appendix I Stage 1 groundwater monitoring bore pumping tests

Australia Pacific LNG Upstream Phase 1

Coal Seam Gas Water Management

Queensland s Petroleum & Gas Industry Snapshot

MEETING MINUTES Arrow Surat Community Reference Group Fitzy s Toowoomba, 153 Margaret Street DATE: 9 November 2017 COMMENCEMENT TIME: 9.

Shale gas operation & water resource preservation. PECC, November 2013

CHAPTER 2 Energy and demand projections

ARROW ENERGY ARROW LNG PLANT. May 15 th to 19 th 2012

A pipeline of resource opportunities. Petroleum and gas in Queensland

Energy in Australia: A Queensland Perspective

TAROOM COAL PROPRIETARY LIMITED (ABN ) ELIMATTA PROJECT UPDATE TO THE PROJECT APPLICATIONS SUPPORTING INFORMATION.

Comet Ridge s Galilee Basin Extended Production Test Project Galilee Basin Coal & Energy Conference 2013 Tor McCaul, Managing Director 25 November

1 INTRODUCTION ENTER HERE BACK TO CONTENTS

LNP Policy for a Sustainable Coal Seam Gas Industry

Australia Pacific LNG

Release Notice. Document Conventions. Document Custodian

Quarterly Production Report For period ended 31 March 2018

QGC Regional Gas Field Community Committee 27 February am to 2.00pm Chinchilla Motor Inn and Park, Park St, Chinchilla

Safe and Sustainable Water Management

Non-Deal Investor Roadshow Presentation

MARANOA CIVIL JV. Capabilities

BOWEN GAS PROJECT ENVIRONMENTAL IMPACT STATEMENT COMMUNITY INFORMATION SESSIONS MARCH 2013

Scoping Study Mining and Coal Seam Gas Development

Why is So Much Hot Air Bubbling to the Surface: CSG Impacts vs No Impacts?

Water Management in Queensland Coal Seam Gas. John Walsh, PhD CETCO Energy Services

World s first LNG from Queensland, Australia A precursor to US LNG exports

ATTACHMENT 5 AQUIFER INTERFERENCE POLICY AND WATER LICENSING ADDENDUM

Postal Address: PO Box Brisbane Adelaide Street QLD 4000

1.0 INTRODUCTION 1.1 PROJECT PROPONENT

Liquefied Natural Gas.

6. PUBLIC AND STAKEHOLDER CONSULTATION

6. GREENHOUSE GAS EMISSIONS

Bauxite Hills Project. Supplementary Report to the. Metro Mining. Section 3 Introduction. Environmental Impact Statement

ATTACHMENT 2. Aquifer Interference Policy Considerations and Water Licensing COWAL GOLD OPERATIONS MINE LIFE MODIFICATION

Spring Gully North-West and North-East Project Preliminary Documentation. Appendix 2: Cross Reference with Request for Information

Designing a method for assessing the use of produced water from coal seam gas projects to supplement environmental flows

11.0. Re-injection and repressurisation options

AGM PRESENTATION NOV 2017 ASX: GLL

Z DRAFT ENVIRONMENTAL MANAGEMENT PLAN

Australia Pacific LNG Project. Volume 5: Attachments Attachment 44: KPMG Economic Impact Assessment Report Gas Fields, Pipeline and LNG Facility

Released by EHP under the

Water Technologies & Solutions Water Technologies & Solutions. water treatment solutions for unconventional fuels

DRIVING COST EFFICIENCY - AN INTEGRATED CSG SOLUTION

Quarterly Production Report For period ended 31 December 2017

TAROOM COAL PROPRIETARY LIMITED ELIMATTA PROJECT - MINING LEASE APPLICATION. Section 15 - Accompaniments 1.0 INTRODUCTION.

Submission to the Senate Standing Committee on Rural Affairs and Transport Inquiry

SUPPLEMENTARY COMMUNITY CONSULTATION REPORT

WSGP Coal Seam Gas Water. Management Plan

Unlocking the Cooper Basin s resource potential

ATTACHMENT K WSGP CSG WATER MANAGEMENT PLAN [SENEX-WSGP-EN- PLN-008]

RESOURCES AND ENERGY. we see things differently

Spring Gully Water Treatment Facility Water Quality Discharge Annual Report

Annual Return EPBC 2008/4398 Queensland Curtis LNG Gas Fields QUEENSLAND CURTIS LNG. Rev 0. December 2014

FINAL REPORT SURAT GAS IMPACT ASSESSMENT REPORT GREENHOUSE GAS ASSESSMENT. Coffey Environments Pty Ltd. 24 November 2011.

Released by EHP under the

Basin air quality data now live online

Transcription:

1.0 Stage 3 CSG water monitoring and management plan 1

2 1.0 Stage 3 CSG water monitoring and management plan 1.1 INTRODUCTION Coal seam gas has been produced in Queensland for more than 10 years and accounts for about 80% of all gas consumed in the State. QGC is expanding its existing CSG operations through development of the Queensland Curtis LNG Project (the QCLNG Project). The QCLNG Project is developing coal seam gas in the Surat Basin in southern Queensland to supply gas to export and domestic markets (refer Figure 1-1). QGC, a wholly-owned subsidiary of the BG Group, is drawing on its own extensive CSG expertise as well as the wider group's international Liquefied Natural Gas (LNG) experience to develop the world's first unconventional LNG facility. The process of extracting coal seam gas from the Walloon Coal Measures (WCM) produces water which, when treated, can be beneficially used by local farmers, industry and communities. Central to the project's success is ensuring that the integrity of the Great Artesian Basin (GAB), of which the Surat Basin is a part, is maintained. To this end, QGC has made a firm commitment to geological and hydrogeological data gathering, analysis, modelling and monitoring and the establishment of environmentally sustainable water management strategies around CSG operations. This Stage 3 WMMP outlines QGC's approach and commitment to water monitoring and management for the QCLNG Project. It is based on existing and new scientific information and approaches. The Stage 3 WMMP: Highlights those tasks completed and started since project approval (October 2010); Summarises key findings from data collected and interpreted to date; and Sets out a schedule of tasks, delivery mechanisms and target completion dates (i.e. a plan) for the Department to assess compliance against relevant approval conditions. 1.2 GOALS AND OBJECTIVES QCLNG's success rests fundamentally on maintaining the long-term integrity of the GAB, ensuring minimal impact on the sustainability of local and regional ground and surface water resources and mitigating impacts on ecological systems considered to be MNES. To achieve these objectives, QGC's strategy is: Developing robust water management tools; Establishing an extensive monitoring network; Calculation of early warning signals and response actions; Quantifying and managing potential risks and developing response strategies; and Implementation of responsible CSG water management and beneficial use options.

3 150 E 151 E CAIRNS TOWNSVILLE Cassio MACKAY 26 S 26 S PLA 399 Acrux PL 398 CLERMONT GLADSTONE Polaris WANDOAN ROMA CHINCHILLA BRISBANE Kathleen Cam PL 277 ATP 651 PL 276 Woleebee Ross Creek Mamdal Paradise Downs Alex PL 171 Lawton Carla PLA 393 Peebs ATP 574 PLA 392 Marcus Pinelands ATP 632 Connor PLA 461 DULACCA MILES ATP 676 Avon Downs PLA 472 PL 247 Bellevue PL 211 Berwyndale ATP 676 PLA 459 McNulty PLA 458 CHINCHILLA PL 201 Berwyndale South PL 229 Argyle CONDAMINE ATP 632 PL 212 ATP 620 Matilda-John Lauren PL 179 Kenya Owen PL 263 PL 180 ATP 676 PLA 443 27 S 27 S PL 257 KOGAN PL 228 Codie Kate Kenya East Jammat PL 278 Margaret Jordan Sean David Michelle PL 273 PL 442 ATP 648 Celeste Poppy RubyJo Isabella TARA Will Ridgewood PLA 261 ATP 621 Myrtle Aberdeen PLA 262 PL 275 PL 466 Barney Clunie Jen Broadwater PL 474 PL 279 Cougals Glendower Harry ATP 648 PL 274 Teviot Maire Rae QCLNG Project Area 0 9 18 27 36 Kilometres Town Major Roads Railway QCLNG Project Area QGC Fields in QCLNG Project Area Environmental Authority Areas Avon Downs and McNulty EA Berwyndale South EA Bellevue EA Jordan EA Kenya EA Ruby EA Woleebee Creek EA QGC Development Areas Central Gas Fields Northern Gas Fields Southern Gas Fields Figure 1-1 The QCLNG gas field project area

4 Throughout this document, reference is made to results generated by QGC s GEN2 groundwater model. However, the Queensland Water Commission's (QWC) Underground Water Impact Report (UWIR) was formally released in December 2012 and included an updated groundwater model, which addresses cumulative impacts. Upon formal release of the UWIR and finalisation of associated legal arrangements regarding access to model results, QGC updated the predictions contained in the Stage 2 WMMP. 1.3 QCLNG SNAPSHOT The QCLNG Gas Field Approval (EPBC 2008/4398) authorises the project area which includes the following petroleum tenures: Authority to Prospect (ATP): 574, 610, 621, 632 (portion of), 647, 648, 651, 676 and 768 (portion of); Petroleum Lease (PL): 179, 201, 228, 229, 171, 180, 211, 247; and Petroleum Lease Application (PLA): 212, 257, 259, 261, 262, 263, 273, 274, 275, 276, 277, 278, 279. The QCLNG gas fields project area is shown at Figure 1-1. The gas fields component of the project covers 468,000 ha within the Walloon Fairway of the Surat Basin. Project activity is located on land between the towns of Taroom, Wandoan, Condamine, Tara, Chinchilla and Dalby. The application, granting and conversion of petroleum lease applications is an ongoing process with the Queensland Department of Natural Resources and Mines (DNRM). The list below represents all changes that have occurred with QGC tenures within the overall approved QCLNG Gas Field Approval (EPBC 2008/4398) to 17 September 2012 and includes: ATPs converted to PLs and thereby no longer exist: ATP 610 (covered by PL 247), ATP 651 (covered by PLs 276 and 277); PLAs granted to PL: 212, 257, 263, 273, 274, 275, 276, 277, 278, 279, 398, 442, 466, 474; PLAs withdrawn: 259 (covered by grant of PL 273); PLAs applied for over ATP areas held by QGC (PLA): 392 and 393 (portion of ATP 574), 398 and 399 (portion of ATP 768), 443, 458, 459, 461 and 472 (portion of ATP 676) 442, 466 and 474 (portion of ATP 648); Petroleum Facility Licence Applications (PFL): PFL 19, PFL 22; and Petroleum Facility Licence Grants (PFL): PFL 19, PFL 22. The approval conditions allow for the development of up to a maximum of 6,000 production wells and gas field development over a 50-year period to 31 October 2060. It should be noted that approximately 5,000 wells will be in production at any one time, with new wells progressively brought on-line to replace maturing wells, which will be decommissioned.

5 Works carried out will comprise: Up to 6,000 gas production wells with around 2,000 wells scheduled by mid-2014. The balance of wells will be phased in to replace declining wells over the life of the project; Installation of wells and associated well pad surface equipment including wellhead separators, wellhead pumps, wellhead flares, telemetry devices and metering stations; Installation of gas gathering systems (High Density Polyethylene (HDPE) and steel pipes); Completion of field compressor stations and central processing plants, including dehydration facilities, substations and power lines; Development of access tracks, borrow pits, warehouses, construction and operations camps, offices and telecommunications; Construction of water gathering lines, trunklines, ponds, treatment facilities and brine storage ponds; Preparation of the necessary infrastructure for the beneficial use of treated CSG water; Installation of above-ground 132 kv power lines to connect the new central processing plants to third party substations. Also, installation of underground and above-ground 33 kv power lines connecting central processing plant substations to field compressor stations and Water Treatment Plant substations; and Development of accommodation camps for construction and operations people, along with warehouses, lay down areas, communication towers and fibre optic cabling. QGC will develop the acreage outlined in Figure 1.1 with 24 blocks contributing to QCLNG production in 2014. Therefore, QGC has developed an holistic water monitoring and management plan for the entire project life to responsibly monitor and manage CSG water for the whole acreage. For all key activities a base plan has been selected and each base plan is described in the Stage 3 WMMP. If alternative strategies with better outcomes are proven over time, QGC will apply for revision of the plan. This Stage 3 WMMP will be reviewed at the earlier of: The release of an update to the 2012 Surat Basin Underground Water Impact Report (UWIR); and The exceedance of a trigger monitoring value due to CSG operations. QGC will provide a fully-updated Stage 3 WMMP by July 2016 which will incorporate the data and findings of two operational years and the updated UWIR (QWC 2012) (expected by December 2015). In line with Condition 49(i), annual reports will be provided to the Department in October of each year. 1.4 ADDRESSING REGULATORY REQUIREMENTS QGC submitted its Stage 1 WMMP (QGC 2011) on 21 April 2011 and updated in October 2011 and the Stage 2 CSG Water Monitoring and Management Plan on 23 April 2012, which was approved on 22 December 2012. The Stage 2 WMMP comprised both the hydrogeological findings to date and provided an extensive study and research programs captured as firm commitments. This Stage 3 WMMP provides a comprehensive overview of the findings and results of QGC s studies in fulfillment of these commitments with a focus on Condition 53B. The Stage 2 WMMP approval and Stage 3 WMMP variation are presented in Appendix A.

6 QGC is using proven Reverse Osmosis technology to treat produced CSG water for use by irrigators, industry and municipalities.