Performance Measures for Bridge Preservation

Similar documents
FHWA Bridge Activities Update

A COMPREHENSIVE BRIDGE PRESERVATION PROGRAM TO EXTEND SERVICE LIFE. Bruce Johnson 1

AASHTO Manual for Bridge Evaluation: Section 3, Bridge Management Systems A Practical Tour

National Bridge Management and Preservation Initiatives. Western Bridge Preservation Partnership Meeting November 30, 2010 Sacramento, CA

Target-Setting Workshop

Committee on Bridges and Structures Update for Committee on Maintenance (MaC) July 25, 2018

Bridge Working Group Jeff Milton, VA

LRFD Bridge Design Manual Changes

Fhwa Field Manual For Timber Bridge Inspection

International Symposium Non-Destructive Testing in Civil Engineering (NDT-CE) September 15-17, 2015, Berlin, Germany

April 25, Bruce Johnson, P.E. Oregon DOT

Federal Highway Administration s Role in Bridge Preservation. Anwar S. Ahmad 1

National Database System for Maintenance Actions on Highway Bridges

Bridge Preservation Beyond the Short Term

Incorporating Maintenance & Preservation Strategies into and Integrated Bridge Management System. Jim Edgerton Director of Technical Sales

National Bridge Management, Inspection and Preservation Conference November 1, 2011 St. Louis, MO

Incorporating Performance Measures into NCDOT s Bridge Management System. Rick Nelson, P.E. Jim Edgerton

According to a Federal Highway

National Bridge Management and Preservation Initiatives. Northeast Bridge Preservation Partnership Meeting September 28, 2010 Hartford, CT

MPC-533 August 25, 2017

Washington State DOT: Pavement and Bridge Performance NPRM Comments for federal docket,

Bridge Preservation: Completed, Ongoing and Future Research

Framework for ADOT Asset Management System. Jean A. Nehme, PhD, PE Arizona Department of Transportation

Midwest Bridge Preservation Partnership. Session 3 Preservation Actions, Policies, Needs, & Measures

What Does the FHWA Rulemaking on Bridge Performance Measures Mean to You?

Asset Management Plans for the National Highway System

Bridge Preservation: Thin epoxy overlays

VDOT S BRIDGE PRESERVATION PROGRAM. Virginia Concrete Conference, 2012 RICHMOND, VA. March 9, 2012

National Bridge Management, Inspection and Preservation Conference Managing The Nation s Bridges Beyond The Short Term

Project NCHRP Proposed AASHTO Guide for Bridge Preservation Actions

NCHRP 20 68A U.S. Domestic Scan Program. Domestic Scan 13 03

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

NCHRP UPDATE AASHTO Highway Subcommittee on Construction. Timothy Hess National Cooperative Highway Research Program

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT SYSTEM IMPLEMENTATION. Todd S. Thompson, PE 1

AASHTO TSP-2 Update SCOBS. June 11-15, 2017 Dave Juntunen, MDOT

TRANSPORTATION PERFORMANCE MANAGEMENT

Pavement Management s Role in an Asset Management World

Asset Management: Federal Perspective on Bridge Maintenance and Preservation

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA

CBP. Guidelines for Selection of Bridge Deck Overlays, Sealers, and Treatments. Survey of Transportation CONCRETE BRIDGE PRESERVATION.

AASHTO TSP-2 Update SCOBS. June 11-15, 2017 Dave Juntunen, MDOT

AASHTO S SUBCOMMITTEE ON ASSET MANAGEMENT

Survey of Past Experience and State-ofthe-Practice. Maintenance of Small Movement Expansion Joints in the Northeast

General Info. Number: PROJECT NO

Pavement Management Systems

BrM Help Desk AASHTOWareBridge.com JIRA tickets: bridgeware.atlassian.net

Aashto Lrfd Bridge Design Specifications 6th Edition

BRIDGE MANAGEMENT, EVALUATION AND REHABILITATION. Idaho Transportation Department Matt Farrar

National Bridge Inspection Program Risk-based, Data-driven FHWA Oversight

THESIS DETERMINING THE ITEMS THAT STRUCTURE BRIDGE MANAGEMENT COMPONENTS AND THEIR RELATIVE WEIGHTS. Submitted by. Joshua F.

Introduction. Background

ODOT Bridge and Pavement Funding Allocation Business Process. Bruce Johnson 11 th IBSMC, Mesa Arizona 4/24/17

AASHTO RAC Transportation Knowledge Network Task Force

An Evaluation of the Condition of the Nation s Bridge Infrastructure Using Indicators Extracted from National Bridge Inventory Source Files

Life-Cycle Assessment of Nebraska Bridges

VIRGINIA'S PREVENTIVE MAINTENANCE CHALLENGES AND INNOVATION. Rodolfo F. Maruri 1

New Development in Accelerated Bridge Design and Construction in WA

MAP-21 Moving Ahead with Progress Title in the 21 st Century Subtitle

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

BRIDGIT: User-Friendly Approach to Bridge Management

THINLAY ASPHALT FOR PAVEMENT PRESERVATION

Fouad H. Fouad and Christopher J. Waldron, Department of Civil, Construction, and Environmental Engineering, University of Alabama at Birmingham

Report on. Texas Bridges. as of September Prepared by the Bridge Division Texas Department of Transportation

Condition of US Bridges and Present Corrosion Technologies Used for Bridge Structures

BrM (formerly Pontis)

Bridge Deck Issues. Paul D. Krauss, P. E. Wiss, Janney, Elstner, Associates

Bridge Inspection, Maintenance, and Management Strategies in Canada

Summary of Critical Findings Reviews for the National Bridge Inspection Program

NEW MEXICO LAND OF ENCHANTMENT

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE

Transportation Asset Management Webinar Series

MEETING MINUTES. ACEC-IL / IDOT Bridge Committee

Ongoing MwRSF Research on Bridge Railings, Culvert Barriers, & Transitions

2014 NWPMA Conference

2008 Michigan Bridge Conference March 19, 2008 Mount Pleasant, MI

NEVADA BRIDGE PROGRAM

ODOT Asset Management Plan 0

Bridge Management. Developments in Short and Medium Span Bridge Engineering 94. Summary

Selection and Use of Thin Surface Treatments

FHWA Update AASHTO Subcommittee on Maintenance Annual Meeting Providence, RI. Connie Yew

Bridge Model Validation at Indiana DOT Gary Ruck, P. Eng., PMP, Deighton

AASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded

Assessment of Long-Time Behavior for Bridge Girders Retrofitted with Fiber Reinforced Polymer

BrM Training. User Group Walkthrough Example September 20-21, 2016 San Antonio, Texas

Bridge Preservation and MAP-21. Bert Hartman, Oregon DOT

Inspection Frequency MiSIM Chapter 3

Movable Bridge Maintenance and Preservation

Metropolitan Planning Organization Safety Performance Measures Fact Sheet

Word count in abstract (231), text (3420), references (204), 5 figures (1250), and 4 tables (1000) = 6105 words

State of the Structures and Bridges Fiscal Year 2017 July 1, 2017

MDOT Camelback Bridge Example

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE

Design and Rehabilitation Strategies for Sustainable Concrete Pavements

Jason Chapman Louisiana DOTD. [Transportation Innovation: Solving Tomorrow s Challenges]

Scour Technology Transfer

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Moving Ahead for Progress in the 21 st Century Act MAP-21

Chapter 13 Bridge Load Rating

Strengthening Highway Bridges with CFRP Composites

VDOT s Experience with Reinforced Concrete and Metal Culverts

Transcription:

Performance Measures for Bridge Preservation George Hearn Univ. of Colorado David Juntunen Anwar S. Ahmad Bruce V. Johnson Bridge Operations Engineer Michigan Dept. of Transportation Bridge Preservation Engineer USDOT Federal Highway Administration State Bridge Engineer Oregon Dept. of Transportation

Performance Measures Approach & Goals DOTs' Inputs Questionnaire to US State DOTs Scans and Case Studies Published Practices Midwest Transportation Knowledge Network Washington DOT Performance Measure Library Proposed Performance Measures Building on existing data Relevant to bridge preservation Case study http://www.fhwa.dot.gov/asset/hif12029/hif12029.pdf Scan http://onlinepubs.trb.org/onlinepubs/nchrp/docs/nchrp20-68a_07-05.pdf MTKN http://members.mtkn.org/measures/ WsDOT http://www.wsdot.wa.gov/accountability/publications/library.htm

Performance Measures - Categories

Performance Measures Use of Data

Performance Measures - Dashboards

Performance Measures - Bridges Source NCHRP AASHTO BPETG MTKN 20-24(37)E Roundtable Questionnaire DOTs Represented, count 36 39 33 17 Performance Measure Input Performance Measure Use, % of DOTs Bridge Condition 56 56 55 64 Bridge Program 33 10 18 7 Functional Obsolescence 14 26 15 29 Weight Restriction 3 10 18 7 Maintenance & Operations 22 3 12 7 Structural Deficiency 39 56 52 50 Sufficiency Rating - 10 9 7

Performance Measures - Preservation Preservation candidates Bridges to preserve. Preservation need Work needed to preserve the candidates. Preservation plan Resources required to deliver the annual need. Preservation impact Outcomes of preservation programs

Performance Measures - Preservation Preservation Candidates Preservation need Preservation plan Preservation impact

Performance Measures - Examples Bridges & Culverts, State-Owned, Span > 20 ft 3,450 Bridge Deck Area, Sq Yards 3,510,000 Median Age, years 42 Median General Condition Ratings 7

Performance Measures Colorado Candidates count 3200 percent 93% Deck, Sq Yd 3,140,000 Replacements 1992 to 2011, count 425 Annual replacements, average count 21 Annual deterioration, average count 23

Performance Measures Colorado Need Structure-Level Structures, Count 3200 64 years 50 / year Structures, Deck area, SY 3,140,000 49,100 SY / year Element-Level RC Deck, Epoxy bars, SY 316,000 31 years 10,200 SY / year Seals, Compression Joints, Ft 55,000 9.1 years 6,040 Ft / year

Performance Measures Colorado Plan Project Type Cost, $ / SY Bridge repair 180 Bridge major repair or rehabilitation 446 Bridge replacement 658 Structure-Level Structures, Deck area, SY 49,100 SY / year $446 / SY $21,900,000 Element-Level RC Deck, Epoxy bars, SY 10,200 SY / year $43 / SY $439,000 Seals, Compression Joints, Ft 6,040 Ft / year $345 / Ft $2,083,800

Performance Measures Colorado Impact on General Condition Ratings GCR years 9 1.6 8 8.7 7 22.3 6 22.6 5 17.4 4 28.8 Condition Preservation Replacement Program Program Average Condition Rating 6.6 6.0 +0.6 Bridges GCR 6 86% 63% +13% Bridges GCR 5 100% 83% +17%

Performance Measures Colorado Impact on Work Need Program, years basis / year Preservation 64 structures 50 + 12 / year deck area 49,100 SY +12,000 SY / year Replacement 84 structures 38 deck area 36,900 SY Impact on Plan Program basis / year Cost Preservation deck area 49,100 SY $446 / SY ($2,400,000) Replacement deck area 36,900 SY $658 / SY

Performance Measures Colorado Example Summary Preservation Candidates Bridges, count 3200 Deck area, SY 3,140,000 % of State-owned 93% structures Preservation Need Network Level Bridges, count 50 Deck area, SY 49,100 Preservation Need Element Level RC deck, Epoxy barsl, SY 10,200 Compression joints, Ft 6,040 Preservation Plan Network Level All structures $21.9 millions Preservation Plan Element Level RC deck, Epoxy bars, SY $439,000 Compression joints, Ft $2,083,800 Preservation Impact Average GCR + 0.6 Bridges GCR 6 + 23% Bridges GCR 5 + 17% Projects per year + 12 Deck Area per year + 12,000 Annual Plan $(2.4 millions)

Performance Measures for Bridge Preservation Performance Measures Candidates Need Plan Impact Existing Data NBI record, Element-Level Info, Average Costs Guidance Monitor, plan and evaluate programs for bridge preservation Application Trial with Colorado State-owned bridges and culverts

Performance Measures for Bridge Preservation George Hearn Univ. of Colorado David Juntunen Anwar S. Ahmad Bruce V. Johnson Bridge Operations Engineer Michigan Dept. of Transportation Bridge Preservation Engineer USDOT Federal Highway Administration State Bridge Engineer Oregon Dept. of Transportation