A Successful Upstream Integration in the Heavy Mineral Sands Industry JM FOURCADE CEO, TIZIR LIMITED

Similar documents
Titanium mining and processing. INVESTOR PRESENTATION September 2013

1Q 2018 OPERATIONS REVIEW

3Q 2017 OPERATIONS REVIEW

COMBINED GENERAL SHAREHOLDERS' MEETING. 27 May 2016

OUTSTANDING RESULTS FROM ILMENITE UPGRADE TESTWORK

For personal use only. Amazon Bay Ironsands Project

2011 RESULTS. SFAF meeting, Paris February 16 th, 2012 ALLOYS, ORES & PEOPLE.

WIM150 Mineral Sands Project 15 th Anniversary Mineral Sands Conference

ERAMET. RESULTS 1 st half SFAF meeting, Paris July 28 th, 2011 ALLOYS, ORES AND PEOPLE

Southern Ionics Mining to Support the American Zirconium OxyChloride (ZOC) Business

Sales in third-quarter 2017 at 877 million, up by 23% compared with third-quarter 2016.

Ilmenite Pellet Production and use at TiZir

DEVELOPING A HIGH GRADE ILMENITE DEPOSIT TIO 2 WORLD SUMMIT 3-5 OCTOBER 2017 ALICANTE, SPAIN

Third-quarter sales in 2016 at 714 million euros, steadily increasing since the start of 2016.

TZMI CONGRESS 2014, SHANGHAI CHINA NOVEMBER 2014

SHEFFIELD ORE RESERVE FOR DAMPIER PROJECT AT 01 OCTOBER 2018 (in-situ assemblage) HiTi Leuc (%) Zircon (%)

Austpac Resources N.L (APG)

CHAPTER 1 INTRODUCTION

What Bob Becher s developments meant to the world pigment industry and WA in particular

CHINA S ECONOMIC GROWTH AND ITS IMPACT ON MINERALS MARKET. Pierre Alla CEO Goro Nickel New-Caledonia

Trimex Beach Sand Beneficiation Plant

ERAMET TOKYO PRESS CONFERENCE. July 6 th, 2017

For personal use only

1.1 TiO2 pigment feedstock

Bauxite Mine & Metals Facility Manjimup BMMF - Project COMMUNICATION RELEASE DRAFT. Minerals & Energy 1

Iluka Resources Limited

Mozambique Real Opportunity. Benchmark World Tour Sydney 21 st September

Tronox Limited: A Brighter Future From the Ground Up. Tennessee Tombigbee Waterway Conference

Dredging and Land Spirals For Alluvial HM Deposits

ASX ANNOUNCEMENT. Fungoni Heavy Mineral Sands Project DFS HIGHLIGHTS. 6 October 2017

Cristal Australia Pty Ltd

PRE-FEASIBILITY STUDY UPDATE CONFIRMS THUNDERBIRD AS THE WORLD S BEST UNDEVELOPED MINERAL SANDS PROJECT

REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 PRESENTATION 2004

Kenmare Resources Plc Moma Titanium Minerals Mine. January 2013 Update

For personal use only

XXV International Mineral Processing Congress (IMPC 2010) Eco-Efficient Gravity Separation Solutions in India

For personal use only

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

MINING TOGETHER BUILDING TOGETHER THE GCO FAMILY PROJECT PARTNERS

DECEMBER 2013 QUARTERLY REPORT TO SHAREHOLDERS

ERAMET. Investors and Analysts Presentation - December 2015

Magnetite potential of the Upper Zone of the Bushveld Complex in the Northern Limb. Limpopo Minerals Conference 12 November 2015.

For personal use only

Roger Bell, CFA. Hannam & Partners (Advisory) LLP 2 Park Street Mayfair London W1K 2HX

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT

Australia s leading magnetite producer. Southdown Magnetite Project

Bauxite Residue Reclamation Projects Investor Presentation

H Results Presentation 20 th August 2018

Gum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011

FUTURE PRODUCER OF IRON, VANADIUM AND TITANIUM. COMEX - Environmental and Social Impact Review Committee Ouje-Bougoumou - December 4 th, 2018

Andromeda Metals A New Direction in Industrial Minerals

HIGHLIGHTS. Mining movements lift in fourth quarter with successful remediation, and development of North Pit west wall.

Construction and Сommissioning of ERAMET SiMn + EMM Plant in Gabon

Building South Australia s Largest Iron Ore Project

25 July half-year results

Grange Resources Australia s leading magnetite producer

WINDIMURRA SITE VISIT PRESENTATION

Australia s leading magnetite producer

For personal use only

Rare Earths WE TOUCH THEM EVERYDAY. Roskill International Rare Earths Conference Presentation. 16 November 2011

Pilot-Scale Demonstration of Ilmenite Processing Technology Project Update

AN OVERVIEW OF SOUTH AFRICA S TITANIUM MINERAL CONCENTRATE INDUSTRY

QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2017

Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

An overview of the Namakwa Sands Ilmenite Smelting Operations

Industeel Industeel, the right steel Creusabro at the right place Unique, Best, Proven

For personal use only

For personal use only

Converting Steel Industry Waste into Profits. Presentation by Mike Turbott Managing Director

Market Update Southdown Magnetite Project

Pit to Port Infrastructure in SA

Australia s most experienced magnetite producer. UBS Iron Ore and Coal Conference Sydney, Australia November 2013

Australia s leading magnetite producer Southdown Magnetite Project. Russell Clark Managing Director & CEO February 2012

Austpac Resources NL Page 2 of 7 EAW

By-products recovery via integrated copper operations at Rio Tinto Kennecott. EU Commission - Brussels 12 th Nov 2015

PRODUCER SERVICE PROVIDER INDUSTRY SUPPLIER PROJECT INCUBATOR REDUCTANT SPECIALIST COMMODITY SUPPLY SPECIALIST SOUTHERN AFRICAN AGRI VALUE CHAIN

A Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo

Annual General Meeting Presentation. Shaun Verner, Managing Director and CEO

70 019oz 30 % 0.19Moz LTIFR 0.0. $19.1 million 32% $988/oz 11 % $1.14 million. MALARIA IncIDence RATE. 48 Randgold Resources ANNUAL REPORT 2017

For personal use only

ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016

INVESTOR SITE VISIT WONDERKOP SMELTER

OPTIMISATION OF RADIATION PROTECTION IN NORM INDUSTRIES 3 NOVEMBER 2015 AJ VAN DER WESTHUIZEN

STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT

World Titanium Resources.

INDONESIAN MINING POLICY UPDATE

Investor Presentation

For personal use only

QUARTERLY REPORT March 2011

Health and Safety. Update: No LTI at Prestea Open Pits. 5.65M man hours worked with no LTI

Case No COMP/M ERAMET / TINFOS. REGULATION (EC) No 139/2004 MERGER PROCEDURE. Article 6(1)(b) NON-OPPOSITION Date: 03/07/2008

For personal use only. Company Overview. 30 May 2011

Indian Chrome Ore and Ferro Chrome Industry

Metallurgical Innovations and Critical Parts for the Defence & Aerospace Industries

CHAPTER 26 ORES, SLAG AND ASH

A Deeper Look 04/ / 187. Lonmin Plc Annual Report and Accounts 2016

Ore mineral: a mineral from which one or more metals can be extracted.

Fast-tracking Montepuez & Balama Projects. BATTERY MINERALS LIMITED AGM Presentation 30 th May 2018

Transcription:

A Successful Upstream Integration in the Heavy Mineral Sands Industry JM FOURCADE CEO, TIZIR LIMITED 1

Agenda 1. Creating a Joint Venture Between MDL, Australia and Eramet, France 2. Developing a Huge TiO2 and Zr Mining Project in Senegal 3. Starting up a New Global Actor in the Heavy Mineral Sands Industry 2

Creating a Joint Venture Between MDL and Eramet History ERAMET SA Mining and Metallurgy Group 15000 People, 22 Countries Nickel, Manganese, Super Alloys 2008 Tinfos Acquisition (incl. TTI) 2009 2010 Strategic Analysis TTI Upstream Integration Project MINERAL DEPOSITS LTD Extensive Experience in H M S Successful Gold Project in Senegal Concession of Grand Cote in 2007 DFS of the GCO Project 2010 Downstream Integration & Partnership CREATION OF TIZIR LIMITED OCTOBER 2011 JV 50/50 3

Creating a Joint Venture Between MDL and Eramet 4

Creating a Joint Venture Between MDL and Eramet TiZir Titanium and Iron (TTI) Tyssedal Ilmenite Upgrading Plant 5

Creating a Joint Venture Between MDL and Eramet Tyssedal What does it do? Smelts ilmenite to produce a titanium-rich slag and pig iron co-product Input Pre-reduction Smelting Outputs Customers Ilmenite Rotary Kiln Electric Furnace Titanium Slag High Purity Pig Iron Pigment Producers (Sulphate process) Foundries ~345ktpa mostly sourced ~200ktpa containing ~80% TiO 2 ~110ktpa 6

Senegal Ownership: TiZir 90%, Senegal Govt. 10% Concession: 25 years extendable 7

Grande Côte What makes it a quality project? Simple Ore Body Assemblage Water Scale Quality Project No overburden Minor vegetation Free flowing sands Minimal slimes Uniform grain size 10.7% zircon 74.5% ilmenite 2.5% rutile 3.2% leucoxene 90.9% VHM Shallow water table + Deep aquifer Allows dredge mining 100km x 4 km ore body 7,000 t/hr dredge 36MW power station Own railway and port facilities 85ktpa zircon + 575ktpa ilmenite Long mine life 8

55 Mt/y Mining Process Flow Sheet 55 Mt/ y Dredge 7000 t/h 7000 t/h 1.7 % HM 1 Mt / y Wet Concentration Plant (WCP) Spirals Tailings 1.7% HM Processing Magnetic Stockpiles 100 t/ h 1 M t/y Truck Stockpile of Heavy Mineral Concentrate (HMC) Wet High-Intensity Magnetic Separation (WHIMS) Plant Non- Magnetic Tailings Wet Tables Mineral Separation Plant (HMC to MSP) 140 t/h Non-Magnetic Zircon/Rutile/Leucoxene/Kyanite/Quartz Tailings Tailings Ilmenite Dry Mill MSP Dry Mill 30 t / h Tailings Ilmenite Zircon Rutile Leucoxene Products NB All Tailings return to Dredge Pond 9

10

TiZir Products Zircon Avgannual production 85 Kt Production description / target markets Premium quality low in key impurities Suitable for full spectrum of zircon consumers Container shipments provides logistics benefits for customers Ilmenite 400 Kt 54% TiO 2 Feedstock for Tyssedal plant or market 175 Kt 59% TiO 2 Feedstock for chloride pigment production Rutile 6 Kt Premium grade and fine grain size ideal for welding sector Leucoxene 10 Kt Suitable for welding sector Titanium slag 200 Kt Premium quality slag suitable for Sulphate process Pig Iron 110 Kt Premium quality for high quality iron castings 11

Safety is our Culture During the Construction Phase over 11 million hours reached with only 3 lost time injuries (FR = 0.27) 400,000 hours of safety training delivered Peak construction workforce of 2,400, inclusive of 240 expats on site Expected long term workforce of 660 total incl. 65 expats initially Emergency Response Team & Clinic operational from start of construction Fire, injury & critical emergency drills carried out weekly Transition to Operations Zero Harm Policy Adaption of the philosophy 12

Community & Social Responsibility Creating employment and investing in education, health & infrastructure Substantial positive impact on the local economy Local kindergarten built and supported Successful relationship with local village elders Land compensation rates inline with World Bank standards Assistance with infrastructure ongoing water bores, water towers, roads, etc Refurbishment of local schools program underway 13

Operating to world-class environmental standards Sound Environmental Management Potential risk identification Develop & Implement an environment management system based on ISO 14001. Follow IFS standards and Equator Principles Rehabilitation plan proven, tested & approved (Re-vegetation to use native plant species seed collection started) Monitoring program in place Partnerships with local service providers (farmers, waste management) 14

15

Starting up a New Global Actor in the Heavy Mineral Sands Industry From a SP TiO2 Feedstocks HP Pig Iron Player, to a CP + SP TiO2 Feedstocks HP Pig Iron High TiO2 products Zrfor ceramics, refractory + other applications Player Within very versatile and cyclical markets, our size (circa 8% of the world MS) and our process allow us the flexibility and the ability to adapt to the changing conditions. 16

Starting up a New Global Actor in the Heavy Mineral Sands Industry TTI optionality creates market flexibility Ilmenite 18% Pigment production feedstock source (Outside China) Ilmenite 61% Slag 39% Slag 46% Syn Rutile +UGS 18% Rutile 18% 17