Braced deep excavations in soft ground

Similar documents
GEO-SLOPE International Ltd, Calgary, Alberta, Canada Tie-back Wall

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Tie-back Wall

SETTLEMENTS DUE TO TUNNEL CONSTRUCTION

Back Analyses and Performance of Semi Top-Down Basement Excavation of 11m Deep in Sandy Alluvial Deposits overlying Kenny Hill Formation in Malaysia

Evaluation of negative skin friction on sheet pile walls at the Rio Grande dry dock, Brazil

Analysis of Buried Arch Structures; Performance Versus Prediction

Sequential Tailings Placement

CHAPTER 3 ANALYSIS METHOD

EFFECT OF DEEP EXCAVATION SUPPORTED BY CONCRETE SOLIDER PILE WITH STEEL SHEET PILE LAGGING WALL ON ADJACENT EXISTING BUILDINGS

Footing Bearing Capacity on Elastic-Plastic Soil

COURSE ON COMPUTATIONAL GEOTECHNICS A Geotechnical Design Tool. Faculty of Civil Engineering UiTM, Malaysia

Estimation of Lateral Earth Pressure on Cantilever Sheet Pile using Flat Dilatometer Test (DMT) Data: Numerical Study

DISPLACEMENT OF DIAPHRAGM WALL FOR VERY DEEP BASEMENT EXCAVATION IN SOFT BANGKOK CLAY

CADS A3D MAX. How to model shear walls

UNDERPINNING A CRANE FOUNDATION

STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN

Enabling Work Package for Emirates Pearl Tower and Bab Al Qasr Hotel

Footing Bearing Capacity on Elastic-Plastic Soil

NON-LINEAR ANALYSIS OF BURIED ARCH STRUCTURES

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore.

Comparison of geotechnic softwares - Geo FEM, Plaxis, Z-Soil

MODELLING OF SHEAR WALLS FOR NON-LINEAR AND PUSH OVER ANALYSIS OF TALL BUILDINGS

Design of deep excavations with FEM - Influence of constitutive model and comparison of EC7 design approaches

Behavior of pile due to combined loading with lateral soil movement

CHAPTER 5 2D FINITE ELEMENT MODELLING OF BURIED PIPE TESTS

Northport Berth 3 design and construction monitoring

RS 3 A New 3D Program for Geotechnical Analysis

Question Paper Code : 11410

Analytical Study of Foundation Soil Pipe Interaction

SEISMIC SOIL-PILE GROUP INTERACTION ANALYSIS OF A BATTERED PILE GROUP

Finite Element Analysis of Flexible Anchored Sheet Pile Walls: Effect of Mode of Construction and Dewatering Naveen Kumar 1, Arindam Dey 2*

Coupled Stress-Seepage Numerical Design of Pressure Tunnels

Chapter 7. Finite Elements Model and Results

Level 6 Graduate Diploma in Engineering Structural analysis

To have a clear idea about what really happened and to prevent the

Rapid Drawdown with Effective Stress

Use of Concrete Cross Walls to Reduce Movements Induced by Deep Excavation

Case Histories in Geotechnical Engineering

1.364 ADVANCED GEOTECHNICAL ENGINEERING HOMEWORK No. 5

Modelling issues for numerical analysis of deep excavations

Numerical Study on Response of Laterally Loaded Piles in Soils

Repute benchmarks. 4 x 4 pile group in firm to stiff clay. Results from Repute. Comparison with benchmark. Comments. Reference.

Compressibility of Soil. Chapter 11

Better ZSOIL, Better Geotechnical Analysis

OPTUM COMPUTATIONAL ENGINEERING FEATURES

Top down excavation between diaphragm (slurry) walls with slabs (SI units)

Earthquake Design of Flexible Soil Retaining Structures

2012 Soil Mechanics I and Exercises Final Examination

Pile foundations Introduction

Lateral Loads on Micropiles. Thomas Richards Nicholson Construction Company

The Effect of mixed foundations on the response of some buildings to excavation

A Case Study Comparing Two Approaches for Applying Area Loads: Tributary Area Loads vs Shell Pressure Loads

PILE DESIGN METHOD FOR IMPROVED GROUND USING THE VACUUM CONSOLIDATION METHOD

Effects of Wall Embedded Length Ratio and Wall Thickness Ratio on Undrained Stability of Cantilever Piled Walls

MAE Advanced Computer Aided Design. 03. Beams and Trusses. Solution of Beams and Trusses Problems

MASONRY INSIGHTS. Finite Element Modeling, Analysis, and Design for Masonry. Introduction

SEISMIC DESIGN OF THE STATIONS AND THE INTER-STATION TUNNELS OF A METRO-LINE IN SOFT GROUND: A CASE STUDY

CODE PROVISIONS RELATED TO SOILS AND FOUNDATIONS

Modeling of Shear Walls for Nonlinear and Pushover Analysis of Tall Buildings

EFFECT OF THE GRID-SHAPED STABILIZED GROUND IMPROVEMENT TO LIQUEFIABLE GROUND

AVOIDING EXCESSIVE DISPLACEMENTS: A NEW DESIGN APPROACH FOR RETAINING WALLS

Soldier pile and tremied concrete walls with strut supports (SI units)

Verification of a multi-anchored wall

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome

Engr. Thaung Htut Aung M. Eng. Asian Institute of Technology Deputy Project Director, AIT Consulting

NPTEL Course. GROUND IMPROVEMENT Factors affecting the behaviour and performance of reinforced soil

Proceedings of the 10th Australia New Zealand Conference on Geomechanics

SIMPLE INVESTIGATIONS OF TENSILE MEMBRANE ACTION IN COMPOSITE SLABS IN FIRE

Relationship between twin tunnels distance and surface subsidence in soft ground of Tabriz Metro - Iran

CHAPTER 7 ANALYTICAL PROGRAMME USING ABAQUS

Example Application 10. Analysis of a Concrete Diaphragm Wall

Numerical Modeling of Slab-On-Grade Foundations

PILE SETTLEMENT ZONES ABOVE AND AROUND TUNNELLING OPERATIONS

Study on Shear Lag Effect of Composite Box Girder Bridge with Corrugated Steel Webs

twenty four foundations and retaining walls Foundation Structural vs. Foundation Design Structural vs. Foundation Design

Influence of arch bridge skewness

Case study of deep excavation in existing underground structure of three-story basement and diaphragm wall

Modelling of Piled Raft Foundation on Soft Clay

SHEAR BEHAVIOR OF RC DEEP BEAMS WITH SOLID CIRCULAR CROSS SECTION UNDER SIMPLY SUPPORTED CONDITION AND ANTI-SYMMETRIC MOMENT

COMPARATIVE REPORT CYPECAD VS. ETABS

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

SEISMIC SOIL-STRUCTURE INTERACTION IN FULLY INTEGRAL ABUTMENT BRIDGES WITH HP STEEL PILES

MG University, Kerala

CHAPTER 6 FINITE ELEMENT ANALYSIS

Nonlinear Models of Reinforced and Post-tensioned Concrete Beams

Code No: R Set No. 1

COMPARISON OF EC7 DESIGN APPROACHES FOR NUMERICAL ANALYSIS OF DEEP EXCAVATIONS

twenty six concrete construction: foundation design ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013

Analytical and Numerical Solutions of Tunnel Lining Under Seismic Loading and Investigation of Its Affecting Parameters

User Elements Developed for the Nonlinear Dynamic Analysis of Reinforced Concrete Structures

3 Dimensional Structural Modelling of Segmental Tunnel Lining Using Finite Element Software

This document downloaded from vulcanhammer.net vulcanhammer.info Chet Aero Marine

STUDY ON TUNNELING FOR UNDERGROUND METRO RAIL SYSTEM IN DHAKA CITY

Cyclic Loading Tests Of Steel Dampers Utilizing Flexure-Analogy of Deformation

Analysis of Shear Wall Transfer Beam Structure LEI KA HOU

Three-dimensional computer simulation of soil nailing support in deep foundation pit

Transcription:

1 Introduction Braced deep excavations in soft ground Halim and Wong presented a paper in a publication called Underground Singapore 2005. The title of the paper is Evaluation of Modified Cam Clay Parameters for Deep Excavation Analysis. In this paper they present six case histories where deflections of the shoring walls were measured during construction. Each of the cases was re-analyzed with the software SAGE CRISP. Their prime interest was to determine if the Cam Clay constitutive model could be used to numerically model the behavior of the excavation shoring walls. The SAGE-CRISP computed deflections and field measurements presented in the paper are a useful source of information which can be used to verifying the performance and capability of GeoStudio for cases like this. Each one of the six case histories is briefly described here together with comparative graphs of the wall deflections. Included as well are comments pertinent to the GeoStudio modeling procedures and techniques. The included GeoStudio data file Braced deep excavation in soft ground.gsz presents only the analysis of the Lavender MRT Station. Data files for the other five analyses are available upon request if necessary. 2 General modeling considerations This section presents some general thoughts on the modeling techniques and procedures used in analyzing the six cases histories. The details are different for each case. They can be examined by opening each of the related GeoStudio data files and stepping though each of the stages. 2.1 Excavation forces In a finite element analysis, the excavation process is simulated with the application of boundary stresses on the excavation. Before excavation there are stresses on a future excavation face. Once the soil has been removed, the stress on the excavation face is zero. The changes in the stresses on the excavation face are applied as a boundary condition. The change in stress on the excavation face is a total stress change (unless the excavation is done below water). Physically this means that removing the material removes both the soil and the water. The implication is that we need to know the total stress distribution in the ground before the excavation construction begins. A typical distribution of the total x- and y-stress distribution with depth at the wall location is presented in Figure 1. Over the wall length (14 m) the horizontal stress accumulates at an average rate of 12.5 kpa per metre. This value can be used as a Hydraulic Pressure boundary condition. In this illustrative case the specified elevation would be m and the unit weight per depth would be -12.5. The negative sign means the computed equivalent nodal forces pull on the wall as illustrated in Figure 2. Note how the three horizontal arrows point away from the wall meaning the forces are pulling on the wall. SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 1 of 14

Y (m) 98 96 Total y : 1 days 94 92 Total x : 1 days 88 86 0 50 150 200 250 kpa Figure 1 Total x-stress and y-stress profiles at a wall location Figure 2 Excavation boundary conditions on the excavation face The total vertical stress in fig increases at a rate of 16.8 kpa. This means that removing 1 m of soil is equivalent to an upward applied stress of 16.8 kpa; removing 2 m of soil is equivalent to an upward applied stress of 33.6 kpa and so forth. Separate boundary conditions are consequently required for each excavation layer of a specific thickness. The resulting uplift pressure on the base of the excavation is illustrated in Figure 2. The area under the x-stress profile in Figure 1 represents the total force that will be acting on the wall once the excavation is complete. Or stated another way, the structural shoring system will have to pick up the equivalent force. In this illustrative example, the total lateral force would be approximately, F h H 2 2 With gamma equal to 12.5 and H equal to 14 m, the total lateral force is 1,225 kn. The struts and the wall will have to pick up this force by the time all the soil is excavated. Due the soil structure interaction, the 1,225 kn is not necessarily the exact amount of force the shoring system will have to pick up but it is a reasonable approximation useful for spot checking the results of the GeoStudio analysis. SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 2 of 14

As is clearly evident from this discussion, the excavation forces are directly related to the stress state that exists in the ground before the excavation process begins. This is why it is absolutely mandatory to establish the correct starting insitu stress conditions. It is also vitally important to understand that the groundwater conditions affect the insitu horizontal total stresses. The presence of a watertable significantly increases the total horizontal stress, and this is how the ground water comes in play in the analysis. Water pressures are not dealt with separately - they are included indirectly in the total insitu stresses. SIGMA/W will automatically compute the excavation boundary forces if a boundary condition is not specified on the excavation face. The insitu stress profiles such as illustrated in Figure 1 are unique to each site specific case. This type of graph was created for each of the case histories discussed in this document. The boundary condition values used to represent the excavation forces can be examined in each of the related GeoStudio data files. 2.2 Structural wall The flexural stiffness of the wall is included in the analysis as a beam element which requires the specification of the moment of inertia (I) and the cross-sectional area per metre of wall, and the elastic Young s modulus. For a diaphragm wall the moment of inertia I about the bending axis is, 3 3 l * t 1* t I where t is the wall thickness. 12 12 For sheet piling I and the area are generally available from the steel manufacture. The Young s modulii are generally representative of values for concrete and steel or some combination of these. The properties of the sheet piling used in two of the cases are approximations. The Halim and Wong paper does not provide details on these values. 2.3 Struts and braces Struts or braces are best modeled as bar elements which have only axial forces and no resistance to bending. The connection between the wall and the strut is consequently analogous to a pin connection. Pre-loads are specified as part of the strut definition. 2.4 Constitutive models The soft clay is modeled using the Modified Cam-Clay (MCC) constitutive relationship. The sandier and more competent layers are modeled as linear-elastic or elastic-plastic materials. The watertable for all six cases is just below the ground surface. Consequently to correctly model the pore-pressures changes resulting from the construction of the excavations and in turn the correct effective stress paths, it is necessary to do a fully couple stress-pore-pressure type of analysis. This means that hydraulic boundary conditions as well as stress-strain boundary conditions must be applied at each stage. SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 3 of 14

The analyses are based on the assumption that there will be no drainage of the ground water conditions behind the wall during the excavation phase of the project and that the watertable will be at the base of the excavation at as the construction proceeds. This is accommodated in the analyses with the specification of zero pressure at the original watertable behind the wall and zero water pressure long the base of the excavations. A fully coupled analysis requires the definition of time. Assuming that there will be no drainage can be accommodated by making the time step small for each construction stage. In this case an arbitrary value of 1-day was selected. This is a time-step long enough to allow the calculations to proceed but short enough so there is no long term pore-pressure dissipation and consolidation. The time steps are evident in the related analysis trees. 2.5 Poisson s Ratio and K o Halim and Wong used a Poisson s ratio 0.4 for un-drained behavior. The thinking behind this is that there will be no volume change when the soil behaves in an undrained manner, and the no-volume change condition can be simulated with v = 0.5. A value of 0.5 cannot be used for numerical reasons and so a value close to 0.5 is used. In a fully coupled effective stress/pore-pressure type of analysis in GeoStudio there is no need to try and simulate a no-volume change condition through an artificial Poisson s ratio. A value of Poisson s Ratio equal to 0.334 is consequently used for all materials in the analyses presented here. Setting v to 0.334 even at the insitu stage represents a K o condition equal to 0.5. How close this is to the actual field conditions is somewhat uncertain. On average it is likely not an unreasonable value for soft normal or slightly over-consolidated soil. The initial K o conditions could likely be refined somewhat but such refinement would likely not affect the results significantly. 2.6 Wall-soil interface To prevent water from leaking through the wall it is necessary to use interface elements along the wall with a special interface material. The easiest way to do this is to make the interface material a total stress material. Total stress materials do not consider pore-pressures in the calculations; that is, the seepage continuity equations are not formed at the nodes which have only total stress materials in common. This has the effect of not allowing seepage to cross the interface. Also, the interface material in these analyses is modeled as an elastic-plastic soil with an arbitrarilyspecified undrained shear strength of kpa. Judging by the favorable match obtained between the GeoStudio computed and measured wall deflections, slippage between the soil and the wall is not an important issue. A lower undrained strength could be used for the interface to investigate this further but this has not been done for the presentation here. 2.7 Surcharge load Note that in all the analyses a surcharge of 10 kpa has been applied to the ground surface 10-m beyond the wall. The reason for the surcharge is not clear. Does it represent light structures that were present SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 4 of 14

long before the excavation was constructed or does it represent at surcharge that comes about during the construction. In the analyses here it has been assumed the latter is the case. Regardless of the actual field situation, the surcharge only has a minor effect on the magnitude of the wall deflection. It has no significant effect on the shape of the deflection profile which is the key to structural stresses induced by the excavation process. 2.8 Dimensions In the six cases analyzed here all the geometric dimensions are rounded off to the nearest metre or nearest half metre. This makes the numerical modeling easier and the mental interpretation of the results easier. Working with dimensions to the nearest 10 th or th of a metre does not increase the accuracy of the analysis in cases like this, especially in light of the accuracy with which the soil properties can be defined. Refined geometric dimensions can unnecessarily complicate the numerical modeling. 3 Wall deflections The wall deflections profiles as computed with GeoStudio are compared with the ones presented in the paper by Halim and Wong. The measured and SAGE CRISP lateral deflections presented graphically in the paper have been re-plotted for convenient comparison. A configuration diagram and the associated wall deflection graphs are presented below for each of the six case histories. In summary, the GeoStudio computed lateral wall deflections are in remarkably good agreement with the field measured values, and the GeoStudio deflection profiles match the measured profiles as well or better than SAGE CRISP computed profiles. SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 5 of 14

Elevation - m Elevation - m 3.1 Taipei Basin in Taiwan Taipei Basin in Taiwan 35 m Back fill - sandy clay 14 m Top clay 65 Intermediate clay 60 55 Sand 50 45-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance - m Taipei Basin, Taiwan GeoStudio CRISP Measured 0.0 50.0.0 150.0 200.0 Deflection - mm SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 6 of 14

Elevation - m Elevation - m 3.2 Farrer Park - Kandang Kerbau MRT Line 105 10 m Cut-and-cover tunnel - Farrer Park to Kandang Kerbau, Singapore Fill (sand) Fluvial sand 18 m Upper marine clay Fluvial clay Lower marine clay Dense alluvium Very dense alluvium 65 60-5 0 5 10 15 20 25 30 35 40 45 50 55 60 Distance - m 105 Farrer Park - Kandang Kerbau GeoStudio CRISP Measured - -60-40 -20 0 20 Lateral deflection - mm SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 7 of 14

Elevation - m Elevation - m 3.3 Ministry of Environment Building Fill (silty clay) 35 m Upper marine clay 7 m Soft silty clay Lower marine clay Soft sandy clay Loose sand Dense silt 65 60 55-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 105 Distance - m MOE Building GeoStudio CRISP Measured -50 0 50 150 200 250 300 350 Lateral deflection - mm SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 8 of 14

Elevation - m Elevation - m 3.4 Rochor Complex Rochor Complex 45 m Sand Upper marine clay 6.5 m Firm clay Lower marine clay Very stiff silty clay 65 60 55-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 105 Distance - m Rochor Complex GeoStudio CRISP Measured 0 50 150 200 Deflection - mm SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 9 of 14

Elevation - m Elevation - m 3.5 Syed Alwi Project 14 m Syed Alwi Project 8 m Clay Silt Soft marine clay Sand Soft clay Dense silty sand Very dense silty sand 65 60-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance - m Syed Alwi Project GeoStudio CRISP Measured 98 96 94 92 88 86 84 82 - -60-50 -40-30 -20-10 0 Wall deflection - mm SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 10 of 14

Elevation - m Elevation - m 3.6 Lavender MRT Station Lavender MRT Station 12 m Fill Upper marine clay 15.5 m Lower marine clay Medium dense silty sand Dense silty sand Very dense clayey silt 65 60 55-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Distance - m Lavender MRT Station GeoStudio CRISP Measured -20-10 0 10 20 30 40 Lateral deflection - mm SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 11 of 14

Y-Displacement (m) Y-Displacement (m) 4 Surface settlements back of the wall The settlement behind a shored excavation wall is always a key issue. A GeoStudio analysis makes it possible to obtain a picture of the possible magnitude and trend. Figure 3and Figure 4 show the surface settlements for two cases. These are typical of all the six cases. 0.02 0 Surface settlement -0.02-0.04-0.06-0.08-0.1-0.12-0.14-0.16-0.18 0 10 20 30 40 50 60 X (m) Figure 3 Surface settlement profiles at the MOE Building Surface settlement 0.02 0-0.02-0.04-0.06-0.08-0.1-0.12-0.14-0.16 0 10 20 30 40 50 X (m) Figure 4 Surface settlement profiles at the Lavender MRT Station There are several features in these profiles that are of significance. The surface surcharge has an influence on the settlements and consequently it is necessary to have an understanding as to why and when the surcharge is applied. Probably the most significant observation is that the maximum settlement takes place some distance behind the wall and not immediately behind the wall. This is logical and consistent with the overall behavior of the walls. Once the top strut is in place the walls tend to bow out near the bottom of the excavation. This in essence causes the wall and soil wedge behind the wall to rotate about the top strut. SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 12 of 14

The maximum settlements are consequently towards the far side of the rotating soil wedge behind the wall. The tendency for the retained soil wedge to rotate further suggests that slippage between the soil and the wall is not a serious issue in the numerical analysis. These comments and observation of course infer that there is no loss of ground from behind the wall as would be the case for a diaphragm wall or a sheet-piling wall. In the case of a pile-and-lagging shoring system this may not be always true depending on the ground conditions there may be some loss of ground from behind the wall which could significantly influence the settlement behind the wall. The numerical analysis cannot consider such loss of ground. The point here is that the computed settlements behind the wall must be judged in light of the actual events during construction. 5 Strut loads Section 2.1 above discusses how the lateral excavation forces are applied and how they are defined. The area under the x-stress profile is a representation of the total lateral force that will acting on the wall over excavated height of the wall. As noted earlier, the struts or will have to pick up this load. The following table compares the total lateral force as computed from the initial insitu horizontal total stress with the summation of the strut loads at the end of the excavation. As is evident from these values, the summation of the loads in the struts do reflect the pressure on the wall. Force from pressure diagram (kn) Summation of strut loads (kn) Taipei Basin 1125 12 Farrer Park 2 2165 MOE building 300 493 Rochor Complex 260 573 Syed Alwi Project 440 634 Lavender MRT Station 1500 12 The flexural rigidity of diaphragm wall or sheet pile wall itself will pick up some of the applied loads and so the strut loads will not necessarily be exactly equal to pressures based on the initial insitu stresses. There should however be a rough correlation. If there is no correlation then it would be advisable to carefully check the input parameters and numerical model design. SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 13 of 14

Y (m) 6 Bending moments One of the significant benefits of numerically modeling structures such the braced excavations is that it is possible to investigate the bending moments and structural forces which can be used to check that they have sufficient capacity to withstand the resulting stresses. A typical result is presented in Figure 5. Such diagrams can be plotted for all the cases. Moment -600-400 -200 0 200 400 600 0 0 1200 Moment (kn-m) Figure 5 Bending moments in the Lavender diaphragm wall 7 Concluding remarks The analysis here of six Case Histories demonstrates that GeoStudio has all the features and capabilities for modeling the behavior of deep shored excavations in soft ground. Also, the favorable agreement in the computed results between GeoStudio and a completely independently developed software product SAGE CRISP lends credence to the fact that GeoStudio has been formulated and implemented correctly. 8 Reference Halim, D. and Wong K.S. (2005). Evaluation of Modified Cam Clay Parameters for Deep Excavations Analysis, Underground Singapore 2005, pp. 188 199. SIGMA Example File: Braced deep excavations in soft ground (pdf) Page 14 of 14