Overhead Power Lines. Corporate Safety Policy Overhead Power Lines. (Cont.)

Similar documents
Scaffolding and Raised Platforms

Safety & Environmental Orientation Program for Northeast Utilities Contractors. Northeast Utilities Safety 12/10

Safety & Environmental Orientation Program for Northeast Utilities Transmission Contractors. Northeast Utilities Safety 12/10

VALE # MSPEC LAST REVISION. Name: Brian Koltun Position: Process Superintendent Department: Power Department, Ontario Operations

Safety & Environmental Orientation Program for Contractors

SAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant

CAL/OSHA ELECTRICAL HIGH VOLTAGE

ANCHORAGE MUNICIPAL LIGHT & POWER ENGINEERING DIVISION

Haulage Conveyors. Standard Operating Procedures Haulage Conveyors. (Cont.)

Document Revision Change Table Revision Number

SAUDI ARAMCO Policy: HSE 008 DRILLING & WORKOVER OPERATIONS Issued: 4/27/2006 HSE PROCEDURE Revised : 4/27/2006

LAST REVIEWED 05/3/13 CHEVRON

Cranes and Derricks Standard Summary. April, 2010

Effective Date: 10-January Table of Contents

Barricades. Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File)

Description of Best Practice

Field Instruction. Any part of a person (body). Any conducting object, tool or equipment being held or carried.

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Iron Ore Company of Canada Health, Safety & Environment

Procedure. Procedure

Delaware State University

CUSP Base Exams and T&D Endorsement Exam Sample Questions and Format

Site Specific Safety Plans (SSSP)

Tree Trimming Operations

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY NHMFL LOCKOUT/TAGOUT SAFETY PROCEDURE SP-1

The following is Copyright 2009 The Queen s Printer, Saskatchewan

ON TRACK SAFETY MANUAL

The Corporation of The City of London

Contractor EHS Program Attachments

Subcontractor Project Management Plan

SECTION 5 CLEARANCES. Unless otherwise noted, all clearances are from surface-to-surface and all distances are measured center-to-center.

OSHA Subpart V: Power Transmission and Distribution. Cleveland State University Work Zone Safety and Efficiency Transportation Center

HEALTH AND SAFETY POLICY

Machine Guarding and Maintenance

Work Performed On or Near Overhead Lines Work Performed On or Near Overhead Lines

Hazardous Materials and Chemicals

Duke Energy April 2011

Apprenticeship Curriculum Standard. Powerline Technician. Level 1. Trade Code: 434A

SECTION 2 SAFETY GOALS AND RESPONSIBILITIES P AGE 1

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

TOOLS, EQUIPMENT, AND PERSONAL PROTECTIVE EQUIPMENT ASSOCIATED WITH THIS PROCEDURE

Job Safety Health Quarterly Job Safety & Health Quarterly

MOUNT RAINIER CHAPTER FEDERAL SAFETY AND HEALTH COUNCIL

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY

Advanced Electrical Safety Training

Electricity At Work: Forestry. Irish Forestry Safety Guide (IFSG) 804

LOCKOUT TAGOUT SAFETY PROGRAM

Electric Service Handbook

P.U.D. No. 1 of Pend Oreille County. JOURNEYMAN LINEMAN Construction & Engineering

BP OIL -- TOLEDO REFINERY

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0

Property and Public Protection Plan

SICKLESTEEL C R A N E S I N C. Experience the Difference. Quality Service Since 1937

Work involving excavations

WHITMAN COLLEGE TRENCHING AND SHORING PLAN

James E. Thompson, Inc. dba JTS Construction

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

ESSENTIAL SAFETY RESOURCES

Roadway Worker Protection (RWP) 49 CFR Part 214 Subpart C and Railroad Communications

JOB POSTING Traverse City Light & Power

Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep):

COMPENDIUM OF TYPICAL HAZARDS ASSOCIATED WITH CLADDING WORKS AND THEIR CONTROL MEASURES IN THE CONSTRUCTION INDUSTRY CLADDING WORKS

SAFE WORKPLACE PROCEDURE No. 222 WORKING NEAR OVERHEAD & UNDERGROUND SERVICES

CONSTRUCTION HEALTH AND SAFETY, AND INJURY PREVENTION Prevent hazards when working with cranes, lifting appliances and rigging on construction sites

(Insert Company Name)

SEASONAL APPRENTICE LINEMAN Position Description Effective: March 2018

FACT SHEET Standard: Lockout - Tagout

Project Safety Orientation and Procedures

FrameSAFE Site-Specific Fall Protection Plan Template. Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL SAMPLE

-Sample- Hazardous Energy Control Program

RMM 307 Scaffolds/Suspended Scaffolds and Powered Elevated Platforms Safety Program Page 2 November 2016

COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

Storm Response & Onboarding. Safety First and Always

QUORUM MINING & RELINING SERVICES HEALTH AND SAFETY MANAGEMENT

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES

Individual Unit Function: Safety Procedure No.: SOP-0138 Page: 1 of 10

Field Instruction. All Horizon Power workers who work in and around excavations.

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015

"CAUGHT-IN/BETWEEN HAZARDS IN CONSTRUCTION ENVIRONMENTS"

Risk Control at United Fire Group

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF:

Operations: HSE. Ground Disturbance Safe Work Practice (SWP)

Tom Carpenter Crane Maintenance Technician

XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors)

Contractor EHS Program Attachments

ASSEMBLY / DISASSEMBLY POWER LINES POWER LINES. Identify Work Zone. Work Zone

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM

The Hong Kong Polytechnic University Facilities Management Office

Hazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

THE NEW CRANE STANDARD

Fall Protection Safety Program and Training Materials

LOCK OUT/ TAG OUT PROGRAM

ROADWAY WORKER PROTECTION

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

LOCKOUT / TAGOUT PROGRAM

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.

Cover Page / Revision Status

Transcription:

Corporate Safety Policy Overhead Power Lines Last Modified: JAN 2013 1 of 6 Overhead Power Lines I Purpose To provide procedures, for working on overhead power lines or in their vicinity on COMPANY sites, which will prevent serious injuries associated with high tension electrical power lines and ensure that only qualified specialists conduct work on high voltage overhead power lines. 2 SCOPE This procedure applies to all functional areas, operations, projects, Geology, Exploration, and offices, including employees, vendors, visitors and contractors within the scope of the Integrated Management System (IMS). 3 DEFINITIONS AND ACRONYMS Definitions Absolute Limit of Approach Distance is the minimum safe distance a vehicle, equipment, machine, or load can approach an energized overhead power line. This distance is voltage dependent as shown in Table 1 of this document. At Risk Activities Work Near Overhead Power Lines is any work such as excavations, earth moving, drilling, blasting, lifting or reaching with the use of cranes and boom trucks within 75 feet of an energized overhead power line. Overhead Element is any overhead metal element that may inadvertently get dangerously close to a high voltage line, such as crane booms, mobile scaffolding, dump truck hoppers, etc. Overhead Power Line is any above ground, live or dead conductor that is not fully voltage sheathed or enclosed. Poles, guy wires, underground anchors and any such structural member that contributes to the structural integrity of the power line shall be included as part of the power line. Overhead Power Line Work Supervisor is the supervisor responsible for the work and is present at the work site to monitor and control work within 75 feet of an overhead power line. Qualified Line Builders are contractors, approved by the Maintenance Electrical Department and Contracts Department that specialize in working with overhead power lines. Site refers to any COMPANY facility. Acronyms HMR HSLP Management Representative HSLP Health Safety and Loss Prevention (Cont.)

JAN 2013 2 of 6 4 ROLES AND RESPONSIBILITIES Document Owner HMR Responsible Roles and Position Holders Employees and Contracted Employees / Persons Performing the Work Near Energized Overhead Power Lines are all employees in any position whether COMPANY or contracted employees working on any COMPANY site. They must be trained to recognize the hazards associated with overhead power lines and to understand and be responsible for complying with the requirements as outlined in this procedure. Electrical General Foreman or Designee shall be a COMPANY employee working or traveling on any COMPANY site. The Electrical General Foreman or Designee authorizes all work meeting the At Risk Activities near overhead power lines definition within the 75 feet limit of overhead power lines. Spotter/Signalman is an employee assigned to observe and monitor equipment performing At Risk Activities Work Near Overhead Power Lines. The Spotter/Signalman shall be competent to communicate effectively through hand signals or verbally through radio or other communication forms. Overhead Power Line Work Supervisor/Designee can be a COMPANY employee or a contractor/vendor working or traveling on any COMPANY site who shall remain on the work site and oversee all workers and equipment activities to ensure safe execution of work and compliance to this procedure. While work is performed, the Overhead Power Line Work Supervisor shall take immediate corrective measures, including stopping work, to eliminate hazardous conditions. They are responsible for training of and enforcement of all requirements, rules, and established guidelines as outlined in this procedure. Contractor Supervision can be a COMPANY employee or a contractor/vendor working or traveling on any COMPANY site. They are responsible for training of and enforcement of all requirements, rules, and established guidelines as outlined in this procedure. HSLP is any COMPANY employee working under and including the Regional Director of HSLP. They are responsible for periodically auditing for compliance to this procedure. COMPANY Contractor Representative can be any COMPANY employee working or traveling on any COMPANY site. They shall ensure a proper work scope is provided to the contractor, ensure all electrical system drawings are updated and available for the contractor conducting the work, and ensure that the contractor complies with the applicable COMPANY procedures. 5 DIRECTION All employees, vendors, contractors, and visitors traveling/working on site shall comply with and ensure personnel accountable to them comply with the following requirements of this procedure.

JAN 2013 3 of 6 General Requirements Work on energized overhead power lines shall not be done by COMPANY personnel, with the exception of replacing fuses. Work beyond replacing of fuses will only be performed by contracted line builders with the appropriate qualifications specializing in this type of work. a Contractors performing any work at any COMPANY operation shall submit their safety plan to include standard operating procedures pertinent to the specific job being performed. b The safety plan shall comply with COMPANY procedures such as: Personal Protective Equipment and Rules Compliance Energy Isolation Overhead Power Lines Hot Work Confined Spaces Excavations and Trenches Safe Work Permit Cranes and Lifting Equipment Electrical Storms A Working Near Overhead Power Lines Permit shall be completed any time At Risk Activities are to be performed within 75 feet of an energized overhead power line. De-energizing and grounding of lines (where possible) shall be the primary means of preventing injury from contact between cranes or machinery and power lines. Evaluate alternative work methods that do not require use of cranes, boom trucks, or over head elements in the proximity of energized overhead power lines. Vehicles, equipment, booms, scaffolding, personnel etc. shall adhere to the appropriate Absolute Distance of Approach of any energized power line, except for specialized overhead power lines crews with appropriate equipment and personnel trained to handle this type of work safely. Absolute Limit Of Approach Distance Line Voltage Minimum Distance From Power Line Up to 50,000 volts 10 feet 50,000 to 115,000 volts 12 feet 115,000 to 230,000 volts 16 feet 230,000 to 500,000 volts 25 feet

JAN 2013 4 of 6 The Working Near Overhead Power Lines Permit must be completed during daylight hours. If work near overhead power lines will be performed during darkness, a safe work permit must be completed and written authorization must be obtained from the Maintenance Electrical Department. Work near overhead power lines shall be stopped anytime environmental conditions could potentially effect the safe completion of the work. Work shall be stopped if environmental conditions have some of the following characteristics: Wind speed higher than 20 miles/hr. Heavy rain, hail and snow. Electrical storms. Other abnormal phenomena affecting safety. Insulating barriers, proximity warning devices, insulating boom guards, swing limit stops, non-conductive tag lines, ground rods, and similar devices may be used for protection against electrical hazards, but shall not take the place of de-energized lines or minimum absolute limit of approach distances. When the work requires excavation, the Excavation and Trenches procedure shall be followed, which includes an excavation and trenches permit. Overhead power lines shall be installed and maintained such that the minimum distance between the cable and the tallest piece of rolling stock normally accessing the road meets the criteria in the table above. When specialized equipment taller than the normal rolling stock must work in or travel under the overhead power line, a Working Near Overhead Power Lines Permit shall be completed. Existing conditions related to the safety of the work to be performed shall be determined before working on or near overhead power lines as per this procedure. Only authorized personnel shall enter switch yards of transformer areas. Working Near Overhead Power Lines Permit As part of the permit, an Overhead Power Line Work Supervisor must be assigned to the work project and shall: a Generate the permit with a complete sketch of the work area and any overhead power lines in the area. b Post and barricade the work area prior to requesting authorization from the Electrical General Foreman. c Notify the Electrical General Foreman or his designee of the work / project and conduct an inspection of the work area. d Sign the Working Near Overhead Power Lines Permit and accept responsibility for the safe execution of the work as stated on the permit.

JAN 2013 5 of 6 The Electrical General Foreman or his designee shall: a Inspect the work site before work starts. b Review the permit and add any additional safety precautions required to the permit. c Sign the permit authorizing work to proceed within the 75 foot limit of overhead power lines after documenting all special requirements for the job. The Overhead Power Line Work Supervisor shall sign the permit and remain at the work site to supervise the work and ensure the permit procedures are followed throughout the duration of the job. The permit shall remain in the work area until the job is complete. When the work is completed, the Overhead Power Line Work Supervisor shall sign the permit signifying it has been closed and return the permit to the Electrical General Foremen. Protective safety systems, i.e., warning signs and barricades shall be removed upon completion of work. The completed and signed permit shall be kept on file with the Maintenance Electrical Department for a period of six (6) months. Equipment Spotter \ Signalman A competent person shall be assigned to observe equipment: a Where it is difficult for the equipment operator to visually observe how close his equipment or the load is to an energized overhead power line. b Whenever the equipment is within a booms length of the energized overhead power line. The spotter \ signalman shall: a Warn the operator when the machine is working near a power line. b Warn the operator when any part of the machine is nearing the Absolute Limit of Approach Distance. c Remain vigilante to this assignment not allowing them to become distracted. d Position themselves in full view of the operator when hand signals are used. Job Briefing Supervisors shall ensure that the employee in charge of a job conducts a job briefing or pretask meeting with the employees involved before they start each job. The briefing shall cover at least the following subjects: Hazards associated with the job Work procedures involved

JAN 2013 6 of 6 Special precautions Energy source controls Personal protective equipment requirements If the work or operations to be performed during the work day or shift are repetitive and similar, at least one job briefing shall be conducted before the start of the first job of each day or shift. Additional job briefings shall be held if significant changes, which might affect the safety of the employees, occur during the course of the work. Overhead Power Lines