QUALITY ASSURANCE IN THE PROCESS FROM ROCKS TO CATHODES.

Similar documents
Evolution of the estimation of the metallurgical balance

Sampling of Mineral Commodities Where Everything Begins

Copper Concentrate Sampling, control over final product.

INTRODUCTION TO SAMPLING FOR MINERAL PROCESSING. Part 2 in a series Sampling Basics

Technological Challenges in Mining

FW: CuMo Mine Objection thompsoncreekmolybdenumminearialview.pdf; Thompson_Creek_mine.jpg; Mo_processing_flow.gif

1 Introduction MEC2016

The Value of Good Sampling

integrated solutions in material handling

Soluciones Ambientales Para la Minería

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics

AGM - Lorena Gold Project

Hydrometallurgical Options to Add Value to Copper Projects and Operations

Draw management system

Locked Cycle Leaching Test and Yellowcake Precipitation

Contained Gold (koz) Tonnes. Contained Gold (koz)

CONTINUITY OF COPPER MOLYBDENUM MINERALISATION DEMONSTRATED BY DRILLING RESULTS BETWEEN THE NAYAM AND MISILI PROSPECTS, SIMUKU

VHG Labs. Standards and Supplies for Spectrochemical Analysis QUALITY. TRACEABILITY. DEPENDABILITY. WORLDWIDE

We are building NEW AITIK. New Aitik. 36 million tonnes

Minera San Cristobal S.A. utilizes Thermo Fisher SampleManager LIMS Software for laboratory integration and automation

For personal use only

Pebble Project Environmental Baseline Studies Technical Summary. APPENDIX A. Analytical Quality Assurance/Quality Control Review

(TSX: AUQ) (NYSE: AUQ)

Second drill rig to accelerate major drilling program at Productora

Establishment of an Accredited Reference Measurement Laboratory

Heading Data Quality for Reporting How Point Point Point Point

RIMINI ROAD IMPROVEMENT PROJECT RESTORATION OF ABANDONED MINE SITES PROJECT DRAFT REPORT

Positive Lerokis Copper Recovery Testwork

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

GLP/SC/01 Basic statistical tools for analytical chemistry (2 days)

OUTOTEC TOMRA SENSOR-BASED ORE SORTING SOLUTIONS BENEFITS

Online analyser for heavy minerals grade control

West African Resources commences deep diamond drilling targeting high-grade primary zone with +400m holes

The competent person in mine-site evaluation and responsibilities for study design, management and findings

Horseshoe Metals Limited (HOR)

NEWS RELEASE. Foran Finds Elevated Precious Metal Values at Depth

AMUR MINERALS CORPORATION (AIM: AMC) 2018 Alex Stewart Laboratory Final Results

Where Exploration Intersects Discovery

ASX Announcement FURTHER DRILLING WARRANTED AT SIMUKU TO PROGRESS TO FEASIBILITY COMPLETION OF CONCEPTUAL MINING STUDY

Determining in-depth plant performance

For personal use only

Certificate of Analysis

Black Butte Copper Project Mine Design Conference, Fairmont, April TSX.V:TAU OTCQX:TINTF

OPTIMIZING THE WORLD'S MOST COMPLEX MINING ASSETS FOR OVER 15 YEARS.

For personal use only

Optimal Economic Envelope of Joint Open-Pit and Underground Mines*

Fortuna provides update on the Lindero gold Project in Argentina

Blast Hole Sampling validation at Mantoverde. Antoni Magri, Eduardo Magri and Cristian Neira

GRADE CONTROL BLENDING AND SELECTIVITY FOR OPTIMAL PROCESS PERFORMANCE AT THE SKORPION ZINC MINE, NAMIBIA G B GNOINSKI

Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year

NEW ASSAYS CONFIRM THE POTENTIAL OF DRAKE S BÄSINGE COPPER-COBALT PROJECT, SWEDEN

Safety in the Matrix. Siemens AG All rights reserved.

The following table details operating statistics related to Batu Hijau copper production, sales and production costs.

For personal use only

For personal use only

6 June 2017 Georgian Mining Corporation Further Drill Results from Kvemo Bolnisi East s Gold Zone 2 Target

News Release. Highlights of the Cobalt Resource:

Mines update. CMD 21 November Jan Moström President Boliden Mines

Global and local challenges for research, development and innovation in mining and metallurgy: a Chilean perspective.

For personal use only

Certificate of Analysis First issued: May 2008 Version: May 2008

GRADE DETERMINATION FOR SPANISH MOUNTAIN GOLD PROJECT

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

2018 Resources and Reserves

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Real Time Operational Perfomance and Variability Supervision

INTEGRATED SGS SERVICES FOR EXPLORATION AND RESOURCE DEVELOPMENT

Iván Arriagada, CEO Antofagasta Minerals. Producer Challenges

Granmuren final results adds deeper nickel/copper mineralisation

CIM Best Practice Guidelines for Mineral Processing

Proficiency testing of wastewater sampling: What can we learn?

Preparation of Reference Materials for Analytical Quality Control in the Water Laboratories

FILO MINING REPORTS 61% INCREASE IN RESOURCE TONNES AT FILO DEL SOL PROJECT


RECOVERY OF IRON-MOLYBDENUM ALLOY FROM COPPER SLAGS

Regulus Announces that Preliminary Metallurgical Results Indicate Good Gold Recovery is Achievable at the Rio Grande Cu-Au-Ag Project, Argentina

Azure Minerals Ltd ASX Code:

ASX:MEI COBALT COBALT COBALT!

Operational excellence and organic growth. Mikael Staffas, President Boliden Mines Capital Markets Day November

Sampling and subsequent testing of aggregate is performed for several reasons:

HUCKLEBERRY MINES LTD. An Overview

Current concerns related to the research and exploitation of useful mineral deposits

Carlos CAMURRI, Claudia CARRASCO, Soraya ALBRETCH

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Apron feeder. Robust design, improved uptime. Apron feeders

REPORT ON ASSESSMENT OF THE QA/QC PROGRAM FOR DIAMOND DRILLING CAMPAIGNS

Flotation cplant: an Optimum Modular Approach

NEWS RELEASE. Centerra Gold 2017 Year-End Statement of Mineral Reserves and Resources and Fourth Quarter Exploration Update

The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007

Variography applied as a tool to monitor metallurgy. EMPV software application to gold and silver recovery

FASTGRADETM LOGGING TOOL: PULSED NEUTRON TECHNOLOGY. Exploring New Dimensions

Figure 1: Schematic block-diagram of the project test work

1 Graphite is a form of carbon. (a) Graphite is used as a lubricant. Write down one property of graphite that explains why it is used as a lubricant.

INITIAL PROOF OF CONCEPT STUDY DEMONSTRATES SUITABILITY OF CONCENTRATE FOR BATTERY CHEMICALS

At Home in North America

From sand to silicon wafer

Oyu Tolgoi Mine Optimizing the efficient use of scarce water resources

MICHIGAN TEST METHOD FOR STANDARD PRACTICE OF SAMPLING HMA PAVING MIXTURES

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

N E W S R E L E A S E

Transcription:

QUALITY ASSURANCE IN THE PROCESS FROM ROCKS TO CATHODES. Gerencia Funcional Ingeniería y Procesos Vicepresidencia de Proyectos Magali Campos B.

INTRODUCTION ALONG THE VALUE CHAIN OF THE MINING BUSINESS, FROM ROCK TO CATHODES, MANY CRITICAL DECISION ARE BASED ON SAMPLES AND ASSAYS (P. Carrasco et al 2004)

THE ECONOMIC IMPACT OF CORRECT SAMPLING AND ANALYSIS PRACTICE SAMPLING What Happened when a Proper Sampling Device was Installed in a Tail Discharge? Before the proper sampling device was installed the copper tail grade was assumed to be 0,15 %, the real value was 0,2%. The flow rate was 96.000tons/day. The annual copper losses were 17520 ton/year Considering a copper price of 1 dollar/pound The annual loss is 38.544MUS$

THE ECONOMIC IMPACT OF CORRECT SAMPLING AND ANALYSIS PRACTICE ANALYSIS PRACTICE Some few years ago, Codelco decided to sell 51% of El Abra deposit. Due diligence process encountered assays were biased by - 0,06% Cu in the oxide zone. Because of the high tonnage and low grade of the deposit, impact of analytical bias caused economic loss of 300 MUS$

QUALITY ASSURANCE Define standards and procedures of the best practices to ensure and confirm the quality, robustness and reliability of the geo/mining/metallurgy base in order to obtain the economic benefits expected by the project, helping to maximize longterm economic value of the Corporation.

STANDARD, BEST PRACTICE GUIDES AND ANALYTICAL PROTOCOLS. FUNDAMENTAL ERROR GROUPING & SEGREGATION ERROR DELIMITATION ERROR EXTRACTION ERROR PREPARATION ERROR

IMPLEMENTATION OF SAMPLING PROTOCOL CNAM 008 HETEROGENEITY TEST TO DETERMINE SAMPLING CONSTANTS AND NOMOGRAMS FOR SAMPLE PREPARATION

SAMPLING CONSTANT

IMPLEMENTATION OF SAMPLING PROTOCOL CNAM - 007 STANDARD CONDITIONS OF SAMPLING STATIONS FOR MATERIAL BALANCE AND TRANSFER POINTS OF PRODUCTS

SAMPLING METHODS Manual, not equiprobabilistic Automatic Sampler

IMPLEMENTATION OF SAMPLING PROTOCOL CNAM - 017 QUALITY ASSURANCE IN DIAMOND DRILL CUTTING

IMPLEMENTATION OF SAMPLING PROTOCOL CNAM - 011 INGAMELL S TEST SUB SAMPLING IN A LABORATORY

Ingamells test Keep the position (X, Y) for every analysis and put it into a graphic

STATISTICAL ANALYSIS FOR THE TEST

IMPLEMENTATION OF SAMPLING PROTOCOL CNAM - 015 SAMPLING AND CHEMICAL ANALYSIS OF COPPER CATHODES

The correct sampling of copper cathodes is a profound issue in the copper industry, worldwide. The determination of various impurity contents has vast economic consequences for the copper cathode producers, and especially for the copper cathode users. F.Pitard (2002) It is necessary to perform experiments to better understand variability within cathodes, between cathodes, and between processing units.

STRATIFIED RANDOM SAMPLING

PRESERVING SAMPLE INTEGRITY CNAM - 012 STANDARD CONDITIONS TO FULFILL DURING SUBSAMPLING OPERATIONS AT THE LABORATORY

PREVENTION OF ANALYTICAL ERROR CNAM - 009 PREPARATION AND OBTENTION OF REFERENCE MATERIALS

CERTIFIED VALUES FOR A REFERENCE MATERIAL When using Atomic Absorption methods or other non absolute methods, the final outcome corresponds just to a recommended value. The certified value has to be obtained through a procedure where the result is a value obtained from direct measurement of a relevant parameter, traceable to a fundamental unit in the International Unit System (SI).

ABSOLUTE METHOD COPPER ABSOLUTE METHOD MOLYBDENUM ABSOLUTE METHOD ARSENIC

QUANTIFICATION OF ANALYTICAL ERROR CNAM - 010 VERIFICATION OF CHEMICAL ANALYSIS RESULTS FOR MINERALS CNAM - 013 QUALITY ASSURANCE IN PREPARATION OF MINERAL SAMPLES FOR CHEMICAL ANALYSIS

Cu A % Cu B % Dif. Cu (A - B) % PROMEDIO 0,4534 0,4538-0,0004 VARIANZA 0,240 0,244 0,000092 DESVIACION ESTANDAR 0,490 0,493 0,0068 DATOS 410 410 410 ERROR MEDIO 0,00034 T -1,07 CV % 1,50 % ERROR SESGO -0,08

WEIGHTING ERROR CNAM - 014 STANDARD CONDITIONS OF WEIGHTING SYSTEMS FOR CONVEYOR BELTS FOR METALLURGICAL BALANCE AND TRANSFER OF MATERIALS

CONCLUSION The application of standards and best practice guides, enable quality assurance of data for resource estimation, grade control, metallurgical balance and commercial transactions. The Quality Assurance Analytical information is essential for the development of projects in the copper industry, the correct sampling and analysis practices give a huge benefit because they eliminate hidden losses and maximize the available resources. The use of standards help to maximize long-term economic value of the Corporation, allow the company to maintain excellence in everything we do and the practice of continuous improvement, makes us a world leader in the copper industry.

PEDRO CARRASCO MENTOR OF STANDARDS AND BEST PRACTICE GUIDELINES Muchas Gracias