DRAFT AIR QUALITY TECHNICAL MEMORANDUM

Similar documents
Final Air Quality Report

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida

AIR QUALITY TECHNICAL MEMORANDUM

Robin Rhinesmith and Crystal Geiger, Florida Department of Transportation (FDOT) Lindsay Baumaister, KB Environmental Sciences, Inc.

Final Air Quality Report

Air Quality Analysis Technical Memorandum

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

Air Quality Analysis Technical Memorandum

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

LOCATION HYDRAULIC REPORT

Air Quality Analysis Technical Memorandum

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)

DRAFT Geotechnical Technical Memorandum

Air Quality Analysis Technical Memorandum

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

Oklahoma Department of Transportation Environmental Programs Division Office Fax

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

INTERCHANGE MODIFICATION REPORT

CLA /10.54, PID Project Description:

Harlem Avenue Interchange Design Discussion. August 24, 2015

Design-Build and Design-Bid-Build

Environme ntal Assessment Addendum

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Categorical Exclusion (CE)

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

Environmental Consequences and Mitigation

Florida Department of Transportation, District Three

CHAPTER 3 SCOPE SUMMARY

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis

Interstate 66 Tier 1 Environmental Impact Statement Public Hearing

State Road (S.R.) 12 (Florida Arts Trail PD&E)

Placerville, a Unique Historical Past Forging into a Golden Future

Alternatives Evaluation Methodology

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

I-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report

St. Francis Drive through the City of Santa Fe Corridor Study

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

Constructability Guidelines

Categorical Exclusion (CE)

Air Quality Technical Report PM2.5 Quantitative Hot spot Analysis. A. Introduction. B. Interagency Consultation

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

PUBLIC HEARING LOOP 9

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

500 Interchange Design

Draft Noise Study Report

Community Advisory Committee Meeting No. 2. June 22, 2006

Transportation Conformity Guidance for Qualitative Hot-spot Analyses in PM 2.5 and PM 10 Nonattainment and Maintenance Areas

Chapter 4: Transportation and Circulation

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

Arizona Association of County Engineers New Rules for Categorical Exclusions for FHWA Projects

PROGRAMMATIC AGREEMENT FOR APPROVAL OF CERTAIN CATEGORICAL EXCLUSIONS

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered

MEDIAN OPENINGS AND ACCESS MANAGEMENT

Section 7 Environmental Constraints

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Draft Preliminary Engineering Report

FTBA 2018 Construction Conference Major Projects Update

PROGRAMMATIC AGREEMENT

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

Executive Summary. How to Use this Document

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

Air Report. Project Information PPTA/LAP. Traffic Data I-495 NORTHERN SECTION SHOULDER USE. Project Number: , C501, P101 UPC:

U.S. Army Corps of Engineers Permit Application Tips

Conclusions & Lessons Learned

MEMORANDUM: INITIAL CONCEPTS SUMMARY

4.9 TRANSPORTATION AND CIRCULATION

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

500 Interchange Design

Douglas Woods Wind Farm

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

LOCATION AND DESIGN DIVISION

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

Agenda Item B.9 CONSENT CALENDAR Meeting Date: May 19, 2015

PAVEMENT DESIGN MEMORANDUM

Highway Construction Program

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

12 Evaluation of Alternatives

SWFWMD RAI No. 1 Comments 8a & 8b Response Appendix G Proposed Drainage Design Criteria

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

2003 PRELIMINARY ENGINEERING STUDY JUNE 2006

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

Value Engineering For Transportation Improvements. Interstate 4 from West of State Road 528 (Beachline) to West of State Road 435 (Kirkman Road)

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

ES-1. Central Florida Freight Corridor (US 27/SR 60) Multimodal Mobility Enhancement Improvements. Project Name

Arterial Connector Study Adoption Considerations

Transcription:

AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida Department of Transportation District One P.O. Box 1249 Bartow, FL 33831-1249 October 2016

AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida Department of Transportation District One P.O. Box 1249 Bartow, FL 33831-1249 Prepared by: Atkins North America, Inc. 600 North Broadway Avenue Suite 310 Bartow, FL 33830 October 2016

1.0 INTRODUCTION The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) study to evaluate costs and impacts of constructing a new overpass to carry State Road (SR) 60 over the CSX railroad (milepost 25.544, crossing #625419N) approximately eleven (11) miles east of Bartow and four (4) miles west of Lake Wales in Polk County, Florida. The project location map (Figure 1) illustrates the location and limits of the study. The Design and permitting phase is overlapping with the PD&E phase to facilitate a quicker delivery process. The PD&E study limits are SR 60 from 3,900 feet (ft) west of CSX railroad crossing #625419N to 2,700 ft east of the CSX railroad crossing #625419N, a distance of 6,600 ft (1.25 miles). The project is located within Section 01, Township 30 South, Range 26 East, and Section 6, Township 30 South, Range 27 East, within the Eloise United States Geological Survey (USGS) 7.5-minute (1:24,000) quad map and the USGS Fort Pierce 1 x 2 degree (1:250,000) topographic map. 2.0 PURPOSE AND NEED The purpose of the project is to replace the existing SR 60 at-grade railroad crossing with a grade separation. The need for the project is not based on the need for additional capacity. It is based on improving safety; to provide a grade separation of the railroad crossing to separate vehicle traffic from the train traffic. The project will also reduce travel delays by removing the need to stop traffic for trains. The purpose of the PD&E study is to provide documented environmental and engineering analyses to assist the FDOT in reaching a decision on the location and conceptual design of the new railroad overpass and associated improvements in order to accommodate future traffic demand in a safe and efficient manner. This PD&E study satisfies the FDOT requirements and follows the process outlined in the FDOT Project Development and Environment Manual, Part 1 Chapter 10: State, Local, or Privately Funded Projects. This PD&E study documents the need for the improvements and presents the procedures utilized to develop and evaluate the overpass concept. Information relating to the engineering, environmental, and social characteristics essential for development of the railroad overpass concept was collected. Design criteria were established and a preliminary alternative was developed. The evaluation of the overpass concept was based on a variety of parameters utilizing a matrix format. This process identifies the Recommended Alternative that minimizes the sociocultural, economic, natural, and physical impacts while providing the necessary future transportation improvements. The study also solicits input from the community and users of the facility. The design year for the analysis is 2040. 1 Draft Air Quality Technical Memorandum

Figure 1: Project Location Map 2 Draft Air Quality Technical Memorandum

3.0 EXISTING AND PROPOSED IMPROVEMENTS SR 60 is a four-lane divided rural roadway within the study area as shown in Figure 2. Two 12-ft lanes, an 8-ft inside shoulder and a 10-ft outside shoulder (5-ft paved) are provided in each direction, separated by a 40-ft depressed, grassed median. SR 60 is carried over the Peace Creek Drainage Canal on two bridges; eastbound (EB) bridge number 160133 and westbound (WB) bridge number 160045 (Figure 3). Exclusive right turn lanes are provided at the median openings serving C&J Trucking, Peterson Industries and the former International Paper property. No sidewalks are present. Bicyclists are accommodated on the 5-ft paved outside shoulders. The existing westbound roadway is crowned in the center, whereas the eastbound roadway slopes to the outside. The typical existing controlled access right-of-way (ROW) width varies, typically 182 ft wide; however, some wider areas exist throughout the study area, up to 232 ft wide. In the existing condition, the stormwater runoff from the roadway sheet flows offsite and into roadside ditches to the Peace Creek Drainage Canal. The project is a 1.25-mile-long segment of SR 60 that includes elevating the SR 60 roadway over the existing CSX railroad at-grade crossing. The roadway will be elevated using permanent retaining walls (i.e. MSE walls). Three new pairs of SR 60 bridge structures are proposed over the existing CSX railroad, over an existing underground petroleum pipeline, over a proposed frontage road, and over the Peace Creek Drainage Canal. The existing eastbound SR 60 bridge over the Peace Creek Drainage Canal will be rehabilitated and reused for frontage road access and the westbound bridge will be removed. Sidewalks, bicycle lanes, and three new frontage roads will be included in the improvements. Two off-site stormwater management facilities (SMFs) are proposed. The proposed SR 60 typical section is a four-lane divided rural roadway with a 23.5-ft median that varies from 23.5 ft to 40 ft, which includes two 10-ft 9-inch paved inside shoulders and a center barrier wall. Two 12-ft travel lanes, 12-ft of additional pavement for a future lane, and a 10-ft flush outside paved shoulders are provided in each direction. Bicyclists will be accommodated on 7-ft buffered bike lanes within the outside 10-ft paved shoulder in each direction. An 8-ft 3-inch sidewalk, barrier-separated from the shoulder, is also provided in each direction. The travel lanes are on embankment with mechanically stabilized earth (MSE) walls approaching the bridges over the railroad. The proposed design speed for this typical section is 70 mph. A frontage road is required on the south side, west of the railroad tracks, which will utilize the existing eastbound roadway pavement. Another frontage road is required on the north side, east of the railroad tracks, which will utilize new pavement. A driveway is provided on the north side to provide access to adjacent parcels, as shown in the Concept Plans. ROW acquisition will be required to accommodate the driveways. These typical sections require between 267 ft and 432 ft of ROW, with ROW being acquired on both sides of SR 60 (predominantly on the north side). 3 Draft Air Quality Technical Memorandum

Figure 2: Existing SR 60 Mainline Roadway Typical Section 4 Draft Air Quality Technical Memorandum

Figure 3: Existing Roadway Typical Section for the WB and EB bridges over the Peace Creek Drainage Canal 5 Draft Air Quality Technical Memorandum

The proposed typical sections for the Recommended Alternative are shown in Figures 3a-3d. The proposed improvements will require a total of 6.0 acres of new ROW along the SR 60 mainline. Two off-site stormwater management facilities (ponds) are needed. Pond 1, on the north side of SR 60 west of the Peace Creek Drainage Canal, will require approximately 2.93 acres of new ROW that will be obtained via a land swap with a private land owner for comparable acreage of land owned by FDOT (a former borrow pit). Pond 3 is approximately 3.79 acres on the north side of SR 60 east of the CSX railroad and will not require ROW acquisition as it is located on a parcel already owned by FDOT. A minor amount (0.03 acre) of drainage easements will be needed for pond inflow/ outfall facilities and maintenance ingress/egress to the ponds. The project will affect eleven (11) parcels, but will not require any business or residential relocations. Three new pairs of SR 60 bridge structures are proposed over the existing CSX railroad, over an existing underground petroleum pipeline, over a proposed frontage road, and over the Peace Creek Drainage Canal. The existing eastbound SR 60 bridge over the Peace Creek Drainage Canal will be rehabilitated and reused for frontage road access and the westbound bridge will be removed. While the purpose and need for this project is not to add capacity, an ultimate six-lane facility for the bridge structures was evaluated in order to accommodate future widening along SR 60, eliminate the future need to reconstruct the bridges and minimize the potential for multiple ROW acquisitions from the same property owners. A graphic providing an overview of the proposed improvements is provided as Figure 4. 6 Draft Air Quality Technical Memorandum

Figure 3a: Proposed Roadway Typical Section West of the Peace Creek Drainage Canal 7 Draft Air Quality Technical Memorandum

Figure 3b: Proposed Roadway Typical Section East of the CSX Railroad 8 Draft Air Quality Technical Memorandum

Figure 3c: Proposed SR 60 Bridge Typical Section 9 Draft Air Quality Technical Memorandum

Figure 3d: Frontage Road Bridge Typical Section 10 Draft Air Quality Technical Memorandum

Figure 4: Proposed SR 60 at CSX Railroad Improvements (including stormwater ponds) 11 Draft Air Quality Technical Memorandum

4.0 AIR QUALITY EVALUATION A preliminary, non-quantitative evaluation of air quality considerations was completed for this project. This evaluation was completed to document that the subject project improvements will not result in significant air quality impacts. The proposed improvements have been compared against other local proposed improvements, most notably the proposed improvements at the US 27/SR 60 interchange associated with the US 27 PD&E Study from the Polk/Highlands County Line to north of SR 60 (FPID# 419243-1-22-01). The US 27/SR 60 interchange is approximately 3.65 miles due east of the subject grade separation project location. The US 27 PD&E Study s improvements at the US 27/SR 60 interchange are anticipated to include the reconstruction of the existing partial cloverleaf interchange to a Single Point Urban Interchange (SPUI) (see Figure 5). This alternative replaces the existing partial cloverleaf interchange with a four-ramp configuration connecting the freeway (SR 60) to the surface road (US 27). This improvement provides additional turn lanes at the ramp terminals intersecting at a single signalized juncture. A two-lane, two-way frontage road was added to the southwest quadrant of the interchange so that all access management issues could be properly addressed. The proposed urban typical section will widen SR 60 from its existing four lanes to six 11-ft lanes, a 22-ft median, 7-ft buffered bicycle lanes, and 5-ft sidewalks. Motor vehicle emissions are typically highest at intersections where operating speeds are slower and vehicles are delayed at traffic signals. A review of traffic data documented in the US 27 PD&E Study Project Traffic Report showed the US 27/SR 60 interchange and associated ramp intersections as having the highest vehicle approach volumes. Therefore, the subject grade separation project is compared against the US 27/SR 60 interchange (based on the local geographic location and significantly higher traffic volume) as a worst-case scenario for air quality. An air quality analysis, specifically an analysis of carbon monoxide (CO) concentrations, was performed for the US 27 PD&E Study using methodology established in the Florida Department of Transportation (FDOT s) Project Development and Environment (PD&E) Manual, Part 2, Chapter 16. CO levels were predicted using FDOT s screening model CO Florida 2012. The results of this analysis were documented in the US 27 PD&E Study s Final Air Quality Technical Memorandum (September 2016) and are not repeated here. 12 Draft Air Quality Technical Memorandum

Figure 5: US 27/SR 60 Proposed Single Point Urban Interchange 13 Draft Air Quality Technical Memorandum

5.0 RESULTS Based on the worst-case results modelled for capacity improvements at the US 27/SR 60 interchange during the US 27 PD&E study, the highest predicted CO concentrations were estimated at 6.4 parts per million (ppm) for a 1-hour averaging time and 3.8 ppm for an 8-hour averaging time. All predicted CO concentrations for the No-Build and Build conditions in the opening year (2020) and design year (2040) are below the National Ambient Air Quality Standards (NAAQS) of 35 ppm for a 1-hour averaging time and the NAAQS of 9 ppm for an 8-hour averaging time. The predicted 1-hour and 8-hour concentrations include a background CO level of 3.3 ppm and 2.0 ppm, respectively. Despite having significantly higher traffic volumes and associated vehicle exhaust emissions, the US 27/SR 60 proposed condition does not result in adverse air quality impacts. Similarly, the significantly reduced traffic volumes and exhaust emissions in the vicinity of the SR 60 at CSX Railroad grade separation project do not result in significant air quality impacts. 6.0 CONCLUSION Although all phases of this project are State-funded and the environmental class of action is a State Environmental Impact Report (SEIR), as per the FDOT PD&E Manual Part 1, Chapter 10 State, Local, or Privately-funded Project Delivery, the level of environmental documentation is anticipated to be comparable to a Type 2 Categorical Exclusion (CE). A CE is a project or category of actions which do not individually or cumulatively have a significant/adverse impact. With respect to air quality, PD&E Manual Part 2, Chapter 16 Air Quality states: 16.2.2.1 Categorical Exclusions Projects evaluated as Categorical Exclusions (CEs) are projects that do not involve significant environmental impacts. These types of projects typically have no effect on area-wide air quality levels, but may provide some air quality benefits on a local basis. As such, FHWA has indicated that an air quality analysis is generally not necessary. As discussed previously in Section 2.0 of this document, the need for the project is not based on the need for additional capacity. It is based on improving safety; to provide a grade separation of the railroad crossing to separate vehicle traffic from the train traffic. The project will also reduce travel delays by removing the need to stop traffic for trains, which will in turn reduce the concentrated discharge of exhaust emissions from these vehicles. Reducing vehicle exhaust emissions will serve to have a net benefit on air quality. Construction activities for the project may have short-term air quality for those residents and travelers within the immediate vicinity of the project. The air quality effect will be temporary and will primarily be in the form of emissions from diesel-powered construction equipment and dust from embankment and haul road areas. Air pollution associated with the creation of airborne 14 Draft Air Quality Technical Memorandum

particles will be effectively controlled through the use of watering or the application of other controlled materials in accordance with FDOT s Standard Specifications for Road and Bridge Construction. State Implementation Plan Conformity The project is in an area that has been designated as attainment for all of the NAAQS established by the Clean Air Act and subsequent amendments. Therefore, demonstration of conformity with a State Implementation Plan (SIP) is not required for this project. Green House Gases Green House Gasses (GHG) cause a global phenomenon in which heat is trapped in the earth s atmosphere. Because atmospheric concentration of GHGs continues to climb, our planet will continue to experience climate-related phenomena. For example, warmer global temperatures can cause changes in precipitation and sea levels. The burning of fossil fuels and other human activities are adding to the concentration of GHGs in the atmosphere. Many GHGs remain in the atmosphere for time periods ranging from decades to centuries. To date, no national standards have been established regarding GHGs, nor has United States Environmental Protection Agency (EPA) established criteria or thresholds for ambient GHG emissions pursuant to its authority to establish motor vehicle emission standards for carbon dioxide (CO2) under the Clean Air Act. GHGs are different from other air pollutants evaluated in the Federal environmental reviews because their impacts are not localized or regional due to their rapid dispersion into the global atmosphere, which is characteristic of these gases. The affected environment for CO2 and other GHG emissions is the entire planet. In addition, from a quantitative perspective, global climate change is the cumulative result of numerous and varied emissions sources (in terms of both absolute numbers and types), each of which makes a relatively small addition to global atmospheric GHG concentrations. In contrast to broad scale actions such as actions involving an entire industry sector or very large geographic areas, it is difficult to isolate and understand the GHG emissions impacts for a particular transportation project. Furthermore, presently there is no scientific methodology for attributing specific climatological changes to a particular transportation project s emissions. Under NEPA, detailed environmental analysis should be focused on issues that are significant and meaningful to decision-making (40 CFR 1500.1(b), 1500.2(b), 1500.4(g), and 1501.7). FHWA has concluded, based on the nature of GHG emissions and the exceedingly small potential GHG impacts of the proposed action that the GHG emissions from the proposed action will not result in reasonably foreseeable significant adverse impacts on the human environment (40 CFR 1502.22(b)). The GHG emission from the project build alternatives will be insignificant, and will not play a meaningful role in a determination of the environmentally preferable alternative or the selection of the preferred alternative. More detailed information on GHG emissions is not essential to a reasoned choice among reasonable alternatives (40 CFR 1502.22(a)) or to making 15 Draft Air Quality Technical Memorandum

a decision in the best overall public interest based on a balanced consideration of transportation, economic, social, and environmental needs and impacts (23 CFR 771.105(b)). This document does not incorporate an analysis of the GHG emissions or climate change effects of each of the alternatives because the potential change in GHG emissions is very small in the context of the affected environment. Because of the insignificance of the GHG impacts, those local impacts will not be meaningful to a decision on the environmentally preferable alternative or to a choice among alternatives. For these reasons, no alternatives-level GHG analysis has been performed for this project. 16 Draft Air Quality Technical Memorandum