Placer Parkway Phase 1

Similar documents
Refined Project Alterna ves

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

3.14 TRANSPORTATION AND TRAFFIC

CHAPTER 4 REGIONAL TRANSPORTATION ISSUES & ENVIRONMENTAL CHALLENGES

DRAFT WATER QUALITY TECHNICAL MEMORANDUM

2.0 EXECUTIVE SUMMARY

3.14 TRANSPORTATION AND TRAFFIC

US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015

EVERY MOST SOME FEW NONE (DK/NA)

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

3.0 COMMENTS AND RESPONSES

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists

TRANSFORM 66 Outside the Beltway Project Update March 2018

SR 65 Capacity and Operational Improvements Project. Noise Study Report

1.4 Analysis of Alignment Alternatives

Clinton Keith Road Extension Project

Minnesota Statewide Freight Bottlenecks

Interstate 66 Tier 1 Environmental Impact Statement Public Hearing

FINDINGS OF FACT and CONCLUSIONS

Attachment D Advanced Planning Studies

5.0 CUMULATIVE IMPACTS SUMMARY

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

Progress Report Regional Express & Bus Rapid Transit Program

There are three basic goods movement transportation patterns occurring in the Sacramento region.

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

for Placer I-80 Auxiliary Lanes Project EA-03F230

General Plan EIR Scoping Meeting

El Dorado Water & Power Authority. El Dorado Water Reliability Project

Air Quality Analysis Technical Memorandum

Notice of Intent to Prepare a Draft Environmental Impact Statement for the

CLA /10.54, PID Project Description:

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia May 8,

CEQA Initial Study Checklist ENVIRONMENTAL CHECKLIST FORM. Potential Industries Solid Waste Facility Permit for a Recycling Transfer Station

Air Quality Analysis Technical Memorandum

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

University of Virginia Master Planning Committee November 17 th Charlottesville Albemarle Metropolitan Planning Organization

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

June 5, 2018 State and Regional Ballot Measures

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

Transportation Workshop. FORA Staff 9/8/17

CHAPTER 8 TRANSPORTATION ELEMENT

3.12 LAND USE AND PLANNING

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

Alternatives Evaluation Methodology

Executive Summary. What is the Regional Transportation Commission of Southern Nevada?

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Outer Loop/Rail Bypass Study

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE

4.9 TRANSPORTATION AND CIRCULATION

Purpose Today: Review information to assist with Prioritization

Placerville, a Unique Historical Past Forging into a Golden Future

Notice of Preparation of a Draft Environmental Impact Report Vallco Special Area Specific Plan

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

DECEMBER P R O G R E S S R E P O R T

PROJECT DESCRIPTION...

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.)

Setting the Stage for the Future: Greater Owensboro Area Year of Planning Summit July 17, 2014

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

Draft Environmental Impact Report

2012 Regional Transportation Plan for Butte County Public Outreach Workshops

Free Bridge Congestion Relief Project: Using FHWA s Eco-Logical Process

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

CTA Blue Line Forest Park Branch Feasibility/Vision Study: Transit Ridership Forecasting Analysis Technical Memorandum Submitted By

TABLE OF CONTENTS ES EXECUTIVE SUMMARY 1.0 INTRODUCTION 2.0 PROJECT DESCRIPTION 3.0 ENVIRONMENTAL ANALYSIS

SPHERE OF INFLUENCE ANNEXATION

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

APPENDIX M CEQA Initial Study Checklist

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

In order to comply, the following must be analyzed: The practicability of alternatives to any longitudinal encroachments

RESOLUTION NO:

2016 Arizona Pavement/Materials Conference. Dennis Smith MAG Executive Director (602)

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project

California Environmental Quality Act NOTICE OF PREPARATION FOR AN ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING

Airport Metro Connector. 96th Street Transit Station July 13, 2016 Public Hearing

6. Significant Unavoidable Adverse Impacts

BRIDGE GENERAL PLAN ESTIMATE OR PLANNING ESTIMATE X

ALAMEDA CORRIDOR EAST San Gabriel Valley

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

Florida Department of TRANSPORTATION FTBA CONSTRUCTION CONFERENCE January 17-18, 2019 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft

2016 Regional Transportation Plan / Sustainable Communities Strategy for Butte County

Natural Environment Study

Table of Contents Local Agency Guidelines Section B August 2011

CONSENT ITEM LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017

Zoo Interchange Reconstruction

US 70 Corridor James City Project Update. Craig Young, Three Oaks Engineering US 70 Corridor Commission May 21, 2015

Introduction. Begin Project at US 52/Rivers Avenue. End Project at US 17/Savannah Highway

Business Advisory Committee. July 12, 2016

US-101 CORRIDOR ADVISOR S UPDATE

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report

Transcription:

Placer Parkway Phase 1 Placer Parkway Phase I May 28, 2015

Project Partners

Completed Regional Transportation Projects Lincoln Bypass 2014 SR 65/Ferrari Ranch Rd 2012 SR 65 Widening 1999 SR 65/Pleasant Grove Blvd 2009 SR 65/Sunset Blvd 2010 I-80/Sierra College Blvd 2009 Roseville Bypass and Original I-80/SR 65 IC 1985 SR 65/Galleria Blvd 2008 I-80 Carpool Lanes 2011 I-80/Douglas Blvd 2006 I-80/Eureka Rd 2013

Planned Regional Transportation Projects SR 65/Nelson Ln SR 65/Whitney Ranch Pkwy 2016 Placer Parkway - Segment 1 2020 SR 65 Overlay 2016 SR 65/Twelve Bridges Dr SR 65 Widening I-80/SR 65 IC -Phase 1A 2019 I-80/Horseshoe Bar Rd I-80/Rocklin Rd I-80 WB 5 th Lane 2020 I-80 EB Auxiliary Lane 2019 I-80/SR 65 IC - Phases 2B -4

It s All About The Bucks

Keep Placer Moving Did You Know? The state and federal gas tax supply less than halfthe funding needed to maintain current roads, with no money for new capacity. Federal/state transportation dollars are declining and often contingent on a local funding match and strings. Developer fees are maxed out and cannot pay for existing problems. Placer County is one of the largest counties in the state with no local transportation funding.

Keep Placer Moving Did You Know? $ 1.25 billion Projected Funding Available Funding Outlook $1.75 billion Deficit $ 3.0 billion Need Federal - 10% Federal Highways Admin. Federal Transit Admin. Projected Funding Source Breakdown SHOPP STIP STA State 22% Local Funding 68% Local Transportation Fund Regional Fees Developer Fees Transit Fares

Transportation Funding Strategy Keep the money we ve already got Leverage future State/Federal funding Additional developer impact fees High Occupancy Toll (HOT) lanes Toll Roads Transportation sales tax Legislative changes to increase funding flexibility

Placer Parkway -Project Background Placer Parkway is a high speed regional transportation facility connecting State Route 65 to State Route 99 1994 Placer County General Plan depicts a plan line for Placer Parkway Early 2000s the Placer Parkway Corridor began being further refined Placer Parkway Corridor Selection 5 Corridors Studied Tier I EIR and EIS completed by South Placer Regional Transportation Authority (SPRTA) EIR certified December of 2009 FHWA completed its Record of Decision May 2010 Placer County General Plan Update December 2011 SPRTA Fee Program

Placer Parkway Selected Corridor

Placer Parkway Phase I

Placer Parkway -Major Features New Interchange at SR65 Grade Separation of Industrial Avenue and UPRR Tracks At-Grade Connection at Foothills Boulevard Four Lane Extension with Center Median Whitney Ranch IC Improvements

Placer Parkway Cross Sections Roadway Overcrossing

Placer Parkway Phase 1 Alternative 1

Placer Parkway Phase 1 Alternative 2

Placer Parkway Phase 1 Alternative 3

Placer Parkway Phase 1

Technical Studies Completed Aesthetics Agricultural and Forestry Resources Air Quality Biological Resources Cultural Resources Geology and Soils Greenhouse Gas Emissions Hazards and Hazardous Materials Hydrology and Water Quality Land Use and Planning Mineral Resources Noise Population and Housing Public Services Recreation Transportation/Traffic Utilities and Service Systems

Mitigation Measure Summary Native Grass & Wildflower Replanting for Erosion Control New Tree Plantings - Replacements Air Quality Placer County Air Pollution Control District Compliance Biological Impacts Protection of Sensitive Areas, Training, Monitoring, Mitigation Credits Cultural Resources Monitoring Water Quality Storm Water Best Management Practices Noise Impacts Restrictions on Nighttime Work Traffic Impacts Future Traffic Signal Projects

Schedule Draft Project Report Signed January 2015 Initial Study/Mitigated Negative Declaration Completed May 2015 Environmental Document Public Review Ongoing Comment Period Closes June 9 th Finalized Environmental Document & Project Report Fall 2015

Public Participation Project Website: http://www.placer.ca.gov/departments/work s/projects/placerparkway Official Comment Cards Due June 9 th

Thank You Rich Moorehead Luke McNeal-Caird Placer County DPW PCTPA RMoorehe@placer.ca.gov lmcneel-caird@pctpa.net (530) 745-7533 (530) 823-4033 Matt Brogan Celia McAdam Mark Thomas & Company PCTPA mbrogan@markthomas.com cmcadam@pctpa.org (916) 381-9100 (530) 823-4030