SECTION BRICK FLOORING

Similar documents
SECTION MASONRY GROUTING

Narrow Modular Pavers (NMP) for Mortar-Set Concrete Tiling Installations

Narrow Modular Pavers (NMP) for Sand-Set Installations

for Mortar-Set Concrete Tiling Installations

SECTION STONE FLOORING

SECTION RESILIENT BASE AND ACCESSORIES

SECTION UNIT PAVERS

California Architectural Pavers for Mortar-Set Concrete Tiling Installations

Editing notes to assist users are separated from specification text by rows of asterisks. Delete these notes prior to final printing.

SECTION RESILIENT SHEET FLOORING

SECTION BRICK MASONRY ASSEMBLIES

Reinforced California Architectural Roof Pavers, Pedestal Supported

TILE TILE

Sections Paver Tiling Guide Specification; for installation of Marion Ceramics, Thin Brick Tiles; Flooring, Veneer

MASONRY MORTARING

SECTION Vitrified Clay Wall Coping 2014

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

SECTION PAVER TILE

SECTION RESINOUS FLOORING

CONCRETE BALUSTRADE SYSTEM

CONCRETE TILE PAVERS

B. Related Sections: 1. Division 07 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces.

Conditions of the Contract and Division 1 General Requirements are a part of this section.

SECTION CONCRETE PAVING SLABS SET IN MORTAR

The following specification refers to the Stepstone, Inc. product known as: Steptreads

SECTION MULTICOLOR INTERIOR FINISHING

SECTION CEMENTITIOUS SHEATHING

1. Repairing brick masonry, including replacing damaged units as indicated on drawings. 2. Repointing mortar joints.

CONSULT COLDSPRING FOR ASSISTANCE IN EDITING THIS SPECIFICATION GUIDE FOR SPECIFIC APPLICATIONS.

SECTION CERAMIC and QUARRY TILE

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

***************************************************************************************************************

SECTION TILING

SPECIAL SPECIFICATION 2043 Brick Veneer on MSE Wall

SECTION QUARTZ SURFACING COUNTERTOPS

SECTION CERAMIC TILE. B. Ceramic tile wall finishes including standard and custom designs.

Master Specifications for Microcotta November 2017

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

SECTION LIMESTONE PAVING

SECTION ULTRACOMPACT WALL FINISHES - THIN SET

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS

SECTION PORTLAND CEMENT TERRAZZO FLOORING

SECTION SUBSURFACE PREPARATION FOR FLOOR FINISHES

Custom Polishing Systems

Finish Flooring- Hard Flooring Materials

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

Student Services & Classroom Addition

SECTION DECORATIVE METAL FENCES AND GATES

Union County Vocational - Technical Schools Scotch Plains, New Jersey

MANUFACTURER S SPECIFICATION

SECTION CONCRETE PAVING

1. Concrete pavers, with ungrouted joints, over sand base. a. Large precast sections in random mix with smaller concrete pavers

1.1 RELATED DOCUMENTS

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples.

Bush Elem. Addition & Alterations QUARRY TILE SECTION QUARRY TILE PART 1 - GENERAL

CON-DEK ICC-ES ESR-2097 SYSTEM

SECTION MANUFACTURED MASONRY VENEER

Kolorines Glass Mosaic Tiles Project Specification

SECTION TILING

SECTION UNIT MASONRY

SECTION TERRAZZO FLOOR TILE

Sample Specifications

Sample Specification

2018 Flooring Specification - Tile Set Method TECTURA DESIGNS CEMENT TERRAZZO TILES

CUT LIMESTONE - ANCHORED

SECTION PAVEMENT MARKINGS

CSI GUIDE Countertops

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

1/16 Single Broadcast Polymer Flooring System

SECTION QUARRY TILE. A. American National Standards Institute ANSI A108.3.

SECTION QUARRY TILE

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

SPECIFICATION GUIDELINE

CONSULT COLDSPRING FOR ASSISTANCE IN EDITING THIS SPECIFICATION GUIDE FOR SPECIFIC APPLICATIONS.

MANUFACTURER S SPECIFICATIONS Section LIMESTONE PLASTER

SECTION PORTLAND CEMENT PLASTERING

SECTION MORTAR

Construction Specification

SPECIFICATION GUIDELINE

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

EVERLAST CONCRETE TECHNOLOGIES PROTECTION PRODUCTS SECTION CONCRETE ADDITIVES AND ADMIXTURES

SECTION STAMPED CONCRETE PAVING

Stonecraft Industies 8300 County Road Holmesville, OH

SECTION RESILIENT BASE AND ACCESSORIES

1. Division 09 Section "Rough Carpentry."

SECTION TILING

SECTION CEMENT BOARD SUPPORTED ADHERED MASONRY VENEER. 2. Installation materials including adhesives, mortars, and pointing mortars.

SECTION PASS WINDOWS. 1.1 SUMMARY A. Section Includes: 1. Factory finished sliding glass, counter mounted pass windows.

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick

SECTION EPOXY TERRAZZO TILE WITH RECYCLED GLASS MATRIX

SECTION MORTAR-BED STONE TILING [Interior Applications] [SECTION ]

B. Samples: Submit, for verification purposes, samples of the following:

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

SECTION EPOXY TERRAZZO

Sample Specifications

SECTION SURFACE-APPLIED CRYSTALLINE WATERPROOFING AND CONCRETE REPAIR

Transcription:

SECTION 09 63 13 BRICK FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Brick flooring set in mortar. 1.2 RELATED REQUIREMENTS SPEC WRITER NOTE: Update and retain references only when specified elsewhere in this section. A. Color and Texture of // Grout // Mortar // Brick //: Section 09 06 00, SCHEDULE FOR FINISHES. 1.3 APPLICABLE PUBLICATIONS A. Comply with references to extent specified in this section. B. American National Standards Institute (ANSI): 1. A108 - A118 - A136.1 (2014) - Installation of Ceramic Tile. C. ASTM International (ASTM): 1. C67-14 - Sampling and Testing Brick and Structural Clay Tile. 2. C144-11 - Aggregate for Masonry Mortar. 3. C150/C150M-15 - Portland Cement. 4. C207-06(2011) - Hydrated Lime for Masonry Purposes. 5. C270-14a - Mortar for Unit Masonry. 6. C902-14 - Pedestrian and Light Traffic Paving Brick. 7. C979/C979M-10 - Pigments for Integrally Colored Concrete. 1.4 SUBMITTALS A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. B. Submittal Drawings: 1. Show brick flooring layout and patterns. 2. Show special brick shapes. C. Manufacturer's Literature and Data: 1. Description of each product. D. Samples: 09 63 13-1

1. Brick: Full size of each type and color. a. Minimum five individual samples showing full color and texture range. 2. Grout: Samples of brick with grouted joints of each color. 1.5 QUALITY ASSURANCE SPEC WRITER NOTE: Ensure mockup location and size are shown on drawings. Otherwise, specify size and location. A. Mockups: Provide mockup of size indicated on drawings to confirm flooring materials and pattern and to establish workmanship quality. 1.6 DELIVERY A. Deliver products in manufacturer's original sealed packaging. B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date. C. Before installation, return or dispose of products within distorted, damaged, or opened packaging. 1.7 STORAGE AND HANDLING A. Store masonry materials under waterproof covers on planking clear of ground. B. Protect products from damage during handling and construction operations. 1.8 FIELD CONDITIONS A. Environment: 1. Work Area Ambient Temperature Range: Minimum 4 degrees C (40 degrees F) continuously, during and 48 hours after installation. 1.9 WARRANTY SPEC WRITER NOTE: Always retain construction warranty. FAR includes Contractor's one year labor and material warranty. A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction." PART 2 - PRODUCTS 2.1 SYSTEM PERFORMANCE A. Design brick complying with specified performance: 09 63 13-2

1. Slip Resistance: ASTM C902. 2.2 PRODUCTS - GENERAL A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES. B. Provide each flooring system component from one manufacturer and from one production run. 2.3 BRICK A. Paving Brick: ASTM C902; Class SX, Type I. SPEC WRITER NOTE: Class SX, Type 1 pavers are suitable for freeze-thaw exposure and are abrasion resistant for use in public spaces. SPEC WRITER NOTE: Application PS is intended for general use. For more exacting tolerances, specify Application PX pavers which have tighter dimensional tolerances and allow consistently narrow joints between pavers. 1. Manufacturing Tolerances: // Application PS // Application PX //. 2.4 MORTAR AND GROUT A. Cement: ASTM C150/C150M, Portland Type 1. B. Hydrated Lime: ASTM C207 Type S. C. Aggregate: ASTM C144. D. Pigments: ASTM C979/C979M, inorganic, mineral type for coloring grout. E. Mortar: ASTM C270, Type S, cement-lime proportion specification mix. 1. Admixtures: Not acceptable. SPEC WRITER NOTE: Use sand-portland cement grout for field mixed grout. Proportions vary depending on joint width. F. Sand-Portland Cement Grout: ANSI A108 - A118 - A136.1; // with pigments to produce selected color //. G. Standard Cement Grout: ANSI A108 - A118 - A136.1; sanded type, factory mixed // with pigments to produce selected color //. 09 63 13-3

SPEC WRITER NOTE: Use polymer modified grout for higher bond strength and for stain resistance. H. Polymer Modified Grout: ANSI A108 - A118 - A136.1; sanded type, factory mixed // with pigments to produce selected color //. I. Sealer: Water based, penetrating, no sheen, stain resistant type suitable for use with brick and grout joints. PART 3 - EXECUTION 3.1 PREPARATION A. Examine and verify substrate suitability for product installation. 1. Verify floor slab depression depth accommodates brick flooring installation thickness. B. Protect existing construction and completed work from damage. 1. Prevent damage from contact with mortar and grout. C. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance. 1. Remove film forming curing compounds and surface contamination. 3.2 INSTALLATION - GENERAL A. Install products according to manufacturer's instructions and approved submittal drawings. 3.3 BRICK INSTALLATION A. Do not use bricks with chips, cracks, discoloration or other visible defects. B. Layout brick flooring according to pattern indicated on drawings. C. Spread and screed mortar setting bed mixture 13 mm to 25 mm (1/2 inch to 1 inch) thick and true to plane. D. Limit setting bed area so brick is installed before initial set. E. Wet brick according to ASTM C67 rate of absorption test. F. Apply 1 mm (1/32 inch) layer of neat cement paste over setting bed. Set and level each brick immediately. Tamp brick to completely contact setting bed. 1. Maintain uniform, aligned joints // 10 mm (3/8- inch) // 13 mm (1/2 inch) // wide. G. Grout joints upon mortar bed initial set. Place grout in joints, strike flush and tool slightly concave. H. Cure grout by maintaining damp condition for seven days. 09 63 13-4

I. Installation Tolerances: 1. Floor surface true to plane within 1 in 1000 (1/8 inch in 10 feet), non-cumulative. 2. Joint width deviation maximum 25 percent of dimension indicated. 3.4 CLEANING A. Remove excess mortar and grout before fully set. B. Clean exposed brick and grout surfaces. Remove contaminants and stains. C. Apply sealer according to manufacturer's instructions. 3.5 PROTECTION A. Protect brick flooring from traffic and construction operations. B. Cover brick flooring with reinforced kraft paper, and plywood or hardboard. C. Remove protective materials immediately before acceptance. D. Repair damage. - - E N D - - 09 63 13-5