MICHIGAN DEPARTMENT OF TRANSPORTATION

Similar documents
MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION

BRIDGE INSPECTION REPORT

Element Condition Values

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 22 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 20 over POMME DE TERRE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT

Mn/DOT BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT

I 939. RMP I 515N-I 15S Over I 15 & US 95 01/26/2015. Report Contents. Signs and Utilities Inspection Report Maintenance Recommendation Report

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT SUBJECT: CONSIDERATION OF TRAFFIC WAY BRIDGE REPLACEMENT PROJECT PROGRAMMING

Prepared for: The City of Afton. Prepared by WSB and Associates. Bridge Safety Program Administrator Barritt Lovelace, PE

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 14 over OTTER TAIL RIVER. Date of Inspection: Equipment Used: 07/26/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 3 over RED LAKE RIVER. Date of Inspection: Equipment Used: 09/26/2016. County Highway Agency

Wall Asset Management Implementation at Colorado Department of Transportation. Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

HistoricBridges.org - National Bridge Inventory Data Sheet

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

Element Condition Values

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3

2016 UNDERWATER BRIDGE INSPECTION REPORT. MUN 28 over RIVER DR/OTTER TAIL RIVE. Date of Inspection: Equipment Used: 10/17/2016

HistoricBridges.org - National Bridge Inventory Data Sheet

2017 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # CSAH

Element Condition Values

2017 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 7 over ST LOUIS RIVER. Date of Inspection: Equipment Used: 09/12/2016. County Highway Agency

2017 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 8 over KNIFE RIVER. Date of Inspection: Equipment Used: 04/06/2017. County Highway Agency.

Crossing Type: Heritage Designation:

LYNNVILLE ROAD BRIDGE. Site Number D00027 LYNNVILLE ROAD, CONCESSION 11, WINDHAM. 2.3km W of Highway 24

Element Condition Values

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3

BRIDGE NO Inspection Type: Routine and Special STONINGTON STILLMAN AVENUE over PAWCATUCK RIVER

Ontario Structure Inspection Manual Inspection Form Structure Number: 12

DECOU ROAD BRIDGE. Municipal Structure Inspection Form NORFOLK COUNTY. Site Number DECOU ROAD, SIMCOE. 1.Okm E of Willow Drive

I 940R. RAMP I15N TO MLK & Over RAMP I15N TO US 95E 01/28/2015. Report Contents

NORFOLK STREET BRIDGE

HEAD STREET BRIDGE (SIMCOE)

EAST ¼ LINE BRIDGE, CONCESSION 2

TALBOT STREET BRIDGE

LOT 1 CONCESSION 3 HOUGHTON

2016 UNDERWATER BRIDGE INSPECTION REPORT. ST GERMAIN over MISSISSIPPI RIVER. Date of Inspection: Equipment Used: 09/30/2016

2 AVE SW(MSAS 123) over CANNON RIVER

How to Review SI&A Data

VENISON CREEK BRIDGE

COLLEGE DR (126) over MISSISSIPPI RIVER

Element Condition Values

BRANT - NORFOLK TOWNLINE ROAD

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 108 over PALEFACE RIVER. Date of Inspection: Equipment Used: 06/18/2016. County Highway Agency

YOUNG S CREEK TWIN CULVERTS. Site Number D00026 CHARLOTTEVILLE EAST QUARTERLINE ROAD, CHARLOTTEVILLE. 0.3 km South of Charlotteville Road 5

LOT 4 CONCESSION 11-12, N. WALSINGHAM

NORWICH ROAD BRIDGE. Site Number D00016 NORWICH ROAD, DELHI. 1.0 km N of King Street Delhi

HistoricBridges.org - National Bridge Inventory Data Sheet

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 356 over STREAM. Date of Inspection: Equipment Used: 06/20/2016. County Highway Agency.

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 11 over CANNON RIVER. Equipment Used: A-62. County Highway Agency. Inspected By: Owens, Garrett

2017 UNDERWATER BRIDGE INSPECTION REPORT. ELM WAY over MINNESOTA RIVER. Date of Inspection: Equipment Used: 06/07/2017. County Highway Agency

HistoricBridges.org - National Bridge Inventory Data Sheet

2017 UNDERWATER BRIDGE INSPECTION REPORT. PLYMOUTH AVE over MISSISSIPPI RIVER. Date of Inspection: Equipment Used: 06/02/2017

National Bridge Inspection Program Risk-based, Data-driven FHWA Oversight

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

Other Special Bridge Inspection Report

2017 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 25 over ROOT RIVER. Date of Inspection: Equipment Used: 10/21/2016. County Highway Agency

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

Appendix A. Sample Inspection Report

The short-listed firms will be posted on our Consultant Selection Summary Table website at:

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) Bridge. Bridge Inspection Form Type Lot No. 2

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE

2017 UNDERWATER BRIDGE INSPECTION REPORT. CEDAR (10TH) over MISS R; BNSF STS. Date of Inspection: Equipment Used: 07/07/2017

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 133 over WHITEFACE RIVER. Date of Inspection: Equipment Used: 06/24/2016. County Highway Agency

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY

Minnesota Department of Transportation (MnDOT) Historic Bridge Management Plan Addendum

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Bridge Asset Management City of Battle Creek Planning and Projects

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008)

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 31 over RABBIT LAKE NARROWS. Equipment Used: Life Jacket, Probing Rod, Other - boat, hammer

CoMBIS Guidance for Inventory Level Data Collection

Cochran Mill Road Bridge over Tuscarora Creek

Bridge Preservation Beyond the Short Term

ERRATA SHEET RECORDING AND CODING GUIDE FOR THE STRUCTURE INVENTORY AND APPRAISAL OF THE NATION=S BRIDGES REPORT NO. FHWA-PD , DECEMBER 1995

2017 UNDERWATER BRIDGE INSPECTION REPORT. QUAKER AVE over Minnesota River. Date of Inspection: Equipment Used: 05/25/2017. County Highway Agency

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

PROJECT DESCRIPTION PIK-CR PID 95402

Municipal Structure Inspection Form Structure Number: 5

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over

2016 UNDERWATER BRIDGE INSPECTION REPORT. CSAH 15 over ARCOLA CHANNEL. Date of Inspection: Equipment Used: 09/07/2016. County Highway Agency

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

STRUCTURE AND BRIDGE DIVISION

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

Bridge management systems: An asset management tool for road structures

PUBLIC INFORMATION MEETING June 24, 2015

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) Bridge. Bridge Inspection Form Type Lot No. 1

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 7 WATONWAN COUNTY

Cast in place concrete parapet and Ministry standard sidewalk railing.

The FHWA Long-Term Bridge Performance Program

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

Transcription:

STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6) Feature Length / Width Owner PINE RIVER 155.81 / 34.15 County: Midland(56) Location Built / Recon. / Paint / Ovly. TSC Operational Status 0.3 MI S OF PINE RIVER RD 2000 / / / Mt. Pleasant(4A) A Open, no restriction(a) Region / County Material / Design Last NBI Inspection Scour Evaluation Bay(4) / Midland(56) 5 Prestressed Concrete / 06 Single/Spread Box 09/22/2015 / LI4U 5 Stable w/in footing NBI INSPECTION LI4U Inspector Name Agency / Company Name Insp. Freq. Insp. Date Eric Rickert Great Lakes Engineering Group 24 09/22/2015 GENERAL NOTES Good. DECK 09/11 09/13 09/15 1. Surface (SIA-58A) 2. Expansion Joints 3. Other Joints 7 7 7 Concrete deck. Noted shrinkage/asr cracking along both sides under railing. No visible cracks in lanes. In NBD lane at south reference line, 1sft spall, no exposed steel. (09/15) Concrete deck. Noted shrinkage/asr cracking along both sides under railing. No visible cracks in lanes. In NBD lane at south reference line, 1sft spall, no exposed steel. (09/13) Under railing noted shrinkage/asr cracking along both sides. No visible cracks in lanes. In NBD lane at south reference line, 1sft spall, no exposed steel. (09/11) 7 7 6 Hairline shrinkage/asr cracks in header. Joint is full of dirt and retainers are rusting. Compression joints at abutments. At north abutment, 10% adhesion failure. At south abutment, spall in EBD and estimate 25% of joint material missing. (09/15) Hairline shrinkage/asr cracks in header. Joint is full of dirt (09/13) Hairline shrinkage/asr cracks in header. Joint is full of dirt (09/11) 8 7 N Corrected per guidelines. (09/15) Compression joints at abutments. Joint material mostly intact with hot poured rubber over joint. (09/13) Compression joints at abutments. Joint material intact. (09/11) 4. Railings 8 8 8 Concrete open parapet railing. Concrete surface sealer on inside of railing. Hairline shrinkage cracks on outside (09/15) Concrete open parapet railing. Concrete surface sealer on inside of railing. Hairline shrinkage cracks on outside (09/13) Concrete surface sealer on inside of railing. Hairline shrinkage cracks on outside (09/11) 5. Sidewalks or Curbs 6. Deck Bottom Surface (SIA-58B) 7. Deck (SIA-58) N N N (09/15) (09/13) (09/11) 8 8 8 Stay in place forms, no rust noted. (09/15) Stay in place forms, no rust noted. (09/13) Stay in place forms, no rust (09/11) 8 7 7 Surface: Concrete deck with shrinkage/asr cracks under railing. Bottom: Stay in place forms with no rust. Fascias: Shrinkage/ASR cracks. (09/15) Surface: Concrete deck with shrinkage/asr cracks under railing. Bottom: Stay in place forms with no rust. Fascias: Shrinkage/ASR cracks. (09/13) Shrinkage/ASR cracks in top of deck along outside and on fascias, stay in place forms along bottom (09/11) 8. Drainage (09/15) Off fascias. (09/13) (09/11) SUPERSTRUCTURE 09/11 09/13 09/15 Form P2502 Printed on 10/01/2015 Page 1 of 3

STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6) Feature Length / Width Owner PINE RIVER 155.81 / 34.15 County: Midland(56) Location Built / Recon. / Paint / Ovly. TSC Operational Status 0.3 MI S OF PINE RIVER RD 2000 / / / Mt. Pleasant(4A) A Open, no restriction(a) Region / County Material / Design Last NBI Inspection Scour Evaluation Bay(4) / Midland(56) 5 Prestressed Concrete / 06 Single/Spread Box 09/22/2015 / LI4U 5 Stable w/in footing 9. Stringer (SIA-59) 10. Paint (SIA-59A) 11. Section Loss 8 8 8 4' wide spread box beams. Cracks on ends of fascia beams at pier. (09/15) 4' wide spread box beams. Cracks on ends of fascia beams at pier. (09/13) 4' wide spread box beams (09/11) N N N (09/15) (09/13) (09/11) N N 3 (09/15) (09/13) (09/11) 12. Bearings 8 8 8 Elastomeric bearing pads in place. (09/15) Elastomeric bearing pads in place. (09/13) Elastomeric bearing pads in place. (09/11) SUBSTRUCTURE 09/11 09/13 09/15 13. Abutments (SIA-60) 14. Piers (SIA-60) 15. Slope Protection 8 8 7 Curtainwall abutments. Shrinkage/ASR cracks in both abutments/slopewalls outside of bearing area. (09/15) Curtainwall abutments. Shrinkage/ASR cracks in both abutments/slopewalls outside of bearing area. (09/13) Shrinkage/ASR cracks in both abutments/slopewalls outside of bearing area (09/11) 8 7 6 Solid wall pier. East & west 3'-4' and bottom 3'-4' has shrinkage/asr cracks. East 1' has honeycomb concrete with exposed steel. Riprap around pier. (09/15) Solid wall pier. East & west 3'-4' and bottom 3'-4' has shrinkage/asr cracks. East 1' has honeycomb concrete. Riprap around pier. (09/13) East & west 3'-4 and bottom 3'-4'' has shrinkage/asr cracks. East 1' has honeycomb concrete. Riprap around pier. (09/11) 7 7 7 Riprap in place. (09/15) Riprap in place. (09/13) Riprap in place (09/11) APPROACH 09/11 09/13 09/15 16. Approach Pavement 17. Approach Shoulders Sidewalks 18. Approach Slopes 7 7 6 Both approach slabs have shrinkage/asr cracking mainly at ref lines. Transverse crack in south approach SBD lane. (09/15) Both approach slabs have shrinkage/asr cracking mainly at ref lines. (09/13) Both approach slabs have shrinkage/asr cracking mainly at ref lines (09/11) 8 8 8 Concrete with approach curb and gutter then HMA shoulders (09/15) Concrete with approach curb and gutter then HMA shoulders (09/13) Concrete then HMA shoulders (09/11) Vegetated approach slopes. (09/15) Vegetated approach slopes. (09/13) Vegetated approach slopes (09/11) 19. Utilities None noted on bridge. (09/15) None noted on bridge. (09/13) None noted on bridge (09/11) 20. Channel (SIA-61) 21. Drainage Culverts 7 7 7 Braided channel up and down stream with an island upstream of the bridge. (09/15) Braided channel up and down stream with an island upstream of the bridge. (09/13) Braided channel up and down stream (09/11) (09/15) (09/13) (09/11) Form P2502 Printed on 10/01/2015 Page 2 of 3

STR 6947 MISCELLANEOUS Guard Rail Other Items Item Rating Item Rating 36A. Bridge Railings 1 71. Water Adequacy 9 36B. Transitions 1 72. Approach Alignment 6 36C. Approach Guardrail 1 Temporary Support 0 No Temporary Supports 36D. Approach Guardrail Ends 1 High Load Hit (M) No Special Insp. Equipment 2 Underwater Insp. Method 1 False Decking (Timber) Removed to Complete Inspection Critical Feature Inspections (SIA-92) Freq 92A. Fracture Critical 92B. Underwater 92C. Other Special 92D. Fatigue Sensitive MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6) Feature Length / Width Owner PINE RIVER 155.81 / 34.15 County: Midland(56) Location Built / Recon. / Paint / Ovly. TSC Operational Status 0.3 MI S OF PINE RIVER RD 2000 / / / Mt. Pleasant(4A) A Open, no restriction(a) Region / County Material / Design Last NBI Inspection Scour Evaluation Bay(4) / Midland(56) 5 Prestressed Concrete / 06 Single/Spread Box 09/22/2015 / LI4U 5 Stable w/in footing Date N/A - No False Decking Form P2502 Printed on 10/01/2015 Page 3 of 3

STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION STRUCTURE INVENTORY AND APPRAISAL Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6) Feature Length / Width Owner PINE RIVER 155.81 / 34.15 County: Midland(56) Location Built / Recon. / Paint / Ovly. TSC Operational Status 0.3 MI S OF PINE RIVER RD 2000 / / / Mt. Pleasant(4A) A Open, no restriction(a) Region / County Material / Design Last NBI Inspection Scour Evaluation Bay(4) / Midland(56) 5 Prestressed Concrete / 06 Single/Spread Box 09/22/2015 / LI4U 5 Stable w/in footing Bridge History, Type, Materials 27 - Year Built 2000 106 - Year Reconstructed 202 - Year Painted 203 - Year Overlay 43 - Main Span Bridge Type 5 06 44 - Appr Span Bridge Type 77 - Steel Type 78 - Paint Type 79 - Rail Type 6 80 - Post Type 1 107 - Deck Type 1 108A - Wearing Surface 1 108B - Membrane 0 108C - Deck Protection 1 Structure Dimensions 34 - Skew 0 35 - Struct Flared 0 45 - Num Main Spans 2 46 - Num Apprs Spans 0 48 - Max Span Length 77.8 49 - Structure Length 155.8 50A - Width Left Curb/SW 0 50B - Width Right Curb/SW 0 33 - Median 0 51 - Width Curb to Curb 30.84 52 - Width Out to Out 34.15 112 - NBIS Length Y Inspection Data 90 - Inspection Date 09/22/2015 91 - Inspection Freq 24 92A - Frac Crit Req/Freq N 93A - Frac Crit Insp Date 92B - Und Water Req/Freq N 93B - Und Water Insp Date 92C - Oth Spec Insp Req/Freq N 93C - Oth Spec Insp Date 92D - Fatigue Req/Freq N 93D - Fatigue Insp Date 176A - Und Water Insp Method 1 58 - Deck Rating 7 58A/B - Deck Surface/Bottom 7 8 59 - Superstructure Rating 8 59A - Paint Rating N 60 - Substructure Rating 6 61 - Channel Rating 7 62 - Culvert Rating N Navigation Data 38 - Navigation Control 0 39 - Vertical Clearance 0 40 - Horizontal Clearance 0 111 - Pier Protection 116 - Lift Brdg Vert Clear Route Carried By Structure(ON Record) 5A - Record Type 1 5B - Route Signing 4 5C - Level of Service 0 5D - Route Number 05637 5E - Direction Suffix 0 10L - Best 3m Unclr-Lt 0 0 10R - Best 3m Unclr-Rt 99 99 PR Number Control Section 11 - Mile Point 0 12 - Base Highway Network 0 13 - LRS Route-Subroute 0000008900 10 19 - Detour Length 3 20 - Toll Facility 3 26 - Functional Class 07 28A - Lanes On 2 29 - ADT 444 30 - Year of ADT 1999 32 - Appr Roadway Width 25.92 32A/B - Ap Pvt Type/Width 4 25.98 42A - Service Type On 1 47L - Left Horizontal Clear 0.0 47R - Right Horizontal Clear 22.0 53 - Min Vert Clr Ov Deck 99 99 100 - STRAHNET 0 102 - Traffic Direct 2 109 - Truck % 5 110 - Truck Network 0 114 - Future ADT 660 115 - Year Future ADT 2019 Freeway 0 Structure Appraisal 36A - Bridge Railing 1 36B - Rail Transition 1 36C - Approach Rail 1 36D - Rail Termination 1 67 - Structure Evaluation 7 68 - Deck Geometry 6 69 - Underclearance N 71 - Waterway Adequacy 9 72 - Approach Alignment 6 103 - Temporary Structure 113 - Scour Criticality 5 Miscellaneous 37 - Historical Significance 5 98A - Border Bridge State 98B - Border Bridge % 101 - Parallel Structure N EPA ID Stay in Place Forms 1 143 - Pin & Hanger Code 1 148 - No. of Pin & Hangers Route Under Structure (UNDER Record) 5A - Record Type 5B - Route Signing 5C - Level of Service 5D - Route Number 5E - Direction Suffix 10L - Best 3m Unclr-Lt 10R - Best 3m Unclr-Rt PR Number Control Section 11 - Mile Point 12 - Base Highway Network 13 - LRS Route-Subroute 19 - Detour Length 20 - Toll Facility 26 - Functional Class 28B - Lanes Under 29 - ADT 30 - Year of ADT 42B - Service Type Under 5 47L - Left Horizontal Clear 47R - Right Horizontal Clear 54A - Left Feature 54B - Left Underclearance 99 99 54C - Right Feature 54D - Right Clearance 99 99 Under Clearance Year 55A - Reference Feature N 55B - Right Horiz Clearance 327.8 56 - Left Horiz Clearance 0 100 - STRAHNET 102 - Traffic Direct 109 - Truck % 110 - Truck Network 114 - Future ADT 115 - Year Future ADT Freeway Proposed Improvements 75 - Type of Work 76 - Length of Improvement 0 94 - Bridge Cost 0 95 - Roadway Cost 0 96 - Total Cost 0 97 - Year of Cost Estimate Load Rating and Posting 31 - Design Load 9 41 - Open, Posted, Closed A 63 - Fed Oper Rtg Method 1 64F - Fed Oper Rtg Load 99.9 64MA - Mich Oper Rtg Method 64MB - Mich Oper Rtg 161 64MC - Mich Oper Truck 65 - Inv Rtg Method 1 66 - Inventory Load 69.7 70 - Posting 5 141 - Posted Loading 193 - Overload Class A 0 Form 1717A (01/2002) Printed on 10/01/2015 Page 1 of 1

STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION WORK RECOMMENDATIONS Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6) Feature Length / Width Owner PINE RIVER 155.81 / 34.15 County: Midland(56) Location Built / Recon. / Paint / Ovly. TSC Operational Status 0.3 MI S OF PINE RIVER RD 2000 / / / Mt. Pleasant(4A) A Open, no restriction(a) Region / County Material / Design Last NBI Inspection Scour Evaluation Bay(4) / Midland(56) 5 Prestressed Concrete / 06 Single/Spread Box 09/22/2015 / LI4U 5 Stable w/in footing WORK RECOMMENDATIONS LI4U Inspector Name Agency / Company Name Insp. Freq. Insp. Date Eric Rickert Great Lakes Engineering Group 24 09/22/2015 RECOMMENDATIONS & ACTION ITEMS Recommendation Type Priority Description Detailed Insp. M Investigate cause of cracking in abutments and pier Joint Repair L Blow out joint yearly Deck Patching L Place healer sealer on deck Substr Repair L Patch east end of pier Printed on 10/01/2015 Page 1 of 1

Midland County 2015 Bridge Inspections Road and bridge section facing north Spalls along south end joint 1

Midland County 2015 Bridge Inspections Concrete surface Expansion joint over pier 2

Midland County 2015 Bridge Inspections Upstream channel section Downstream channel section 3

Midland County 2015 Bridge Inspections West elevation of bridge North abutment 4

Midland County 2015 Bridge Inspections Spread box beams Center pier 5

Midland County 2015 Bridge Inspections Spalls with exposed steel at east end of pier South abutment 6