For personal use only

Similar documents
For personal use only

Great Western Scoping Study Update & Onsite Gold Processing

Highlights. Wa Project. Akoko Project. Scoping studies on the Julie West gold vein were completed with the following outcomes;

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES

For personal use only

For personal use only

FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET

OPERATIONAL UPDATE AND 2019 PRODUCTION GUIDANCE

For personal use only

QUARTERLY ACTIVITIES REPORT

FIRST GOLD ORE DISPATCHED FROM ULYSSES

For personal use only

ASX Announcement 25 November 2010 MT BEVAN IRON ORE PROJECT EXPLORATION UPDATE. About Legacy Iron Ore. The Company Announcements Office ASX Limited

DALGARANGA PRE-FEASIBILITY UPDATE

For personal use only

Haoma Mining NL. Dear Sir, ACTIVITIES REPORT FOR THE QUARTER ENDED MARCH 31, 2011 HIGHLIGHTS

Maiden Ore Reserve for Camel Creek JV

For personal use only

For personal use only

Investor Update. June 2016

For personal use only

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2018

For personal use only

ABM Hits 3000 Ounce Target from Trial Mining

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

AGM - Lorena Gold Project

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

Bryah Secures Option over Historic Manganese Mine

For personal use only

DALGARANGA GOLD PROJECT CONSTRUCTION UPDATE LESS THAN 5 MONTHS TO FIRST GOLD

DALGARANGA GOLD PROJECT - CONSTRUCTION UPDATE 8 MONTHS TO FIRST GOLD

2014 MINERAL RESOURCES AND ORE RESERVES

For personal use only

DALGARANGA GOLD PROJECT DEVELOPMENT UPDATE

Thalanga Operations Ore Reserve and Mineral Resource Statement

For personal use only

For personal use only

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

ASX ANNOUNCEMENT 12 MAY 2016

FIRST QUARTILE CASH COSTS

ASX Release ASX Code: YTC

DALGARANGA GOLD PROJECT CONSTRUCTION & OPERATIONAL UPDATE 2 MONTHS TO FIRST GOLD

For personal use only

MINING COMMENCES AT KONONGO GOLD PROJECT

Niuminco Group Limited

For personal use only

For personal use only

AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M

SOUTHERNGOLD COMPELLING VALUE IN A UNIQUE GOLD EXPLORER AND PRODUCER. ASX Ticker: SAU

2014 AGM PRESENTATION

For personal use only

For personal use only

Quarterly Report Period ending 30 September 2018

Azure Minerals Ltd ASX Code:

SIGNIFICANT GOLD AND BASE METALS INTERCEPTS AT CONDOBOLIN Four prospects drilled, four lodes intersected

Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement

ASX ANNOUNCEMENT 26 February 2013 ASX Code: BDR. MAIDEN DUCKHEAD HANGINGWALL LODE RESOURCE 584, g/t for 71,000 oz gold

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Drilling indicates strike continuity of gold-silver mineralisation at the Ban Houayxai deposit, Laos

For personal use only

March 2015 Quarterly Report

Haoma Mining NL A.B.N

NEW ASSAYS CONFIRM THE POTENTIAL OF DRAKE S BÄSINGE COPPER-COBALT PROJECT, SWEDEN

For personal use only

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 MARCH 2018

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

Ore Reserves and Mineral Resources Statements 30 June 2013

For personal use only

For personal use only

280,000 ounces of gold in near-surface Inferred Resource at Cargo, NSW.

For personal use only

Ferrowest acquires Yalyirimbi Iron Project

PACIFIC BAUXITE ACQUIRES NEW BAUXITE PROJECT IN WESTERN AUSTRALIA

For personal use only

For personal use only

For personal use only

Awak Mas DFS Optimisation - Metallurgical Breakthrough

For personal use only

ASX : BLK. Australian gold producer with exceptional growth opportunity

Bald Hill Delivers Excellent Metallurgical Test Work Results

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

INVESTOR PRESENTATION. March 2019

QUARTERLY ACTIVITIES REPORT

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

SPECTACULAR DRILL RESULTS EXTEND HIGH GRADE RESOURCE AT DUCKHEAD PROSPECT, BRAZIL

Kingsgate 2012 Mineral Resources & Ore Reserves

Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results

For personal use only

West African Resources commences deep diamond drilling targeting high-grade primary zone with +400m holes

For personal use only

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

BAUXITE RESOURCES LIMITED ACN

For personal use only

Hot Chili Commences Scoping Study on Productora Copper Project, Chile

Second drill rig to accelerate major drilling program at Productora

QUARTERLY ACTIVITIES REPORT For the period ending June 30, 2009

Transcription:

ACN 092 471 513 QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2018 HIGHLIGHTS PENNY S FIND GOLD MINE KALGOORLIE (WA) 25,771 dry tonnes of ore processed at an average head grade of 6.55g/t Au 5,061 ounces recovered and sold at an average $1,698/oz All-In Sustaining Cost (AISC) A$945 per ounce for quarter. Average gold grade increasing with depth Underground feasibility study nearing completion Post Quarter Fourth toll treatment campaign (~28,000t) commenced at the Lakewood Mill 1

REVIEW OF OPERATIONS Penny s Find (WA): gold mine (60% interest) Empire Resources Ltd ( Empire, Company, ASX code: ERL) holds a 60% interest in and acts as Manager for the Penny s Find Joint Venture ( PFJV ) that owns and operates the Penny s Find gold mine, located 50km northeast of Kalgoorlie in Western Australia. The remaining 40% interest is held by unlisted Brimstone Resources Ltd. Open pit mining commenced at Penny s Find in May 2017. Open Pit Mining During the March 2018 quarter, 25,771 dry tonnes of ore were mined and processed from the Penny s Find open pit which has reached a depth of 75 metres. No major operational problems were encountered in the pit during the quarter. Open pit mining is expected to finish by the end of April 2018 when the pit will have reached a depth of 85m. A photograph of the open pit operation taken at the end of the quarter is shown below in Figure 1. Figure 1 : Penny s Find Open Pit looking north. One Lost Time Injury was reported during the quarter. The contractor s employee has recovered and returned to normal duties. 2

Gold Treatment Lakewood Mill One toll treatment campaign was completed during the quarter at the Lakewood Mill situated on the southern outskirts of Kalgoorlie - Boulder. After receiving final reconciliations from the Lakewood Mill and Perth Mint, this campaign processed a total of 25,771 dry tonnes of ore at an average calculated head grade of 6.55g/t Au. Details of the quarter s production are: Total gold recovered was 5,061oz which includes gold poured and gold retained on carbon the value of which is paid by the mill to the PFJV partners. Average total gold recovery was 93.2%, with 56% recovered by gravity. Total gold sales amounted to A$8.6 million. Average price per ounce received was $1,698 The All-In Sustaining Cost (AISC) was A$945 per ounce for the quarter. Since gold production started, the AISC is A$1,288 per ounce. Average gold grades continue to increase with depth as shown in Figure 2. 12.00 10.00 8.00 DAILY CALCULATED HEAD GRADE - LAKEWOOD MILL g/t Au 6.00 4.00 2.00 0.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 DAYS - Three campaigns Figure 2 : Average gold grade increasing as ore is sourced from deeper within the open pit Post Quarter A fourth toll treatment campaign commenced at the Lakewood Mill on 14 April 2018. This campaign will process the final approximately 28,000 tonnes of high grade ore from the bottom of the open pit. The campaign is expected to take two weeks to complete. 3

Burbanks As announced to the ASX on 29 March 2018, dispute resolution proceedings have commenced between Empire and Eastern Goldfields Milling Services (EGMS) operators of the Burbanks Mill at Coolgardie. EGMS is a wholly owned subsidiary of Maximus Resources Limited ( Maximus, ASX code MXR). Empire is seeking to recover in excess of $830,000 owed to the Company following the processing in October to December 2017 by EGMS of ore from the Penny's Find Joint Venture The claim can be broken down into 3 areas: Failure to pay Final Gold in Circuit (GIC) EGMS has failed to pay to Empire 384.75 ounces of gold resulting from the final GIC conducted at the Burbanks facility following termination of the milling campaign in December 2017. The value of that gold at a gold price of $1,740 per ounce (the Perth Mint buy price as at 26 March 2018) is $669,461. Offset against this are amounts owed by Empire to EGMS of $370,436 leaving a balance owing of $299,025. Maximus in an article in the business section of the West Australian newspaper dated 31 March 2018, did not dispute the amount of GIC owing to the Company. The Final GIC was due for payment on 16 January 2018.. Gold Ounces Discrepancy Following a thorough review by a metallurgical consultant of the records maintained by EGMS, Empire believes EGMS has failed to account for 315 ounces of gold contained in ore that was delivered to the Burbanks Facility. The gold Empire is seeking recompense for has been determined only from data provided by EGMS and has been verified by a second independent metallurgical consultant. The value of that gold at $1,740 per ounce is $548,100. Calculation of Belt Calibration Adjustments Errors Other Empire believes belt calibration adjustments applied to the amount of ore as measured by the weightometer have been incorrectly applied by EGMS. This error has resulted in an overcharge for toll milling fees of $55,009.35. The announcement to the ASX (19 April, 2018) by Maximus has effectively confirmed the position taken by ERL and the Company will be seeking satisfaction of the Claim. The final amount claimed will be subject to adjustment for the gold price, the silver price, legal costs and other adjustments. 4

If the matter is not settled by negotiation between the parties, the Company will proceed to a formal arbitration. This has been a difficult episode for the Company because even though the Toll Treatment Agreement was signed on 3 July 2017, production did not commence until 7 October 2017, with the first gold pour on 26 October 2017. The Agreement was eventually terminated because, along with high haulage costs, the treatment of Penny s Find ore through the Burbanks facility had not met the Company s expectations. Production ceased on 21 December 2017. Potential Future Underground Operations Underground Resource On 13 December 2017 the Company reported to the ASX an updated Penny s Find underground resource of 248,000 tonnes @ 7.04g/t Au for 56,000oz (Table 1). This underground mineral resource extends from the planned base of the current open pit operation (max. 85m depth) to at least 250m below surface and remains open at depth (Figure 3). Table 1 Penny s Find Gold Mine Resources - Underground 1.5g/t Au lower cut-off Class Tonnes Au g/t Contained Ounces Measured - - - Indicated 147,000 8.06 38,000 Inferred 101,000 5.57 18,000 TOTAL 248,000 7.04 56,000 5

Underground Feasibility Figure 3: Long Section (looking west) shows all blocks by classification. Light Blue Indicated, Dark Blue Inferred The full underground mine feasibility study, which will determine mining reserves available to be extracted from the underground operations directly below the Penny s Find open pit, is currently being undertaken. The potential ore reserve and mine design portion of this study is being carried out by mining consultants Intermine Engineering Consultants. The feasibility study is expected to be completed early in the next quarter. Figure 4: Latest conceptual underground mine design for Penny s Find. 6

Barloweerie (WA): Silver - Zinc - Lead Project (100% interest) The Company has recently applied for a 110km 2 exploration licence located approximately 155km west of Cue, WA. The exploration licence application covers part of the Barloweerie greenstone belt where historical exploration discovered anomalous silver and base metal mineralisation in a volcanogenic massive sulphide (VMS) setting. Initially, re-processing and modelling of pre-existing detailed aeromagnetics will be undertaken to identify possible drill targets close to known mineralisation. Yuinmery (WA): Copper - Gold Project (100% interest and earning 91% interest in adjoining tenements) The Yuinmery project is a volcanogenic massive sulphide (VMS) copper - gold project located 80km southwest of Sandstone, WA. The Company has already outlined a copper gold deposit at the Just Desserts prospect as reported in previous quarterly reports. Previous exploration has also intersected significant copper-gold mineralisation at the A Zone prospect situated just 1.3km along strike from the Just Desserts deposit. No field work was undertaken during the quarter. CORPORATE FYI Resources Limited (Empire 4.4% interest) ASX-listed FYI Resources Ltd (ASX Code FYI ) is focused on potash exploration in South East Asia where potential exists for the discovery of first tier potash deposits. FYI Resources is currently in joint venture negotiations with a Chinese group regarding resource development and potential production in Laos. It also has applications pending for potash tenements covering two separate project areas in Thailand. Whilst the potash strategy is continuing, FYI has pursued a high purity alumina (HPA) development opportunity in Western Australia through the purchase of 100% of the shares of Kokardine Kaolin Pty Ltd, as announced to the ASX on the 8 May 2017. During the quarter the Company sold 5 million FYI shares at $0.08 to raise $400,000. DAVID SARGEANT MANAGING DIRECTOR April 2018 For further information on the Company, David Sargeant Managing Director Phone: +61 8 9361 3100 Visit: www.resourcesempire.com.au 7

Competent Persons The information is this release concerning the Mineral Resources for the Penny s Find Deposit have been estimated by Mr Peter Ball B.Sc who is a director of DataGeo Geological Consultants and is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Ball has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and qualifies as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ball consents to the inclusion in this public release of the matters based on his information in the form and context in which it appears. Tenement Holdings at 31 March 2018 PROJECT TENEMENT NUMBER PERCENTAGE INTEREST HELD 31 December 2017 PERCENTAGE INTEREST HELD 31 March 2018 PENNY'S E27/410 60 60 FIND E27/420 60 60 E27/553 60 60 E27/591 60 60 E27/592 60 60 E27/593 60 60 G27/1 60 60 L27/90 60 60 L27/91 60 60 L27/92 60 60 L27/93 60 60 M27/156 60 60 P27/2007 60 60 P27/2008 60 60 P27/2245 60 60 P27/2262 60 60 COMMENTS/ CHANGES SINCE LAST QUARTER BARLOWEERIE E59/2306 0 100 APPLICATION YUINMERY M57/265 100 100 M57/636 100 100 P57/1214 100 100 P57/1215 100 100 P57/1216 100 100 P57/1217 100 100 E57/1037 100 100 APPLICATION covers P57/1214-1217 EVOLUTION E57/681 0 0 OPTION TO ACQUIRE OPTION E57/1027 0 0 91% INTEREST 8