Waste Management Plan. Pine Dale Coal Mine (Including the Yarraboldy Extension)

Similar documents
DURALIE COAL MINE WASTE MANAGEMENT PLAN

ANY LIMITED (WMP) Version. Review. Date. All. Plan 5 Yearly. December All. MCC Environmental, Technical. December Yearly.

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

17 Non-mining Waste 17-1

Dendrobium Mine. Waste Management Plan

14. Waste Management

Bulli Seam Operation. Waste Management Plan. Bulli Seam Operations

Millennium Expansion Project Environmental Impact Statement CHAPTER 9: WASTE

WASTE MANAGEMENT PLAN

BARANGAROO SOUTH BUILDING C1 WASTE MANAGEMENT PLAN

ENVIRONMENTAL IMPACT STATEMENT

Aberdeen Harbour Expansion Project. Construction Environmental Management Document

Appendix B7 Construction Waste Management Plan

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B7 Construction Waste Management Plan

Kurnell Refinery Conversion Project

PEABODY ENERGY WILPINJONG COAL WASTE MANAGEMENT PLAN

Waste and Energy Management Plan

Waste Management Plan

Pine Dale Coal Mine (Including the Yarraboldy Extension)

Kurnell Refinery Conversion Project

Wastewater Management Procedure Environment

Construction Waste Management Plan

CHAPTER 8 NON-MINING WASTE MANAGEMENT GULF ALUMINA LTD SKARDON RIVER BAUXITE PROJECT

APPENDIX B7. Construction Waste and Energy Management Plan

Page 1 of 27. DUNMORE LAKES SAND PROJECT Waste Management Plan

Site Waste management Plan (SWMP)

Signatory Name: Master Distributors Pty Ltd

Waste Management Plan

(24 July 2015 to date) NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008

Construction Waste and Resources Management Plan (Appendix B7)


BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT

To license or not to license? Listed or Unlisted? Presented by: Stuart Gower-Jackson

Construction Waste and Resource Sub-Plan

ESTATES OFFICE OPERATIONS. DEPARTMENTAL PROCEDURE No.16. Disposal of Redundant Materials

Consent of copyright owner required for any other use. For inspection purposes only.

Sydney Port Botany Terminal 3 Project Waste Management Plan

5 EIS Waste Management

DEPARTMENT OF ENVIRONMENTAL AFFAIRS. No November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.

Water Management Plan. Pine Dale Coal Mine (Including the Yarraboldy Extension)

Environment Incident Identification & Response (Mining Areas)

GENERAL WASTE MANAGEMENT

Safety Management System. Initial Revision Date: Version Revision No. 02 GENERAL WASTE MANAGEMENT

GENERAL WASTE MANAGEMENT

Mastip Environmental Policy Statement: Protect the Environment on a daily basis

Environmental Management Plan

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

Environmental Policy. Excellence, Sustainability, Innovation, Passion

Blast Management Plan. Pine Dale Coal Mine (Including the Yarraboldy Extension)

Green Stamp Certification Criteria for Printing Businesses

Cristal Mining Australia Ltd. MSP Waste Management Plan

Environmental Management Programme (EMP)

Construction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders

TRAFFIC MANAGEMENT PLAN

ENVIRONMENTAL GENERAL WASTE MANAGEMENT BEST PRACTICES

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

NC Sturgeon Safety Management System

CORAKI QUARRY ENVIRONMENTAL MANAGEMENT PLAN

Heiton Buckley. Builders Merchants. Annual Environmental report for Licence No. PO340-01

Loy Yang B Environment Improvement Plan

Construction Environment Management Plan

Signatory Name: Key Pharmaceuticals Pty Ltd

APPLICATION FOR WATER LICENCE, AMENDMENT OF LICENCE, OR RENEWAL OF LICENCE

A Waste Management Review

City Circle Recycling pty. ltd Construction & Demolition Waste Recycling Jones Rd Brooklyn

Crushing and Screening Management Procedure Environment

ENVIRONMENTAL & SUSTAINABILITY POLICY

Kurnell Refinery Conversion Project

ASSET MANAGEMENT SUSTAINABILITY POLICY 2016

Waste Management Plan

Traffic Management Plan. for the. Dargues Gold Mine

Executive Summary INTRODUCTION THE APPLICANT

DEPARTMENT OF ENVIRONMENTAL AFFAIRS. No November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.

ATTACHMENT B GENERAL

Newstan Colliery S75W Modification Project Briefing Paper

For guidance on disposal of Polychlorinated Biphenyl (PCB) contaminated equipment or fluids, please refer to the Guidance Note NR/GN/ESD03.

WASTE MANAGEMENT CHAPTER TWENTY-FOUR

Environmental Sustainability Destination Action Plan

Section 11.2 describes the study area and the legal context for resources and waste;

Environmental Risk Analysis

ARDILL PAYNE & P a r t n e r s ABN:

There will be no significant impact from solid waste arising during the development of the proposed power plant.

2. DEFINITIONS Certificate of Safe Disposal disposal permit general waste hazardous chemical substance hazardous waste IBC landfill site litter

MATERIALS MANAGEMENT PLAN (MMP)

Australian Packaging Covenant

North West Site Waste Management Plan September 2011

Examples of Hazardous Wastes produced by the University include:

Waste Management Statement for Demolition, Construction and Operation. Proposed Office Development. Ballsbridge, Merrion Road, Dublin 4.

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

MANAGING STORMWATER AND TRADE WASTEWATER

Action Plan for Caltex Australia

Appendix B8 Construction Hazard and Risk Management Plan

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PUBLIC)

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004

INDUSTRIAL WATER USE INSPECTION REPORT

WASTE MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT STRATEGY

GUIDE TO REVIEWING WASTE AND RECYCLING CONTRACTS

CURRENT STATE OF CONSTRUCTION WASTE IN THE CITY OF CAPE TOWN. A VAN VUUREN / 16 September 2014

Transcription:

Enhance Place Pty Limited ABN: 31 077 105 867 Waste Management Plan for the Pine Dale Coal Mine (Including the Yarraboldy Extension) August 2015

Version Revision Date Revision History Reason for Revision Author Authorised by: 1 June 2011 First edition RW Corkery & Co Hilton Goldinch 2 August 2015 Care and Maintenance Coleen Milroy Graham Goodwin

This page has intentionally been left blank

CONTENTS Page 1. INTRODUCTION... 5 2. SCOPE... 5 3. WASTE MANAGEMENT OBJECTIVES... 5 4. SITE LOCATION AND DESCRIPTION... 6 5. APPROVAL AND LEGISLATIVE REQUIREMENTS... 8 6. MINE WASTE STREAMS... 8 7. WASTE MANAGEMENT MEASURES... 9 7.1 GENERAL SITE WASTE MANAGEMENT... 9 7.2 WASTE REDUCTION... 10 7.3 REUSE OF WASTE MATERIALS... 10 7.4 RECYCLING... 11 7.5 WASTE DISPOSAL... 11 8. RESPONSIBILITIES AND ACCOUNTABILITIES... 11 TABLES Table WA1 Schedule of wastes likely to be generated at the Pine Dale Coal Mine... 9 Table WA2 Accountable Positions and Tasks... 11 FIGURES Figure BF1 Locality Plan... 7 iii

This page has intentionally been left blank

1. I N T R O D U C T I O N This Waste Management Plan (WaMP) has been prepared for the Pine Dale Coal Mine, incorporating the Yarraboldy Extension, ( the mine ) in accordance with Schedule 3 Condition 40 of Project Approval 10_0041 which requires that the WaMP be prepared to the satisfaction of the Director-General and be submitted for approval by the end of April 2011. It is noted that an extension of the required date for submission of the WaMP to 16 May 2011 was provided by the then Department of Planning and Infrastructure (DoP&I). The WaMP provides information on the following. 1. Relevant approval and legislative requirements (see Section 2). 2. Waste Management Objective (see Section 3). 3. Waste streams generated by the mine (see Section 4). 4. Waste management Measures (see Section 5). 5. Responsibilities and accountabilities (see Section 6). This WaMP applies for the life of the mine and applies to both the establishment and operational phases. It is proposed that the WaMP will be reviewed on a bi-annual basis and, if required, updated to reflect any changes to waste management practices. Any significant updates to the WaMP will be submitted to the DPE for endorsement. The Pine Dale Mine has been placed on care and maintenance following the cessation of all coal extraction in April 2014. Rehabilitation activities are proposed during the care and maintenance term only. 2. S C O P E The scope of the WaMP applies to the mine, incorporating ML 1569, ML 1578, and MLA 375, and covers all activities during the care and maintenance term which may impact on, or influence a risk to waste management. The purpose of the WaMP is to: a) Identify mine waste streams (Section 6); b) Implement controls to mitigate accumulation and generation of waste (Section 7); c) Define responsibilities (Section 8). 3. WAS T E M AN A G E M E N T O B J E C T I V E S The objectives of waste management at the mine are as follows. (i) (ii) To identify and classify waste types and quantities generated on site. To minimise waste production and avoid unnecessary resource consumption (Reduce). (iii) To identify potential re-use or recycling opportunities and ensure appropriate handling and collection procedures are in place (Reuse & Recycle). (iv) To ensure the disposal of wastes conforms to applicable guidelines and standards. 5

(v) To ensure areas where fuels, oils or other potential contaminants are stored are appropriately bunded. (vi) To ensure sewage disposal does not result in adverse environmental impacts. 4. S I T E L O C AT I O N AN D D E S C R I P T I O N The Pine Dale coal mine is owned and operated by Enhance Place Pty Ltd (Enhance Place), located approximately 17 kilometres north-west of Lithgow and 5km north of Wallerawang in New South Wales (see Figure BF1). Extractive open cut mining operations ceased in April 2014 when Approved mineable resources were exhausted. Rehabilitation activities are currently being undertaken consistent with the Approved Care and Maintenance Mining Operations Plan.

Figure BF1 Locality Plan 7

5. AP P R O VAL AN D L E G I S L AT I V E R E Q U I R E M E N T S Conditional requirements within Project Approval 10_0041 relevant to the WaMP include the following. Ref Waste Schedule 3 Condition 39 Waste Schedule 3 Condition 40 Project Approval Condition The Proponent shall: (a)minimise the waste generated by the project; (b)and ensure that the waste generated by the project is appropriately stored, handled and disposed of, to the satisfaction of the Director-General. The Proponent shall prepare and implement a Waste Management Plan for the project to the satisfaction of the Director-General. This plan must be submitted to the Director-General by the end of April 2011. Table 1 The following Acts, Regulations and Guidelines are also considered to be applicable to the WaMP. Waste Classification Guidelines (DECCW 2009). Protection of the Environment Operations Act 1997. Waste Avoidance and Resource Recovery Act 2001. Protection of the Environment Operations (Waste) Regulation 2005. 6. M I N E WAS T E S T R E AM S The wastes that will be generated at the mine can be categorised into non-production and production wastes. Non-production wastes and estimated volumes may include the following. General domestic type wastes from the on-site office, amenities, ablutions and first aid facilities and routine maintenance consumables (approximately 3m 3 per month). Hydrocarbons including waste oil (approximately 2 000L per month). Sewage / Septic Pump Out (approximately 3 000L per month). Scrap steel and other wastes remaining from equipment maintenance and former open cut mining operations (approximately 0.5t per month). Production wastes generated by the mine will effectively consist of waste rock / overburden material. No wastes from the crushing of the coal will be produced as the crushing facility does not produce any coarse reject or fine tailings. Table WA1 provides a summary of the waste types, their likely source and management / disposal options.

Table WA1 Schedule of wastes likely to be generated at the Pine Dale Coal Mine Waste Type Source Management/Disposal Paper Cardboard PET bottles, Aluminium cans etc Plastic Packaging Putrescible Waste Timber Metal Hydrocarbons Batteries Tyres Effluent Waste Rock Office/Workshop areas. Used as packaging for various items. Office, Crib Room, Workshop Used for shrink wrap over large goods deliveries. Used for general packaging. Waste from employees. Pallets / crates from goods deliveries. Scrap materials from maintenance. Used in workshop and servicing areas. Expended batteries from vehicle fleet. Expended tyres from vehicle fleet. From bathhouse and office areas. From mining activities. Paper to be placed into recycling bins for collection. Cardboard to be placed into recycling bins for collection. Placed into recycling bins for collection. Placed into general rubbish receptacles for disposal to landfill. Placed into general rubbish receptacles for disposal to landfill. Collected as firewood for employees. Metals to be stored separately and removed from site for recycling. Any excess oil which is collected will be stored in an appropriately bunded location prior to removal by a licensed waste oil recycler / transport to a licenced facility. Will be removed from site for collection by a licenced contractor / transported to a licenced facility. Tyres will be disposed of at a licensed facility. Effluent will be treated using the on-site septic system and pumped out by a licenced contractor for disposal at a licenced facility. Construction of amenity bund and backfilling of mined out areas. 7. WAS T E M AN A G E M E N T M E AS U R E S A Care and Maintenance Risk Assessment (CMRA) has been undertaken for the Care and Maintenance term (Pine Dale Mine 2014). Waste was not identified as a risk due to minimal number of employees and contractors based at Pine Dale Mine on a permanent basis. 7.1 GENERAL SITE WASTE MANAGEMENT The following general site waste management actions will be put into practice to minimise the accumulation / generation of waste on site. All Company and contract personnel working on site will undergo a site induction. The site induction will include an overview of the waste management practices at the mine site. 9

All waste areas will be clearly identified as waste storage areas. This will include bins and other receptacles for domestic waste, and which will be marked according to the type of waste accepted, eg. scrap metal, oil filters and oily rags, general waste, etc. Clear instructions will be posted within the Crib Room detailing recycling and waste separation information. There will be no long term storage of any waste materials on the mine site (excepting waste rock / overburden) and no off-site wastes will be accepted or disposed of on site. Notably, the waste rock / overburden will be utilised in construction of the amenity bund and backfilling of mined areas. During care and maintenance the further waste management actions will be put into practice to minimise the accumulation / generation of waste on site. General waste bins will be kept at the site office for the collection of putrescible waste. These bins will be emptied and inspected as part of the regular inspection and maintenance program for the site. There will be some machinery and ancillary equipment located at Pine Dale during care and maintenance. As such hydrocarbon based materials will be stored or kept at the site in accordance with this plan and the Environment Management Strategy. Any waste hydrocarbon materials will be transported from the site by a licenced contractor. In the unlikely event that contaminated soil is identified then the material would be treated on site or disposed off-site by a licenced contractor. Sewage management facilities will be maintained during care and maintenance and regular inspections and pump out undertaken as required. 7.2 WASTE REDUCTION The following methods will be used to minimise waste production. The ordering of stock will be regularly reviewed to ensure efficient stock control and to avoid wastage. Effluent from the site office, bathhouse and other amenities will continue to treated using the on-site pump-out septic system. The use of degreasers will be regulated in the workshop to ensure the efficiency of the oil-water separator. 7.3 REUSE OF WASTE MATERIALS Opportunities for the re-use of materials on site will be evaluated on a regular basis, for example wherever possible machinery parts will be reconditioned and reused.

7.4 RECYCLING The Company will provide appropriate storage areas or receptacles for all materials that are suitable for recycling. The main recyclable waste materials that will be generated are as follows. Paper and cardboard: will be primarily generated within the office and to a lesser in the workshop area. Paper will be placed into appropriate collection bins, which will be collected by a recycling contractor or transported to a recycling facility on an as needs basis. Scrap metal: will be generated principally within the workshop. The scrap metal will be placed into large skip bins or stockpiled and will be collected by a metal recycler as sufficient quantities are available. Waste oil, oil filters and oily rags: will be generated at the workshop and will be collected within bunded areas. Oily waste will be removed from site by a licensed waste oil contractor for recycling. Batteries: will be removed from site for delivery to a facility able to despatch them to an appropriate recycling facility. Miscellaneous recyclables: including printer cartridges, aluminium cans and recyclable plastics will also be stored at appropriate locations prior to collection by, or delivery to, appropriate recycling facilities. The Manager Mining Engineering will undertake random inspections of waste storage locations to ensure that the appropriate separation and collection waste is being undertaken. 7.5 WASTE DISPOSAL Waste materials which cannot be either re-used or recycled will be sent to a licensed landfill that may accept that category of waste or collected by a licenced waste contractor. Any wastes which are required to be tracked will be done so, in accordance with the relevant legislation. 8. R E S P O N S I B I L I T I E S AN D AC C O U N TAB I L I T I E S The procedures and management measures presented in the WaMP will be made available to all members of the workforce on site. The responsible workforce will be made aware of the procedures through inductions, training (as required) and regular toolbox talks / meetings. The ultimate responsibility for waste management is the Manager Mining Engineering. Table WA2 outlines the accountable positions and tasks relating to waste management at the Pine Dale Coal Mine. Table WA2 Accountable Positions and Tasks Position Manager Mining Engineering Accountable Task Ensure that the management measures outlined within the WaMP are implemented. Ensure that all waste contractors are appropriately licenced / wastes 11

are disposed of at a licenced facility. Ensure that regular inspections and maintenance program for the site are maintained during care and maintenance. Review this plan on an annual basis and revise if required. All Employees Ensure that all wastes are placed into appropriate storage receptacles. Utilise resources / consumables efficiently and reduce waste generation where possible. Ensure that wastes are not disposed of on site or accept any wastes to site.

This page has intentionally been left blank 13