NRC 1988: Coastal Hazard Identification. Whangarei County. Technical Publication No.1988/1, March 1988, held by Northland Regional Council.

Similar documents
7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION

Appendix 9 - Engineering Performance Standards

7 Section 32 Summary for the Natural Hazards Chapter

8 MANAGING THE EFFECTS OF NATURAL HAZARDS

Part 8 Natural hazards

Kaipara District Plan: Proposed Plan Change 2 - Fire Safety Rules SUMMARY

8 Subdivision and Development

PART 5D - NATURAL HAZARDS

DRAFT PROPOSED SECTION 32 CHAPTER 5 NATURAL HAZARDS

The natural hazard types that have been identified within the City include the following:

47 Road Transport Rules

MPT.2.8. Management Plan Technique. Index. Description and Explanations

14 NATURAL HAZARDS Background Resource Management Issues

5 NATURAL HAZARDS. Contents. 5.1 Introduction Flooding Land Instability Coastal Hazards Fire. 5.1.

RPE.3.4. Rural Production Environment. Index. RPE.1.1 Description and Expectations

Section 8A. 8A Purpose of the Natural Hazards Provisions A.1 Objectives and Policies for the Natural Hazards Provisions... 1.

8A Purpose of the Natural Hazards Provisions A.1 Objectives and Policies for the Natural Hazards Provisions... 1

Rural Development Strategy. Hazards: Issues and Options

14 NATURAL HAZARDS Background Resource Management Issues

DRAFT. DRAFT Natural hazards. Chapter 5 - Natural Hazards. Contents

E36. Natural hazards and flooding

Natural Hazards Natural Hazards Explanatory Statement Significant Issues Objectives and Policies...

E36. Natural hazards and flooding

Thinking about developing or building on land with ponding or drainage issues?

Acid Sulphate Soils Recommendations in response to submissions on the Proposed Regional Plan for Northland - Section 42A hearing report

The approach to managing natural hazards in this Plan is to: set out a clear regional framework for natural hazard management,

E1. Water quality and integrated management

E36. Natural hazards and flooding

The District Council and the Regional Council both have functions for avoiding or mitigating natural hazard events in the District.

74 Subdivision Rules - Business 1, 2, 3, 4, Town Basin, Marsden Point Port, Port Nikau and Airport Environments

Chapter 5 Natural Hazards

NTW.1 Network Utilities

Activities can be unduly restricted by other activities that demand a higher level of amenity.

14 NATURAL HAZARDS Background Resource Management Issues

AMENDMENTS TO CANTERBURY REGIONAL POLICY STATEMENT

Section 8B Purpose of the Coastal Hazard Erosion Plan Area (CHEPA) and Coastal Protection Plan Area

22 Natural Hazards Purpose. Flood Hazard Areas

H28. Special Purpose Quarry Zone

73 Subdivision Rules - Countryside and Coastal Countryside Environments

13 Land Use Activities and Indigenous Biological Diversity

Proposed Kapiti Coast District Plan

STAGE 3 - SECTION 32 CHAPTER 5 NATURAL HAZARDS PART 2

Chapter 5 - Natural Hazards STAGE 3 - SECTION 32 FOR COUNCIL FINAL APPROVAL CHAPTER 5 NATURAL HAZARDS PART 2

44 Marsden Point Port Environment Rules

23 Network Utility Operations

Chapter 5 Natural Hazards (Part)- Stage 1

The Proposed Auckland Unitary Plan (notified 30 September 2013)

EXHIBIT # ATTACHMENT #

EXHIBIT # ATTACHMENT #

#24. Submission by Transpower NZ Limited on the Upper Hutt City Council Proposed Plan Change 42 Mangaroa and Pinehaven Flood Hazard Extents 2017

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

S e c t i o n B i o d i ve r s i t y

DRAFT NSW COASTAL PLANNING GUIDELINE: ADAPTING TO SEA LEVEL RISE SUBMISSION BY THE PLANNING INSTITUTE OF AUSTRALIA (PIA) DECEMBER 2009

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

A. INSTRUCTIONS (Please print or type all answers)

IN THE MATTER of the Resource Management Act 1991 and the Canterbury Earthquake (Christchurch Replacement District Plan) Order 2014

Last amended 3 May 2011 Earthworks Operative 27/07/2000

Policy Statement Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001

subdivision BUSH LIVING ENVIRONMENT ASSESSMENT CRITERIA RULES

AMENDMENT. Section 3.5 and 3.6 Flood Hazard Area Land Use Management Guidelines

general natural area GUIDELINES TO THE RULES This section updated September 2015

STATEMENT OF EVIDENCE OF PETER BLACKWOOD

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

The difficulties Maori can experience in expressing their cultural relationship with ancestral lands.

subdivision INFILL SUBDIVISION ASSESSMENT CRITERIA RULES

The damage and destruction of heritage trees can significantly affect the heritage, cultural, amenity and natural values of an area.

CITY OF NAPIER DISTRICT PLAN. The following resource management issues have been identified as significant throughout Napier City:

S e c t i o n S u b d i vision

Issues in measuring and managing changes to the ecological character of the Western Port Ramsar Site as a result of climate change

IPCC 5 th Assessment Report : Coastal systems and lowlying

Surface Water Guidance for Developers

Earthworks Consent -13,000m 3 of earthworks. Date Received 9/08/2016 Date of Report 22/08/ Engineering Comments -

New Castle County, DE. Floodplain Regulations

Resource Management (National Environmental Standards for Plantation Forestry) Regulations 2017 Consenting and Compliance Guide - May 2018

13 Section 32 Summary for the Residential Chapter

17 Natural Hazard Policy Area Rules

11. NATURAL HAZARDS. Submitter 14 CPHWC. Support 28 INTAF. Oppose 54 STRAT. Oppose in part 54 STRAT GENERAL SUBMISSIONS ON NATURAL HAZARDS

Part B Assessment of Environmental Effects. Earthworks (Minor Effects) Consent No.:... Earthworks (Minor Effects) AEE 6

Section 1 - Introduction

Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads

6.5 The Present Situation Water Quality Stormwater quality is currently being improved by:

ROYAL FOREST AND BIRD PROTECTION SOCIETY OF NEW ZEALAND INCORPORATED KAPITI COAST DISTRICT COUNCIL

DRAFT Coastal Resiliency Technical Bulletin Page 1

E2. Water quantity, allocation and use

10.1 OBJECTIVES. Note: Refer to Section 6 for Issues, Methods of Implementation, and Environmental Results Anticipated.

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

APPENDIX L AHAD KHAN DEVELOPMENT ENGINEERING REPORT

5.9 MARAE DEVELOPMENT ZONE

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

FORM B: DAMMING AND DIVERSION OF WATER

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) South Nicomekl Irrigation Meeting November 2 nd, 2016

PART A RESOURCE MANAGEMENT REQUIREMENTS

UTE.1 Urban Transition Environment

Code of Practice for the Sustainable Management of the Forests and Tree Resources of Tonga

Prepared by Christchurch City Council, P.O. Box 73013, Christchurch. Submission by Avon-Ōtākaro Network, 9 Stable Way, Christchurch 8051

14 Business: Commercial and Industrial Chapter

Application for resource consent Form B Damming and diversion of water

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps.

BMA Broadmeadow Mine - EHP EA amendment application (Pre-lodgement meeting) Wednesday 22 April, 2015

General A. General A.1 Activities Not Specifically Provided For A.2 Temporary Activities... 3

Transcription:

56 Natural Hazards 56.1 Introduction This Chapter contains rules relating to land uses in areas mapped as hazard areas. These areas are shown on the Planning Maps by shading on the Resource Area Maps. These rules apply in addition to any other rules in this Plan applicable to the same areas or sites. In addition, Council's "Policy for Application of Section 36(2) of the Building Act 1991 1 " will apply to all areas mapped as hazard areas, particularly to Coastal Hazard Areas. The Planning Maps identify land which, on the information currently available, is susceptible to flooding; either due to rivers or streams overflowing their banks, inundation from the sea during high tides or storm surges, or to water ponding during extended periods of wet weather. Due to the scale of the mapping, there will be some areas within the identified land that are less prone, or not prone, to flooding, just as outside the identified flood-prone land there will be land which is subject to flooding. Coastal hazard reports prepared for Northland Regional Council and Whangarei District Council from 1988 onwards have been used as information sources to assess Coastal Hazard Areas. A list of these information sources is contained in Schedule 56.1 of the Plan. Copies of these references are available from the Council. The Council is conscious of the need to improve the quality of the natural hazards information and will be carrying out the appropriate research and analysis as resources permit. For example there is a programme to prepare Catchment Drainage Plans for all significant areas of development in the District. People who wish to carry out development in an area identified on the Resource Maps as being subject to natural hazards, should check with the Council to see whether there is any more detailed or up-to-date information relating to the property in question. Schedule 56.1 The coastal hazard information included on the Resource Maps of this Plan is derived from the following Coastal hazard information sources: NRC 1988: Coastal Hazard Identification. Whangarei County. Technical Publication No.1988/1, March 1988, held by Northland Regional Council. Gibb, J.G. 1998a: Review of Coastal Hazard Zones for Eleven Selected Beaches in Whangarei District, Northland Region. Consultancy Report C.R. 98/4 prepared for and held by Northland Regional Council. July 1998. Gibb, J.G. 1998b: Coastal Hazard Zone Assessment for the One Tree Point- Marsden Bay Area, Whangarei Harbour, Whangarei District. Consultancy Report C.R. 98/3 prepared for and held by Whangarei District Council. Gibb, J.G. 1999: Coastal Hazard Risk Zone Assessment for Pataua and Matapouri Bay, Whangarei District. Consultancy Report C.R. 99/7 prepared for and held by Whangarei District Council. December 1999. IPCC 1996: Climate Change 1995. The Science of Climate Change. Summary for Policy Makers and Technical Summary of the Working Group 1. Report. 1 Now superceded by Section 72 of the Building Act 2004 Whangarei District Plan Chapter 56 Page 1

Intergovernmental Panel on Climate Change. Cambridge. Held by Northland Regional Council. Cambridge University Press, 56.2 Natural Hazards Rule Table 56.2.1 Coastal Hazards Construction or alteration of a building or structure in a Coastal Hazard Area is permitted if: a) It does not occur in Coastal Hazard Area 1; and b) All buildings within Coastal Hazard Areas have a minimum floor level of 2.5m above One Tree Point Datum Mean Sea Level 1964. The construction or alteration of a building or structure that does not comply with a condition for a permitted activity is a discretionary activity. 56.2.2 Earthworks Earthworks upon sand dune complexes are a permitted activity if: a) Such earthworks do not occur in Coastal Hazard Area 1; and b) In Coastal Hazard Area 2, the earthworks do not exceed a volume of 25.0m 3 or an area of 150.0m 2, and all sand displaced by such works is returned to the dune complex immediately; and c) The site of the earthworks which will not be covered by buildings or structures is immediately stabilised by appropriate dune binding vegetation within 10 working days of such earthworks being completed. Any earthworks upon dunes that does not comply with a condition for a permitted activity is a discretionary activity. Chapter 56 Page 2 Whangarei District Plan

56.2.3 Flooding Construction or alteration (excluding internal modifications) of a building, construction of vehicular access to a building or allotment, or earthworks in a Flood Susceptible Area, is a permitted activity if: a) A report or certificate from a suitably qualified and experienced professional is provided to the Whangarei District Council which indicates that the activity is designed to accommodate the flood hazard and will not create any adverse effects upstream or downstream nor endanger human life; or b) The work involved is maintenance of an existing building. Note: Reference may be made to previous reports relating to the flood susceptibility of the area. Construction or alteration of a building or earthworks that does not comply with a condition for a permitted activity is a restricted discretionary activity. Discretion is restricted to: i. Construction or alteration of a building in relation to its location; ii. The avoidance, remediation or mitigation of coastal hazards. 56.2.4 Mining Subsidence Construction or alteration (excluding internal modifications) of a building or earthworks within a Mining Hazard Area is a permitted activity if: a) A geotechnical survey of the ground under, and in the immediate vicinity of the site, is undertaken, and b) A report or certificate, which has been prepared by a suitable qualified and experienced professional, is provided to the Council which indicates that: i) Where the site is to accommodate a residential unit, there is an identified building area of at least 100m2 where a residential unit can be built so that there is compliance as a permitted activity with the rules in this plan; and ii) The site is suitable for the activity or structure, and iii) The structure is of an appropriate design and the building materials are appropriate in the circumstances; and c) The risk of subsidence is not increased by the construction, alteration or excavation. Construction or alteration of a building or earthworks that does not comply with a condition for a permitted activity is a restricted discretionary activity. Discretion is restricted to: i. Construction standards; ii. Effects on health and safety. Whangarei District Plan Chapter 56 Page 3

56.3 Reasons for Rules / Explanations Coastal Hazards Short-term coastal erosion occurs because of storm events such as high winds, waves and increased water levels along the coastal foreshore. Coastal flooding is an associated natural hazard. Coastal Hazard Areas prone to coastal erosion and flooding are shown on the Planning Maps. These coastal hazards can present a serious risk to human life and physical structures. A potential rise in sea level will exacerbate these hazards. By ensuring that the floor levels of structures and buildings are at least 2.5m above One Tree Point Datum Mean Sea Level 1964, this risk will be significantly reduced. Natural processes and features such as coastal dunes and mangroves can provide some defence against coastal hazards and this protection should be maintained and enhanced where possible. Earthworks Earthworks in coastal dunes can reduce the protection these natural systems provide against coastal hazards. Earthworks also make the dunes very unstable, thus causing a new hazard to emerge. Re-vegetation will help protect the dunes and thus protect the properties behind them. Flooding The Flood Susceptible Areas identified on the Planning Maps identify flooding from river systems, potential overland flow and low-lying areas which have experienced, or could be subject to, flooding under conditions such as poor drainage. The controls in the Plan are intended to reduce the risk from flooding by requiring the flood risk to be assessed when undertaking any activity such as building or forming an access to an allotment or building. There is also a perceived risk to human safety to those traversing such an access during peak flood periods. The assessment of flood susceptibility in plantation forestry areas may be included as part of the Annual Harvesting Plans, prepared as a requirement of resource consents granted by the Northland Regional Council. Mining Subsidence The areas subject to possible mining subsidence are identified on the Planning Maps. A network of tunnels exists in the residential areas of Kamo and Hikurangi. The risk to properties situated above these old coal mining tunnels, and to human life, can be minimised by ensuring that any earthworks or structure is suitable and does not increase the likelihood of subsidence. This can be achieved by controlling the design and building materials of structures that are built in these areas. Chapter 56 Page 4 Whangarei District Plan

Revision and Sign-off Sheet Date Approved 27 June 4 October 4 October 4 February 2010 21 September 2010 Editor Paragraph Change Reference Decision Date Approved By FP Typo Paragraph 1 page 4. PW FP 56.2.3; 56.3 Plan change 51 as notified PW FP 56.2.3; 56.3 Plan change 51 amendments as adopted by Council ES 20 September FP 56.2.3 Typo correction PW FP Reference to Chapter 2.3.3 Plan Change 106 consequential changes, this provision no longer exist. Record 10/96471 PW PW Editor France Prevost (FP) Editor Position Approved By Approver Position Team Administrator Policy Division Paul Waanders (PW) Policy and Monitoring Manager (PW) Whangarei District Plan Chapter 56 Page 5