ASBESTOS DISPOSAL INFORMATION (Revised 07/15/18)

Similar documents
Solid Waste Services

Idaho Solid Waste Association

ASBESTOS DISPOSAL PROCEDURES

ARTICLE 4: ASBESTOS CONTROL STANDARDS

NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES

COMPLIANCE ASSISTANCE BULLETIN July Revised July ASBESTOS REQUIREMENTS for DEMOLITION and RENOVATIONS SUMMARY

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES

Rowan University Asbestos Management Program

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION

(1) Adequately wet asbestos-containing waste material as follows by doing all of the following:

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

DATE OF DECLARATION PROPERTY OWNER(S) ASSESSOR PARCEL NUMBER

Mississippi Department of Environmental Quality. Policy for Handling Demolitions of Structures to Address Potential Asbestos January 3, 2006

APPENDIX D1. ASBESTOS NESHAP 40 CFR 61 Subpart M PRE CAA90 40 CFR PART 61 NESHAP

Hazardous Building Materials in Your Community. John Pavitt, EPA Jon Jones, EPA

ASBESTOS - R NOV ATION AND DEMOLITION

Effective 9/1/2018 all construction and demolition loads will need to be accompanied by a Construction and Demolition Acceptance Form.

The following are some of the most commonly asked questions about the Asbestos NESHAP for demolitions and renovations.

A trained attendant will meet with you to assess your load and help you through this process.

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION

ASBESTOS CEMENT WATER MAIN REPLACEMENT

Asbestos Management Program

THE SUSSEX COUNTY MUNICIPAL UTILITIES AUTHORITY ASBESTOS DISPOSAL APPLICATION AND FORMS

Module 3: Asbestos. 15 th Annual OSC Readiness Training Program.

SECTION 16 ASBESTOS MANAGEMENT

Demolition Permit Requirements

Standard for demolition and renovation.

Asbestos Removal, Renovation, and Demolition. Rule 1206

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2065

Asbestos Elevator Industry Workshop November 25, 2015

Rutgers Environmental Health and Safety (REHS)

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

Safety Policy and Procedure

Ensure policy is adhered to by all employees. Follow policy requirements.

Limited Asbestos Demolition Survey

Asbestos in Roads. what is required before work begins. Jeremy Brown. Michigan Department of Environmental Quality. Air Quality Division

Asbestos Management Program. Site Function: Ecology, Health and Safety (EHS) Procedure No.: WYN Page: 1 of 13

Asbestos Management Program April 27, 2017

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION

Chapter 15 Landfill Inspections

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL DEMOLITION PERMIT APPLICATION

Asbestos forms flow chart for Water Department

Guidance Document for the Management of Asbestos-containing Material (ACM) (Updated 01/06/2004)

Asbestos Awareness Program

Demolition and Disposal Issues re: Mobile Homes

In general, the management plan development process consisted of:

Scope of Work. Containing Material); therefore the following requirements must be met:

TSCA Toxic Substances Control Act

Washington University Asbestos Operations and Maintenance Plan

ASBESTOS CLEARANCE CERTIFICATION Required for All Demolition Debris

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL

UI Procedures for Asbestos Management

TOWN OF CAPE ELIZABETH

MICHIGAN STATE UNIVERSITY

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

Standard for notification prior to demolition or renovation.

Pillsbury Mills Community Meeting

ASBESTOS REMOVAL, RENOVATION, AND DEMOLITION (Adopted & Effective 11/15/17)

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

FRIABLE AND NON-FRIABLE ASBESTOS REMOVAL. Provisions of the General Conditions and Special Conditions are part of this Division.

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

TEXAS CONSULTING SERVICES PO Box 9910 * Midland, Texas Phone: (432) * Fax: (432)

HIGGINSVILLE HABILITATION CENTER MISC. BUILDING RENOVATIONS STATE OF MISSOURI HIGGINSVILLE, MISSOURI SECTION ASBESTOS ABATEMENT PART 1 -GENERAL

PRE-DEMOLITION HAZARDOUS MATERIALS ASSESSMENT 5785 MONTANA CREEK ROAD JUNEAU, ALASKA

INSTRUCTIONS NESHAP NOTIFICATION OF DEMOLITION AND/OR RENOVATION FORM

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

A. Prior to commencement of any work, make a complete inspection of all of the facilities listed in this specification

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT

Asbestos Exposure. COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

APPLICATION FOR DEMOLITION PERMIT

ASBESTOS MANAGEMENT PLAN PROCEDURE

Beth Israel Deaconess Medical Center Environment of Care Manual

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

Memphis-Shelby County Airport Authority Project # Tchulahoma Warehouse Asbestos Survey Report

SWCAA 476 Standards for Asbestos Control, Demolition, and Renovation

ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina Phone: Fax:

Demolition & Disposal Requirements J A K E B R A D Y M P C A

WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN

Asbestos. Rules of Abatement. What you need to know about removal and maintenance

Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites

S (Tribal Road) Bridge over I-85 (Exit 104) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report

FACILITY ASBESTOS MANAGEMENT PLAN

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral

Asbestos Management Program

NASTT NE Regional Chapter Trenchless Conference Thursday, November 16, 2017

National Asbestos Meeting Denver, CO June 23 & 24, 2011

Work Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928

CmDv Demolition Services Bid Packet #1804

US-29 (E. Cherokee St.) Bridge over I-85 (Exit 106) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report

OHIO DEPARTMENT OF TRANSPORTATION ASBESTOS GUIDANCE DOCUMENT

Demolition Information Packet

S (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

Transcription:

Fairbanks North Star Borough Division 455 Sanduri Street Fairbanks, Alaska 99701 (907) 459-1482 FAX 459-1017 ASBESTOS DISPOSAL INFORMATION (Revised 07/15/18) The FNSB Division accepts asbestos on a scheduled basis. Please see the following information and instructions. 1. DAYS / TIMES ACCEPTED: First & Third Thursdays of the month from 9:00 a.m. 11:30 a.m. Waste Shipment Manifest approval required prior to disposal. Missed appointments will need to be rescheduled. 2. PACKAGING: Friable asbestos waste must be properly packaged and appropriately labeled per applicable Federal and State of Alaska regulations (Anchorage EPA: 907-271-1485). Non-Friable loads must be completely wet prior to off-loading at the Facility. Metal pipe, etc., must be less than 8 feet in length. 3. FEES: Asbestos generated from: Within the FNSB: Waste Shipment Manifest charge of $167.00 per ton. Outside the FNSB: Waste Shipment Manifest charge of $222.00 per ton. Outside the FNSB/over 25 tons per month: complete the Request To Use Facilities form & print from the Internet at http://fnsb.us, Borough Functions, Solid Waste and Transfer Sites, Forms & Documents Waste Shipment Manifest load charge of $50/each; a $200 flat rate fee for customer-caused asbestos discrepancies. Payment or use of approved charge account required at time of disposal. Fees are effective July 1, 2018 - June 30, 2019. 4. PROCEDURES: Complete Items 1 through 8. Fax to FNSB Division at 907-459-1017. Manifests are reviewed for completeness, appointment scheduled, and then returned. On the original manifest(s), complete Item 9, and Transporter Section (if applicable). Original manifest(s) must accompany each load. W:\Landfill\FORMS\AsbestosManifest.docx (converted to PDF) Page 1 of 3 7/15/2018

FAIRBANKS NORTH STAR BOROUGH SOLID WASTE DIVISION 455 SANDURI STREET FAIRBANKS, ALASKA 99701 (907) 459-1482 FAX (907) 459-1017 Waste Shipment Manifest Instructions WASTE GENERATOR SECTION (ITEMS 1-9) 1. Enter the name of the facility at which asbestos waste is generated and the address where the facility is located. In the appropriate spaces, enter the name of the owner of the facility and the owner s phone number. 2. Enter the name and address of the Abatement Operator (Contractor) performing the asbestos removal. In the appropriate spaces, enter their phone and fax number. 3. N/A - Information already entered 4. N/A - Information already entered 5. Indicate the types of asbestos waste materials generated: 6. Enter the number and type of containers checked in Item 5. See codes below: DM Metal drums DP Poly drums BA 6 mil. Plastic bags or wrapping Other 7. Enter the total cubic yards of material in all shipping containers listed in Item 6. 8. Use this space for additional information or to request a disposal date. 9. To be completed by the Abatement Operator (Contractor). TRANSPORTER SECTION 10 & 11. To be completed by Transporter(s). DISPOSAL SITE SECTION 12 & 13. N/A - Completed by the FNSB Division. NOTE: Upon disposal, the original manifest will be retained by the FNSB Division and a copy will be given or mailed to the Abatement Operator (Contractor). W:\Landfill\FORMS\AsbestosManifest.docx (converted to PDF) Page 2 of 3 7/15/2018

FAIRBANKS NORTH STAR BOROUGH SOLID WASTE DIVISION GENERATOR For Office Use Only 1. Work Site Name & Mailing Address: FOR OFFICE USE WASTE SHIPMENT MANIFEST DATE APPROVED: DISPOSAL DATE: TIME: A MISSED APPOINTMENT IS REQUIRED TO BE RESCHEDULED. Owner s Name: Owner s Telephone #: 2. Abatement Operator (Contractor s) Name & Mailing Address: Operator s Telephone # : Email: (we may scan and return by email) Fax # : 3. Waste Disposal Site Name and Mailing Address: Telephone #: FNSB Division 455 Sanduri Street, Fairbanks, AK 99701 4. (907) 459-1482 phone (907) 459-1017 fax Name and Mailing Address of Responsible Agency: Asbestos NESHAP Coordinator US EPA, Region 10 (OCE-127) 1200 Sixth Ave., Suite 900 Seattle, WA 98101 5. Type of Materials: Agency Telephone #: (907) 271-1485 6. Number and Type of Containers: No. Type 7. Total Cubic Yards of Shipping Containers Friable Non-Friable 8. Special Handling Instructions, Additional Information, or to Request a Disposal Date: 9. Abatement Operator s (Contractor s) Certification: I hereby declare that the contents of this consignment are fully and accurately described above by proper shipping name and are classified, packed, labeled, and are in all respects in proper condition for transportation by highway according to applicable International, Federal and State of Alaska regulations. Printed Name & Title TRANSPORTER 10. Transporter 1 (Acknowledgement of Receipt of Materials) Company Name, Address & Phone Name and Title 11. Transporter 2 (Acknowledgement of Receipt of Materials) Company Name, Address & Phone Name and Title DISPOSAL SITE 12. Discrepancy Indication Space: None 13. Waste Disposal Site or Operator: except as noted in Item 12. Certification of receipt of asbestos materials covered by this manifest Name & Title W:\Landfill\FORMS\AsbestosManifest.docx (converted to PDF) Improperly Contained Improper Labeling Quantity Page 3 of 3 7/15/2018

August 2016 Asbestos refers to a group of naturally-occurring minerals used in a wide variety of building materials and friction products. Asbestos is not hazardous if it remains undisturbed. However, if the material is disturbed and the fibers become airborne and are inhaled or ingested, they can cause lung and other cancers. During the demolition or renovation of most structures, you are required to identify and properly manage asbestos-containing material (ACM) to protect workers and the public from possible exposure. ACM must be carefully removed, packaged, and disposed to avoid exposure. Division of Environmental Health Anchorage Office: 555 Cordova St Anchorage, AK 99501 (907)269-7802 Fax (907) 269-7510 Fairbanks Office: 610 University Ave Fairbanks, AK 99709 (907) 451-2108 Fox (907) 451-2188 Juneau Office: 410 Willoughby Ave. Suite 303 Juneau, AK 99801 (907) 465-5318 Fax (907) 465-5362 Prior to 1980 a variety of construction materials contained asbestos fibers. Although some uses were restricted in 1980, asbestos can still be found in wallboard, flooring materials, roofing materials, mastics, thermal protection, and cement products. To ensure that the hazards are properly identified, prior to demolition or renovation a certified inspector must perform a building or hazard survey to identify suspected ACM. Asbestos cannot be identified by sight but can be identified through simple laboratory tests. Samples of each suspect material must be tested to determine the presence of asbestos fibers. Material that contains more than 1% asbestos fibers is regulated as ACM. Regulations divide ACM into two categories based on whether the material is friable or non-friable. Friable ACM is material that can be crumbled, pulverized, or reduced to powder by hand pressure. This typically includes products such as thermal or acoustic insulation and ceiling texture. The handling and disposal of friable ACM is stringently regulated as the material poses the greater health risk to residents and workers. Friable ACM is more commonly referred to as regulated ACM (RACM). Non-friable ACM, also referred to as non-regulated ACM (non- RACM), falls into one of two classifications: Category I non-friable ACM include packing, gaskets, resilient floor coverings, and asphalt roofing products that are not friable or likely to become friable during handling. Category II non-friable ACM include any other ACM that are not friable. Despite the use of non-regulated to describe these materials, both state and federal regulations govern the handling and disposal of non- RACM. These less-stringent regulations apply as long as these materials are handled carefully during demolition or renovation to prevent the release of asbestos fibers. If these materials are damaged to the point that they may create dust or release asbestos fibers, they are regulated as RACM, and must be removed, packaged, and disposed accordingly. Page 1

Auugguusstt 22001166 Removal of ACM Federally, the Environmental Protection Agency (EPA), and Occupational Safety and Health Administration (OSHA) regulate the removal and handling of ACM. At the State level, Alaska Occupational Safety and Health (AKOSH) performs regulatory compliance and enforcement duties and offers consultation and training services to help contractors ensure that they are in compliance with the regulations. 8 AAC 61.600. Certification required. A person performing, directly supervising, or monitoring asbestos abatement work must have a certificate issued under 8 AAC 61.720. The certificate must be in the person's possession when performing work. Due to the potential health risks, AKOSH requires special training, certification, and protection plans for asbestos removal workers. RACM removal requires very careful handling and special equipment. Non-RACM must be handled appropriately so it is not exposed to sanding, grinding, crushing, or other processes that could damage the material and result in release of fibers. At least 10 days prior to beginning the demolition of any structure (except a residential structure with four or fewer units) and regardless of the presence of ACM, EPA requires that the operator submit a notification form the project. A notification must also be submitted for a renovation project that will disturb ACM above the EPA regulatory threshold. Even though a project may not require notification, health and management standards still apply. Many of the applicable regulations overlap, but each set of regulations has requirements that must be applied to an asbestos abatement project. The project must adhere to the most stringent of the regulations when a conflict occurs. Asbestos Regulations Agency Regulation Description EPA 40 CFR 61, Subpart M National Emissions Standards for Asbestos EPA 40 CFR 61.145 Asbestos Emission Standards for Demolition and Renovation EPA 40 CFR 61.150 Standards for Waste Disposal from Demolition and Renovation EPA 40 CFR 61.154 Standards for Active ACM Waste Disposal Sites OSHA 29 CFR 1926.1101 Occupational Safety & Health Regulations for Asbestos in Construction & Demolition AKOSH 8 AAC 61.600-720 Asbestos Abatement Regulations ADEC 18 AAC 60.450 Asbestos Disposal Regulations Page 2

Auugguusstt 22001166 Disposal of ACM Waste The Alaska Department of Environmental Conservation (ADEC) regulates the disposal of ACM. ACM may only be disposed in a landfill permitted to accept it. This can include Class I and Class II municipal landfills, or monofills specific to construction and demolition debris or asbestos. However, each landfill determines its own acceptance policy. Most small rural landfills (Class III) are not permitted to accept any ACM. Contact the landfill directly to determine specific policies for ACM waste disposal, or contact your ADEC regional office to discuss disposal options in the project area. All RACM, including any non-racm that has been damaged by processes that could result in release of fibers, must be packaged in leak-tight containers or bags, with proper warning labels and generator information. A waste shipment record signed by both the transporter and the landfill operator must accompany each load. In addition, the transporter must adhere to the Department of Transportation (DOT) hazardous materials requirements. RACM Container Label [29 CFR 1910.1001(j)(5)(ii)] DANGER CONTAINS ASBESTOS FIBERS MAY CAUSE CANCER CAUSES DAMAGE TO LUNGS DO NOT BREATHE DUST AVOID CREATING DUST The landfill operator is required to inspect each load to verify that the RACM is properly packaged and labeled and that waste shipment records match the quantities delivered. Any discrepancies in the waste shipment record must be reported to EPA. Access to the RACM disposal cell must be restricted with warning signs posted around the cell, and the landfill operator must supervise the disposal of each container to ensure that containment remains intact. One copy of the signed waste shipment record must be retained in the landfill record, and one returned to the waste generator. Detailed records of the quantities and disposal locations and depths of all RACM disposed in the landfill must also be kept in the landfill record. Non-RACM that has not been damaged does not require special packaging or shipment records, although the landfill may have specific requirements. Once at the landfill, non-racm requires special handling to ensure that it does not become friable. This requires gently placing the material into the disposal cell so it does not break or create dust, and preventing landfill equipment from running over or compacting the non- RACM until it is covered by at least six inches of material that does not contain asbestos. Landfills often choose to dispose of non-racm separately from other waste because access restrictions also apply. These restrictions include prohibiting salvaging in any cell that accepts non-racm to protect the public from contacting asbestos fibers. Landfills are not required to track waste shipment records or disposal quantities for non-racm unless they are commingled with RACM and are therefore disposed in the RACM cell. Page 3

Auugguusstt 22001166 Summary Take responsibility for protecting yourself, workers, and the public from contacting asbestos fibers by following the regulatory requirements for identification, handling, and disposal of ACM. Contact EPA, AKOSH, or ADEC if you have any questions regarding the requirements and options for handling ACM for your project. Asbestos Regulatory Contacts Agency Issue Phone EPA Asbestos Emissions, Reporting, Handling 907.271.3688 AKOSH Worker Safety & Training 800.656.4972 AKOSH Workplace Compliance & Enforcement 800.770.4940 ADEC Disposal Options & Requirements Regional Office or 907.269.7622 Summary of ACM Handling Requirements Generators Must: Perform surveys and testing Notify EPA & AKOSH, as required Ensure removal is performed by certified asbestos abatement professionals only Use proper removal and safety techniques Handle materials so they are not crushed, broken, abraded, or otherwise may release fibers Determine landfill acceptance policies Deliver to a landfill permitted for asbestos disposal Landfills Must: Ensure that ACM from demolitions and renovations is properly identified when delivered. ADEC recommends requiring submittal of building surveys for a project to identify if ACM is present, and disposal records if ACM is disposed elsewhere. Place all ACM at the appropriate working face in a manner that does not create breakage or dust Cover ACM daily with at least six inches of soil or non-acm Do not allow salvaging in any area with ACM Also for RACM: Seal RACM in leak-proof containers Apply required warning label Label with generator information Fill out all required shipping records Maintain all required records Inspect each load to verify that RACM waste is properly contained and labeled Ensure that shipping records are complete and match the amounts delivered, and report any discrepancies to EPA Track quantities, depths, and location of all RACM waste Maintain access control and signage Page 4