Project Overview- Feasibility Report

Similar documents
REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

Storm Water Resource Plan Criteria and Metrics Checklist

San Diego Basin Study IRWM RAC Meeting

Introduction. October 25, Stephanie Gaines, County of San Diego

Impacts of Permit-Exempt Wells

One Water LA Consultant Team

San Diego IRWMP Public Meeting. Agenda. Morning Agenda

5/21/2012. Welcome and Introductions Introduction to the IRWM Program Statewide Program Merced Region IRWM Plan. Regional Advisory Committee

Chapter 3 Previous Studies

San Diego Basin Study Preview for IRWM RAC

Stormwater design considerations

Rockland County s Water Resources -Selected Findings from the USGS Study- Paul M. Heisig, Hydrologist New York USGS Water Science Center Troy, NY

Surface Water Improvement and Management (SWIM) Plan Development

Nichole M. Embertson, Ph.D. Whatcom Conservation District. May 2, 2012 Abbotsford-Sumas Aquifer Groundwater Nitrate Science Forum Abbotsford, CN

Appendix A. SWRP Self Certification Checklist

MADERA COUNTY STORM WATER RESOURCE PLAN. TAC Meeting #2. August 30th, 2017

Surface Water Improvement and Management (SWIM) Plan Development

OWOW PROGRAM STATUS UPDATE FOR THE OWOW STEERING COMMITTEE MAY 24, 2018

10/30/2018. Meeting Objectives. Agenda Merced SWRP/IRWMP Update Regional Advisory Committee Meeting #5

Chapter 13. Implementation Plan

MADERA COUNTY STORM WATER RESOURCE PLAN. TAC Kick-off Meeting #1. August 7th, 2017

Santa Margarita River WQIP. Consultation Committee Meeting May 17, 2017

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore

Elsinore Valley Municipal Water District. Groundwater Management Plan Adoption. June 10, 2004

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #7 9 NOVEMBER 2017

Establishing Environmental Flows for California Streams. Eric Stein Southern California Coastal Water Research Project

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

OVERVIEW OF WATER RESOURCE ISSUES IN THE CARSON RIVER WATERSHED EDWIN JAMES, P.E. CWSD GENERAL MANAGER 2016

Stakeholder Meeting #1

San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018

Overview of Conjunctive Management in California Let s Have a Frank Discussion

WATER SENSITIVE URBAN DESIGN. David Knights Shaun Leinster Phill Piper

PROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised

DRAFT ANNOTATED OUTLINE 12/4/2006

2015 Restoration Allocation and Default Flow Schedule January 20, 2015

AGENDA. DECEMBER 15, :30 PM Conference Room A. 1. Water Production, Groundwater Levels, and Lake Level Projections

WATER SUPPLY POLICIES

Poso Creek. Integrated Regional Water Management Plan

Tapping into Available Capacity in Existing Infrastructure to Create Water Supply and Water Quality Solutions. Los Angeles Area Chamber of Commerce

Assessing the Effect of Best Management Practices on Stormwater Quality and Flow Regime in Urban Watersheds under Climate Change Disturbance

Maintaining Water Supply Resilience in Extreme Times

City of San Clemente Water Usage Report

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Priorities & Metrics Workgroup Proposed Vision, Mission, Goals, Objectives, and Targets

2015 IRP/RUWMP Kickoff Workshop April 8, 2015

Los Angeles 3 rd Regional

GSP Development Update

San Diego IRWM Project Scoring Guidelines for Prop 84 Round 3 Drought Relief Grant Cycle. Scoring Guidelines

Water Resources of the Virgin River Basin

GSP Coordinating Committee

LEVEE SAFETY UPDATE. June 28,2017

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

Chapter 1 Introduction

A Case Study on Integrated Urban Water Modelling using Aquacycle NTUA, 2007

Rainwater Harvesting

Exploring the Possibilities At Prado Dam

North Monterey County Drought Contingency Plan

Folsom Dam Water Control Manual Update

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012

Implementing the Streamflow Restoration Act in WRIA 1

Stormwater Friend and Foe in the Ojai Valley Ventura River Watershed U April 29, 2010

Goal of the 1972 Clean Water Act

Proposed Work Plan for Seventh Plan Development. October 2, 2014 GRAC Tom Eckman

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Contents Chapter 1: Introduction Chapter 2: Identification and Description of Santa Clara Basin Watershed

Santa Barbara County-Wide Integrated Stormwater Resource Plan

Planning for Water Reuse in Northeastern Illinois (and other places where most people think there is an abundant water supply)

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Section V: Water Accounting and Water Supply Reliability

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Water Infrastructure Needs in the Columbia River Basin Legislative Council on River Governance

Legislative Committee on Public Lands

Hydrologic Analysis of a Watershed-Scale Rainwater Harvesting Program. Thomas Walsh, MS, PhD Candidate University of Utah

Stormwater Non-Potable Uses and Impacts on Urban Infrastructure

WORK COMPLETED TO DATE

Welcome to the MWON Advanced Webinar Series

Draft SGMA Groundwater Sustainability Plan (GSP) Regulation Concepts

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7

5/1/2013. Puget Sound Conditions. LID research, data, guidelines, specifications, and regulations are evolving rapidly.

Salinas and Carmel River Basins Study

OCSD Urban Runoff Program SCAP Collection Systems in Motion

Design Division Project Management & Engineering Department Anchorage: Performance. Value. Results.

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012

3 rd Annual TRIECA Conference March 25 & 26, CIVICA. Media Partner

Lecture 9A: Drainage Basins

..Title Receive Report on Salinas Valley Water Conditions for the Third Quarter of Water Year

Folsom Dam Water Control Manual Update

Surface Water. Solutions for a better world

Raw Water Supply Master Plan Development

CHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC

Reutilización de Aguas Residuales en la Agricultura

Decentralised Wastewater Management. A sustainable strategy for wastewater management

Reservoir on the Rio Boba

Wetland Water Balance Linking hydrogeological processes to ecological effect

AGENDA DATE: November 14, 2018

Transcription:

OVERVIEW OF STORMWATER CAPTURE AND USE FEASIBILITY STUDY TAC MEETING #1, JULY 18, 2017 PRESENTED TO SAN DIEGO IRWM RAC AUGUST 2, 2017 2 Project Overview- Feasibility Report 1. Existing Conditions 2. Feasibility Analysis 4. Implementation Approach/ Prioritization 5. Feasibility Report 3. Cost Analysis 1

3 TAC Meeting Summary TAC Representation Invited to Participate Academia BIA* Tribal* Copermittees* Department of Navy Water Agencies* NGO s* Construction Legal Counsel Hydrologists IRWM* Regional Board Taxpayer s Association Public Utilities* (POTWs) Floodplain Management* Resource Agencies* Farm Bureau* NRCS Caltrans School Districts ASLA UCSD* IEA CWEA Wastewater JPA * Indicates representation on the RAC Project Overview - Data Collection & Existing Conditions Analysis 4 Existing watershed conditions Inventory of stormwater capture facilities Current plans & studies Regulatory framework 2

Project Overview - Feasibility Analysis Technical Feasibility Analysis Stormwater Capture & Use Memo Description & rationale for modeling approach Model results & analyses Conclusions on opportunities & constraints 5 Collection and distribution to storage Retention and storage Identification of beneficial uses Distribution to treatment system Treatment for beneficial use Distribution to end user Up to 55% Runoff Where are the opportunities? 3

Project Overview - Feasibility Analysis Conceptual Model Approach 7 1 2 3 4 5 6 Collection and Retention Identification Distribution Treatment Distribution distribution and storage of beneficial to treatment for beneficial to end user to storage uses system use From SWRP 1 92,000 Potential Storage at Public Parcels 1. High-level analysis, subject to change 23,000 Infiltration to Potable GW Basin 3,000 Infiltration to Non-Potable GW basin 1,000 Treatment & Irrigation On-site or Nearby Site 65,000 Treatment & Potable or Recycled Use Feasibility Analysis Conceptual Model Approach Collection and distribution to storage Retention and storage Identification of beneficial uses Distribution to treatment system Treatment for beneficial use Distribution to end user Potential Beneficial Uses A. Direct Discharge to designated Groundwater Aquifer and extracted for potable use B. Discharge to groundwater to reestablish natural hydrology to restore biological beneficial uses C. Irrigation for On site or nearby Park, Golf Course, Recreational Area D. Small scale on site use for irrigation and other private use E. Sustain Vegetation in Natural Treatment System (wetland treatment) and/or restoration site F. Controlled discharge to Waste Water Treatment for Solids Management during Low Flows G. Controlled discharge to Waste Water Treatment for Indirect Potable Use H. Controlled discharge to Waste Water Treatment for Recycled Water Use 4

9 Project Overview - Cost Analysis Cost of Concept / Actual Projects Capital, O&M, rehabilitation & replacement costs Use select concepts as basis for compiling cost for similar projects & sites Develop unit costs $/volume Identify potential funding Project Overview - Implementation Approach - Prioritization Implementation Approach for Capture & Use Description of implementation approach & classification scheme Implementation analysis of specific projects, areas or alternatives for increasing stormwater capture & use A summary table of ranking or priority for each area, project or alternative 10 5

Project Overview - Implementation Approach - Prioritization Develop Criteria Volume of local water supply augmented Multi-Benefits (Stormwater Resource Plan Scoring) Feasibility Sources vs. Needs Constructability Level of new infrastructure needed Cost - Funding Short & Long-Term Implementation Time Line Prioritize projects Identify short-, mid- & long-term projects Short Term Mid- Term 11 Long- Term 12 TAC Meeting Summary Considerations recommended by TAC: Maximum storage times for Vector Control (72 hrs.) Projects on private property no regional quantification Variability of the runoff capture volumes to understand range Base line flow needs for ecological benefits Capturing dry weather flows for diversion to the sanitary sewer Account for increased population/wastewater generation rates Incorporating current studies to look at stormwater diversion to wastewater plants Real-time monitoring & controls for conveyance of stormwater to treatment 6

13 TAC Meeting Summary Considerations recommended by TAC, continued: Flood mapping & effects on flood areas Cost analysis - use a triple bottom line approach Depth to groundwater needed to assess recharge capacity & treatment of stormwater infiltration Present study as a living document that can be used by others for future planning Investigate including federal lands Include studies by Caltrans looking at storage projects in right of ways 14 How the Basin Plan may inform the SWCFS Improve the efficiency & effective use of existing structural systems, including reservoirs, & conveyance, treatment & reclamation facilities. Increase water supply reliability & resilience. Increase accessibility of locally developed, advanced treated purified water. Take advantage of potential energy management opportunities. Address anticipated climate change impacts. Determine how climate change will impact the current & future water supply portfolio of the San Diego region. 7

Data Sharing Opportunities Data Sharing: Time frame FTP Site: COB August 8, 2017 Open file explorer: ftp.esassoc.com Username: TAC Password: SDH2O 15 http://www.projectcleanwater.org/stormwater-capture-and-use-feasibility-study/ Next Steps 16 Milestone Task 1: Data Collection & Existing Conditions Technical Memo Task 2: Technical Feasibility Analysis, Model Approach Draft Memo Time frame 9/26/17 10/23/17 TAC Meeting #2: Model Approach Webinar Late October 8

Next Steps 17 Data Collection, Existing Cond. Analysis Feasibility Analysis Cost Analysis Implementation Approach/Prioritization Feasibility Study Report Project Schedule 2017 2018 Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov TAC Meetings Thank you! Stephanie Gaines Watershed Protection Program stephanie.gaines@sdcounty.ca.gov 858-694-3493 David Pohl DPohl@esassoc.com 760-497-3318 9