DRAFT ANNOTATED OUTLINE 12/4/2006

Similar documents
Project Application Form

Agenda. Agenda. Agenda. What is Integrated Regional Water Management (IRWM) Planning? Benefits of IRWM Planning

San Diego IRWMP Public Meeting. Agenda. Morning Agenda

Section M CONSISTENCY WITH LOCAL PLANS

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

Central Orange County Integrated Regional Water Management Plan 1.1 GEOGRAPHY OF INTEGRATED REGIONAL WATERSHED MANAGEMENT PLAN

2 Vision and Objectives

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012

2 Vision and Objectives

Priorities & Metrics Workgroup Proposed Vision, Mission, Goals, Objectives, and Targets

Napa Watershed Symposium. Factors affecting future water quantity and quality in Napa County, and strategies for adaptation

5. RESOURCE MANAGEMENT STRATEGIES

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

AMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

South Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

SANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN

PLUMAS COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT UPPER FEATHER RIVER INTEGRATED REGIONAL WATER MANAGEMENT MEMORANDUM OF UNDERSTANDING

Integrated Regional Water Management

South Orange County Watershed Management Area Public Workshop. September 19, 2012

San Diego IRWM Project Scoring Guidelines for Prop 84 Round 3 Drought Relief Grant Cycle. Scoring Guidelines

PROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised

7.1 Data Management Collection

Storm Water Resource Plan Criteria and Metrics Checklist

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Section 4 Regional Water Management Strategies

Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives

Overview of Conjunctive Management in California Let s Have a Frank Discussion

Water for Southern California: How Bay-Delta is Key to All of the Above Strategy

WORK COMPLETED TO DATE

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

2009 Comprehensive Water Package

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template

8 Resource Management Strategies

IRWMP UPDATE IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs

Carlsbad and San Dieguito Watershed Workshop Notes Attendance Welcome and Introductions

INTEGRATED FLOOD MANAGEMENT PLANNING

Chapter 13. Implementation Plan

A10. Cost and Benefits Summary

U.S. Environmental Protection Agency s Interim Expectations for the Phase III Watershed Implementation Plans

San Juan, Santa Margarita and San Luis Rey Watershed Workshop Notes Attendance Welcome and Introductions

Developing Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011

How to Reduce Costs While Improving the Reliability and Quality of Water Resources. The water in a watershed is essential for supporting all life.

Priorities & Metrics Workgroup Meeting No. 3

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Pacific Grove Garbage Disposal Buy-Back Program

The Army Corps of Engineers and America s Coasts and Estuaries

Central Orange County Integrated Regional Water Management Plan

Appendix A. SWRP Self Certification Checklist

Central Coast Climate Collaborative

Chapter 3 Planning Objectives and Constraints and the Alternative Development Process

COASTAL CONSERVANCY. Staff Recommendation May 24, 2007 NORTH SAN DIEGO COUNTY COASTAL WATERSHEDS HYDROLOGIC MONITORING NETWORK

Surface Water. Solutions for a better world

In Hot Water: Climate and Water in the West

COASTAL CONSERVANCY. Staff Recommendation December 11, 2003 LAGUNA DE SANTA ROSA: RESTORATION MANAGEMENT PLAN AND PHASE II SEDIMENTATION STUDY

Ecohydrology Research Vision. SCCWRP Commission Meeting December 4, 2015

Chapter 9 Wetlands Park Study Team

Surface Water Management

IRWM Plan Update Kick-off Meeting. 5 March 2012 MWA Headquarters Apple Valley

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Section 6 Resource Management Strategies

San Diego Basin Study IRWM RAC Meeting

Unify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas:

CLEAN WATER PLAN Policies, Assessments and Management Programs

SOUTH ORANGE COUNTY WATERSHED MANAGEMENT AREA 2013 INTEGRATED REGIONAL WATER MANAGEMENT PLAN An Integrated, Healthy and Balanced Watershed

3.0 MANAGEMENT ISSUES AND RECOMMENDATIONS

CHAPTER. Freshwater Resources CONTENTS. Introduction Freshwater Resources Action Plan. Coastal Bend Bays Plan, 2nd Edition 143

Low Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How

Contents Chapter 1: Introduction Chapter 2: Identification and Description of Santa Clara Basin Watershed

HEALTHY ENVIRONMENT Enhancing Our Natural Habitats, Air, Water, and Beaches

1.1 MONITORING PROGRAM OBJECTIVES The major objectives of the Monitoring Program outlined in the Municipal Stormwater Permit are to:

San Diego Region. Watersheds DEFINING THE REGION

Model Riparian Buffer Ordinance.

Charter: Great Lakes Region Aquatic Habitat Connectivity Collaborative

Local, State and Federal Funding Opportunities

U.S. Environmental Protection Agency s Interim Expectations for the Phase III Watershed Implementation Plans

UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM

Pacheco Reservoir Expansion

SECTION 1. REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

There is a reliable, clean water supply for current and future generations.

CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Pacific Grove ASBS Storm Water Diversions to MRWPCA

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Tahoe Sierra IRWM Please submit by 17 January 2014 to Project Template

The Nature Conservancy Cosumnes River Preserve Franklin Boulevard Galt CA 95632

SHORELINE INVENTORY AND RESTORATION PLANNING

The Future of Integrated Water Management: Moving the Program Forward

Surface Water Improvement and Management (SWIM) Plan Development

7. WATER QUALITY MONITORING PROGRAM PLAN

4677 Overland Avenue San Diego, California AGENDA SPECIAL BOARD OF DIRECTORS MEETING. AUGUST 9, :30 3:30 p.m.

Lane Channel (OCFCD Facility No. F08) from Confluence with F05 channel to Von Karman.

Attachment. Memorandum of Mutual Understandings Integrated Regional Water Management Plan November 11, 2010

The 2008 Florida Statutes

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN

Sea Level Rise Adaptation Strategy for San Diego Bay. Brian Holland, AICP, Climate Program Manager City of San Diego EESTF June 29, 2011

GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019

Transcription:

DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan) addresses a region that includes all of San Diego County that is tributary to coastal waters. The region is entirely within the jurisdiction of the California Regional Water Quality Control Board, San Diego Region (Regional Board). The IRWM Plan was prepared under the direction of a Regional Water Management Group (RWMG) that consists of representatives from the San Diego County Water Authority (Water Authority), City of San Diego, and County of San Diego. The IRWM Plan builds upon the many individual and sub-regional management plans within San Diego County, and was developed with input from a comprehensive array of water management stakeholders. The IRWM Plan provides a mechanism for stakeholders to work together to overcome potential project implementation constraints and effectively implement water management projects that achieve designated regional water management objectives. A.1 Plan Overview Purpose of Plan Existing Planning Environment San Diego Region California Water Plan Update A.2 Regional Water Management Group San Diego County Water Authority City of San Diego County of San Diego A.3 Water Management Challenges Benefits of Regional Approach A.4 Plan Development IRWM Plan Organization Plan Preparation Team Plan Development Process and Stakeholder Input Section A References B. DESCRIPTION OF REGION Summary The region consists of 11 parallel and similar watersheds that discharge to coastal bays, estuaries, and lagoons. The regional boundaries were selected on the basis of watershed boundaries, regulatory jurisdictional boundaries, political boundaries, water service area boundaries, and similar physical and hydrological characteristics. Coastal areas of the region are urbanized, but significant open space exists in upstream areas of the Page 1 of 12 Draft Annotated Outline 12/4/06

region s watersheds. The region is home to numerous endangered species, and Multiple Species Conservation Plans were developed to protect important habitats. Precipitation and streamflows are highly seasonal. Key water quality constituents of concern within the region s 11 watersheds include coliform, sediment, nutrients, salinity, metals, and toxic organic compounds. Imported water supplied by the Water Authority typically comprises more than 80 percent of the region s current water supply. Water conservation, local surface waters, groundwater, and recycled water comprise the remaining supply. The region s water agencies have targeted increasing local supplies as a key element in meeting future regional water demands. B.1 Selection of Regional Boundaries Water Quality Regulation Political Jurisdictions Physical and Hydrologic Similarities Common Imported Water Supply Similarities in Wastewater Management Future IRWM Plan Boundary Considerations B.2 Regional Overview Population Land Use Regional Economy Disadvantaged Communities Climate and Precipitation B.3 San Diego Region Watersheds Regional Watersheds Beneficial Uses B.4 Agency Jurisdictions and Relations Land Use Regulation Agencies Water Supply Agencies Wastewater Agencies Storm Runoff Agencies Flood Control Agencies Environmental Management Organizations B.5 Surface Water Resources Streamflow Coastal Waters Surface Water Quality Standards 303(d) Listed Waters Regional Constituents of Concern B.6 Groundwater Resources Overview of Aquifers Groundwater Quality Objectives Groundwater Quality Issues B.7 Environmental Resources Habitat Resources Vegetation Communities Wildlife and Endangered Species Aquatic, Estuarine and Marine Habitats Invasive Species B.8 Recreational Resources B.9 Water Supply Infrastructure Page 2 of 12 Draft Annotated Outline 12/4/06

Imported Water System Water Supplies Regional Water Supply Infrastructure Emergency Storage Program Wastewater/Recycled Water Water Supply Outside Water Authority Service Area B.10 Water Demand and Supply Diversification Demand Forecasts Supply Diversification Section B References C. CHALLENGES AND OBJECTIVES Summary Principal water management challenges within the San Diego Region include: (1) water supply reliability; (2) water quality protection; (3) resource protection and enhancement; and (4) management coordination. A wide variety of plans were developed within the region that involve management of water resources, including the Basin Plan, watershed management plans, urban water management plans, recycled water and groundwater plans, habitat protection plans, land use management plans, recreational plans, and flood control plans. Through an extensive public outreach process, the RWMG and regional stakeholders developed a vision statement and a list of four goals to address the region s water management challenges. Goals include: (1) develop reliable water supplies; (2) protect and enhance water quality; (3) provide stewardship of our natural resources; and (4) increase coordination and integration of water management planning. The RWMG and regional stakeholders also developed 11 specific IRWM Plan water management objectives for attaining the four IRWM Plan goals. C.1 Water Management Challenges Water Supply Reliability Water Quality Protection Resources Protection and Enhancement Management Coordination C.2 Water Management Planning in the San Diego Region Basin Plan Water Supply Plans Land Use Plan Habitat Protection Plans Water Quality/Storm Runoff Plans Flood Control Plans Recreation Plans Watershed Management Plans Watershed Management Regulation C.3 RWMG Vision and Goals IRWM Plan Vision IRWM Plan Goals C.4 Plan Objectives Section C References Page 3 of 12 Draft Annotated Outline 12/4/06

D. WATER MANAGEMENT STRATEGIES Summary The California Water Plan Update 2005, the Water Authority s 2005 Urban Water Management Plan, and local water management plans developed by San Diego Region agencies and groups identify a number of strategies for achieving water management goals. The plans address a variety of water management categories that include water supply diversification and reliability strategies, environmental and habitat enhancement strategies, water quality improvement strategies, flood control strategies, and recreational strategies. This section builds upon the water management actions proposed in the region s existing plans to achieve designated regional water management goals and objectives. To this end, the plan incorporates more than 200 water management programs and projects proposed within regional or local plans that address a wide range of water supply, environmental, habitat, water quality, flood control, and recreational strategies. D.1 Categories of Water Management Strategies Overview Ecosystem Restoration Environmental and Habitat Protection and Improvement Water Supply Reliability Flood Management Groundwater Management Recreation and Public Access Stormwater Capture and Management Water Conservation Water Quality Protection and Improvement Water Recycling Wetlands Enhancement Invasive Species Control Conjunctive Use Seawater Desalination Groundwater Demineralization Imported Water Land Use Planning Land Conservation/Management Non-Point Source Control Surface Storage/Reservoir Management Watershed Planning Water Treatment Wastewater Treatment and Disposal Water Transfers Public Education Brine Management D.2 San Diego Region Water Management Projects Overview Pollution Management/Water Quality Enhancement Habitat Enhancement and Preservation Flood Control Recreation and Public Access Water Conservation Page 4 of 12 Draft Annotated Outline 12/4/06

Potable Water System Groundwater Recycled Water Brine Management Section D References E. INTEGRATION OF STRATEGIES Summary A variety of water management strategies are required to address the diverse water management issues facing the San Diego Region. In recognition of the diverse water management needs within each of the region s watersheds, a watershed approach is used to integrate water management strategies. Under this approach, proposed projects are identified that address the water management needs within each specific watershed. The projects are assessed on a watershed-by-watershed basis to identify potential project conflicts, common coordination/implementation issues, and conformance with the IRWM Plan objectives. For each watershed, a diverse mix of habitat preservation, water quality protection, flood control, recreation, water conservation, water supply, groundwater, recycled water, and brine management projects are integrated to address both regional and watershed-specific water management challenges. E.1 Watershed Approach to Integrating Projects E.2 Region-Wide Projects Proposed Projects Project Conflicts/Coordination E.3 Santa Margarita Watershed E.4 San Luis Rey Watershed E.5 Carlsbad Watershed E.6 San Dieguito Watershed E.7 Penasquitos Watershed Page 5 of 12 Draft Annotated Outline 12/4/06

E.8 San Diego River Watershed E.9 Pueblo Watershed E.10 Sweetwater Watershed E.11 Otay Watershed E.12 Tijuana Watershed E.13 Benefits of Regional Integration Section E References F. REGIONAL PRIORITIES Summary Water management challenges within the San Diego Region are diverse, complex, and geographically distributed. To address these water management challenges, a multi-step process is used for designating short-term and long-term priorities among the proposed San Diego Region water management projects. Activities and projects are designated as short-term priority on the basis of: (1) near-term implementability; (2) conformance with multiple plan objectives; and (3) support needs other long-term water management programs. Projects designated as long-term priority include those that are not immediately implementable, but achieve multiple plan objectives. It is recognized that the preliminary short-term and long-term designations presented herein will require periodic updating in response to: (1) increased data collection and water management understanding; (2) changing water management conditions and needs; and (3) future changes in IRWM Plan water management objectives or priorities. F.1 Overview Complexity and Diversity of Water Management Challenges Approach to Prioritization F.2 Short-Term and Long-Term Priorities Regional-Wide Projects Santa Margarita Watershed Page 6 of 12 Draft Annotated Outline 12/4/06

San Luis Rey Watershed Carlsbad Watershed San Dieguito Watershed Penasquitos Watershed San Diego River Watershed Pueblo Watershed Sweetwater Watershed Otay Watershed Tijuana Watershed F.3 Reassessment and Modification of Priorities Section F References G. IMPLEMENTATION Summary A regional IRWM Plan management structure will be required to oversee implementation of the IRWM Plan, solicit stakeholder input, and provide for long-term coordination and management of regional water management issues. To represent the diverse water management interests within the San Diego Region, the IRWM institutional structure (either a Joint Powers Authority or council/committee formed by Memorandum of Agreement) will be comprised of regional land use, water, and wastewater agencies; environmental, business, and agricultural non-governmental organizations; and other regional stakeholders. The regional organization will assist project proponents in resolving implementation issues, coordinating regional funding efforts, coordinating monitoring/data management efforts, and coordinating resolution of regional regulatory or jurisdictional conflicts. As a roadmap to implementation, this section addresses the technical and economic feasibility of the proposed projects and identifies key implementation issues, regulatory approvals, and action items required to implement the projects. G.1 Implementation Overview G.2 Plan Implementation Management Structure Management Structure Responsibilities Management Structure Options G.3 Issues Affecting Project Implementation G.4 Feasibility of Proposed Projects Regional-Wide Projects Santa Margarita Watershed San Luis Rey Watershed Carlsbad Watershed San Dieguito Watershed Penasquitos Watershed San Diego River Watershed Pueblo Watershed Sweetwater Watershed Otay Watershed Tijuana Watershed Economic Feasibility of Plan Section G References Page 7 of 12 Draft Annotated Outline 12/4/06

H. BENEFITS AND IMPACTS Summary Proposed IRWM water management strategies and projects will result in a number of region-wide benefits, including water quality improvement, ecosystem improvement, fish and wildlife enhancement, flood control enhancement, erosion control enhancement, recreation and public access enhancement, public safety enhancement, enhancement of water supply reliability, cultural resource preservation, reduced wastewater discharges, improved water management coordination, enhanced scientific and public understanding, and economic benefits. Proposed IRWM projects will also result in inter-regional benefits associated with helping to achieve State Water Plan objectives and goals, including reducing reliance on Bay-Delta imported water supplies. Impacts associated with proposed projects are primarily limited to short-term construction-related impacts. Inter-regional benefits include: (1) reduced capacity needs for statewide and Metropolitan Water District imported water facilities; and (2) environmental benefits associated with reduced needs for Bay-Delta and Colorado River waters. H.1 Regional Benefits Water Quality Improvements Ecosystem Improvement Fish and Wildlife Enhancement Flood Control Erosion Control Public Safety Recreation and Public Access Water Supply Reliability Preservation of Cultural Resources Reduced Wastewater Discharges Wastewater Management Coordination Increased Scientific Knowledge Increased Public Education and Environmental Awareness Economic Benefits H.2 Regional Impacts H.3 Inter-Regional Benefits and Impacts H.4 Objectives Requiring Regional Solution Water Supply Flood Control Water Quality and Habitat Recreation Stakeholder Involvement Regulatory Compliance Data Management H.5 Environmental Justice Benefits and Impacts H.6 Benefits and Impacts to Other Resources Section H References I. EVALUATION OF PLAN PERFORMANCE Summary This plan is prepared in accordance with guidance presented in the DWR/State Board Integrated Regional Water Management Grant Program Guidelines. Page 8 of 12 Draft Annotated Outline 12/4/06

Existing regional and subregional water management plans (including habitat protection, water quality enhancement, flood control, recreation, and water supply) within the San Diego Region form the basis for evaluation of regional water management planning within this IRWM Plan. Methods used to develop this plan are consistent with these regional plans and IRWM guidelines. A number of parameters are available for measuring plan benefits. An iterative adaptive management process consisting of cycles of assessment, plan formulation, implementation, monitoring, and reassessment will be employed by the San Diego Region IRWM management group. I.1 Basis of Analysis I.2 Methods and Analyses to Develop Plan I.3 Evaluation of Plan Performance I.4 Adaptive management Section I References J. DATA MANAGEMENT Summary A variety of governmental and non-governmental organizations currently collect surface water quality, surface flow, groundwater, habitat, and water use data within the San Diego Region. Regional stormwater data collection efforts have been coordinated and managed by the regional NPDES stormwater copermittees, but no central or organized data management structure exists for the majority of the collected San Diego Region water management data. Significant data gaps exist in the collection and assessment of regional surface water quality, groundwater quality, groundwater availability, and habitat data. Filling the data gaps and coordinating data collection and management within the San Diego Region will be required to assess regional water management needs and to assess the effectiveness of implemented water management projects. J.1 Need for Integrated Data Management Importance of Data Management Regional Watershed Data and Information System J.2 Existing Surface Water Quality Monitoring Programs Stormwater Monitoring NPDES Point-Source Monitoring Monitoring by Non-Government Organizations State and Federal Water Resources Data Collection Monitoring by Drinking Water Agencies J.3 Groundwater Quality Monitoring Waste Discharge Permit Monitoring Underground Tanks Drinking Water Monitoring Special Studies Coastal Water Quality Monitoring J.4 Existing Streamflow Monitoring Programs J.5 Existing Habitat Management Programs J.6 Data Collection/Analysis Needs Data Gaps Surface Water Quality Data Gaps - Streamflow Page 9 of 12 Draft Annotated Outline 12/4/06

Data Gaps Groundwater Data Gaps - Habitat J.6 Regional Support for Statewide Data Management Needs Section J References K. FINANCING Summary The RWMG agencies funded development of this IRWM Plan, and are committing additional funding to facilitate development of a long-term IRWM management structure for the region. A variety of groups will benefit from implementation of the IRWM Plan, including: residential, business, industrial, and agricultural water customers; recreation participants; residents along floodways; and groundwater users. Primary means of financing IRWM capital projects will be through government agency Capital Improvement Program (CIP) budgets. State of California grant funds are also an important potential source of funding for capital projects. IRWM projects for environmental enhancement projects may be funded directly by agencies, by grant funds, or by non-government endowments or contributions. K.1 Plan Financing K.2 Beneficiaries of Integrated Projects K.3 Potential Funding Mechanisms for Project Implementation Capital Improvements Program Funding Funding Programs to Assist Government Agencies Funding Programs to Assist Non-Government Organizations K.4 Potential Funding Mechanisms for Project Operation/Maintenance Section K References L. STATEWIDE PRIORITIES Summary This IRWM Plan is in concert with IRWM Program Preferences established by California Department of Water Resources and the State Water Resources Control Board. Proposed IRWM projects include: (1) integrated projects with multiple benefits; (2) improve water supply reliability; (3) contribute to maintaining water quality standards; and (4) reduce pollution in impaired waters. The IRWM Plan is also consistent with statewide priorities established in IRWM guidelines, as the projects reduce water user conflicts, help implement TMDLs, implement Regional Board policies, and implement the State Board s Non-Point Source Pollution Plan. Additionally, IRWM water supply diversity programs will reduce imported water demands, helping to achieve CALFED Bay-Delta goals and objectives. L.1 Program Preferences L.2 Plan Conformance with Statewide Priorities L.3 Environmental Justice Issues Section L References Page 10 of 12 Draft Annotated Outline 12/4/06

M. CONSISTENCY WITH LOCAL PLANS Summary This IRWM Plan builds on prior San Diego Region water management plans, including: water quality enhancement plans, watershed protection plans, stormwater control plans, habitat and endangered species plans, flood control plans, recreation plans, and water supply plans. Using a stakeholder-driven process, IRWM Plan goals and objectives are, in part, developed from goals and objectives within these regional and subregional plans. This IRWM Plan integrates projects from the regional and subregional water management plans and considers the projects within both a regional and watershed context. Projects considered within this IRWM Plan are consistent with: (1) implementing Basin Plan water quality objectives; (2) protecting existing and potential beneficial uses; and (3) implementing regional and subregional water management plans. M.1 Consistency of IRWM Plan with Basin Plan Importance of Basin Plan in IRWM Planning Consistency with Basin Plan M.2 Consistency of IRWM Plan with San Diego Region Water Management Plans Consistency with Regional Water Management Plans Consistency with Land Use Planning Section M References N. STAKEHOLDER INVOLVEMENT Summary This IRWM Plan is being developed through a multi-faceted stakeholderdriven process. Stakeholder input is an important component of each plan development phase, and includes: (1) stakeholder input to provide initial plan guidance; (2) stakeholder input to identify proposed water management strategies and projects; (3) the creation of a broad-based advisory committee to provide policy-level plan direction; and (4) public review of the draft plan. A diverse range of stakeholders were identified, including land use agencies, water and wastewater agencies, flood control agencies, state and federal agencies, Native American Tribes, and a wide variety of environmental and other nongovernment organizations. The proposed outreach process includes partnering with Project Clean Water, conducting public workshops and presentations, posting information on the internet, holding meetings with stakeholders, and conducting stakeholder activities to incorporate the region s disadvantaged communities in the IRWM process. N.1 Overview N.2 Initial Stakeholder Outreach and Partnerships Project Clean Water Partnership Technical Advisory Committee Participation Web Postings Project Clean Water Annual Summit N.3 Outreach to Disadvantaged Communities N.4 Plan Development and Review Initial Public Workshops Identified Stakeholders Stakeholder Contacts and Meetings Advisory Groups N.5 Plan Adoption N.6 Ongoing Stakeholder Activities Page 11 of 12 Draft Annotated Outline 12/4/06

Section N References O. COORDINATION Summary This IRWM Plan is developed in accordance with IRWM planning guidance developed by the California Department of Water Resources (DWR) and the State Water Resources Control Board (State Board). The RWMG coordinated with these agencies and the Regional Board in developing the IRWM Plan. Implementation of the IRWM Plan and proposed projects will require coordination between the IRWM management organization and a number of state and federal agencies, including regulatory agencies, land management agencies, and resource agencies. The IRWM management organization will also continue to coordinate with the regional land planning agency (San Diego Association of Governments, SANDAG) in implementing the IRWM and in developing future IRWM Plan updates. O.1 Overview O.2 State of California Agencies Regional Board DWR and State Board Other State Agencies O.3 Federal Agencies Regulatory Agencies Land Management and Water Resources Agencies O.4 Regional Land Use Planning Agencies Section O References APPENDIX 1 APPENDIX 2 APPENDIX 3 APPENDIX 4 APPENDIX 5 APPENDIX 6 Designated Beneficial Uses Basin Plan Water Quality Objectives Threatened and Endangered Species Existing and Proposed 303(d) Impaired Waters IRWM August 2006 Workshop Documents Summary of Stakeholder Outreach Activities Page 12 of 12 Draft Annotated Outline 12/4/06